Professional Documents
Culture Documents
ans.
Whereven we create a sale order , system will perform backward scheduling first,
if Backward Schediling fails then system consider forward scheduing.
ans. If we check without RLT and if stock is not avalible then system will confirm
the quantity.
5. What are the parameter system considers while performing Delivery Scheduling ?
ans. Pick Pack time ( Shipping Point) Loading Time (Shipping Point) RLT (Material
master) , Transit Time and Trasnsportation lead Time (Route Determination)
6. Can i maintain p/p Time and loading time other than Shipping Point?
ans.
YES, Route Dependent.