Professional Documents
Culture Documents
fl rni Samvardhana
Mother F. n
- , -, r.-
Project Name
Corn pelt-
1y Unit
Section / Process I *
Department .
Unit / Company ..
Address of the
A
Pin No. •
Telephone
Inception Date of the Circle
No.
Project
_
No
Day of
TMeeting
i m e o f M e e t i n g
Place of
Meeting
Period of Record From . . To :
QUALITY CIRCLE REGISTRATION FORM
Circle Composition :
Leader
Dy. Leader
Members: ,
Members:
Members:
Members:
I Members
Members:
Fadlitator
Co Ordiriator
-
Thesesmall groupOperateAutonomously:
Utilize quality control concepts and techniques and her improvement tools Tap
members' creativity, and Promote self- and mutual-development_
Brainstorming
Suggested Steps
Control Chart
Scatter Diagram
Pareto Diagram
Stratification
Histogram
Data Collection
Diagram
S
Graphs
N for Problem
Solving
Identification of
1 work related 0 0
problems
Selection of
2 problem 0 • •
►
r
Definethe
3 problem • •
Analysethe
4 problem 0 0 I I I •
Identification of •
5 causes • 0 0 0 •
Finding outthe
6 rootcause • 0 • 0 0 I 0 1
7 Dataanalysis • • • • • •
Developing
8 solution 0 • • 0 •
Foreseeing
9 probable I I
resistance
Trial
11 implementation • • • •
3 &
Check
Regular
11 implementation . • •
0
• •
Follow-up&
12
Review
I
1",
Moderate applicability Strong applicability
Ask
THE TOOLS AND TECHNIQUES FOR PROBLEM SOLVING
•
Traditional 7 Tools
1. Collection of data and formats for it.
2. Stratification of data - categorising.
3. Pareto Analysis - for prioritising.
4. Cause and effect diagram - to investigate the cause or causes for an effect (also
called Ishikawa Diagram and Fishbone Diagram).
5. Histogram - frequency distribution of data, also called dispersion of data for off-line
control.
6. Scatter Diagram - to study the correlation between two variables and also to
assess the degreeplcorrelation.
7. Control Chart - specialized line graph with computd1 control limits for on-line
control of a procesk
Other Tools
1. Flow diagram (for process flow)
2. Brainstorming
3. Graphs
MINUTES OF MEETING
•
Note :
I
011 III' 17"11 I'll rfe•I IF rs rs el I I- I''7" 11Fa,'"11" -Fr I A TI"Al reinnA
( )
QUALITY T Lim..Lc PROJECT ncL71.3 I rIbt I ILIIV run wt
Name of
Quality Circle:
t
the Date of
of the Circle:
Formation
Members:
Number
Members & Detail of their Workplaces:
of Names
of
2.
3.
4.
5.
6. ,
Name of
F a c i l i t a t o r :
the Name
Co-ordinator:
of the Area
of Work:
Project No.:
Project Selected:
Name of
Selecting the Project:
the Can it be Implemented
HR Head Authorization
k _ _ .. ... )
nnexure roce
QUALITY CIRCLE
•