You are on page 1of 453

NO. JENIS PEKERJAAN SAT.

VOLUME
PANEL KONTROL IGD
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

2 LANTAI 2
PANEL SDP.D
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.2D
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.AC.2D, CATHLAB


Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00

PANEL KONTROL OK DLL


Status Digital Input Titik 7.00
Trip Alarm Digital Input Titik 7.00
Power Monitoring HLI Titik 7.00

3 LANTAI 3
PANEL PP 3.D
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP AC,
Status Digital Input Titik 4.00
Trip Alarm Digital Input Titik 4.00

4 LANTAI ATAP
PANEL PRESSURIZED FAN
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Power Monitoring HLI Titik 2.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATION SYSTEM

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Peralatan Utama
1 Reverse Osmosis (RO) System CSSD, terdiri dari : set 1.00
a Feed pump
- Jumlah Pompa : 2 unit
- Kapasitas : 2 m3/jam
- Head : 35 M
- Power : sesuai seleksi unit
- Type : Centrifugal
- Operation : Single Alternate (One Duty One Standby)
- Assessories : Motor, Header, Check Valve, Pressure Gauge, dll

b Catridge filter
- Jumlah : 1 set
- Kapasitas : 2 m3/jam
- Assessories : Valve,Fiting, Piping dll

c RO system, meliputi :
- 1 pcs Pompa umpan RO CNP High Pressure, Cap 1 m3/Head 125 m approximax @3,7 KW
Assesries Valve,fitting dan support
- Membrane LG diameter 6"
- Housing Vessel code line FRP 6"
- Rangka skid mounted steel coated
- Panel control dan pengkabelan
- Alat ukur; TDS meter, Fressure gauge,flow meter
- Piping system complete aksesories
- Tangki storage @1 m3 x 3 unit stainles steel

NO. JENIS PEKERJAAN SAT. VOLUME


2 Reverse Osmosis (RO) System Hemodialisa, terdiri dari : set 1.00
a Feed pump
- Jumlah Pompa : 2 unit
- Kapasitas : 3 m3/jam
- Head : 35 M
- Power : sesuai seleksi unit
- Type : Centrifugal
- Operation : Single Alternate (One Duty One Standby)
- Assessories : Motor, Header, Check Valve, Pressure Gauge, dll

b Catridge filter
- Jumlah : 1 set
- Kapasitas : 3 m3/jam
- Assessories : Valve,Fiting, Piping dll

c RO system, meliputi :
- 1 pcs Pompa umpan RO CNP High Pressure, Cap 1,5 m3/Head 125 m approximax @3,7 KW
Assesries Valve,fitting dan support
- Membrane LG diameter 6"
- Housing Vessel code line FRP 6"
- Rangka skid mounted steel coated
- Panel control dan pengkabelan
- Alat ukur; TDS meter, Fressure gauge,flow meter
- Piping system complete aksesories
- Tangki storage @1 m3 x 3 unit stainles steel

SUB TOTAL PERALATAN UTAMA

A.2 Pekerjaan instalasi pipa air bersih dan panas


A.2.1 Lantai 1
1 Instalasi pipa air bersih pipa gravitasi dari roof tank lantai atap Gd. C
ke lantai 1 Gd. D dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 194.00

2 Instalasi pipa RO System dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 32 mm m' 102.00
- dia. 20 mm m' 8.00
- dia. 15 mm m' 12.00
- dia. 20 mm Reject dari Lt 3 m' 31.00

3 Instalasi pipa air bersih dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 13.00
- dia. 50 mm m' 14.00
- dia. 40 mm m' 14.00
- dia. 32 mm m' 38.00
- dia. 25 mm m' 62.00
- dia. 20 mm m' 77.00
- dia. 15 mm m' 108.00

4 Instalasi pipa air panas dengan PPR80 - PN20


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 25.00
- dia. 15 mm m' 14.00
5 Ball Valve
- dia. 32 mm bh 7.00
- dia. 25 mm bh 3.00
- dia. 20 mm bh 19.00
- dia. 15 mm bh 2.00

6 Water Heater Elektrik


Kapasitas : 15 Liter bh 5.00

7 UV lamp bh 2.00

8 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 1

A.2.3 Lantai 2
1 Instalasi pipa air bersih dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 4.00
- dia. 50 mm m' 33.00
- dia. 40 mm m' 5.00
- dia. 32 mm m' 57.00
- dia. 25 mm m' 3.00
- dia. 20 mm m' 83.00
- dia. 15 mm m' 86.00

2 Instalasi pipa air panas dengan PPR80 - PN20


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 38.00
- dia. 15 mm m' 42.00

3 Gate Valve 10K:


- dia. 65 mm bh 1.00

4 Ball Valve 10K:


- dia. 32 mm bh 8.00
- dia. 25 mm bh 1.00
NO. JENIS PEKERJAAN SAT. VOLUME
- dia. 20 mm bh 33.00
- dia. 15 mm bh 1.00

5 UV lamp bh 8.00

6 Water Heater Elektrik bh 8.00


kapasitas : 15 liter
Type : Instant
Sudah termasuk pengkabelannya

7 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 2

A.2.4 Lantai 3
1 Instalasi pipa air bersih dari booster lantai atap Gd. C ke Lantai 3 Gd. D
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 72.00
- dia. 50 mm m' 28.00
- dia. 40 mm m' 76.00

2 Instalasi pipa air bersih dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 18.00
- dia. 50 mm m' -
- dia. 40 mm m' 39.00
- dia. 32 mm m' 3.00
- dia. 25 mm m' 16.00
- dia. 20 mm m' 8.00
- dia. 15 mm m' 12.00

3 Instalasi pipa air Reverse Osmosis dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
Supply
- dia. 80 mm m' 24.00
- dia. 65 mm m' -
- dia. 50 mm m' 10.00
- dia. 40 mm m' 5.00
- dia. 32 mm m' 17.00
- dia. 25 mm m' 7.00
- dia. 20 mm m' 7.00
- dia. 15 mm m' 82.00

Return
- dia. 40 mm m' 15.00
- dia. 32 mm m' 17.00
- dia. 25 mm m' 7.00
- dia. 20 mm m' 7.00
- dia. 15 mm m' 82.00

4 Gate Valve 10K:


- dia. 65 mm bh 2.00

5 Ball Valve 10K:


- dia. 32 mm bh 1.00
- dia. 25 mm bh 4.00
- dia. 20 mm bh -
- dia. 15 mm bh 20.00

6 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 3

A.2.4 Lantai Atap


1 Instalasi pipa air bersih dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 15 mm m' 76.00

2 Ball Valve :
- dia. 15 mm bh 1.00

3 Kran Botol
- dia. 15 mm bh 2.00

Sub Total Lantai Atap

SUB TOTAL PEKERJAAN INST. AIR BERSIH DALAM BANGUNAN

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


B.1 Peralatan Utama
1 Submersible Cutter Pump + QDC (Sewage.D-01) SET 1.00
Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.D-01) unit 1.00


Kapasitas : 5 m³
 Ukuran                                      : 2500 x 2000 x (1000+500)mm           
NO.             JENIS PEKERJAAN SAT. VOLUME

2 Submersible Cutter Pump + QDC (Sewage.D-02) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.D-02) unit 1.00


Kapasitas : 5 m³
Ukuran : 2500 x 2000 x (1000+500)mm

3 Submersible Cutter Pump + QDC (Chemical.D-01) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Chemical.D-01) unit 1.00


Kapasitas : 3 m³
Ukuran : 3000 x 1000 x (1000+500)mm

4 Submersible Cutter Pump + QDC (Chemical.D-02) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Chemical.D-02) unit 1.00


Kapasitas : 3 m³
Ukuran : 3000 x 1000 x (1000+500)mm

5 Submersible Pump (Kolam Pond-3) / Drainage Pit-D-01 SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Pump
Head : 5 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Pump (Kolam Pond-3) / Drainage Pit-D-01 unit 1.00


Kapasitas : 2 m³
Ukuran : 2200 x 1000 x (800+500)mm

SUB TOTAL PERALATAN UTAMA

B.2 Pemipaan Utama


1 Instalasi Pipa Utama Air Kotoran dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 18.00

Shaft
- dia. 100 mm m' 30.00

2 Instalasi Pipa Utama Air Kotor dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 18.00

Shaft
- dia. 100 mm m' 30.00

3 Instalasi Pipa Utama Air Kotor Kimia dengan Pipa Cast Iron
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 13.00

Shaft
- dia. 100 mm m' 30.00

4 Instalasi Pipa Vent dengan pipa PVC kelas AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
Shaft
- dia. 80 mm m' 22.00

5 Floor Clean Out


- dia. 150 mm bh 3.00

6 Vent Cup
- dia. 80 mm bh 2.00

SUB TOTAL PEMIPAAN UTAMA

B.3 Pekerjaan Instalasi Pipa Air Kotor, Kotor & Vent dalam bangunan
B.3.1 Lantai 1
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
HARGA SATUAN JUMLAH HARGA

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 1,856,000
928,000 1,856,000

928,000 6,496,000
928,000 6,496,000
1,677,000 11,739,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 3,712,000
928,000 3,712,000

928,000 1,856,000
928,000 1,856,000
1,677,000 3,354,000

102,000,000

35,000,000 35,000,000

35,000,000

484,387,920

235,875,000 235,875,000
HARGA SATUAN JUMLAH HARGA
276,250,000 276,250,000

512,125,000

177,620 34,458,280

64,860 6,615,720
28,830 230,640
22,590 271,080
28,830 893,730

177,620 2,309,060
132,320 1,852,480
89,540 1,253,560
64,860 2,464,680
46,250 2,867,500
28,830 2,219,910
22,590 2,439,720

37,020 925,500
26,460 370,440
380,783 2,665,478
288,330 864,990
211,523 4,018,928
163,380 326,760

2,799,020 13,995,100

1,500,000 3,000,000

Scope Arsitek

84,043,555

177,620 710,480
132,320 4,366,560
89,540 447,700
64,860 3,697,020
46,250 138,750
28,830 2,392,890
22,590 1,942,740

37,020 1,406,760
26,460 1,111,320

1,962,975 1,962,975

380,783 3,046,260
288,330 288,330
HARGA SATUAN JUMLAH HARGA
211,523 6,980,243
163,380 163,380

1,500,000 12,000,000

2,799,020 22,392,160

Scope Arsitek

63,047,568

177,620 12,788,640
132,320 3,704,960
89,540 6,805,040

177,620 3,197,160
132,320 -
89,540 3,492,060
64,860 194,580
46,250 740,000
28,830 230,640
22,590 271,080

241,040 5,784,960
177,620 -
132,320 1,323,200
89,540 447,700
64,860 1,102,620
46,250 323,750
28,830 201,810
22,590 1,852,380

89,540 1,343,100
64,860 1,102,620
46,250 323,750
28,830 201,810
22,590 1,852,380

1,962,975 3,925,950

380,783 380,783
288,330 1,153,320
211,523 -
163,380 3,267,600

Scope Arsitek

56,011,893

22,590 1,716,840

163,380 163,380

ARSITEK

1,880,220

204,983,235

717,108,235

108,800,000 108,800,000

skope sipil

HARGA SATUAN JUMLAH HARGA

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000
skope sipil

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000

skope sipil

544,000,000

288,460 5,192,280

153,900 4,617,000

288,460 5,192,280

153,900 4,617,000

692,030 8,996,390

425,060 12,751,800

105,190 2,314,180

563,063 1,689,188

341,250 682,500

46,052,618
NO. JENIS PEKERJAAN SAT. VOLUME
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 106.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 39.00
- dia. 80 mm m 66.00
- dia. 50 mm m 33.00
- dia. 40 mm m 29.00

3 Instalasi Pipa Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 31.00
- dia. 80 mm m' 6.00
- dia. 50 mm m' 23.00
- dia. 40 mm m' 3.00

4 Instalasi Pipa Air CSSD Black Steel Sch.40 Grid A


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 31.00

5 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 50.00
- dia. 40 mm m 24.00
- dia. 32 mm m 170.00

6 Floor Clean Out :


- dia. 150 mm bh 2.00
- dia. 100 mm bh 6.00
- dia. 80 mm bh 2.00
- dia. 50 mm bh 1.00

Sub Total Lantai 1

B.3.2 Lantai 2
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 72.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 15.00
- dia. 80 mm m 55.00
- dia. 50 mm m 25.00
- dia. 40 mm m 21.00

3 Instalasi Pipa Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 25.00
- dia. 80 mm m' 44.00
- dia. 50 mm m' 31.00
- dia. 40 mm m' 6.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 35.00
- dia. 40 mm m 84.00
- dia. 32 mm m 120.00

5 Floor Clean Out :


- dia. 100 mm bh 6.00
- dia. 80 mm bh 6.00

Sub Total Lantai 2

B.3.3 Lantai 3
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 37.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 35.00
- dia. 50 mm m 9.00
- dia. 40 mm m 12.00
3 Instalasi Pipa Air Kotor Kimia Cast Iron
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 7.00
- dia. 80 mm m' 25.00
- dia. 50 mm m' 15.00
- dia. 40 mm m' 51.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 20.00
- dia. 40 mm m 17.00
- dia. 32 mm m 56.00

5 Floor Clean Out :


- dia. 100 mm bh 2.00
- dia. 80 mm bh 3.00
- dia. 50 mm bh 2.00

Sub Total Lantai 3

SUB TOTAL AIR KOTORAN, KOTOR DAN VENT DALAM BANGUNAN

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan


1 Roof Drain :
- RD dia. 100 mm bh 25.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia . 100 mm m' 434.00

3 Instalasi Pipa Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia . 100 mm ke Saluran m' 65.00

SUB TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XIV.A Peralatan Utama


1 Medical Gas Regulator Central Oxygen (O) Emergency set 1.00
kapasitas : 2 x 3 Cyl (Emergency)
Type : Manual

2 Automatic Medical Gas Carbon Oxide CO2 (C) set 1.00


Type : Full Automatic Change Over Gas Manifold
Kapasitas : Double Row 2 x@ 2 tabung cylinder (tanpa Tabung)
Output Pressure : 0 - 5 Kg/cm2
~ Double Stage Pressure Regulator (Total 3 Regulators)
~ Pressure Gauge for left and right bank
~ Pressure Gauge for Operating Pressure
Header from High Pressure Copper/Brass dia. 3/4"
~ Copper HP Pig Tails
~ Cylinder Valve High Pressure
~ Safety Valve
~ Regulator inlet emergency
~ Support & Consumable

3 Tabung untuk Medical Gas


- Oksigen Emergency bh 6.00
- Carbon Dioxide CO2 (C) bh 4.00
TOTAL PERALATAN UTAMA

XIV.B Instalasi Utama


Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan Aksesories :

INSTALASI UTAMA

XIV.C Instalasi dalam Bangunan


C.1 Lantai 1
1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O)
- dia. 15,88 mm m 125.00
- dia. 12,7 mm m 110.00
- dia. 12,7 mm Droper m 83.00

Instalasi Jaringan Vacuum  (V)
- dia. 22,23 mm m 53.00
- dia. 19,05 mm m 19.00
- dia. 15,88 mm m 116.00
- dia. 15,88 mm Droper m 83.00

Instalasi Jaringan Medical Air 4 bar (A4)
- dia. 19,05 mm m 59.00
- dia. 15,88 mm m 10.00
- dia. 12,7 mm m 78.00
- dia. 12,7 mm Droper m 56.00

2 Outlet Gas Medis


- Wall Outlet Oxygen (O), pin index, push type bh 26.00
- Wall Outlet Vacuum (V), pin index, push type, slide base bh 25.00
- Wall Outlet Medical Air 4 Bar (A4), pin index, push type, slide base bh 17.00

3 Zone Valve 3 Gas + Alarm Area Gas set 1.00

4 Main Line Valve


- Ball Valve dia. 22.23 mm bh 1.00
- Ball Valve dia. 19,05 mm bh 1.00
- Ball Valve dia. 15,88 mm bh 1.00

5 Bed Head Panel bh 25.00

Sub Total Lantai 1

C.2 Lantai 2
1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O)
- dia. 22,23 mm m 5.00
- dia. 19,05 mm m -
- dia. 15,88 mm m 106.00
- dia. 12,7 mm m 202.00
- dia. 12,7 mm Droper m 100.00

Instalasi Jaringan Oxygen Emergency (OE)
- dia. 15,88 mm M 11.00
- dia. 12,7 mm m 55.00

Instalasi Jaringan Nitrous Oxide (N)
- dia. 15,88 mm m 42.00
- dia. 12,7 mm m 131.00
- dia. 12,7 mm Droper m 20.00

Instalasi Jaringan Vacuum  (VAC)
- dia. 34,93 mm m 14.00
- dia. 22,23 mm m 49.00
- dia. 19,05 mm m 46.00
- dia. 15,88 mm m 202.00
- dia. 15,88 mm Droper m 100.00

Instalasi Jaringan Carbon Dioxide (CO2)
- dia. 12,7 mm m 88.00
- dia. 12,7 mm Droper m 3.00

Instalasi Jaringan Medical Air 8 Bar (A8 )
- dia. 12,7 mm m 88.00
- dia. 12,7 mm Droper m 3.00

Instalasi Jaringan Medical Air 4 Bar (A4 )
- dia. 28,58 mm m 5.00
- dia. 15,88 mm m 42.00
- dia. 12,7 mm m 136.00
- dia. 12,7 mm Droper m 40.00

