LAPORAN CUACA PROJECT

BULAN : JULI 2022 DIAJUKAN DIKETAHUI

PROJECT : GUDANG MUNISI JADI (48 x 150 M = 7200 M2 )

LOKASI : PINDAD MALANG

KONTRAKTOR : PT. LAVERTON PROTETION TECHNOLOGY

PT. LAVERTON PROTETION TECHNOLOGY PT. TUJUH PILAR HIJAU

JAM
NO HARI / TANGGAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 Jumat 1-June-22

2 Sabtu 2-June-22

3 Minggu 3-June-22

4 Senin 4-June-22

5 Selasa 5-June-22

6 Rabu 6-June-22

7 Kamis 7-June-22

8 Jumat 8-June-22

9 Sabtu 9-June-22

10 Minggu 10-June-22

11 Senin 11-June-22

12 Selasa 12-June-22

13 Rabu 13-June-22

14 Kamis 14-June-22

15 Jumat 15-June-22

16 Sabtu 16-June-22

17 Minggu 17-June-22

18 Senin 18-June-22

19 Selasa 19-June-22

20 Rabu 20-June-22

21 Kamis 21-June-22

22 Jumat 22-June-22

23 Sabtu 23-June-22

24 Minggu 24-June-22

25 Senin 25-June-22

26 Selasa 26-June-22

27 Rabu 27-June-22

28 Kamis 28-June-22

29 Jumat 29-June-22

30 Sabtu 30-June-22

31 Minggu 1-July-22

KETERANGAN : = HUJAN LEBAT

= HUJAN

= GERIMIS GERIMIS
LAPORAN CUACA PROJECT

BULAN : DESEMBER 2022 DIAJUKAN DIKETAHUI

PROJECT : PEMBANGUNAN GEDUNG KLINIK DAN LABORATORIUM

KIMIA FARMA DIAGNOSTICA MAKASSAR

LOKASI : JL. AHMAD YANI, MAKASSAR

KONTRAKTOR : PT. LAVERTON PROTETION TECHNOLOGY

PT. LAVERTON PROTETION TECHNOLOGY PT. SURYA CIPTA ENGINEERING

JAM
NO HARI / TANGGAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 Kamis 1-December-22

2 Jumat 2-December-22

3 Sabtu 3-December-22

4 Minggu 4-December-22

5 Senin 5-December-22

6 Selasa 6-December-22

7 Rabu 7-December-22

8 Kamis 8-December-22

9 Jumat 9-December-22

10 Sabtu 10-December-22

11 Minggu 11-December-22

12 Senin 12-December-22

13 Selasa 13-December-22

14 Rabu 14-December-22

15 Kamis 15-December-22

16 Jumat 16-December-22

17 Sabtu 17-December-22

18 Minggu 18-December-22

19 Senin 19-December-22

20 Selasa 20-December-22

21 Rabu 21-December-22

22 Kamis 22-December-22

23 Jumat 23-December-22

24 Sabtu 24-December-22

25 Minggu 25-December-22

26 Senin 26-December-22

27 Selasa 27-December-22

28 Rabu 28-December-22

29 Kamis 29-December-22

30 Jumat 30-December-22

31 Sabtu 31-December-22

KETERANGAN : = HUJAN LEBAT

= HUJAN

= GERIMIS GERIMIS
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
GUDANG MUNISI JADI - DIVISI MUNISI PT. PINDAD (PERSERO)
TAHUN 2022
Jumlah Harga
No. Uraian Pekerjaan
Pekerjaan
1 PEKERJAAN PERSIAPAN Rp 167,926,515.06

2 PEKERJAAN GALIAN & TIMBUNAN TANAH Rp 341,016,486.95

3 PEKERJAAN GUDANG MUNISI JADI (48 x 150 = 7.200 M2)


I PEKERJAAN STRUKTUR BAWAH
A PEKERJAAN PONDASI TELAPAK Rp 1,100,630,777.68
B PEKERJAAN KOLOM PEDESTAL K1 (350x600x600) Rp 176,300,944.33
C PEKERJAAN KOLOM PEDESTAL K2 (300x550x600) Rp 36,740,744.36
D PEKERJAAN PONDASI BATU KALI SETEMPAT Rp 8,340,101.50
E PEKERJAAN SLOOF 250 x 350 MM Rp 702,864,042.60
F PEKERJAAN BASE PLATE BP1 (300 x 550 MM) Rp 116,013,498.45
G PEKERJAAN BASE PLATE BP2 (250 x 500 MM) Rp 25,583,363.93

II PEKERJAAN STRUKTUR ATAS


A PEKERJAAN KOLOM BAJA Rp 1,542,894,020.19
B PEKERJAAN BALOK BAJA Rp 585,331,754.36
C PEKERJAAN KOLOM PRAKTIS 150X150 MM Rp 120,781,013.41
D PEKERJAAN BALOK 150X150 MM Rp 74,811,611.22
E PEKERJAAN BALOK LINTEL 150X150 MM Rp 69,906,623.55
F PEKERJAAN PLAT LANTAI Rp 3,791,920,049.18
G PEKERJAAN LOADING DOCK Rp 90,744,517.26
H PEKERJAAN PLAT LANTAI RAMP DALAM Rp 73,766,294.27
I PEKERJAAN PLAT LANTAI RAMP LUAR Rp 100,775,854.53
J PEKERJAAN DINDING PENAHAN LOADING DOCK Rp 21,255,941.07

