10 Steps of Setting Out A Building
1) Make sure you know your boundaries and your building lines
Identify the right block of land.
Clearing the site by removing machinery and hazardous substances.
5) Establish peg C
Use the Pythagoras theorem method :
X 2 = 4 2+22
2
X = 16 + 4
2
X = 20
X = √ 20
X =4.472 m
Put the nail on the peg C. Establish a 2 m string line from peg C to peg A.
Establish a 4.472 m string line from peg B to peg C.
Make sure peg A and peg B forms a right angel on the corner.
6) Establish peg D
Check diagonal A-D and C-B to make sure it is parallel.
Establish the string lines up
Marked out an overall building envelope.
7)Erect profiles
How far back to put the pegs depend on the method of excavation you choose.
Use spirit level (dumpy level) to put in the profile top.
Mark profiles with nails.
9) Take the string lines off and transfer the marks on survey pegs onto the profiles.