You are on page 1of 2

REGISTER OF WORK TEST OF CONCRETE

a) Sample No:- d) Date and Time of cube:-


b) Proportion of mix:- e)Identification mark:-
c) Portion of work and qty
Represented by sample:-

Sample taken in presence of JE AE EE Contractor

7 DAYS TEST OPTIONAL


1) Due date of test:
2) Actual date of test:
3) Actual Comp strength of cube:-
4) Avg. strength of three cubes

JE AE EE Contractor.
28 DAYS TEST
1. Due date of test :-
2. Actual date of test :-
3. Actual Comp strength of cube :-
a) Minimum Strength :-
b) Maximum Strength :-
c) Avg. Strength of three cubes :-
d) 85% of Avg. Strength :-
e) 115% of Avg. Strength :-
4. IF 3(a)≥3(d)and 3(b)≤(e) :- Values of 3(c) shall be valid for further calculation
5. IF 3(a)< 3(d) and 3(b) >(e) :- Value of 3(c) shall be invalid
6. Acceptable Comp. Strength Ref.
Table - 6 specification (5.8.4.1
& 5.8.4.3)(For individual
Test result ≥Fck- 4N/mm2 ) :- i.e 21N/mm2 (for M-25 mix)
7. IF 3(c)≥(6) :- Strength is in order individual test result
8. If 3(c) <(6) :- EE may order further investigation.
9. Previous average test result( i/c. this test )

10. Mean group of 4 Non-


Overlapping consecutive test result
(i/c this test ):-
11. Acceptable Comp. Strength Ref.
Table 6 of specification (5.8.4.1 & 5.8.4.3)
(for mean of 4 non overlapping
(Consecutive test Result . Fck+4Nmm2 ) :- i.e. 29N/mm2 (For M-25mix)

12. If 3(10)≥(11) :- Strength is in order for group.

13. If 3(10)<(11) :- EE may order further investigation.

JE AE EE Contractor
CUBE TEST REGISTER
Agreement No :- 21/CE/EE/Ahmedabad/2020-21
Name of work : C/o Hostel, New Mess and Guest house for IGTR at
Vatva, Ahmedabad including Water Supply, Sanitary
Installations, Drainage, Electrical Installations, and
Development works.

Name of Contractor : M/s RSC Infratech developers


LLP,Ajmer(Jodhpur)

Estimated cost : Rs . 19,80,86,228/-

Tendered Amount : Rs. 13,32,12,988/-

Earnest Money : Nil


Performance Guarantee : Rs.39,96,390 /-

%age under Clause – 12 : 32.75 % below E.C

Time of completion: 15 Months

Date of start : 12/03/2021

Date of Completion : 11/06/2022

Rebate : Nil

Certified that this register contains pages 01 to pages only