Instalasi Jaringan Anastetic Gas (AG)
- dia. 12,7 mm m 27.00
- dia. 12,7 mm Droper m 20.00

2 Outlet Gas Medis


- Wall Outlet Oxygen (O), pin index, push type bh 26.00
- Wall Outlet Vacuum (V), pin index, push type, slide base bh 26.00
- Wall Outlet Medical Air 4 Bar (A4), pin index, push type, slide base bh 12.00
- Wall Outlet Medical Air 8 Bar (A8), pin index, push type, slide base bh 1.00
- Wall Outlet Nitrous Oxide (N), pin index, push type bh 6.00
- Wall Outlet Carbon Dioxide (CO2), pin index, push type bh 1.00
- Anesthetic Gas Scavening System (AGSS) bh 6.00

3 Zone Valve
- Zone Valve 5 Gas + Alarm Area Gas set 6.00
- Zone Valve 2 Gas + Alarm Area Gas set 1.00

4 Quick Check Valve : bh 36.00

5 Main Line Valve


- Ball Valve dia. 34,93 mm bh 1.00
- Ball Valve dia. 28,58 mm bh 1.00
- Ball Valve dia. 22,23 mm bh 1.00
- Ball Valve dia. 15,88 mm bh 2.00

5 Bed Head Panel bh 14.00

Sub Total Lantai 2

C.3 Lantai 3
1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O2)
- dia. 15,88 mm m 47.00
- dia. 12,7 mm m 53.00
- dia. 12,7 mm Droper m 28.00

Instalasi Jaringan Vacuum  (VAC)
- dia. 19,05 mm m 47.00
- dia. 15,88 mm m 53.00
- dia. 15,88 mm Droper m 28.00

2 Outlet Gas Medis


- Wall Outlet Oxygen (O), pin index, push type bh 10.00
- Wall Outlet Vacuum (V), pin index, push type, slide base bh 10.00

3 Zone Valve :
- Zone Valve 2 Gas + Alarm Area Gas set 1.00

4 Main Line Valve


- Ball Valve dia. 15,88 mm bh 2.00

5 Bed Head Panel bh 10.00

Sub Total Lantai 3

TOTAL INSTALASI DALAM BANGUNAN

XIV.D Pekerjaan Testing & Commissioning


1 Testing & Commissioning Peralatan dan Instalasi Medical Gas lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Peralatan Utama

Jumlah Peralatan Utama

XV.B Instalasi Pemipaan Utama dan katup - katup Ruang Pompa

TOTAL PEMIPAAN DAN KATUP-KATUP RUANG POMPA

XV.C Site Plan (Hydrant)

TOTAL SITE PLAN

XV.D Instalasi Pemipaan Riser Tegak


D.1 Fire Hydrant
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting, gantungan/hanger/ssupport dan aksesoriesnya :
- dia. 100 mm Tegak (Shaft) m' 30.00
- dia. 25 mm m' 2.00

2 Gate Valve Non Rising Steam 16K :


- dia. 100 mm bh 2.00
- dia. 25 mm bh 2.00

3 Air Release Vent (ARV) dia. 25 mm bh 2.00

4 Pressure Gauge + gate valve bh 2.00

Sub Total Fire Hydrant

D.2 Sprinkler
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting dan aksesoriesnya :
- dia. 150 mm Tegak (Shaft) m' 15.00
- dia. 80 mm ( Test Drain ) m' 15.00

2 Gate Valve Non Rising Steam class 16K :


- dia. 150 mm bh 1.00
- dia. 25 mm bh 1.00

3 Main Control Valve dia. 150 mm + Alarm Gong bh 1.00

4 Air Release Vent (ARV) dia. 25 mm bh 1.00

5 Vent Out dia. 80 mm bh 1.00

Sub Total Sprinkler

TOTAL PEMIPAAN DAN KATUP-KATUP RISER TEGAK

XV.E Instalasi Fire Hydrant Dalam Bangunan


E.1 Lantai 1
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
- 1 pc Hose Rack

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40 Grid A


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 34.00
- dia. 40 mm m' 9.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve :
- dia. 65 mm bh 2.00

Sub Total Lantai 1

E.2 Lantai 2
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
- 1 pc Hose Rack

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40 Grid A


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 10.00
- dia. 40 mm m' 15.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve 16K:


- dia. 65 mm bh 2.00

Sub Total Lantai 2

E.3 Lantai 3
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
- 1 pc Hose Rack

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40 Grid A


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 10.00
- dia. 40 mm m' 15.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve 16K:


- dia. 65 mm bh 2.00

Sub Total Lantai 3

E.4 Lantai 4 (ATAP)


1 Hydrant Box Type Indoor lengkap terpasang unit 1.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
- 1 pc Hose Rack

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40 Grid A


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 7.00
- dia. 40 mm m' 12.00

3 Landing Valve 16K :


- dia. 65 mm bh 1.00

4 Gate Valve 16K:


- dia. 65 mm bh 1.00

Sub Total Lantai 4 (ATAP)

TOTAL INSTALSI FIRE HYDRANT DALAM BANGUNAN

XV.F Instalasi Sprinkler pada Bangunan


F.1 Lantai 1
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 Grid A termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 150 mm m' 26.00
- dia. 100 mm m' 5.00
- dia. 80 mm m' 23.00
- dia. 65 mm m' 18.00
- dia. 50 mm m' 22.00
- dia. 40 mm m' 26.00
- dia. 32 mm m' 65.00
- dia. 25 mm m' 210.00
- dia. 25 mm Drooper m' 46.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 Grid A termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 7.00
3 Branch Control Valve dia. 150 mm terdiri dari : set 1.00
- Butterfly Valve with Tamper Switch dia. 150 bh = 1 bh
- Flow Switch dia. 150 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh
- Coupling

4 Head Splinker type Pendant bh 84.00

Sub Total Lantai 1

F.2 Lantai 2
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 Grid A termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 150 mm m' 13.00
- dia. 100 mm m' 8.00
- dia. 80 mm m' 36.00
- dia. 65 mm m' 30.00
- dia. 50 mm m' 63.00
- dia. 40 mm m' 45.00
- dia. 32 mm m' 53.00
- dia. 25 mm m' 190.00
- dia. 25 mm Drooper m' 50.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 Grid A termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 5.00

3 Branch Control Valve dia. 150 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 150 bh = 1 bh
- Flow Switch dia. 150 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh
- Coupling

4 Head Splinker type Pendant bh 90.00

Sub Total Lantai 2

F.3 Lantai 3
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 Grid A termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 100 mm m' 19.00
- dia. 80 mm m' 16.00
- dia. 65 mm m' 29.00
- dia. 50 mm m' 15.00
- dia. 40 mm m' 7.00
- dia. 32 mm m' 35.00
- dia. 25 mm m' 166.00
- dia. 25 mm Drooper m' 32.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 Grid A termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 8.00

3 Branch Control Valve dia. 100 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 100 bh = 1 bh
- Flow Switch dia. 100 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh

4 Head Splinker type Pendant bh 58.00

Sub Total Lantai 3

TOTAL INSTALASI FIRE SPLINKER DALAM BANGUNAN

XV.G Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 9.00
Lantai 2 bh 9.00
Lantai 3 bh 10.00

2 Fire Extingusher type CO2 5 kg


Lantai 1 bh 1.00
Lantai 2 bh 1.00
Lantai 3 bh 6.00

TOTAL FIRE EXTINGUISHER

XV.H Pekerjaan Fire Supression


R. Cath Lab, R. OK1, R. OK2, R. OK3, R. OK4, R. OK5, R. Server, R.IT

H.1 Fire Supression System


1 Cylinder 80-300 M25 UL&FM 24m³ ea 6.00
2 Ci IV8-300 Manosw w/ Low Pressure Switch ea 6.00
3 Ci IV8-300 Manosw Basic ea 1.00
4 Discharge Hose ea 7.00
5 Ci IS8 Solenoid Actuator w/ manual ea 7.00
6 Nozzles ea 19.00
7 SV22 Zone kit set 7.00
8 SV CiV Start kit set 7.00
9 SV22 Next Kit (Connecting Hose) ea 6.00
10 SV22 Manifold and Orifice MT 7 set 1.00
11 DV7- w/2 Outlet set 1.00
12 SV Test Port ea 7.00
13 End Plug Kit ea 1.00
14 Discharge Pressure Switch ea 7.00
15 Fire Rated Pressure Relief A 250-ø200 ea 1.00

Sub Total Fire Supression System

H.2 Sistem Deteksi


1 Addressable Fire Suppression Control Unit VS4 ea 1.00
2 Input Module ea 9.00
3 Releasing Module ea 7.00
4 Output Module ea 14.00
5 Intelligent Photoelectric Smoke Detector ea 22.00
6 Manual Release - Single Action ea 7.00
7 Abort Switch ea 7.00
8 Bell ea 7.00
9 Horn & Strobe ea 7.00
10 Warning Lamp (Gas Discharge) ea 7.00
11 Warning Lamp (Evacuate) ea 7.00
12 Service Disconnect Switch ea 1.00

Sub Total Sistem Deteksi

H.3 Instalasi
1 Pipe ASTM A53/A106 Seamless Sch. 40
- dia. 65 mm m 290.00
- dia. 80 mm m 132.00

2 Pengkabelan STP AWG #18 dalam konduit mtr 936.00

3 Pengkabelan NYA 2 x 1,5 mm dalam konduit mtr 2,160.00

4 Transportasi, akomodasi dan biaya supervisi ls 1.00


testing commissioning dan training

Sub Total Instalasi

TOTAL Pekerjaan Fire Supression

XV.I Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL Testing Commissioning

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Pekerjaan AC Ruang OK


A.1 Ruang OK 1
A.1.1 Peralatan Utama AC OK
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.OK1 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 100.000 BTUH
- Sensible : 70.00 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.800 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC OK

A.1.2 Unit Fan


1 EF-GD.D.3.OK.1 unit 1.00
- Type : In-Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.1.3 Pekerjaan Pemipaan Ruang OK


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.OK1
Pipa AHU-DX VRF + Isolasi
dia.12,7 mm & 25,4 mm OU-AHU-GD.D.3.OK.1A & OK.1B m 20.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang OK

A.1.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 4.80

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 36.48

Return
- Stainless Steel 304 tebal 0,6 mm m2 23.81
- Stainless Steel 304 tebal 0,5 mm m2 32.72

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 21.60

4 Return Air Grille (RAG)


- 400 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00
6 Exhaust Air Louvre (EAL)
- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00

8 AHU FILTER - AHU-GD.D.3.OK1


- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 1.800
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 300 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm) x 4 Set
: 2x (350 mm x 600 mm x 150 mm) x 4 Set

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - EF-GD.D.3.OK1


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 4 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 4 set
: (500 mm x 400 mm x 20 mm) x 4 set

10 Motorized Volume Damper bh 1.00

11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00


Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.1.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.1.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

3 Room humidity indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan

6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00

12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total Control System

Sub Total Ruang OK 1

A.2 Ruang OK 2
A.2.1 Peralatan Utama AC OK
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.OK2 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 100.000 BTUH
- Sensible : 70.00 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.800 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU
Sub Total Peralatan Utama AC OK

A.2.2 Unit Fan


1 EF-GD.D.3.OK2 unit 1.00
- Type : In-Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.2.3 Pekerjaan Pemipaan Ruang OK


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.OK2
Pipa AHU-DX VRF + Isolasi
dia.12,7 mm & 25,4 mm OU-AHU-GD.D.3.OK.2A & OK.2B m 20.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang OK

A.2.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 4.80

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 36.48

Return
- Stainless Steel 304 tebal 0,6 mm m2 23.81
- Stainless Steel 304 tebal 0,5 mm m2 32.72

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 21.60

4 Return Air Grille (RAG)


- 400 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00

6 Exhaust Air Louvre (EAL)


- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00

8 AHU FILTER - AHU-GD.D.3.OK2


- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 1.800
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 300 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm) x 4 Set
: 2x (350 mm x 600 mm x 150 mm) x 4 Set

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - EF-GD.D.3.OK2


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 4 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 4 set
: (500 mm x 400 mm x 20 mm) x 4 set

10 Motorized Volume Damper bh 1.00

11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.2.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.2.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location
3 Room humidity indicator for room unit 1.00
housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan

6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00

12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total

Sub Total Ruang OK 2

A.3 Ruang OK 3
A.3.1 Peralatan Utama AC OK
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.OK.3 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 100.000 BTUH
- Sensible : 70.00 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.800 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC OK

A.3.2 Unit Fan


1 EF-GD.D.3.OK.3 unit 1.00
- Type : In-Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.3.3 Pekerjaan Pemipaan Ruang OK


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.OK.3
Pipa AHU-DX VRF + Isolasi
dia.12,7 mm & 25,4 mm OU-AHU-GD.D.3.OK.3A & OK.3B m 20.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang OK

A.3.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 4.80

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 36.48

Return
- Stainless Steel 304 tebal 0,6 mm m2 23.81
- Stainless Steel 304 tebal 0,5 mm m2 32.72

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 21.60

4 Return Air Grille (RAG)


- 400 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00

6 Exhaust Air Louvre (EAL)


- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00

8 AHU FILTER - AHU-GD.D.3.OK.3


- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 1.800
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 300 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm) x 4 Set
: 2x (350 mm x 600 mm x 150 mm) x 4 Set

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - EF-GD.D.3.OK3


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 4 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 4 set
: (500 mm x 400 mm x 20 mm) x 4 set

10 Motorized Volume Damper bh 1.00

11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.3.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.3.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

3 Room humidity indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan
6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00

12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total

Sub Total Ruang OK 3

A.4 Ruang OK 4
A.4.1 Peralatan Utama AC OK
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.OK4 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 100.000 BTUH
- Sensible : 70.00 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.800 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC OK

A.4.2 Unit Fan


1 EF-GD.D.3.OK4 unit 1.00
- Type : In-Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.4.3 Pekerjaan Pemipaan Ruang OK


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.OK4
Pipa AHU-DX VRF + Isolasi
dia.12,7 mm & 25,4 mm OU-AHU-GD.D.3.OK.4A & OK.4B m 20.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang OK

A.4.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 4.80

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 36.48

Return
- Stainless Steel 304 tebal 0,6 mm m2 23.81
- Stainless Steel 304 tebal 0,5 mm m2 32.72

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 21.60

4 Return Air Grille (RAG)


- 400 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00

6 Exhaust Air Louvre (EAL)


- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00

8 AHU FILTER - AHU-OK4


- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 1.800
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 300 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm) x 4 Set
: 2x (350 mm x 600 mm x 150 mm) x 4 Set

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - EF-GD.D.3.OK4


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 4 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 4 set
: (500 mm x 400 mm x 20 mm) x 4 set

10 Motorized Volume Damper bh 1.00

11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.4.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.4.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

3 Room humidity indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan

6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00


12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total

Sub Total Ruang OK 4

A.5 Ruang OK 5 (COVID)


A.5.1 Peralatan Utama AC OK type DX
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.OK5 (COVID) unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 110.000 BTUH
- Sensible : 77.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.941 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC OK type DX

A.5.2 Unit Fan


1 EF-GD.D.OK.3.5 unit 1.00
- Type : In - Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran :1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.5.3 Pekerjaan Pemipaan Ruang OK


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.OK5 (COVID)
Pipa AHU-DX VRF + Isolasi
dia. 12,7 mm & 25,4 mm OU-AHU-GD.D.3.OK.5A & OK.5B m 15.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang OK

A.5.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 11.42

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Return
- Stainless Steel 304 tebal 0,6 mm m2 46.31

Return
- Stainless Steel 304 tebal 0,6 mm m2 35.15
- Stainless Steel 304 tebal 0,5 mm m2 31.10

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 21.60

4 Return Air Grille (RAG)


- 400 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00

6 Exhaust Air Louvre (EAL)


- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00

8 AHU FILTER - AHU-GD.D.3.OK5 (COVID)


- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 1.800
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 300 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm) x 4Set
: 2x (350 mm x 600 mm x 150 mm) x 4Set

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - EF-GD.D.OK.3.5


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 1 set
: (500 mm x 400 mm x 20 mm) x 1 set

10 Motorized Volume Damper bh 1.00


11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.5.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.5.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

3 Room humidity indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan

6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00

12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total Control System

Sub Total Ruang OK 5 (COVID)

A.6 Ruang Cathlab Hybrid


A.6.1 Peralatan Utama AC Cathlab type DX
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.3.Cathlab unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 185.000 BTUH
- Sensible : 129.500 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 3.200 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang OK-Cathlab Hybrid

Sub Total Peralatan Utama AC Cathlab type DX

A.6.2 Unit Fan


1 EF.GD.D.3.Cathlab unit 1.00
- Type : In-Line
- Kapasitas : 500 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.6.3 Pekerjaan Pemipaan Ruang Cathlab Hybrid


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.3.Cathlab
Pipa AHU-DX Inverter + Isolasi
dia. 15,9 mm & 34,9 mm OU-AHU-GD.D.3.Cathlab A & Cathla m 20.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan Ruang Cathlab Hybrid

A.6.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 6.73

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 44.06

Return
- Stainless Steel 304 tebal 0,6 mm m2 37.37
- Stainless Steel 304 tebal 0,5 mm m2 32.40

3 Ducting tanpa isolasi finish cat zinkromat lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
Fresh Air
- BjLS 50 m2 1.08

Exhaust Air
- BjLS 50 m2 11.12

4 Return Air Grille (RAG)


- 500 mm x 200 mm bh 4.00
- 250 mm x 200 mm bh 4.00

5 Fresh Air Louvre (FAL) + Pre Filter


- 400 mm x 250 mm bh 1.00

6 Exhaust Air Louvre (EAL)


- 350 mm x 250 mm bh 1.00

7 Volume Dumper (VD)


- 250 mm x 200 mm bh 1.00
8 AHU FILTER - GD.D.3.Cathlab
- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 3.200
Everage Arrestance :
99,99%
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 75
Frame : Stainless Steel 304
Size Frame : 1.900 mm x 2.400 mm x 200 mm
Quantity Filter : 5x (1.200 mm x 600 mm x 150 mm)
: 2x (350 mm x 600 mm x 150 mm)

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 3.200
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 3.200
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

9 FAN FILTER - GD.D.3.Cathlab


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 1 set
: (500 mm x 400 mm x 20 mm) x 1 set

10 Motorized Volume Damper bh 1.00

11 Sensor Filter Indicator set 1.00

12 Sensor Static Pressure Hepa Filter set 1.00

13 Saklar On/Off AC unit 1.00

14 Kontrol Temperature Ruang unit 1.00

15 Pressure Gauge bh 1.00

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.6.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00
2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

A.6.6 Control System


1 Magnehelic pressure differential indicator for room unit 1.00
pressures (local indicator) installed on the wall near to
the appropriated rooms

2 Room temperature indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

3 Room humidity indicator for room unit 1.00


housing (local indicator) installed on the wall of
the appropriated location

4 Pressure differential transmitter and sensor installed on the unit 2.00


housing HEPA filters, this pressure sensor is to send the input
signal to the HVAC controller for modulating the Variable
Speed Drive (VSD) of the AHU supply fan in order to
maintain a constant room pressure

5 Pressure differential transmitter and sensor cross the duct works of unit 1.00
Exhaust fan, this sensor send the signal input to the
HVAC controller for modulating the VSD of the exhaust
fan in order to kept constant flow rate of the exhaust fan

6 Room temperature transmitter and sensor at the grid of cooling coil. unit 1.00
This sensor is to send a signal input to the HVAC
controller in order to maintain a constant dew point
temperature of leaving coil air from cooling coil.