III PEKERJAAN RANGKA ATAP Rp 8,652,634,574.57

IV PEKERJAAN FINISHING BANGUNAN


A PEKERJAAN DINDING Rp 770,808,494.20
B PEKERJAAN PEMASANGAN PINTU DAN JENDELA Rp 2,532,576,211.84
C PEKERJAAN RAILLING RAMP DALAM Rp 6,694,864.10
D PEKERJAAN FINSISHNG LANTAI & LOADING DOCK Rp 527,865,594.30
E PEKERJAAN PENGECATAN Rp 630,520,547.32
F PEKERJAAN PENUTUP ATAP Rp 2,147,157,618.85
G PEKERJAAN SELASAR Rp 165,941,754.04

V PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING


V.1 PEKERJAAN MEKANIKAL
V.1.1 PEKERJAAN MEKANIKAL STANDAR
V.1.1.1 PEKERJAAN PEMIPAAN PLUMBING Rp 2,157,250.00
V.1.1.2 PEKERJAAN SANITARY FIXTURE Rp 4,013,700.00
V.1.1.3 PEKERJAAN SEPTIK TANK dan RESAPAN Rp 21,732,100.00
Jumlah Harga
No. Uraian Pekerjaan
Pekerjaan
V.1.2 PEKERJAAN MEKANIKAL NON STANDAR
V.1.2.1 PEKERJAAN TATA UDARA Rp 92,262,100.00
V.1.2.2 PEKERJAAN PEMADAM KEBAKARAN Rp 834,634,200.00

V.2 PEKERJAAN ELEKTRIKAL


V.2.1 PEKERJAAN ELEKTRIKAL STANDAR
V.2.1.1 PEKERJAAN PANEL DAYA Rp 42,550,400.00
V.2.1.2 PEKERJAAN RAK KABEL Rp 73,466,500.00
V.2.1.3 PEKERJAAN KABEL DAYA Rp 135,841,700.00
V.2.1.4 PEKERJAN LAMPU PENERANGAN & DAYA Rp 542,684,200.00
V.2.1.5 PEKERJAAN PENANGKAL PETIR Rp 35,510,600.00

4 PEKERJAAN RUANG KANTOR, RUANG GANTI & KAMAR MANDI


I PEKERJAAN STRUKTUR BAWAH
A PEKERJAAN PONDASI BATU KALI Rp 24,104,451.76
B PEKERJAAN SLOOF 150x200 MM Rp 4,804,608.99
C PEKERJAAN PEMASANGAN LANTAI KERAMIK Rp 6,910,982.74

II PEKERJAAN STRUKTUR ATAS DAN ATAP


A PEKERJAAN KOLOM 150X150 MM Rp 12,116,896.04
B PEKERJAAN RING BALOK 150X150 MM Rp 5,358,043.48
C PEKERJAAN STRUKTUR DAN PENUTUP ATAP KANTOR Rp 38,243,265.05
D PEKERJAAN DINDING KANTOR Rp 28,577,791.13
E PEKERJAAN PINTU DAN JENDELA KANTOR Rp 45,552,720.13
F PEKERJAAN PLAFOND KANTOR Rp 3,399,895.50
G PEKERJAAN RAILLING Rp 1,804,981.08

5 PEKERJAAN INFRASTRUKTUR
A PEKERJAAN PAVING BLOCK Rp 95,465,824.75
B PEKERJAAN JEMBATAN BOX CULVERT Rp 68,730,639.27
C PEKERJAAN PEMASANGAN SALURAN DRAINASE Rp 299,164,944.31
D PEKERJAAN OVERLAY JALAN LAMA Rp 81,975,527.21
E PEKERJAAN JALAN BARU Rp 283,256,895.09
F PEKERJAAN PEMASANGAN PAGAR BRC Rp 103,132,266.60

6 PEKERJAAN FINISHING Rp 54,000,000.00

7 PEMBUATAN IMB Rp 250,000,000.00

Jumlah Rp 27,773,256,296.24
Dibulatkan Rp 27,773,200,000.00
Terbilang : Dua Puluh Tujuh Milyar Tujuh Ratus Tujuh Puluh Tiga Juta Dua Ratus Ribu Rupiah

Bandung, 07 Februari 2022


PT. LAVERTON PROTECTION TECHNOLOGY

Rd. Moch. Alam Aribrata


Jumlah Harga
No. Uraian Pekerjaan
Pekerjaan
Direktur Utama
0.60
-
1.23
-
-
-
3.96
0.63
0.13
0.03
2.53
0.42
0.09
-
-
5.56
2.11
0.43
0.27
0.25
13.65
0.33
0.27
0.36
0.08
-
31.15
-
-
2.78
9.12
0.02
1.90
2.27
7.73
0.60
-
-
-
-
0.01
0.01
0.08
-
-
0.33
3.01
-
-
-
0.15
0.26
0.49
1.95
0.13
-
-
-
0.09
0.02
0.02
-
-
0.04
0.02
0.14
0.10
0.16
0.01
0.01
-
-
0.34
0.25
1.08
0.30
1.02
0.37
-
0.19
-
0.90