Professional Documents
Culture Documents
PART A- SUPPLY OF MATERIAL (INCLUSIVE CALCIUM SILICATE BLOCK, SHEET ETC.) /RUNNING MTR
SL NO ITEM DESCRIPTION UOM
PART B- SERVICE: EXECUTION RATE /RUNNING MTR (WITH ALL TOOL AND MANPOWER)
SL NO JOB DESCRIPTION UOM
Service for replacement of old LRB insulation with new calcium
silicate pipe covering block insulation with all tools and manpower
80 14948.00 1195840.00
5009640.00
% 18.00% 901735.20
5911375.20
2704.00 540800.00
200
2250.00 180000.00
80
720800.00
% 18.00% 129744.00
850544.00
6761919.20