7 Variable speed drive for AHU fan unit 1.00

8 Variable speed drive for Exhaust fan unit 1.00

9 Control panel included relays, switches, field controller unit 1.00


for all necessary AI, AO, DI and DO asper mentioned on
the air schematic diagram.

10 Programing and software unit 1.00

11 Pengkabelan Control Sensor System unit 1.00

12 Testing, balancing, adjusting, and commisioning unit 1.00

Sub Total Control System

Sub Total Ruang Cathlab Hybrid

A.7 AHU CADANGAN UNTUK R.CATHLAB, R.OK.1, R.OK.2


A.7.1 Peralatan Utama AC
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.OK.7 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 110.000 BTUH
- Sensible : 77.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.800 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC

A.7.2 Unit Fan


1 EF-GD.D.OK.3.7 unit 1.00
- Type : In-Line
- Kapasitas : 500 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.7.3 Pekerjaan Pemipaan


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.OK.7
Pipa AHU-DX Inverter + Isolasi
dia. 12,7 mm & 25,4 mm m 30.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan

A.7.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 69.49

2 Ducting Bahan Stainless Steel isolasi luar


lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Return
- Stainless Steel 304 tebal 0,6 mm m2 59.16

3 Motorized Volume Dumper


- 500 mm x 300 mm bh 3.00

4 AHU FILTER - AHU-GD.D.OK.7


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 1.800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

5 FAN FILTER - EF-GD.D.OK.3.7


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 1 set
: (500 mm x 400 mm x 20 mm) x 1 set

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.7.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

Sub Total AHU CADANGAN UNTUK R.CATHLAB, R.OK.1, R.OK.2

A.8 AHU CADANGAN UNTUK R.OK.3, R.OK.4, R.OK.5


A.8.1 Peralatan Utama AC
Pengadaan dan Pemasangan unit AHU lengkap dengan
gantungan/hanger/support dan akseories lainnya :
Unit AHU sudah dilengkapi :
- Pre Filter
- Medium Filter
- Return Plenum Box
- Electric Heater
- UV Lamp
- Pressure Differential Monitor

1 AHU-GD.D.OK.6 unit 1.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 185.000 BTUH
- Sensible : 129.500 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 3.200 cfm
- External Static Pressure : 3,5 Inch Wg
- Lokasi : Ruang AHU

Sub Total Peralatan Utama AC

A.8.2 Unit Fan


1 EF-GD.D.OK.3.6 unit 1.00
- Type : In-Line
- Kapasitas : 300 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesual seleksi unit

Sub Total Unit Fan

A.8.3 Pekerjaan Pemipaan


Pengadaan dan pemasangan pipa AC, drain lengkap isolasi dengan
hanger/gantungan/support dan aksesories pendukung lainnya
sesuai dengan gambar dan spesifikasi teknis
PIpa Refrigerant : Copper Tube ASTM B280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi : Elestomeric Nitrille Rubber Class 0-1

1 AHU-GD.D.OK.6
Pipa AHU-DX Inverter + Isolasi
dia. 15,9 mm & 34,9 mm m 30.00
Refnet Joint unit 1.00
Pipa Drain + Isolasi :
- dia. 32 mm m 10.00

Sub Total Pekerjaan Pemipaan

A.8.4 Pekerjaan Ducting, Grille, Diffuser dan Instalasinya


1 Ducting Bahan Stainless Steel isolasi luar dalam
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Supply
- Stainless Steel 304 tebal 0,6 mm m2 53.38
2 Ducting Bahan Stainless Steel isolasi luar
lengkap split damper, gantungan/hanger/support dan aksesories lainnya :
Bahan isolasi elestomeric nutrille rubber class 0 tebal 25 mm
Return
- Stainless Steel 304 tebal 0,6 mm m2 53.10

3 Motorized Volume Dumper


- 500 mm x 300 mm bh 3.00

4 AHU FILTER - AHU-GD.D.OK.6


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 3.200
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 3.200
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Face Felocity. MpM : 150
Frame : Stainless Steel 304
Quantity Filter : Menyesuaikan ukuran AHU

5 FAN FILTER - EF-GD.D.OK.3.6


- Medium Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 300
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 set
Quantity Filter : (500 mm x 400 mm x 150 mm) x 1 set
: (500 mm x 400 mm x 20 mm) x 4 set

Sub Total Pekerjaan Ducting, Grille, Diffuser dan Instalasinya

A.8.5 Pekerjaan Pengkabelan


1 Kabel dari Panel ke unit AC & Unit Outdoor
- NYY 4 x 25 mm2 m 20.00

2 Pengkabelan Fan dengan NYY 4 x 2,5 mm2 m 30.00

Sub Total Pekerjaan Pengkabelan

Sub Total AHU CADANGAN UNTUK R.OK.3, R.OK.4, R.OK.5

Sub Total Pekerjaan AC Ruang OK

XVI.B Unit AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan
pengisian freon, remote control,
gantungan/hanger/support dan akseories lainnya :

B.1 Lantai 1 (IGD & CSSD)


1 IU-OU-GD.D.1.1 unit 1.00
- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Karu

2 IU-OU-GD.D.1.2 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 24.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Admin

3 IU-OU-GD.D.1.3 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Distribusi Steril

4 IU-OU-GD.D.1.4 unit 1.00


- Type : Split Duct c/w Pre Filter, Medium Filter
- Kapasitas : 38.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.000 cfm
- Lokasi : Gudang Steril

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

5 IU-OU-GD.D.1.5 unit 1.00


- Type : Split Duct c/w Pre Filter, Medium Filter
- Kapasitas : 77.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 2.175 cfm
- Lokasi : CSSD

6 IU-OU-GD.D.1.6 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Petugas

7 IU-OU-GD.D.1.7 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Admin Penerima

8 IU-OU-GD.D.1.8 & IU-OU-GD.D.1.8A (1 Standby) unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Trafo Isolasi

9 IU-OU-GD.D.1.9 unit 1.00


- Type : Ceiling Casseette Inverter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Resusitasi Bayi
10 IU-OU-GD.D.1.10 s/d IU-OU-GD.D.1.12 unit 3.00
- Type : Ceiling Casseette Inverter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Transit Jenazah

11 IU-OU-GD.D.1.13 s/d IU-OU-GD.D.1.15 unit 3.00


- Type : Ceiling Casseette Inverter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Observasi

12 IU-OU-GD.D.1.16 s/d IU-OU-GD.D.1.20 unit 5.00


- Type : Ceiling Casseette Inverter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Tindakan

13 IU-OU-GD.D.1.21 s/d IU-OU-GD.D.1.23 unit 3.00


- Type : Ceiling Casseette Inverter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Resus Triase Medis

14 IU-OU-GD.D.1.24 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Alat Linen

15 IU-OU-GD.D.1.25 unit 1.00


- Type : Ceiling Casseette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Ruang Staff

16 IU-OU-GD.D.1.26 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Dokter

17 IU-OU-GD.D.1.27 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Farmasi

18 IU-OU-GD.D.1.28 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Administrasi

19 IU-OU-GD.D.1.29 unit 1.00


- Type : Split Duct c/w Pre Filter, Medium Filter
- Kapasitas : 50.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Ruang Isolasi & Airlock

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit
c Medium Filter lengkap dengan housing set 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

Sub Total Lantai 1 (IGD & CSSD)

B.2 Lantai 2 (OK)


1 a IU-OU-GD.D.2.1 unit 1.00
- Type : Split Duct c/w Pre Filter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Persiapan

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

2 IU-OU-GD.D.2.2 / D.2.2A unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Mesin

3 IU-OU-GD.D.2.3 / D.2.3A / D.2.3B unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Trafo Isolasi

4 IU-OU-GD.D.2.4 / D.2.5 / D.2.6 unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Konsultan, Ruang Staf

5 a IU-OU-GD.D.2.7 unit 1.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 60.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 2.000 cfm
- Lokasi : Ruang Dokter, Farmasi, Ruang Ganti

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

6 a IU-OU-GD.D.2.8 unit 1.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 50.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.450 cfm
- Lokasi : Ruang Dokter, Farmasi, Ruang Ganti

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit
7 a IU-OU-GD.D.2.8 unit 1.00
- Type : Split Duct c/w Pre Filter
- Kapasitas : 70.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 687 cfm
- Lokasi : Ruang Persiapan & Pemulihan, Airlock

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

8 a IU-OU-GD.D.2.9 unit 1.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : AirLock Ruang Operasi Covid

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

Sub Total Lantai 2 (OK)

B.3 Lantai 3 (AHU, HEMODIALISA, SERVER, REKAM MEDIK)


1 IU-OU-GD.D.3.1 unit 1.00
- Type : Cassette Inverter
- Kapasitas : 38.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.200 cfm
- Lokasi : Ruang Tunggu / Admn

2 IU-OU-GD.D.3.2 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Kosong

3 IU-OU-GD.D.3.3 s/d GD.D.3.4 unit 2.00


- Type : Split Duct c/w Pre Filter, Medium Filter
- Kapasitas : 16.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 450 cfm
- Lokasi : Ruang Isolasi

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

4 IU-OU-GD.D.3.5 s/d GD.D.3.8 unit 4.00


- Type : Cassette Inverter
- Kapasitas : 34.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.120 cfm
- Lokasi : Hemodialis

5 IU-OU-GD.D.3.9 s/d GD.D.3.10 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Konsultan, Ruang Karu

6 IU-OU-GD.D.3.11 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 17.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 560 cfm
- Lokasi : Ruang Perawat

7 IU-OU-GD.D.3.12 s/d GD.D.3.13 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Gudang Obat & Gudang Linen

8 IU-OU-GD.D.3.14 s/d GD.D.3.16 unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Perawat, Reuse, R. Kosong,

9 IU-OU-GD.D.3.17 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 16.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 560 cfm
- Lokasi : Gudang Alat & Linen Bersih

11 IU-OU-GD.D.3.18 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 24.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 800 cfm
- Lokasi : Ruang IT

10 IU-OU-GD.D.3.19 s/d GD.D.3.19A (1 Standby) unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Kontrol

12 IU-OU-GD.D.3.20 s/d GD.D.3.23 unit 4.00


- Type : Cassette Inverter
- Kapasitas : 27.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Rekam Medik

Sub Total Lantai 3 (AHU, HEMODIALISA, SERVER, REKAM MEDIK)

Sub Total Unit AC Split

XVI.C Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

C.1 Lantai 1 (IGD & CSSD)


1 EF-GD.D.1.1 unit 1.00
- Type : Propeller
- Kapasitas : 450 CFM
- Ext. Static Pressure : 0,35 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang RO

2 EF-GD.D.1.2 unit 1.00


- Type : Inline
- Kapasitas : 1.375 CFM
- Ext. Static Pressure : 0,75 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Panel, Toilet

3 EF-GD.D.1.3 unit 1.00


- Type : Inline
- Kapasitas : 500 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Pembersihan

4 EF-GD.D.1.4 unit 1.00


- Type : Inline
- Kapasitas : 400 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet,Janitor,Spoelhoek

5 EF-GD.D.1.5 unit 1.00


- Type : Circular
- Kapasitas : 250 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Dekontaminasi

6 EF-GD.D.1.6 unit 1.00


- Type : Inline
- Kapasitas : 700 CFM
- Ext. Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Isolasi, Airlock

7 EF-GD.D.1.7 unit 1.00


- Type : Axial
- Kapasitas : 6.000 CFM
- Ext. Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Area Koridor

8 IF-GD.D.1.1 unit 1.00


- Type : Inline
- Kapasitas : 250 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Fresh Air

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 250
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 set
Quantity Filter : (500 mm x 400 mm x 200 mm) x 1 set

9 IF-GD.D.1.2 unit 1.00


- Type : Inline
- Kapasitas : 800 CFM
- Ext. Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Fresh Air

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 800
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (700 mm x 650 mm x 300 mm) x 1 set
Quantity Filter : (650 mm x 600 mm x 200 mm) x 1 set

10 IF-GD.D.1.3 unit 1.00


- Type : Inline
- Kapasitas : 850 CFM
- Ext. Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Fresh Air

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 850
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (700 mm x 650 mm x 300 mm) x 1 set
Quantity Filter : (650 mm x 600 mm x 200 mm) x 1 set

Sub Total Lantai 1 (IGD & CSSD)

C.2 Lantai 2 (OK)


1 EF-GD.D.2.1 unit 1.00
- Type : Ceiling Fan
- Kapasitas : 50 CFM
- Ext. Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : sesuai seleksi unit
- Lokasi : DTO

2 EF-GD.D.2.2 unit 1.00


- Type : In Line
- Kapasitas : 350 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet

3 EF-GD.D.2.3 unit 1.00


- Type : In Line
- Kapasitas : 275 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet

4 EF-GD.D.2.4 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 175 CFM
- Ext. Static Pressure : 0,35 In Wg
- Putaran : 1.320 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Panel

5 EF-GD.D.2.5 s/d GD.D.2.9 unit 5.00


- Type : Propeller
- Kapasitas : 500 CFM
- Ext. Static Pressure : 0,35 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Koridor

6 EF-GD.D.2.10 c/w UV unit 1.00


- Type : In Line Plenum Box
- Kapasitas : 776 CFM
- Ext. Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Persiapan, Ruang APD

- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 776
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 45-50
Frame : BJLS 100

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 776
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 776
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (700 mm x 650 mm x 1.000 mm) x 1 Set
Quantity Filter : (650 mm x 600 mm x 300 mm) x 1 Set
: (650 mm x 600 mm x 20 mm) x 1 Set
: (650 mm x 600 mm x 300 mm) x 1 Set

7 EF-GD.D.2.11 c/w UV unit 1.00


- Type : In Line Plenum Box
- Kapasitas : 624 CFM
- Ext. Static Pressure : 3,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Spoel Hoek

- Hepa Filter type High Efficiency Catridge Filter / Double Seal unit 1.00
Pengadaan dan Pemasangan Ceiling HEPA Filter lengkap dengan Bracket,
material pendukung dan aksesories lainnya
Air Flow (CFM) : 624
Everage Arrestance :
90 - 95 %
Material Resistance Initial (Pa) :
250
Material Resistance Final (Pa) :
700
Face Felocity. MpM : 45-50
Frame : BJLS 100

- Medium Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 624
Everage Arrestance : 90 - 95% :
90 - 95 %
Material Resistance Initial (Pa) :
150
Material Resistance Final (Pa) :
165
Face Felocity. MpM : 150
Frame : BJLS 100

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 624
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (700 mm x 650 mm x 1.000 mm) x 1 Set
Quantity Filter : (650 mm x 600 mm x 300 mm) x 1 Set
: (650 mm x 600 mm x 20 mm) x 1 Set
: (650 mm x 600 mm x 300 mm) x 1 Set

Sub Total Lantai 2 (OK)

C.3 Lantai 3 (AHU, HEMODIALISA, SERVER, REKAM MEDIK)


1 EF-GD.D.3.1 unit 1.00
- Type : In Line
- Kapasitas : 1.250 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet, R. Panel, R.RO

2 EF-GD.D.3.2 unit 1.00


- Type : In Line
- Kapasitas : 350 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Jan, DTO, Spoelhoek

