Dear Recipient:
All is well Group of Companies committed to powering Indian Railways, It is founded after father’s death.
Began with All stupid & regularly failure Equipment. One of Oldest & Largest Privatising – held companies in
Indian Railways. Entered in the Power Business in 2011. Turnover in INR is approx. (All Employees salary + 60 % )
Sincerely,
YES We…
Why you can rely with 100% confidence ON Swadesi ka Munda.
1
SWADESI KA MUNDA…
RA PROCESS SEQUENCE
1 – Check ACB Panel Upper Side Area To Mount Both Set Rotaries.
2 - Mark The Position Hole Of The Rotary And Drill 4.0 Mm Hole Of
All And Tape With 5.0 Mm Tape To Fix The Rotaries.
3
SWADESI KA MUNDA…
12 – Connect Wire No-BSW1-O/P-Y From BSW1 Terminal No-1 To
Control Transformer K01 Input After Remove And Tape Existed Wire.
4
SWADESI KA MUNDA…
21 – Connect Wire No-BK2-A1 From BSW5 Terminal No-C2 To BK2
Aux. Contactor Coil A1
5
SWADESI KA MUNDA…
36 – Connect Wire No-A-BSW2-O/P-Y From BSW2 Terminal No-1 To
CTR09 Input Y Phase After Removing Existed Wire.
45 – Connect Wire No-24 +Ve From BSW3 For Set A Terminal No-2 .
BSW5 For Set B Terminal No-2 To BSW2 Terminal No D2 For Set A And
BSW5 Terminal No D2 For Set B.
6
SWADESI KA MUNDA…
50 - Connect Wire No-HOG-A-A2 From BK1 Contactor Terminal No -
13 To BSW2 Terminal No-5
7
SWADESI KA MUNDA…
8
SWADESI KA MUNDA…
Photo Gallery Set-B
9
SWADESI KA MUNDA…
10
SWADESI KA MUNDA…