SHELADIA In ZARIMA-MAY TSEBRI -SHIRE ROAD ERA own force
association PROJECT construction
with EIE &HITCON Contract no. 2 division
In place Density Determination
Sand Replacement Method AASHTO T - 191
Test Taken on: Embankment Subbase Wearing Course
Capping Layer Base Course Bedding/Backfill
Date Of Testing _________
Station from ________ To______ Unit weight of sand,γs ________
material Source ________ Sand in cone ________
Station
Layer
Mass of wet soil from hole, Mw[gm]
Mass of sand + jar before pouring, M1
Mass of sand + jar after pouring, M2
Mass of sand in cone, M3[gm]
Mass of sand in hole, M4=M1-M2-M3
Bulk density,γwet =Mw /M4*γs[gm/cc]
Moisture Content Determination
Container No
Mass of wet soil + Container[gm]
Mass of dry soil + Container[gm]
Mass of Container[gm]
Mass of Water[gm]
Mass of dry soil[gm]
Moisture Content, ω[%]
Dry Density,γdry=γwet* 100 /(100+ω)
Optimum Moisture Content[%]
Maximum Dry density[gm/cc]
Degree of Compaction[%]
Moisture Content[%]
Remark ______________________________________________________________
CONTRACTOR: CONSULTANT
TESTED BY CHAKED BY CHAKED BY APPROVED BY
DATE DATE DATE DATE
SIGN SIGN SIGN SIGN