3 IF-GD.D.3.1 unit 1.00


- Type : Inline
- Kapasitas : 450 CFM
- Ext. Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Indoor unit

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 Set
Quantity Filter : (500 mm x 400 mm x 200 mm) x 1 Set

4 IF-GD.D.3.2 unit 1.00


- Type : Inline
- Kapasitas : 400 CFM
- Ext. Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Indoor unit

- Pre Filter lengkap dengan housing unit 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 500
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 Set
Quantity Filter : (500 mm x 400 mm x 200 mm) x 1 Set

5 IF-GD.D.3.3 unit 1.00


- Type : Inline
- Kapasitas : 550 CFM
- Ext. Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Indoor unit
- Pre Filter lengkap dengan housing unit 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Air Flow (CFM) : 550
Everage Arrestance :
80 - 85 %
Material Resistance Initial (Pa) :
75
Material Resistance Final (Pa) :
130
Face Felocity. MpM : 150
Frame : BJLS 100
Size Frame : (550 mm x 450 mm x 300 mm) x 1 Set
Quantity Filter : (500 mm x 400 mm x 200 mm) x 1 Set

Sub Total Lantai 3 (AHU, HEMODIALISA, SERVER, REKAM MEDIK)

C.4 Lantai Atap


1 PF-GD.D.LA.1 / unit 2.00
- Type : Axial
- Kapasitas : 10.000 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Tangga Kebakaran

Sub Total Lantai Atap

TOTAL PERALATAN UTAMA FAN

XVI.D Unit AC Presisi


Pekerjaan termasuk :
- Pipa Drain Pipe lengkap thermal insulation
- Refrigerant Pipe & Thermal Insulation ( Elastromeric Nitrille Rubbrer )
- Air Filter, Filter Dryier dan perlengkapan supporting lainnya.
- Refrigerant charging
- Penarikan kabel daya dari Panel AC terdekat
- Control cable dan pekerjaan penunjang lainnya
- Installation cost
- Holder, hanger, clamp, bracket

1 PAC-GD.D.3.1 & PAC-GD.D.3.2 ( 1 Unit Standby) unit 2.00


- Pelayanan : Ruang Data
- Type : Air Cooled Direct Expansion Down Flow Type
- Kapasitas Pendingin : Total 44,0 kW (150.000 BTU/hr)
Sensible 31,0 kW (105.000 BTU/hr)
Pada 22°C DB/15°C WB
- Air Flow Rate : 11.500 m3/hr (± 6.770 cfm)
- External Static Pressure : 1,25 In-Wg
- Fan Power Input : 2 x 4,0 kW
- Water Flow Rate : - GPM
- Electrical heating : 12 kW
- Nominal power : + 6 kW

2 Material Instalasi termasuk : Pemipaan refrigerant, pemipaan drain, UNIT 2.00


pemipaan humidifier, pekerjaan elektrikal (kabel power, kabel kontrol,
 kabel grounding), refrigerant R-410A, Support material & aksesoris.

TOTAL PERALATAN UTAMA AC PRESISI

XVI.E Pekerjaan Pemipaan


Pengadaan dan pemasangan pipa AC lengkap dengan
gantungan, support dan akseories lainnya sesuai dengan
gambar dan spesifikasi teknis

Bahan :
Pipa Chilled Water : Black Steel Sch 40
Pipa Refrigerant : Cooper TUbe ASTM B 280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi Pipa : Elestomeric Nitrile Rubber Class 0
Jacketing : Alumunium Sheet

E.1 Lantai 1 ( IGD & CSSD )


1 Pipa AC Split + Isolasi
- dia. 9,52 mm & 19,05 mm IU-OU-GD.D.1.1 mtr 31.90
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.2 mtr 35.75
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.1.3 mtr 22.00
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.4 mtr 17.05
- dia. 12,7 mm mm & 25,4 mm IU-OU-GD.D.1.5 mtr 26.95
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.1.6 mtr 23.10
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.1.7 mtr 17.60
- dia. 6,4 mm & 9,5 mm IU-OU-GD.D.1.8 mtr 13.75
- dia. 6,4 mm & 9,5 mm IU-OU-GD.D.1.8A mtr 15.95
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.9 mtr 21.45
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.10 mtr 23.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.11 mtr 26.40
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.12 mtr 17.05
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.13 mtr 18.70
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.14 mtr 23.10
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.15 mtr 24.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.16 mtr 17.60
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.17 mtr 18.15
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.18 mtr 22.00
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.19 mtr 23.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.20 mtr 18.15
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.21 mtr 28.05
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.22 mtr 32.45
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.1.23 mtr 21.45
- dia. 6,4 mm & 9,5 mm IU-OU-GD.D.1.24 mtr 21.45
- dia. 6,4 mm & 15,9 mm IU-OU-GD.D.1.25 mtr 29.70
HARGA SATUAN JUMLAH HARGA

153,900 16,313,400

153,900 6,002,100
105,190 6,942,540
63,440 2,093,520
48,250 1,399,250

425,060 13,176,860
333,500 2,001,000
234,680 5,397,640
189,520 568,560

457,940 14,196,140

63,440 3,172,000
48,250 1,158,000
40,840 6,942,800

563,063 1,126,125
409,500 2,457,000
286,650 573,300
259,350 259,350

83,779,585

153,900 11,080,800

153,900 2,308,500
105,190 5,785,450
63,440 1,586,000
48,250 1,013,250

425,060 10,626,500
333,500 14,674,000
234,680 7,275,080
189,520 1,137,120

63,440 2,220,400
48,250 4,053,000
40,840 4,900,800

409,500 2,457,000
286,650 1,719,900

70,837,800

153,900 5,694,300

105,190 3,681,650
63,440 570,960
48,250 579,000
425,060 2,975,420
333,500 8,337,500
234,680 3,520,200
189,520 9,665,520

63,440 1,268,800
48,250 820,250
40,840 2,287,040

409,500 819,000
286,650 859,950
259,350 518,700

41,598,290

196,215,675

786,268,293

296,888 7,422,188

153,900 66,792,600

153,900 10,003,500

84,218,288

5,000,000 5,000,000

5,000,000

1,592,594,815

site plan

130,473,000 130,473,000

133,474,500 133,474,500

1,400,000 8,400,000
1,400,000 5,600,000
277,947,500

194,080 24,260,000
133,120 14,643,200
133,120 11,048,960

259,840 13,771,520
215,780 4,099,820
194,080 22,513,280
194,080 16,108,640

215,780 12,731,020
194,080 1,940,800
133,120 10,383,360
133,120 7,454,720

1,704,420 44,314,920
1,704,420 42,610,500
1,704,420 28,975,140

37,298,640 37,298,640

250,000 250,000
250,000 250,000
250,000 250,000

skope arsitek

292,904,520

259,840 1,299,200
215,780 -
194,080 20,572,480
133,120 26,890,240
133,120 13,312,000

194,080 2,134,880
133,120 7,321,600

194,080 8,151,360
133,120 17,438,720
133,120 2,662,400

649,040 9,086,560
259,840 12,732,160
215,780 9,925,880
194,080 39,204,160
194,080 19,408,000

133,120 11,714,560
133,120 399,360
133,120 11,714,560
133,120 399,360

472,850 2,364,250
194,080 8,151,360
133,120 18,104,320
133,120 5,324,800

133,120 3,594,240
133,120 2,662,400

1,704,420 44,314,920
1,704,420 44,314,920
1,704,420 20,453,040
1,704,420 1,704,420
1,704,420 10,226,520
1,704,420 1,704,420
44,822,400 268,934,400

83,000,000 498,000,000
36,010,000 36,010,000

785,000 28,260,000

350,000 350,000
350,000 350,000
250,000 250,000
250,000 500,000

skope arsitek

1,209,941,490

194,080 9,121,760
133,120 7,055,360
133,120 3,727,360

215,780 10,141,660
194,080 10,286,240
194,080 5,434,240

1,704,420 17,044,200
1,704,420 17,044,200

36,010,000 36,010,000

250,000 500,000

skope arsitek

116,365,020

1,619,211,030

12,500,000 12,500,000

12,500,000

1,909,658,530
-

457,940 13,738,200
85,310 170,620

7,248,245 14,496,489
867,710 1,735,419

2,613,517 5,227,034

479,145 958,291

36,326,053

800,660 12,009,900
328,950 4,934,250

10,864,886 10,864,886
867,710 867,710

38,949,826 38,949,826

2,613,517 2,613,517

341,250 341,250

70,581,338

106,907,391

4,773,510 9,547,020

259,530 8,824,020
133,880 1,204,920

1,548,708 3,097,416

4,884,868 9,769,736

32,443,112

4,773,510 9,547,020
259,530 2,595,300
133,880 2,008,200

1,548,708 3,097,416

4,884,868 9,769,736

27,017,672

4,773,510 9,547,020

259,530 2,595,300
133,880 2,008,200

1,548,708 3,097,416

4,884,868 9,769,736

27,017,672

4,773,510 4,773,510

259,530 1,816,710
133,880 1,606,560

1,548,708 1,548,708

4,884,868 4,884,868

14,630,356

101,108,810

800,660 20,817,160
457,940 2,289,700
328,950 7,565,850
259,530 4,671,540
178,730 3,932,060
133,880 3,480,880
112,210 7,293,650
85,310 17,915,100
85,310 3,924,260

85,310 597,170
14,023,800 14,023,800

80,010 6,720,840

93,232,010

800,660 10,408,580
457,940 3,663,520
328,950 11,842,200
259,530 7,785,900
178,730 11,259,990
133,880 6,024,600
112,210 5,947,130
85,310 16,208,900
85,310 4,265,500

85,310 426,550

14,023,800 14,023,800

80,010 7,200,900

99,057,570

457,940 8,700,860
328,950 5,263,200
259,530 7,526,370
178,730 2,680,950
133,880 937,160
112,210 3,927,350
85,310 14,161,460
85,310 2,729,920

85,310 682,480

11,025,000 11,025,000

80,010 4,640,580

62,275,330

254,564,910

819,000 7,371,000
819,000 7,371,000
819,000 8,190,000

1,365,000 1,365,000
1,365,000 1,365,000
1,365,000 8,190,000

33,852,000

40,873,140 245,238,840
10,644,480 63,866,880
6,583,500 6,583,500
1,898,820 13,291,740
11,240,460 78,683,220
1,732,500 32,917,500
38,309,040 268,163,280
6,181,560 43,270,920
1,871,100 11,226,600
18,142,740 18,142,740
18,577,440 18,577,440
2,813,580 19,695,060
4,490,640 4,490,640
10,117,800 70,824,600
12,668,040 12,668,040

907,641,000

38,808,000 38,808,000
1,316,700 11,850,300
8,523,900 59,667,300
1,940,400 27,165,600
1,690,920 37,200,240
1,968,120 13,776,840
1,912,680 13,388,760
1,386,000 9,702,000
1,843,380 12,903,660
2,772,000 19,404,000
2,772,000 19,404,000
1,912,680 1,912,680

265,183,380

249,600 72,384,000
302,400 39,916,800

51,424 48,133,033

22,995 49,669,200

95,000,000 95,000,000

305,103,033

1,477,927,413

15,000,000 15,000,000

15,000,000

1,989,360,524
275,000,000 275,000,000

275,000,000

4,550,000 4,550,000

4,550,000

569,800 11,396,000
2,550,000 2,550,000

87,250 872,500

14,818,500

717,510 3,444,048

465,510 16,981,805

465,510 11,082,862
402,800 13,181,227

184,580 199,346

184,580 3,986,928

296,400 1,185,600
222,300 889,200

405,600 405,600
374,400 374,400

468,000 468,000

14,000,000 14,000,000

include unit AHU

include unit AHU

3,711,000 3,711,000

2,750,000 2,750,000

1,550,000 1,550,000

2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000
80,085,016

205,275 4,105,500

24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000

4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000

9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000

10,000,000 10,000,000

130,626,000

509,909,516

275,000,000 275,000,000
275,000,000

4,550,000 4,550,000

4,550,000

569,800 11,396,000
2,550,000 2,550,000

87,250 872,500

14,818,500

717,510 3,444,048

465,510 16,981,805

465,510 11,082,862
402,800 13,181,227

184,580 199,346

184,580 3,986,928

296,400 1,185,600
222,300 889,200

405,600 405,600

374,400 374,400

468,000 468,000

14,000,000 14,000,000
include unit AHU

include unit AHU

3,711,000 3,711,000

2,750,000 2,750,000

1,550,000 1,550,000

2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000

80,085,016

205,275 4,105,500

24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000
4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000

9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000

10,000,000 10,000,000

130,626,000

509,909,516

275,000,000 275,000,000

275,000,000

4,550,000 4,550,000

4,550,000
569,800 11,396,000
2,550,000 2,550,000

87,250 872,500

14,818,500

717,510 3,444,048

465,510 16,981,805

465,510 11,082,862
402,800 13,181,227

184,580 199,346

184,580 3,986,928

296,400 1,185,600
222,300 889,200

405,600 405,600

374,400 374,400

468,000 468,000

14,000,000 14,000,000

include unit AHU

include unit AHU


3,711,000 3,711,000

2,750,000 2,750,000

1,550,000 1,550,000

2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000

80,085,016

205,275 4,105,500

24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000

4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000
9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000

