0% found this document useful (0 votes)
24 views3 pages

Shell Fill

Uploaded by

serdeadem73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views3 pages

Shell Fill

Uploaded by

serdeadem73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

CONTRACTOR: CONSULTANT: CLEINT:

GASHAW BENTI WATER ENGINEERING


OROMIYA IRRIGATION AND
WORKS GENERAL CORPORATION OF
PASTORALIST'S DEVELOPMENT BUREAU
CONTRACTOR OROMIA

FIELD DENSITY DETERMINATION REPORT BY WATER REPLACEMENT METHOD

ASTM Test Method D - 1556 - 96 (1996)/AASHTO T-191-93(1996)


Description Unit
Represent dam Section (Km)
min. compaction requirement % 93
Layer Description

Material Description (source) Shell Material(code 01) Test Date

Test Reference

Density Jar (Apparatus) No. A-1 A-1 A-1 A-1

Chainage (Station) km
Location of Test Point

Depth (Thickness) cm 20 20

Max. Dry Density MDD g/cm3 2.073 2.073

Opt. Moisture Content OMC % 10.4 10.4

Bulk Density determination

Mass of Wet Soil from hole Wws g 5660


Volume of Test Hole Vsh = Wsh/Ds cm 3

Bulk Density of Wet soil WD = Wws/Vsh g/cm3

Moisture Content Determination

Container No.

Wt. of Wet soil + Container A g


Wt. of Dry soil + Container B g
Wt. of Container C g

Wt. of Water A-B g

Wt. of Dry soil B-C g

Moisture Content Mc = (A-B)/(B-C) %

% Compaction Determination

Dry Density of soil DD = (WDx100)/(Mc+100) g/cm3

% Compaction DDx100/Dmax %

Remark:

FOR CONTRACTOR FOR CONSULTANT


x
Tested by Checked by Lab.Tech 1 Checked by M.E
0
A 0
Name: Name: Name:
( x 100
Sign: A Sign: Sign:
Date: +
A Date: Date:
B
)(
Checked
-A by.M.E
C
Name: +
Sign: B
)
Date: -
C
FIELD DENSITY DETERMINATION REPORT BY SAND REPLACEMENT METHOD
ASTM Test Method D - 1556 - 96 (1996)/AASHTO T-191-93(1996)
Repr. Section : Km Layer :

Density of sand (Unit Wt. of Sand) Ds (g/cm3) 1.398 Test Date :


Mass of Sand in Cone Wsc (g) 1636.67 Material Source :
Test Reference Trial

Density Jar (Apparatus) No. Trial-1 Trial-2 Trial-3 Trial-4 Trial-5


Date: 11/12/2015 12/12/2015 13/12/2015 15/12/2015 16/12/2015
Test Point (Station) km
Test Point (Side)
Depth (Thickness) cm ### 15

Max. Dry Density MDD g/cm3 1.499

Opt. Moisture Content OMC % 24.4

Bulk Density determination

Mass of Wet Soil from hole Wws g 3800 4430 5940 4920 4840

Mass of sand + jar Before pouring Wsb1 g 6760 9050 8530 9250 8600

Mass of sand + jar After pouring Wsb2 g 3480 4420 2470 4020 3220

Mass of sand in Hole & cone Wsbc = Wsb1 - Wsb2 g 3280 4630 6060 5230 5380

Mass of sand in Hole Wsh = Wsbc - Wsc g 1643.33 2993.33 4423.33 3593.3 3743.3

Volume of Test Hole Vsh = Wsh/Ds cm3 1175 2141 3164 2570.3 2678

Bulk Density of Wet soil WD = Wws/Vsh g/cm3 3.23 2.07 1.88 1.91 1.81

Moisture Content Determination

Container No.

Wt. of Wet soil + Container A g 770 770 720 740 760

Wt. of Dry soil + Container B g 740.0 720.0 700.0 700.0 714


Wt. of Container C g 510.0 510.0 510.0 510.0 510
Wt. of Water A-B g 30.0 50.0 20.0 40.0 46
Wt. of Dry soil B-C g 230.0 210.0 190.0 190.0 204

Moisture Content Mc = (A-B)/(B-C) % 13.0 23.8 10.5 21.1 22.5

% Compaction Determination

Dry Density of soil DD = (WDx100)/(Mc+100) g/cm3 2.86 1.67 1.70 1.58 1.47

% Compaction DDx100/Dmax % 191% 111% 113% 105% 98.60%

You might also like