VRS No: 001/MTA/KBNME/X11/2020-TRA
INVOICE VERIFICATION ROUTING SHEET
supplierName Pr. Mulya Trans Aditama Date Received
Description voice Angkutan Gatubara PT_TRA Term of Pay
Period (01-15 November 2020 Cost Center
Invoice No. VRS 001 Cost Code
career Aout py 1A7S 200,00 aoe
cash On Se Report (B)
Sub Total :oRp 14.745.240,00
Remarks
ProvitAngkutan Rp 27,000,00 /Ton
wet ula A) = Sb Teta
TonasePeriode —O1-
n 78.241
Senasies 546,120 Ton Rp 14.745.240 (A)
‘created by ‘Created by
PT.MTA, PT. KBMB.
Luca Dei ‘Anton
Engineer Engineer
‘Acknowledge By, ‘Approved By ‘Approved By
PT.MTA, PT. KBMB,
Alsyah Cinintya Flrsa
Direktur Utama
Direktur Utama.Pr Nya Wrancageamna
Trobe Aghutan atarax
Te: 2i December 2020
Tonase Periode
999,950 Ton Ap
16-22 Dee 2020
|
INVOICE VERFICATION ROUTING SHEET
TermofPay
7.906. 10850
Re 7910.00 [Ton
177.806.1058 (A)
VAS No: 003/MTA KBE /2020 KL
"Acenowlasge By,
PT. MTA,
isha Cininta SE
Tresadby
PT. KEMB,
‘approves By
PT. KEMB,
isa[VRS No: O03/MITA/KBMB/XI/2020-TRA
INVOICE VERIFICATION ROUTING SHEET
PT. Mulya Trane Aditama Date Receives
Tvoice Angkuten Bstubara PT. TRA Term fay
(01-15 Novernber 2020 ost Canter
Vas 007 Cost Code
99.393.840,00 | Name
10 00
“Rp 89, 393.840, 00
Remarks
Provit Angkutan
545,20 Ton _ Rp 99:393.240
15 Nov 2020 P “
Cash On Site Repot PT. Java Nayla Kontraktor
Mes Periode November - Desember
Sub Total (B)
Created by
PT. MTA
Luca Del
Engineer
‘Acknowiedge By, "Approved By
PT.MTA
Aisha Cinintya
Direktur Utama
10.000.000
10.000.000
‘Created by
PT. KBMB,
‘Approved By
PT. KBMB,
Firsa
Direktur UtamaREKONSIL PENGANGKUTAN BULK CLAY PERIODE 16 - 31 DESEMBER 2020
PT JAVA NAYLA KONTRAKTOR
wre [cane | wea [ewe Premera moe [en "Yammsoomen] = =
—————— nor a | Hes
“PIAA MAYLA KONTRAKTOR: beieiniierernssnnninal [PTETAPAT BENING MANY BERSAMA
—s es an oa
ord roa mar preteens+ PT Mulla Trans Aditoma
VRS No :002/MTIVKBMB/XIV/2020-TRA
INVOICE VERIFICATION ROUTING SHEET
woice Anghutan BatuBaraPT_T#A
16-30 November2020
VRS001
Tonase Periode 16 1.16040 Ton
30 Nov 2020
‘Acknowledge By,
PT. MTA
ha Cinintya
Direktur Utama
z
Date Received
Term of Pay
Cost Center
Cost Code
31.323.780,00 Name
323.780,00
Remarks
Provit Angkutan Rp 27.000,00 /Ton
Rp
431.323.7820 (A)
‘Approved By
“Created by
PT. KEMB
Anton
Engineer
"Approved By
PT. KEMB
Direktur Utama