10,000,000 10,000,000

130,626,000

509,909,516

275,000,000 275,000,000

275,000,000

4,550,000 4,550,000

4,550,000

569,800 11,396,000
2,550,000 2,550,000

87,250 872,500

14,818,500
717,510 3,444,048

465,510 16,981,805

465,510 11,082,862
402,800 13,181,227

184,580 199,346

184,580 3,986,928

296,400 1,185,600
222,300 889,200

405,600 405,600

374,400 374,400

468,000 468,000

14,000,000 14,000,000

include unit AHU

include unit AHU

3,711,000 3,711,000
2,750,000 2,750,000

1,550,000 1,550,000

2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000

80,085,016

205,275 4,105,500

24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000

4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000

9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000
10,000,000 10,000,000

130,626,000

509,909,516

275,000,000 275,000,000

275,000,000

4,550,000 4,550,000

4,550,000

569,800 8,547,000
2,550,000 2,550,000

87,250 872,500

11,969,500

717,510 8,196,834

465,510 21,556,837

465,510 16,361,745
402,800 12,528,691
184,580 199,346

184,580 3,986,928

296,400 1,185,600
222,300 889,200

405,600 405,600

374,400 374,400

468,000 468,000

14,000,000 14,000,000

include unit AHU

include unit AHU

3,711,000 3,711,000

2,750,000 2,750,000

1,550,000 1,550,000
2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000

94,039,182

205,275 4,105,500
-
24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000

4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000

9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000

10,000,000 10,000,000

130,626,000

521,014,682
345,500,000 345,500,000

345,500,000

5,535,000 5,535,000

5,535,000

680,480 13,609,600
2,550,000 2,550,000

87,250 872,500

17,032,100

717,510 4,830,277

465,510 20,512,233

465,510 17,395,178
402,800 13,050,720

184,580 199,346

184,580 2,053,268

345,800 1,383,200
222,300 889,200

405,600 405,600

374,400 374,400

468,000 468,000
18,500,000 18,500,000

include unit AHU

include unit AHU

3,711,000 3,711,000

3,250,000 3,250,000

1,550,000 1,550,000

2,500,000 2,500,000

2,500,000 2,500,000

75,000 75,000

350,000 350,000

450,000 450,000

94,447,422

205,275 4,105,500
24,150 724,500

4,830,000

3,080,000 3,080,000

3,990,000 3,990,000

4,844,000 4,844,000

9,422,000 18,844,000

9,492,000 9,492,000

9,226,000 9,226,000

12,922,000 12,922,000

8,078,000 8,078,000

36,400,000 36,400,000

11,200,000 11,200,000

2,550,000 2,550,000

10,000,000 10,000,000

130,626,000

597,970,522

275,000,000 275,000,000

275,000,000

5,535,000 5,535,000
5,535,000

569,800 17,094,000
2,550,000 2,550,000

87,250 872,500

20,516,500

717,510 49,861,205

465,510 27,539,572

2,500,000 7,500,000

include unit AHU

include unit AHU

3,711,000 3,711,000

2,750,000 2,750,000
91,361,777

205,275 4,105,500

24,150 724,500

4,830,000

397,243,277

345,500,000 345,500,000

345,500,000

4,550,000 4,550,000

4,550,000

680,480 20,414,400
2,550,000 2,550,000

87,250 872,500

23,836,900

717,510 38,297,814
465,510 24,718,581

2,500,000 7,500,000

include unit AHU

include unit AHU

3,711,000 3,711,000

2,750,000 2,750,000

76,977,395

205,275 4,105,500

24,150 724,500

4,830,000

455,694,295

4,011,560,842

4,818,000 4,818,000
12,984,000 12,984,000

5,940,000 5,940,000

27,810,818 27,810,818

4,520,000 4,520,000

6,755,000 6,755,000

73,026,818 73,026,818

5,940,000 5,940,000

5,940,000 5,940,000

4,818,000 9,635,999

18,421,364 18,421,364
18,421,364 55,264,091

18,421,364 55,264,091

18,421,364 92,106,819

18,421,364 55,264,091

4,818,000 4,818,000

16,218,818 16,218,818

4,818,000 4,818,000

16,218,818 16,218,818

4,818,000 4,818,000

31,386,272 31,386,272

4,520,000 4,520,000
6,755,000 6,755,000

523,244,000

24,247,636 24,247,636

4,520,000 4,520,000

5,940,000 11,880,000

5,940,000 17,820,000

4,944,000 14,831,999

54,557,182 54,557,182

4,520,000 4,520,000

31,386,272 31,386,272

2,700,000 2,700,000
59,057,182 59,057,182

2,700,000 2,700,000

24,247,636 24,247,636

2,700,000 2,700,000

6,755,000 6,755,000

261,922,908

29,951,182 29,951,182

4,944,000 4,944,000

16,144,364 32,288,728

4,520,000 4,520,000

6,755,000 6,755,000
29,951,182 119,804,728

4,944,000 9,887,999

9,024,000 9,024,000

3,708,000 7,416,000

4,944,000 14,831,999

9,024,000 9,024,000

18,421,364 18,421,364

4,944,000 9,887,999

25,633,636 102,534,545

379,291,544

1,164,458,452

7,350,000 7,350,000
7,350,000 7,350,000

4,557,000 4,557,000

3,528,000 3,528,000

2,352,000 2,352,000

7,350,000 7,350,000

8,775,000 8,775,000

2,352,000 2,352,000

2,700,000 2,700,000

6,762,000 6,762,000
4,520,000 4,520,000

6,762,000 6,762,000

4,520,000 4,520,000

68,878,000

776,160 776,160

2,352,000 2,352,000

2,352,000 2,352,000

1,261,260 1,261,260

1,886,500 9,432,500
8,012,000 8,012,000

11,150,000 11,150,000

6,800,000 6,800,000

4,520,000 4,520,000

6,762,000 6,762,000

11,150,000 11,150,000

6,800,000 6,800,000

4,520,000 4,520,000
75,887,920

6,762,000 6,762,000

2,352,000 2,352,000

7,350,000 7,350,000

4,520,000 4,520,000

7,350,000 7,350,000

4,520,000 4,520,000

7,350,000 7,350,000
4,520,000 4,520,000

44,724,000

36,198,050 72,396,100

72,396,100

261,886,020

425,155,500 850,311,000

74,891,050 149,782,100

1,000,093,100

419,780 13,390,982
395,210 14,128,758
273,470 6,016,340
395,210 6,738,331
569,800 15,356,110
273,470 6,317,157
273,470 4,813,072
248,800 3,421,000
248,800 3,968,360
395,210 8,477,255
395,210 9,346,717
395,210 10,433,544
395,210 6,738,331
395,210 7,390,427
395,210 9,129,351
395,210 9,564,082
395,210 6,955,696
395,210 7,173,062
395,210 8,694,620
395,210 9,346,717
395,210 7,173,062
395,210 11,085,641
395,210 12,824,565
395,210 8,477,255
248,800 5,336,760
339,210 10,074,537
NO. JENIS PEKERJAAN SAT. VOLUME
- dia. 6,4 mm & 9,5 mm IU-OU-GD.D.1.26 mtr 11.00
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.1.27 mtr 11.00
- dia. 6,4 mm & 9,5 mm IU-OU-GD.D.1.28 mtr 16.50
- dia. 9,52 mm & 19,05 mm IU-OU-GD.D.1.29 mtr 19.25

2 Pipa Drain + Isolasi :


- dia. 32 mm mtr 127.05
- dia. 25 mm mtr 125.40
- dia. 20 mm mtr 41.40

Sub Total Lantai 1 ( IGD & CSSD )

E.2 Lantai 2 (OK)


1 Pipa AC Split + Isolasi
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.2.1 mtr 36.30
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.2.2 mtr 37.95
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.2.2A mtr 38.50
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.2.3 mtr 36.85
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.2.3A mtr 34.65
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.2.3B mtr 30.25
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.2.4 mtr 13.20
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.2.5 mtr 15.95
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.2.6 mtr 17.60
- dia. 12,7 mm & 25,4 mm IU-OU-GD.D.2.7 mtr 18.15
- dia. 9,52 mm & 19,05 mm IU-OU-GD.D.2.8 mtr 36.85
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.2.9 mtr 27.50

2 Pipa Drain + Isolasi :


- dia. 32 mm mtr 92.95
- dia. 20 mm mtr 38.50

Sub Total Lantai 2 (OK)

E.3 Lantai 3 (R.AHU, HEMODELISA, SERVER, REKAMEDIK)


1 Pipa AC Split + Isolasi
Ruang AHU
- dia. 15,9 mm & 35 mm AHU-OU-GD.D.3.1 mtr 10.45
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.2 mtr 11.55
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.3 mtr 6.60
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.4 mtr 16.50
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.5 mtr 11.00
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.6 mtr 16.50
- dia. 15,9 mm & 35 mm AHU-OU-GD.D.3.7 mtr 20.35
- dia. 15,9 mm & 35 mm AHU-OU-GD.D.3.8 mtr 18.15
- dia. 15,9 mm & 35 mm AHU-OU-GD.D.3.9 mtr 19.25
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.D.3.10 mtr 13.20
Ruang Server
- dia. 15,9 mm & 35 mm OU-PAC-GD.D.3.1 mtr 37.40
- dia. 15,9 mm & 35 mm OU-PAC-GD.D.3.2 mtr 35.20

- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.1 mtr 30.25


- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.2 mtr 14.85
- dia. 6,4 mm & 15,9 mm IU-OU-GD.D.3.3 mtr 10.45
- dia. 6,4 mm & 15,9 mm IU-OU-GD.D.3.4 mtr 12.10
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.5 mtr 12.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.6 mtr 20.35
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.7 mtr 17.60
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.8 mtr 25.30
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.9 mtr 29.70
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.10 mtr 31.90
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.3.11 mtr 20.35
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.12 mtr 27.50
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.13 mtr 29.15
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.14 mtr 31.35
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.15 mtr 9.90
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.16 mtr 20.35
- dia. 6,4 mm & 12,7 mm IU-OU-GD.D.3.17 mtr 25.85
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.18 mtr 20.90
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.19 mtr 20.90
- dia. 6,4 mm & 9,52 mm IU-OU-GD.D.3.19A mtr 20.35
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.20 mtr 19.25
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.21 mtr 25.85
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.22 mtr 34.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.D.3.23 mtr 29.15

2 Pipa Drain + Isolasi :


- dia. 40 mm (Pipa Tegak) mtr 39.60
- dia. 32 mm mtr 108.90
- dia. 25 mm mtr 49.50
- dia. 20 mm mtr 60.50

Sub Total Lantai 3 (R.AHU, HEMODELISA, SERVER, REKAMEDIK)

TOTAL PEKERJAAN PEMIPAAN

XVI.F Pekerjaan Ducting, Diffuser dan Grille


F.1 Lantai 1
1 Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
Ducting Supply
- BjLS 60 m2 26.00
- BjLS 50 m2 49.00

Ducting Return
- BjLS 60 m2 8.00
- BjLS 50 m2 21.00
HARGA SATUAN JUMLAH HARGA
248,800 2,736,800
273,470 3,008,170
248,800 4,105,200
419,780 8,080,765

87,250 11,085,113
68,940 8,645,076
61,550 2,548,170

262,581,020

395,210 14,346,123
273,470 10,378,187
273,470 10,528,595
273,470 10,077,370
273,470 9,475,736
273,470 8,272,468
248,800 3,284,160
248,800 3,968,360
248,800 4,378,880
569,800 10,341,870
419,780 15,468,893
395,210 10,868,275

87,250 8,109,888
61,550 2,369,675

121,868,478

783,000 8,182,350
680,480 7,859,544
680,480 4,491,168
680,480 11,227,920
680,480 7,485,280
680,480 11,227,920
783,000 15,934,050
783,000 14,211,450
783,000 15,072,750
680,480 8,982,336

783,000 29,284,200
783,000 27,561,600

395,210 11,955,103
248,800 3,694,680
339,210 3,544,745
339,210 4,104,441
395,210 4,999,407
395,210 8,042,524
395,210 6,955,696
395,210 9,998,813
248,800 7,389,360
248,800 7,936,720
273,470 5,565,115
248,800 6,842,000
248,800 7,252,520
248,800 7,799,880
248,800 2,463,120
248,800 5,063,080
273,470 7,069,200
395,210 8,259,889
248,800 5,199,920
248,800 5,063,080
395,210 7,607,793
395,210 10,216,179
395,210 13,694,027
395,210 11,520,372
98,760 3,910,896
87,250 9,501,525
68,940 3,412,530
61,550 3,723,775

354,306,953

738,756,451

400,880 10,422,880
372,650 18,259,850

400,880 3,207,040
372,650 7,825,650
NO. JENIS PEKERJAAN SAT. VOLUME

2 Ducting tanpa isolasi bahan BjLS lengkap dengan


gantungan/hanger/support dan aksesories lainya
Fresh Air
- BjLS 50 m2 126.00

Exhaust Air
- BjLS 60 m2 8.00
- BjLS 50 m2 77.00

3 Supply Air Difuser (SAD) bahan alumunium annodized


- uk. 350 mm x 350 mm bh 1.00
- uk. 300 mm x 300 mm bh 12.00
- uk. 250 mm x 250 mm bh 1.00

4 Return Air Grille (RAG) bahan alumunium annodized


- uk. 400 mm x 250 mm bh 7.00
- uk. 300 mm x 200 mm bh 1.00

5 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 550 mm x 250 mm bh 1.00
- uk. 500 mm x 300 mm bh 1.00
- uk. 300 mm x 300 mm bh 3.00
- uk. 250 mm x 250 mm bh 4.00
- uk. 150 mm x 150 mm bh 8.00

6 Intake Air Grille (IG) bahan alumunium annodized


- uk. 600 mm x 300 mm bh 1.00
- uk. 150 mm x 150 mm bh 14.00

7 Intake Air Louver (FAL) lengkap dengan Pre Filter


- uk. 500 mm x 350 mm bh 2.00
- uk. 300 mm x 200 mm bh 1.00
- uk. 200 mm x 200 mm bh 1.00

8 Exhaust Louver (EL)


- uk. 700 mm x 350 mm bh 1.00
- uk. 600 mm x 400 mm bh 1.00
- uk. 400 mm x 300 mm bh 1.00
- uk. 350 mm x 250 mm bh 1.00

9 Volume Damper (VD)


- uk. 400 mm x 300 mm bh 1.00
- uk. 250 mm x 250 mm bh 1.00
- uk. 200 mm x 200 mm bh 2.00
- uk. 150 mm x 150 mm bh 25.00

Sub Total Lantai 1

F.2 Lantai 2
1 Ducting Bahan Polyisocyanurate (PIR) lengkap dengan
gantungan/hanger/support dan aksesories lainya
Ducting Supply
- BjLS 60 m2 17.00
- BjLS 50 m2 67.00

Ducting Return
- BjLS 60 m2 6.00
- BjLS 50 m2 67.00

2 Ducting tanpa isolasi bahan BjLS lengkap dengan


gantungan/hanger/support dan aksesories lainya

Exhaust Air
- BjLS 50 m2 83.50

3 Supply Air Difuser (SAD) bahan alumunium annodized


- uk. 400 mm x 400 mm bh -
- uk. 350 mm x 350 mm bh 4.00
- uk. 300 mm x 300 mm bh 25.00
- uk. 250 mm x 250 mm bh 9.00
- uk. 200 mm x 200 mm bh 2.00

4 Return Air Grille (RAG) bahan alumunium annodized


- uk. 500 mm x 250 mm bh 8.00
- uk. 450 mm x 250 mm bh 5.00
- uk. 400 mm x 250 mm bh 18.00
- uk. 400 mm x 200 mm bh 1.00
- uk. 300 mm x 200 mm bh 1.00
- uk. 250 mm x 200 mm bh 1.00
- uk. 250 mm x 150 mm bh 2.00

5 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 500 mm x 300 mm bh 1.00
- uk. 300 mm x 300 mm bh 1.00
- uk. 250 mm x 250 mm bh 3.00
- uk. 150 mm x 150 mm bh 11.00

6 Exhaust Louver (EL)


- uk. 450 mm x 300 mm bh 1.00
- uk. 300 mm x 250 mm bh 1.00
- uk. 200 mm x 200 mm bh 1.00

7 Volume Damper (VD)


- uk. 550 mm x 350 mm bh 2.00
HARGA SATUAN JUMLAH HARGA

184,580 23,257,080

204,930 1,639,440
184,580 14,212,660

391,300 391,300
335,400 4,024,800
279,500 279,500

321,100 2,247,700
247,000 247,000

395,200 395,200
395,200 395,200
296,400 889,200
247,000 988,000
148,200 1,185,600

444,600 444,600
148,200 2,074,800

530,400 1,060,800
312,000 312,000
249,600 249,600

655,200 655,200
624,000 624,000
436,800 436,800
374,400 374,400

728,000 728,000
520,000 520,000
416,000 832,000
312,000 7,800,000

105,980,300

400,880 6,814,960
372,650 24,967,550

400,880 2,405,280
372,650 24,967,550

184,580 15,412,430

447,200 -
391,300 1,565,200
335,400 8,385,000
279,500 2,515,500
223,600 447,200

370,500 2,964,000
345,800 1,729,000
321,100 5,779,800
296,400 296,400
247,000 247,000
222,300 222,300
197,600 395,200

395,200 395,200
296,400 296,400
247,000 741,000
148,200 1,630,200

468,000 468,000
343,200 343,200
249,600 249,600

936,000 1,872,000
NO. JENIS PEKERJAAN SAT. VOLUME
- uk. 350 mm x 250 mm bh 1.00
- uk. 300 mm x 250 mm bh 1.00
- uk. 200 mm x 200 mm bh 2.00

8 Plenum Box
- uk. 1.100 mm x 600 mm bh 2.00
- uk. 1.000 mm x 500 mm bh 2.00
- uk. 900 mm x 500 mm bh 2.00

Sub Total Lantai 2

F.3 Lantai 3
1 Ducting Bahan Polyisocyanurate (PIR) lengkap dengan
gantungan/hanger/support dan aksesories lainya
Ducting Supply
- BjLS 60 m2 263.00
- BjLS 50 m2 -

Ducting Return
- BjLS 60 m2 151.00
- BjLS 50 m2 -

2 Ducting tanpa isolasi bahan BjLS lengkap dengan


gantungan/hanger/support dan aksesories lainya
Fresh Air
- BjLS 50 m2 125.00

Exhaust Air
- BjLS 60 m2 34.00
- BjLS 50 m2 39.00

3 Supply Air Difuser (SAD) bahan alumunium annodized


- uk. 300 mm x 300 mm bh 1.00
- uk. 250 mm x 250 mm bh 1.00

4 Return Air Grille (RAG) bahan alumunium annodized


- uk. 400 mm x 150 mm bh 1.00
- uk. 350 mm x 150 mm bh 1.00

5 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 400 mm x 150 mm bh 1.00
- uk. 350 mm x 350 mm bh 2.00
- uk. 250 mm x 250 mm bh 2.00
- uk. 200 mm x 200 mm bh 3.00
- uk. 150 mm x 150 mm bh 3.00

6 Intake Air Grille (IG) bahan alumunium annodized


- uk. 150 mm x 150 mm bh 9.00

7 Fresh Air Louver (FAL) lengkap dengan Pre Filter


- uk. 450 mm x 350 mm bh 3.00
- uk. 200 mm x 200 mm bh 1.00

8 Exhaust Louver (EL)


- uk. 650 mm x 350 mm bh 1.00
- uk. 400 mm x 200 mm bh 1.00
- uk. 300 mm x 200 mm bh 1.00

9 Volume Damper (VD)


- uk. 250 mm x 200 mm bh 1.00
- uk. 150 mm x 150 mm bh 16.00
- uk. 150 mm x 100 mm bh 4.00

Sub Total Lantai 3

TOTAL Pekerjaan Ducting, Diffuser dan Grille

XVI.G Pekerjaan Listrik / Pengkabelan


G.1 Lantai 1
1 Pengkabelan unit AC dari P.ACke masing-masing unit titik 30.00

2 Pengkabelan unit Fan dari P.AC ke masing-masing unit titik 6.00

3 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 649.00

Sub Total Lantai 1


G.2 Lantai 2
1 Pengkabelan unit AC dari P.ACke masing-masing unit titik 11.00

2 Pengkabelan unit Fan dari P.AC ke masing-masing unit titik 9.00

3 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 316.25

Sub Total Lantai 2

G.3 Lantai 3
1 Pengkabelan unit AC dari P.ACke masing-masing unit titik 21.00

2 Pengkabelan unit Fan dari P.AC ke masing-masing unit titik 5.00

3 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 756.80

Sub Total Lantai 3

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN


HARGA SATUAN JUMLAH HARGA
624,000 624,000
572,000 572,000
416,000 832,000

596,700 1,193,400
526,500 1,053,000
491,400 982,800

110,367,170

400,880 105,431,440
372,650 -

400,880 60,532,880
372,650 -

184,580 23,072,500

204,930 6,967,620
184,580 7,198,620

335,400 335,400
279,500 279,500

271,700 271,700
247,000 247,000

271,700 271,700
345,800 691,600
247,000 494,000
197,600 592,800
148,200 444,600

148,200 1,333,800

499,200 1,497,600
249,600 249,600

624,000 624,000
374,400 374,400
312,000 312,000

468,000 468,000
312,000 4,992,000
260,000 1,040,000

217,722,760

434,070,230

850,000 25,500,000

600,000 3,600,000

15,698 10,188,002

39,288,002
850,000 9,350,000

600,000 5,400,000

15,698 4,964,493

19,714,493

850,000 17,850,000

600,000 3,000,000

15,698 11,880,246

32,730,246

91,732,741
NO. JENIS PEKERJAAN SAT. VOLUME

XVI.H Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

1 LIFT BARANG (FREIGHT) (L.F-7) unit 1.00


Spesifikasi :
- Type : Machine Room Elevator
- Kapasitas : 1000 kg
- Kecepatan : 60 Mpm
- Travel : 13.770 mm
- Travel Height : 19.770 mm
- Jumlah pemberhentian : 4 bh
- Jumlah Pintu : 4 bh
- Hoistway Size ( W x D ) : 2.400 x 2.250 mm
- Car Size ( W x D x H ) : 1.300 x 1.750 x 2.400 mm
- Type Pintu : 2 - Center Opening Door
- Lebar Pintu : 1.300 mm
- Tinggi Pintu : 2.100 mm
- Overhead : 4.500 mm
- Pit : 1.500 mm
- Kontrol : AC Gearred (OHT) VVVF Control
- Cara Operasi : Duplex Operation
- Penggerak : Traction Drive AC - Gearless
- Car Wall Finishing : Hairline Stainless Steel
- Power : Sesuai Seleksi Unit
termasuk interfacing dengan General Fire Alarm

2 ARD berikut Kelengkapannya unit 1.00


3 Instalasi pengkabelan dari Panel Lift ke mesin dan panel kontrol lot 1.00
4 Supervisory panel lengkap terpasang di R. Kontrol unit 1.00
5 Biaya pemasangan Lift unit 1.00
6 BiayaTransportasi unit 1.00
7 Tesing Commissioning, Ijin-ijin, dll. unit 1.00
8 Biaya scapolding / perancah lot 1.00

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

15,000,000 15,000,000

15,000,000

7,717,557,835

376,000,000 376,000,000

termasuk
25,000,000 25,000,000
termasuk
20,000,000 20,000,000
60,000,000 60,000,000
25,000,000 25,000,000
termasuk

506,000,000
NO. JENIS PEKERJAAN SAT. VOLUME

XVIII PEKERJAAN PNEUMATIC TUBE


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

A Lantai 1
1 STATIONS & DIVERTERS AND ACCESSORIES
Bottom Loading Station Unit 2.00
All Stations incl.: Basket, Cushion and Carrier Rack

2 TUBE AND LINE SYSTEM


Tubes PVC - Diam. 110 MM RAL 7000 M 82.00
Tubes PVC - Diam. 110 MM Transparent M 5.00
Bend R=800, RAL 7001, Grey Buah 13.00
Bend R=800, RAL 7001, Transparent Buah 2.00
Sleeve Buah 53.00
Cable 2x2x0.23 + 3x2.5F M 115.00

3 CARRIERS AND ACCESSORIES


Long Carrier With Chip Buah 2.00
Short Carrier With Chip Buah 8.00

Sub Total Lantai 1

B Lantai 2
1 STATIONS & DIVERTERS AND ACCESSORIES
Bottom Loading Station Unit 1.00
All Stations incl.: Basket, Cushion and Carrier Rack

2 TUBE AND LINE SYSTEM


Tubes PVC - Diam. 110 MM RAL 7000 M 50.00
Tubes PVC - Diam. 110 MM Transparent M 3.00
Bend R=800, RAL 7001, Grey Buah 6.00
Bend R=800, RAL 7001, Transparent Buah 1.00
Sleeve Buah 27.00
Cable 2x2x0.23 + 3x2.5F M 82.00

3 CARRIERS AND ACCESSORIES


Long Carrier With Chip Buah 1.00
Short Carrier With Chip Buah 4.00

Sub Total Lantai 2

C Lantai 3
1 STATIONS & DIVERTERS AND ACCESSORIES
Bottom Loading Station Unit 1.00
All Stations incl.: Basket, Cushion and Carrier Rack

2 TUBE AND LINE SYSTEM


Tubes PVC - Diam. 110 MM RAL 7000 M 40.00
Tubes PVC - Diam. 110 MM Transparent M 3.00
Bend R=800, RAL 7001, Grey Buah 8.00
Bend R=800, RAL 7001, Transparent Buah 1.00
Sleeve Buah 23.00
Cable 2x2x0.23 + 3x2.5F M 62.00

3 CARRIERS AND ACCESSORIES


Long Carrier With Chip Buah 1.00
Short Carrier With Chip Buah 4.00

Sub Total Lantai 3

TOTAL PEKERJAAN PNEUMATIC TUBE


HARGA SATUAN JUMLAH HARGA

39,637,440 79,274,880

178,200 14,612,400
1,128,600 5,643,000
1,230,030 15,990,390
3,852,810 7,705,620
65,520 3,472,560
136,620 15,711,300

3,028,680 6,057,360
2,375,730 19,005,840

167,473,350

39,637,440 39,637,440

178,200 8,910,000
1,128,600 3,385,800
1,230,030 7,380,180
3,852,810 3,852,810
65,520 1,769,040
136,620 11,202,840

3,028,680 3,028,680
2,375,730 9,502,920

88,669,710

39,637,440 39,637,440

178,200 7,128,000
1,128,600 3,385,800
1,230,030 9,840,240
3,852,810 3,852,810
65,520 1,506,960
136,620 8,470,440

3,028,680 3,028,680
2,375,730 9,502,920

86,353,290

342,496,350
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BANGUNAN :
(RADIOLOGI)
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII
XVIII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BANGUNAN : GEDUNG E
(RADIOLOGI)
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG
PEKERJAAN PNEUMATIC TUBE

TOTAL
KUPANG NT BANGUNAN : GEDUNG E

TOTAL
11,951,649,139
-
-
822,026,708
466,789,081
468,916,724
16,770,213
267,057,824
-
439,606,920
172,325,000
1,460,555,735
-
395,772,840
3,035,781,854
3,809,706,752
-
1,739,622,940

25,046,581,731
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BANGUNAN :
(RADIOLOGI)
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


A.1 Lantai 1
1 SDP.E unit 1.00
2 SDP.AC-E unit 1.00
3 SDP.RADIOLOGI unit 1.00
4 PP. 1E unit 1.00
5 PP. AC-1E unit 1.00
6 P. MRI unit 1.00
7 P.XRAY-1 unit 1.00
8 P.XRAY-2 unit 1.00
9 P.DENTAL X RAY unit 1.00
10 P. FLUOROSCOPY unit 1.00
11 P. CT-SCAN unit 1.00
12 P. MAMMOGRAPHY unit 1.00
13 P. USG unit 1.00
14 P. PANORAMIC unit 1.00
15 P. AL unit 1.00
16 P. SUMPIT E unit 1.00
17 SDP PF.E unit 1.00

Sub Total Lantai 1

A.2 Lantai 2
1 SDP.2E unit 1.00
2 PP. 2E unit 1.00
3 P.AC-2E unit 1.00
4 P. ICU unit 1.00
5 P. CVCU unit 1.00
6 PC. CVCU unit 2.00
7 PC. ICU-1 unit 1.00
8 PC. ICU-2 unit 1.00
9 PC. ICU-3 unit 1.00
10 PC. ICU-4 unit 1.00
11 PC. PICU unit 1.00
12 PC. NICU unit 1.00

Sub Total Lantai 2

B.3 Lantai 3
1 PP.3E unit 1.00
2 P.AC-3E unit 1.00

Sub Total Lantai 3

B.4 Lantai Atap


1 P. LIFT-E unit 1.00
2 P. PF-E unit 1.00
3 PC. LIFT-C.1 / 2 unit 2.00
4 PC. PF-E unit 2.00

Sub Total Lantai Atap

TOTAL PEKERAJAAN PANEL- PANEL

I.C Pekerjaan UPS


Pengadaan dan pemasangan UPS (Back up time 30 minute) lengkap dengan earthing,
bonding, support/hanger dan semua material dan alat bantu yang diperlukan
sesuai gambar dan spesifikasi

1 UPS 200 KVA / 3PH UPS P.MRI UNIT -


2 UPS 100 KVA / 3PH UPS P. XRAY-1 UNIT -
3 UPS 100 KVA / 3PH UPS P. XRAY-2 UNIT -
4 UPS 160 KVA / 3PH UPS P. FLUOROSCOPY UNIT -
5 UPS 150 KVA / 3PH UPS P. CT-SCAN UNIT -
6 UPS 40 KVA / 3PH UPS P. PANORAMIC UNIT -
7 UPS 10 KVA / 1PH UPS PC. CVCU 1 UNIT 1.00
8 UPS 8 KVA / 1PH UPS PC. CVCU 2 UNIT 1.00
9 UPS 12 KVA / 1PH UPS PC. ICU-1 UNIT 1.00
10 UPS 12 KVA / 1PH UPS PC. ICU-2 UNIT 1.00
11 UPS 12 KVA / 1PH UPS PC. ICU-3 UNIT 1.00
12 UPS 12 KVA / 1PH UPS PC. ICU-4 UNIT 1.00
13 UPS 12 KVA / 1PH UPS PC. PICU UNIT 1.00
14 UPS 12 KVA / 1PH UPS PC. NICU UNIT 1.00
15 UPS 12,5 KVA / 3PH UPS P. AL UNIT 1.00

TOTAL PEKERAJAAN UPS


UTAN RUMAH SAKIT KUPANG NT BANGUNAN : GEDUNG E

HARGA SATUAN JUMLAH HARGA

64,670,000 64,670,000
85,408,000 85,408,000
120,745,000 120,745,000
9,292,000 9,292,000
23,666,000 23,666,000
32,197,000 32,197,000
22,920,000 22,920,000
22,920,000 22,920,000
22,920,000 22,920,000
32,197,000 32,197,000
32,197,000 32,197,000
4,864,000 4,864,000
4,864,000 4,864,000
5,318,000 5,318,000
9,292,000 9,292,000
12,535,000 12,535,000
33,250,000 33,250,000

539,255,000

50,130,000 50,130,000
8,881,000 8,881,000
36,047,000 36,047,000
11,355,000 11,355,000
9,125,200 9,125,200
trafo isolasi
trafo isolasi
trafo isolasi
trafo isolasi
trafo isolasi
trafo isolasi
trafo isolasi

115,538,200

19,978,000 19,978,000
22,270,000 22,270,000

42,248,000

15,575,000 15,575,000
13,255,000 13,255,000
INCLUDE LIFT
INCLUDE FAN

28,830,000

725,871,200

ALKES
ALKES
ALKES
ALKES
ALKES
ALKES
120,000,000 120,000,000
96,000,000 96,000,000
144,000,000 144,000,000
144,000,000 144,000,000
144,000,000 144,000,000
144,000,000 144,000,000
144,000,000 144,000,000
144,000,000 144,000,000
240,000,000 240,000,000

1,320,000,000
NO. JENIS PEKERJAAN SAT. VOLUME
I.D Pekerjaan Isolation Transformer Medis Lengkap Dengan Panel
Sistem Isolation Transformer Medis Tunggal, Floor Standing lengkap dengan
breaker, pre-safety-system Isolation Transformer Insulation
Monitor Device, load sensor dan kelengkapan lainnya

1 PC. CVCU 1 unit 1.00


- Isolating Transformer 8 KVA/1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/40A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 11 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

2 PC. CVCU 2 unit 1.00


- Isolating Transformer 6,3KVA/1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/32A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 9 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

3 PC. ICU-1 unit 1.00


- Isolating Transformer 10 KVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 13 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

4 PC. ICU-2 unit 1.00


- Isolating Transformer 10 KVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 13 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

5 PC. ICU-3 unit 1.00


- Isolating Transformer 10 KVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 13 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

6 PC. ICU-4 unit 1.00


- Isolating Transformer 10 KVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 13 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

7 PC. PICU unit 1.00


- Isolating Transformer 8 kVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 9 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot
HARGA SATUAN JUMLAH HARGA

144,000,000 144,000,000

139,500,000 139,500,000

177,300,000 177,300,000

177,300,000 177,300,000

177,300,000 177,300,000

177,300,000 177,300,000
144,000,000 144,000,000
NO. JENIS PEKERJAAN SAT. VOLUME
8 PC. NICU unit 1.00
- Isolating Transformer 10 KVA / 1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 9 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

9 Central Remote Alarm Indicator unit 3.00

10 Pengkabelan kontrol dengan STP AWG 18 1 pair ls 1.00

TOTAL PEKERAJAAN ISOLATION TRANSFORMER

I.E PEKERJAAN KABEL FEEDER


1 Dari PDTR-2 :
NYY 4(3 x 1 x 185 mm2) ke SDP.E mtr 300.00
NYY 4(4 x 1 x 185 mm2) ke SDP.AC-E mtr 300.00
NYY 4(5 x 1 x 240 mm2) ke SDP.RADIOLOGI mtr 361.00
FRC 4 x 1 x 35 mm2 ke SDP PF.E mtr 300.00
FRC 4 x 1 x 6 mm2 ke P. AL mtr 300.00

2 Dari SDP.E
NYY 4 x 25 mm2 ke PP.1E mtr 11.00
NYY 4 (2 x 1 x 95 mm2) ke SDP.2E mtr 16.00
NYY 4 x 35 mm2 ke PP.3E mtr 22.00
NYY 4 x 35 mm2 ke P. LIFT.E mtr 26.00
NYY 4 x 25 mm2 ke P. SUMPIT E mtr 13.00

3 Dari SDP.AC-E
NYY 4 x 95 mm2 ke P.AC-1E mtr 12.00
NYY 4 (2 x 1C x 95 mm2) ke P.AC-2E mtr 17.00
NYY 4 x 95 mm2 ke P.AC-3E mtr 22.00

4 Dari SDP.2E
NYY 4 x 10 mm2 ke PP. 2E mtr 10.00
NYY 4 x 35 mm2 ke P. ICU mtr 12.00
NYY 4 x 25 mm2 ke P. CVCU mtr 12.00
NYY 3 x 10 mm2 ke PC. CVCU 1 mtr 41.00
NYY 3 x 6 mm2 ke PC. CVCU 2 mtr 41.00
NYY 3 x 16 mm2 ke PC. ICU-1 mtr 83.00
NYY 3 x 16 mm2 ke PC. ICU-2 mtr 83.00
NYY 3 x 16 mm2 ke PC. ICU-3 mtr 83.00
NYY 3 x 16 mm2 ke PC. ICU-4 mtr 85.00
NYY 3 x 10 mm2 ke PC. PICU mtr 42.00
NYY 3 x 16 mm2 ke PC. NICU mtr 41.00

5 Dari P.LIFT-E
NYY 4 x 10 mm2 PC. LIFT 1 mtr 17.00
NYY 4 x 10 mm2 PC. LIFT 2 mtr 17.00

6 Dari SDP.RADIOLOGI
NYY 4 (2 x 1C x 95 mm2) ke P. MRI mtr 33.00
NYY 4 x 95 mm2 ke P. XRAY-1 mtr 60.00
NYY 4 x 95 mm2 ke P. XRAY-2 mtr 68.00
NYY 4 x 185 mm2 ke P. FLUOROSCOPY mtr 54.00
NYY 4 x 185 mm2 ke P. CT-SCAN mtr 50.00
NYY 4 x 6 mm2 ke P. MAMMOGRAPHY mtr 56.00
NYY 4 x 4 mm2 ke P. USG mtr 40.00
NYY 4 x 16 mm2 ke P. PANORAMIC mtr 47.00
NYY 4 x 6 mm2 ke P. DENTAL X-RAY mtr 51.00

6 Dari P. SUMPIT E
NYY 4 x 4 mm2 PC. SUMPIT E-01 mtr 26.00
NYY 4 x 4 mm2 PC. SUMPIT E-02 mtr 31.00
NYY 4 x 4 mm2 PC. SUMPIT E-03 mtr 91.00
NYY 4 x 4 mm2 PC. SUMPIT E-04 mtr 127.00
NYY 4 x 4 mm2 PC. SUMPIT KIMIA E-02 mtr 31.00
NYY 4 x 4 mm2 PC. SUMPIT KIMIA D-03 mtr 91.00
NYY 4 x 2,5 mm2 PC. SUMPIT AIR HUJAN mtr 104.00
NYY 3 x 4 mm2 PC. PNEUMATIC mtr 104.00
7 Dari SDP PF.E
FRC 4 x 1 x 10 mm2 P.PF-E mtr 26.00

8 Dari P.PF-E
FRC 4 x 1 x 4 mm2 PC. PF.E.1 mtr 15.00
FRC 4 x 1 x 4 mm2 PC. PF.E.2 mtr 35.00

TOTAL PEKERJAAN KABEL FEEDER

I.F Pekerjaan Kabel Ladder dan Kabel Tray


F.1 Kabel Ladder dan Trench
1 Riser shaft :
- uk. 600 mm x 100 mm Shaft Elektrikal m 15.00

2 Kabel Trench :
- Uk. 400 mm x 400 mm m 84.00

SUB TOTAL KABEL LADDER


F.2 Kabel Tray Listrik
1 Lantai 1
Kabel Tray Listrik
- uk. 700 mm x 100 mm m 33.00
- uk. 600 mm x 50 mm m 22.00
- uk. 300 mm x 50 mm m 61.00

Sub Total Lantai 1

2 Lantai 2
Kabel Tray Listrik
- uk. 800 mm x 100 mm m 9.00
- uk. 600 mm x 50 mm m 113.00
- uk. 400 mm x 50 mm m 14.00
- uk. 300 mm x 50 mm m 35.00

Sub Total Lantai 2

3 Lantai 3
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 22.00
- uk. 400 mm x 50 mm m 36.00

Sub Total Lantai 3

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY DAN LADDER

I.G PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 6 mm² m' 513.00
2 BCC 10 mm² m' 183.00
3 BCC 16 mm² m' 61.00
4 BCC 25 mm² m' -
5 BCC 35 mm² m' -
6 BCC 50 mm2 m' 150.00
7 BCC 70 mm2 m' -
8 BCC 95 mm² m' 210.00
9 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.H PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


H.1 Lantai 1
1 RM TLED 3 x 8 Watt + Cover bh 23.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 11.00
3 RM TLED 2 x 14 Watt + Cover bh 79.00
4 RM TLED 2 x 14 Watt + Cover c/w Nicad Battery bh 29.00
5 RM TLED 2 x 8 Watt + Cover bh 3.00
6 RM TLED 2 x 8 Watt + Cover c/w Nicad Battery bh 4.00
7 TLED 2x14 Watt (Balk) bh 2.00
8 TLED 2x14 Watt (Balk) c/w Nicad Battery bh 3.00
9 Lampu Bed / Periksa LED 29 Watt bh 4.00
10 Down Light LED E27 13 Watt Bulb + Cover bh 31.00
11 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 10.00
12 Down Light LED E27 6 Watt Bulb + Cover bh 16.00
13 Lampu Bed Head LED 8 watt bh 4.00
14 Lampu Baret LED E27 10,5 Watt Bulb c/w Nicad Battery bh 2.00
15 LED Strip 5w/meter panjang 1 roll = meter + Ballast roll 5.00
16 Exit Lamp LED 8 Watt bh 3.00
17 Stop Kontak 1 Ph 200 Watt bh 97.00
18 Stop Kontak Bed 1 Ph 200 Watt bh 4.00
19 Stop Kontak Access Point 1Ph 200 Watt bh 2.00
20 Stop Kontak Ceiling TV 1Ph 200 Watt bh 3.00
21 Saklar Tunggal bh 37.00
22 Saklar Ganda bh 41.00
23 Saklar Hotel bh 2.00
24 Grid Switch 8 Gang bh -
25 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 titik 229.00
26 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 106.00

Sub Total Lantai 1

H.2 Lantai 2
1 RM TLED 3 x 8 Watt + Cover bh 8.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 5.00
3 RM TLED 2 x 14 Watt + Cover bh 53.00
4 RM TLED 2 x 14 Watt + Cover c/w Nicad Battery bh 22.00
5 TLED 2x14 Watt (Balk) bh 3.00
6 TLED 2x14 Watt (Balk) c/w Nicad Battery bh 4.00
7 Down Light LED E27 13 Watt Bulb + Cover bh 51.00
8 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 8.00
9 Down Light LED E27 6 Watt Bulb + Cover bh 7.00
10 Spot Light LED 10W bh 10.00
11 Lampu Baret LED E27 10,5 Watt Bulb c/w Nicad Battery bh 2.00
12 Lampu Bed / Periksa LED 29 Watt bh 30.00
13 Lampu Bed Head LED 8 watt bh 30.00
14 Exit Lamp LED 8 Watt bh 2.00
15 Stop Kontak 1 Ph 200 Watt bh 123.00
16 Stop Kontak 1Ph 200 Watt (Backup UPS + Trado Isolasi) bh -
17 Stop Kontak Pendant 1Ph 200 Watt bh 288.00
18 Stop Kontak Pendant 1Ph 500 Watt (Backup UPS + Trado Isolasi) bh 138.00
19 Stop Kontak Ceiling TV 1Ph 200 Watt bh 2.00
20 Saklar Tunggal bh 30.00
21 Saklar Ganda bh 42.00
22 Saklar Hotel bh -
23 Grid Switch 6 Gang bh 1.00
24 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 titik 235.00
25 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 551.00

Sub Total Lantai 2

H.3 Lantai 3
1 RM TLED 3 x 8 Watt + Cover bh 79.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 19.00
3 TLED 2x14 Watt (Balk) bh -
4 TLED 2x14 Watt (Balk) c/w Nicad Battery bh 1.00
5 Lampu Bed TLED 8 Watt bh -
6 Lampu Wastafel 8 watt bh 8.00
7 Down Light LED E27 13 Watt Bulb + Cover bh 40.00
8 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 15.00
8 Down Light LED E27 6 Watt Bulb + Cover bh 8.00
9 Down Light LED E27 6 Watt Bulb + Cover c/w Nicad Battery bh 2.00
9 Lampu Baret LED E27 10,5 Watt Bulb bh 2.00
10 Lampu Baret LED E27 10,5 Watt Bulb c/w Nicad Battery bh 2.00
10 Exit Lamp LED 8 Watt bh 2.00
11 Lampu Strip 6W / meter panjang 5 meter + Trafo roll 18.00
12 Stop Kontak 1 Ph 200 Watt bh 161.00
13 Stop Kontak Ceiling TV 1Ph 200 Watt bh 6.00
14 Stop Kontak Hand Dryer 1000 Watt bh 2.00
15 Saklar Tunggal bh 9.00
16 Saklar Ganda bh 20.00
17 Saklar Hotel bh -
18 Grid Switch 4 Gang bh 1.00
19 Grid Switch 5 Gang bh 1.00
20 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 titik 196.00
21 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 169.00

Sub Total Lantai 3


H.4 Lantai Atap
1 Lampu Dinding E27 Bulb 6 Watt Water Proof bh 15.00
2 Lampu Baret LED E27 10,5 Watt Bulb bh 4.00
3 Lampu Baret LED E27 10,5 Watt Bulb c/w Nicad Battery bh 2.00
4 Saklar Tunggal bh 2.00
5 Saklar Ganda bh 1.00
6 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 titik 21.00

Sub Total Lantai Atap

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.I Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama


1 MCFA ( Master Control Fire Alarm ) termasuk Repeat Panel, Nicad Battery, Unit 1.00
Battery Charger
Kapasitas : 10 loops
Type : Semi Addressable
1 loop=125 address module + 125 address detector
Termasuk :
- Lead Acid Battery Rechargeable
- Power supply
- 1 unit master Telephone & 1 unit handset
- Alarm Bell
- Flasher Lamp
- Report Printer
HARGA SATUAN JUMLAH HARGA
156,150,000 156,150,000

19,125,000 57,375,000

24,352,500 24,352,500

1,374,577,500

4,231,080 1,269,324,000
5,641,440 1,692,432,000
9,321,900 3,365,205,900
521,640 156,492,000
131,376 39,412,800

205,275 2,258,025
1,458,664 23,338,624
278,933 6,136,526
278,933 7,252,258
205,275 2,668,575

736,575 8,838,900
1,458,664 24,797,288
736,575 16,204,650

80,903 809,030
278,933 3,347,196
205,275 2,463,300
62,790 2,574,390
38,640 1,584,240
101,430 8,418,690
101,430 8,418,690
101,430 8,418,690
101,430 8,621,550
62,790 2,637,180
101,430 4,158,630

80,903 1,375,351
80,903 1,375,351

1,458,664 48,135,912
736,575 44,194,500
736,575 50,087,100
1,411,568 76,224,672
1,411,568 70,578,400
50,715 2,840,040
36,225 1,449,000
134,033 6,299,551
50,715 2,586,465

36,225 941,850
36,225 1,122,975
36,225 3,296,475
36,225 4,600,575
36,225 1,122,975
36,225 3,296,475
24,150 2,511,600
27,773 2,888,392
197,064 5,123,664

95,440 1,431,600
95,440 3,340,400

7,000,636,455

307,600 4,614,000

Skope Sipil

4,614,000

546,400 18,031,200
353,000 7,766,000
211,600 12,907,600

38,704,800

586,800 5,281,200
353,000 39,889,000
253,000 3,542,000
211,600 7,406,000

56,118,200

353,000 7,766,000
253,000 9,108,000

16,874,000

111,697,000

116,311,000

6,893 3,536,109
12,831 2,348,073
19,997 1,219,817
27,983 -
38,834 -
47,366 7,104,900
67,704 -
107,494 22,573,740
14,700,000 14,700,000

51,482,639

1,360,594 31,293,667
2,403,118 26,434,300
1,205,715 95,251,485
2,248,239 65,198,931
805,111 2,415,332
1,847,635 7,390,538
881,139 1,762,278
1,923,663 5,770,989
930,304 3,721,217
372,527 11,548,349
1,481,731 14,817,306
284,327 4,549,238
354,799 1,419,197
1,339,288 2,678,575
255,000 1,275,000
1,349,254 4,047,763
52,763 5,117,963
52,763 211,050
52,763 105,525
52,763 158,288
44,163 1,634,031
48,794 2,000,534
46,242 92,484
361,515 -
321,800 73,692,200
400,900 42,495,400

405,081,639

1,360,594 10,884,754
2,403,118 12,015,591
1,205,715 63,902,895
2,248,239 49,461,258
881,139 2,643,417
1,923,663 7,694,652
372,527 18,998,897
1,481,731 11,853,845
284,327 1,990,292
298,704 2,987,040
1,339,288 2,678,575
930,304 27,909,126
354,799 10,643,976
1,349,254 2,698,508
52,763 6,489,788
52,763 -
52,763 15,195,600
52,763 7,281,225
52,763 105,525
44,163 1,324,890
48,794 2,049,327
46,242 -
329,007 329,007
321,800 75,623,000
400,900 220,895,900

555,657,088

1,360,594 107,486,942
2,403,118 45,659,246
881,139 -
1,923,663 1,923,663
354,799 -
540,015 4,320,120
372,527 14,901,096
1,481,731 22,225,959
284,327 2,274,619
1,393,531 2,787,061
229,996 459,992
1,339,288 2,678,575
1,349,254 2,698,508
299,500 5,391,000
52,763 8,494,763
52,763 316,575
78,750 157,500
44,163 397,467
48,794 975,870
46,242 -
227,462 227,462
329,007 329,007
321,800 63,072,800
400,900 67,752,100

354,530,325
1,967,188 29,507,814
229,996 919,985
1,339,288 2,678,575
44,163 88,326
48,794 48,794
321,800 6,757,800

40,001,294

1,355,270,345

7,500,000 7,500,000

7,500,000

11,951,649,139

313,805,625 313,805,625
NO. JENIS PEKERJAAN SAT. VOLUME
2 Color Graphic Monitor unit 1.00
termasuk :
- Software
- PC LCD 14"
- Mouse & Keyboard
- Printer dot matrix

2 Main Distribution Fire Alarm (MDFA) unit 1.00

3 Module Module :
- Addressable Monitor Module u/ Detektor unit 3.00
- Addressable Control Module for Horn & Stobe unit 3.00
- Addressable Mini Module for Manual call point / Break Glass unit 3.00
- Addressable Relay Module to Pressurized Fan unit 2.00
- Addressable Relay Module to P. Lift unit 1.00
- Addressable Mini Module (2 input) for Flow Switch / BCV unit 3.00
- Addressable Relay Module for P. AC unit 3.00

4 Surge arrester unit 1.00

5 Instalasi Peralatan Utama lot 1.00

TOTAL PERALATAN UTAMA

IV.B Kabel Utama


1 Kabel STP AWG # 18 dari MDFA (Loops) dalam conduit PVC HI dia. 20 mm
- TB.FA.1E S/D 3E m 262.00

2 Kabel ITC 2 x 2 x dia. 0,6 mm dari MDF.FA dalam conduit PVC HI dia. 20 mm
- TB.FA.1E S/D 3E m 131.00

3 Kabel NYA 3 x 1,5 mm2 untuk kabel Power Horn & Strobe
dalam conduit PVC HI dia. 20 mm m 131.00
- TB.FA.1E S/D 3E

4 Kabel NYA 2 x 1,5 mm2 untuk Power Module dalam conduit PVC HI dia. 20 mm
- TB.FA.1E S/D 3E m 131.00

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


C.1 Lantai 1
1 Terminal Box (TB. FA - 1E) unit 1.00
2 Horn & Strobe bh 2.00
3 Manual Break Glass bh 2.00
4 Addresable Rate of Rise Detector bh 15.00
5 Addresable Fixed Heat Detector bh 6.00
6 Addressable Smoke Detector bh 37.00
7 Smoke Detector Photoelectric bh 10.00
8 Rate of Rise Detector bh -
9 Fixed Heat Detector bh -
10 Telephone Jack bh 2.00
11 End off line bh 7.00
12 P.AC.1 bh 1.00
13 Flow Switch bh 1.00

14 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 53.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 10.00
Instalasi Horn & Strobe NYA 3 x 1,5 mm2 titik 2.00
Instalasi Manual Break Glass NYA 2 x 1,5 mm2 titik 2.00
Instalasi Telephone Jack ITC 2 x d 0,6 mm titik 2.00
Instalasi PAC NYA 3 x 1,5 mm2
titik 1.00
Instalasi Flow Switch NYA 3 x 1,5 mm2
titik 1.00

Sub Total Lantai 1

C.2 Lantai 2
1 Terminal Box (TB. FA - 2E) unit 1.00
2 Horn & Strobe bh 2.00
3 Manual Break Glass bh 2.00
4 Addresable Rate of Rise Detector bh 10.00
5 Addresable Fixed Heat Detector bh 2.00
6 Addressable Smoke Detector bh 23.00
7 Rate of Rise Detector bh 15.00
8 Smoke Detector Photoelectric bh 8.00
9 Fixed Heat Detector bh -
10 Telephone Jack bh 2.00
11 End off line bh 7.00
12 P.AC.2 bh 1.00
13 Flow Switch bh 1.00

14 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 35.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 23.00
Instalasi Horn & Strobe NYA 3 x 1,5 mm2 titik 2.00
Instalasi Manual Break Glass NYA 2 x 1,5 mm2 titik 2.00
Instalasi Telephone Jack ITC 2 x d 0,6 mm titik 2.00
Instalasi PAC NYA 3 x 1,5 mm2
titik 1.00
Instalasi Flow Switch NYA 3 x 1,5 mm2
titik 1.00

Sub Total Lantai 2

C.3 Lantai 3 + Atap


1 Terminal Box (TB. FA - 3E) unit 1.00
2 Horn & Strobe bh 2.00
3 Manual Break Glass bh 2.00
4 Addresable Rate of Rise Detector bh 2.00
5 Addresable Fixed Heat Detector bh -
6 Addressable Smoke Detector bh 18.00
7 Smoke Detector Photoelectric bh 9.00
8 Rate of Rise Detector bh 6.00
9 Fixed Heat Detector bh -
10 Telephone Jack bh 2.00
11 End off line bh 7.00
12 P.AC.3 bh 1.00
13 Flow Switch bh 1.00
14 P. Pressurized Fan bh 2.00
15 P. Lift bh 1.00

16 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 20.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 15.00
Instalasi Horn & Strobe NYA 3 x 1,5 mm2 titik 2.00
Instalasi Manual Break Glass NYA 2 x 1,5 mm2 titik 2.00
Instalasi Telephone Jack ITC 2 x d 0,6 mm titik 2.00
Instalasi PAC NYA 3 x 1,5 mm2
titik 1.00
Instalasi Flow Switch NYA 3 x 1,5 mm2
titik 1.00
Instalasi Pressurized Fan NYA 3 x 1,5 mm2
titik 2.00
Instalasi P. LIFT NYA 3 x 1,5 mm2
titik 1.00

Sub Total Lantai 3 + Atap

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System


1 Power Amplifier 480 W unit 16.00
2 Mixer Pre Amplifier / Sistem Controller unit 1.00
dilengkapi dengan :
- Emergency Control Panel
- Interface to Fire Alarm
- Pre-record Message
- Activated by Programmable
3 VCD/ DVD/ MP3/ MP4 unit 1.00
4 Paging Microphone & Chime Tone + Key Pad unit 1.00
5 Sound Source unit
6 Selector Switch 45 Zone unit 1.00
7 Power Supply lengkap dengan surge arrester unit 1.00
8 Main Distibution Frame (MDF) Sound System unit 1.00
9 Kabinet Rack lengkap blower junction dan aksesories + unit 1.00
Rectifier & Battery charger
10 Instalasi pengkabelan peralatan utama (ruang kontrol) lot 1.00

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - 1E NYMHY 2(3 x 2.5 mm2) m 14.00
- TB. TS - 2E NYMHY 2(3 x 2.5 mm2) m 200.00
- TB. TS - 3E NYMHY 2(3 x 2.5 mm2) m 205.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


C.1 Lantai 1
1 Terminal Box Sound System Lt.1 (TB. TS. 1E) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 81.00
3 Volume Control bh 25.00
4 Emergency Speaker 6 Watt bh 2.00
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 81.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 25.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk 2.00
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 1

C.2 Lantai 2
1 Terminal Box Sound System Lt.2 (TB. TS. 2E) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 64.00
3 Volume Control bh 14.00
4 Emergency Speaker 6 Watt bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 64.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 14.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 2

C.3 Lantai 3
1 Terminal Box Sound System Lt. 3 (TB. TS. 3C) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 41.00
3 Volume Control bh 15.00
4 Emergency Speaker 6 Watt bh 2.00
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 41.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 15.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk 2.00
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 3

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 1E m 116.00
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 2E m 120.00
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 3E m 113.00
Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories bh 1.00
- Wiring Management 1U bh 2.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 2.00
- UTP Cat 6 Patch Cord, 1m bh 48.00
- Switch Hub 24 port bh 2.00

2 Outlet :
- Outlet Access Point RJ 45 bh 2.00
- Outlet Data RJ 45 bh 33.00
- Outlet Telepon RJ 45 bh 23.00

3 Fixture Unit
- Access Point bh 2.00
- Pesawat Telepon IP Extention bh 23.00

4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 2.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 33.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 23.00

Sub Total Lantai 1

B.2 Lantai 2
1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories unit 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub 24 port bh 1.00

2 Outlet :
- Outlet Access Point RJ 45 bh 2.00
- Outlet Data RJ 45 bh 11.00
- Outlet Telepon RJ 45 bh 10.00

3 Fixture Unit
- Access Point bh 2.00
- Pesawat Telepon IP Extention bh 10.00

4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 2.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 11.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 10.00

Sub Total Lantai 2

B.3 Lantai 3
1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories unit 1.00
- Wiring Management 1U bh 5.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 5.00
- UTP Cat 6 Patch Cord, 1m bh 120.00
- Switch Hub 24 port bh 5.00

2 Outlet :
- Outlet Access Point RJ 45 bh 3.00
- Outlet Data RJ 45 bh 18.00
- Outlet Data Lantai RJ 45 Single bh 6.00
- Outlet Data Lantai RJ 45 Double bh 18.00
- Outlet Telepon RJ 45 bh 14.00
- Outlet Telepon Lantai RJ 45 Single bh 6.00
- Outlet Telepon Lantai RJ 45 Double bh 18.00

3 Fixture Unit
- Access Point bh 3.00
- Pesawat Telepon IP Extention bh 56.00
4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 3.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 60.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 56.00

Sub Total Lantai 3

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 400 mm x 100 mm m 4.00
Kabel Tray 300 mm x 100 mm m 19.00
Kabel Tray 200 mm x 100 mm m 69.00

2 Lantai 2
Kabel Tray 400 mm x 100 mm m -
Kabel Tray 300 mm x 100 mm m 14.00
Kabel Tray 200 mm x 100 mm m 70.00

3 Lantai 3
Kabel Tray 400 mm x 100 mm m 41.00
Kabel Tray 300 mm x 100 mm m 28.00
Kabel Tray 200 mm x 100 mm m 33.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


HARGA SATUAN JUMLAH HARGA
158,025,000 158,025,000

3,152,625 3,152,625

1,659,000 4,977,000
1,602,694 4,808,081
1,020,863 3,062,588
1,328,670 2,657,340
1,328,670 1,328,670
1,621,463 4,864,388
1,328,670 3,986,010

3,525,000 3,525,000

7,500,000 7,500,000

511,692,326

51,424 13,473,135

61,950 8,115,450

25,305 3,314,955

22,995 3,012,345

27,915,885

630,525 630,525
795,769 1,591,538
289,013 578,025
1,092,315 16,384,725
1,092,315 6,553,890
1,373,846 50,832,311
581,805 5,818,050
491,715 -
491,715 -
487,961 975,923
6,379 44,651
by Others
by Others

550,600 29,181,800
231,500 2,315,000
460,000 920,000
231,500 463,000
497,000 994,000
517,700 517,700
773,200 773,200

118,574,338

630,525 630,525
795,769 1,591,538
289,013 578,025
1,092,315 10,923,150
1,092,315 2,184,630
1,373,846 31,598,464
581,805 8,727,075
491,715 3,933,720
491,715 -
487,961 975,923
6,379 44,651
by Others
by Others

550,600 19,271,000
231,500 5,324,500
460,000 920,000
231,500 463,000
497,000 994,000
517,700 517,700
773,200 773,200

89,451,100

630,525 630,525
795,769 1,591,538
289,013 578,025
1,092,315 2,184,630
1,092,315 -
1,373,846 24,729,233
581,805 5,236,245
491,715 2,950,290
491,715 -
487,961 975,923
6,379 44,651
by Others
by Others
by Others
by Others

550,600 11,012,000
231,500 3,472,500
460,000 920,000
231,500 463,000
497,000 994,000
517,700 517,700
773,200 773,200
773,200 1,546,400
773,200 773,200

59,393,059

267,418,496

15,000,000 15,000,000

15,000,000

822,026,708

12,803,700 204,859,200
26,371,800 26,371,800

8,121,750 8,121,750
6,210,750 6,210,750
INCLUDED
16,243,500 16,243,500
1,433,250 1,433,250
907,725 907,725
22,932,000 22,932,000

4,200,000 4,200,000

291,279,975

51,454 720,351
51,454 10,290,735
51,454 10,548,003

21,559,090

800,100 800,100
196,035 15,878,835
451,920 11,298,000
322,382 644,763
297,900 24,129,900

492,500 12,312,500

597,400 1,194,800

66,258,898

800,100 800,100
196,035 12,546,240
451,920 6,326,880
322,382 -
297,900 19,065,600

492,500 6,895,000

597,400 -

45,633,820

800,100 800,100
196,035 8,037,435
451,920 6,778,800
322,382 644,763
297,900 12,213,900

492,500 7,387,500

597,400 1,194,800

37,057,298

148,950,016

5,000,000 5,000,000

5,000,000

466,789,081

27,276 3,164,016
27,276 3,273,120
27,276 3,082,188
9,519,324

2,200,000 2,200,000
148,000 296,000
1,634,400 1,634,400
160,800 160,800
1,380,000 2,760,000
45,000 2,160,000
4,508,000 9,016,000

135,000 270,000
135,000 4,455,000
135,000 3,105,000

1,390,000 2,780,000
1,135,000 26,105,000

936,100 1,872,200
936,100 30,891,300
936,100 21,530,300

109,236,000

2,200,000 2,200,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

135,000 270,000
135,000 1,485,000
135,000 1,350,000

1,390,000 2,780,000
1,135,000 11,350,000

936,100 1,872,200
936,100 10,297,100
936,100 9,361,000

49,876,500

2,200,000 2,200,000
148,000 740,000
1,634,400 1,634,400
160,800 160,800
1,380,000 6,900,000
45,000 5,400,000
4,508,000 22,540,000

135,000 405,000
135,000 2,430,000
135,000 810,000
270,000 4,860,000
135,000 1,890,000
135,000 810,000
270,000 4,860,000

1,390,000 4,170,000
1,135,000 63,560,000
936,100 2,808,300
936,100 56,166,000
936,100 52,421,600

234,766,100

393,878,600

307,600 -

293,400 1,173,600
253,000 4,807,000
199,900 13,793,100

293,400 -
253,000 3,542,000
199,900 13,993,000

293,400 12,029,400
253,000 7,084,000
199,900 6,596,700

63,018,800

2,500,000 2,500,000

2,500,000

468,916,724
NO. JENIS PEKERJAAN SAT. VOLUME

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VII.A Peralatan Utama MATV

Sub Total Peralatan Utama MATV

VII.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Splitter 4 Way Unit 1.00
2 Outlet TV Unit 3.00
3 Instalasi kabel Outlet TV, coaxial RG6 (5C/2 volt) dakan konduit PVC HI dia. 20 titik 3.00
4 Instalasi kabel Splitter, Coaxial RG-11 (7C) dalam konduit PVC HI dia. 20 mm m 52.00

Sub Total Lantai 1

B.2 Lantai 2
1 Splitter 2 Way Unit 1.00
2 Outlet TV Unit 2.00
3 Instalasi kabel Outlet TV, coaxial RG6 (5C/2 volt) dakan konduit PVC HI dia. 20 titik 2.00
4 Instalasi kabel Splitter, Coaxial RG-11 (7C) dalam konduit PVC HI dia. 20 mm m 70.00

Sub Total Lantai 2

B.3 Lantai 3
1 Splitter 6 Way Unit 1.00
2 Splitter 4 Way Unit 1.00
3 Booster Unit 1.00
4 Outlet TV Unit 6.00
5 Instalasi kabel Outlet TV, coaxial RG6 (5C/2 volt) dakan konduit PVC HI dia. 20 titik 6.00
6 Instalasi kabel Splitter, Coaxial RG-11 (7C) dalam konduit PVC HI dia. 20 mm m 105.00

Sub Total Lantai 3

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi MATV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Peralatan Utama

TOTAL PERALATAN UTAMA

VIII.B Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 1E m 116.00
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 2E m 120.00
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 3E m 113.00

Sub Total Pengkabelan Utama

VIII.C Pekerjaan Instalasi Dalam Bangunan


C.1 Lantai 1
1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00
- Indoor Fixed Dome IP Camera + thermal detector bh 1.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 4.00
Sub Total Lantai 1

C.2 Lantai 2
1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 4.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 4.00

Sub Total Lantai 2

C.3 Lantai 3 + Atap


1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 5.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 5.00

Sub Total Lantai 3 + Atap

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


1 P. DDC set 1.00
untuk 150 point

2 Level Switch bh 30.00

Sub Total Peralatan Utama

X.B Pengkabelan DDC


1 Kabel Power dari UPS di Ruang BAS ke: mtr 114.00
DDC Lt. D ~ 3 NYM 3 x 1,5 mm2 dalam Conduit PVC 20 mm

2 Kabel Data dari MCU di Ruang BAS ke: mtr 246.00


DDC Lt. D ~ 3 STP AWG #18 dalam Conduit PVC 20 mm

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm
Kabel yang digunakan :
- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

1 LANTAI 1
PANEL SDP.E
PANEL SDP.AC.E
PANEL SDP. RADIOLOGI
Status Digital Input Titik 3.00
Trip Alarm Digital Input Titik 3.00
Power Monitoring HLI Titik 3.00

PANEL PP.1E
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.AC.1E
P PANORAMIC
P. USG
P. MAMMO
P. CT SCAN
P. FLUOROSCOPY
P. XRAY
P. MRI
Status Digital Input Titik 9.00
Trip Alarm Digital Input Titik 9.00

POMPA SEWAGE PIT


Status Digital Input Titik 8.00
Trip Alarm Digital Input Titik 8.00
Level alarm Digital Input Titik 16.00
POMPA CHEMICAL PIT
Status Digital Input Titik 4.00
Trip Alarm Digital Input Titik 4.00
Level alarm Digital Input Titik 8.00

POMPA POMPA PON


Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Level alarm Digital Input Titik 4.00

PANEL POMPA AIR HUJAN


Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Level alarm Digital Input Titik 4.00

2 LANTAI 2
PANEL SDP.E
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.2E
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.AC.2E
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00

PANEL KONTROL ICU DLL


Status Digital Input Titik 6.00
Trip Alarm Digital Input Titik 6.00
Power Monitoring HLI Titik 6.00

3 LANTAI 3
PANEL PP 3.E
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00
PANEL PP AC.3E
Status Digital Input Titik 4.00
Trip Alarm Digital Input Titik 4.00

4 LANTAI ATAP
PANEL PRESSURIZED FAN
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Power Monitoring HLI Titik 2.00

PANEL LIFT
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XI.A Lantai 1
1 Controller Mesin Antrian unit 1.00
2 Tombol Panggil unit 3.00
3 Counter Display unit 3.00
4 Main Counter Display unit 2.00
5 Mini Speaker System unit 2.00
6 Instalasi Sistem Antrian titik 10.00

TOTAL Lantai 1

XI.B Lantai 2
1 Controller Mesin Antrian unit -
2 Tombol Panggil unit 2.00
3 Counter Display unit 2.00
4 Main Counter Display unit 2.00
5 Mini Speaker System unit 1.00
6 Instalasi Sistem Antrian titik 7.00

TOTAL Lantai 2

XI.C Testing Commisioning


1 Testing Commissioning ls 1.00

TOTAL Testing Commisioning

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Peralatan Utama

SUB TOTAL PERALATAN UTAMA

A.2 Pekerjaan instalasi pipa air bersih dan panas


A.2.1 Lantai 1
1 Instalasi pipa air bersih gravitasi dari roof tank ke Lantai 1 dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 195.00

2 Instalasi pipa air bersih dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 18.00
- dia. 40 mm m' 25.00
- dia. 32 mm m' 47.00
- dia. 25 mm m' 47.00
- dia. 20 mm m' 59.00
- dia. 15 mm m' 136.00
3 Ball Valve :
- dia. 32 mm bh 2.00
- dia. 25 mm bh 7.00
- dia. 20 mm bh 3.00
- dia. 15 mm bh 3.00

4 Floating Valve :
- dia. 20 mm bh 1.00

5 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 1

A.2.2 Lantai 2
1 Instalasi pipa air bersih dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m' 26.00
- dia. 32 mm m' 67.00
- dia. 25 mm m' 19.00
- dia. 20 mm m' 25.00
- dia. 15 mm m' 68.00

2 Instalasi RO sistem dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 25 mm m' 91.00
- dia. 20 mm m' 7.00
- dia. 15 mm m' 53.00

3 Ball Valve :
- dia. 40 mm bh 1.00
- dia. 32 mm bh 2.00
- dia. 25 mm bh 3.00
- dia. 20 mm bh -
- dia. 15 mm bh 9.00

4 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 2

A.2.3 Lantai 3
1 Instalasi pipa air bersih dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 84.00
- dia. 50 mm m' 87.00
- dia. 40 mm m' 14.00
- dia. 32 mm m' 52.00
- dia. 25 mm m' 2.00
- dia. 20 mm m' 55.00
- dia. 15 mm m' 74.00

2 Instalasi pipa air panas dengan PPR80 - PN20


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 26.00
- dia. 15 mm m' 4.00

3 Instalasi RO sistem dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 25 mm m' 102.00

4 Ball Valve 10K :


- dia. 40 mm bh 2.00
- dia. 32 mm bh 4.00
- dia. 20 mm bh 8.00

5 Water Heater Elektrik


Kapasitas : 15 Liter bh 4.00
6 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &
Hand Shower, Shower, Janitor, Kran taman)

Sub Total Lantai 3

A.2.4 Lantai Atap


1 Instalasi pipa air bersih dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 15 mm m' 77.00
2 Ball Valve :
- dia. 15 mm bh 1.00

3 Kran Botol
- dia. 15 mm bh 2.00

Sub Total Lantai Atap

SUB TOTAL PEKERJAAN INST. AIR BERSIH DALAM BANGUNAN

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


B.1 Peralatan Utama
1 Submersible Cutter Pump + QDC (Sewage.E-01) SET 1.00
Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.E-01) unit 1.00


Kapasitas : 3 m³
Ukuran : 1500 x 1500 x (1400+500)mm

2 Submersible Cutter Pump + QDC (Sewage.E-02) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.E-02) unit 1.00


Kapasitas : 3 m³
Ukuran : 1500 x 1500 x (1400+500)mm

3 Submersible Cutter Pump + QDC (Sewage.E-03) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.E-03) unit 1.00


Kapasitas : 5 m³
Ukuran : 2500 x 2000 x (1000+500)mm

4 Submersible Cutter Pump + QDC (Sewage.E-04) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Sewage.E-04) unit 1.00


Kapasitas : 5 m³
Ukuran : 2500 x 2000 x (1000+500)mm

5 Submersible Cutter Pump + QDC (Chemical.E-02) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Chemical.E-02) unit 1.00


Kapasitas : 2 m³
Ukuran : 2000 x 1000 x (1000+500)mm

6 Submersible Cutter Pump + QDC (Chemical.E-03) SET 1.00


Kapasitas : 2 x @9 m3/ jam
Type : Submersible Sewage Pump with Cutter
Head : 20 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Cutter Pump + QDC (Chemical.D-03) unit 1.00


Kapasitas : 3 m³
Ukuran : 3000 x 1000 x (1000+500)mm

7 Submersible Pump (Kolam Pond-1) / Drainage Pit-E-01 SET 1.00


Kapasitas : 2 x @4.5 m3/ jam
Type : Submersible Pump
Head : 8 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Pump (Kolam Pond-1) / Drainage Pit-E-01 unit 1.00


Kapasitas : 1 m³
Ukuran : 1000 x 1000 x (800+500)mm

8 Submersible Pump (Pompa Air Hujan) / Drainage Pit-E-01 unit 1.00


Kapasitas : 2 x @4.5 m3/ jam
Type : Submersible Pump
Head : 10 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Pump (Pompa Air Hujan) / Drainage Pit-E-01 unit 1.00
Kapasitas : 1 m³
Ukuran : 1000 x 1000 x (800+500)mm

SUB TOTAL PERALATAN UTAMA

B.2 Pemipaan Utama


1 Instalasi Pipa Utama Air Kotoran dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 32.00

Shaft
- dia. 100 mm m' 41.00

Dari Sumpit ke IPAL
- dia. 80 mm m' 337.00
- dia. 50 mm m' 4.00

2 Instalasi Pipa Utama Air Kotor dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 30.00

Shaft
- dia. 100 mm m' 23.00
- dia. 80 mm m' 23.00

3 Instalasi Pipa Utama Air Kotor Kimia dengan Pipa Cast Iron
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 150 mm m' 6.00
- dia. 100 mm m' 26.00

Shaft
- dia. 100 mm m' 20.00

Dari Sumpit ke IPAL
- dia. 80 mm m' 333.00
- dia. 50 mm m' 4.00
4 Instalasi Pipa Vent dengan pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
Shaft
- dia. 80 mm m' 39.00
- dia. 50 mm m' 9.00

5 Floor Clean Out


- dia. 150 mm bh 6.00

6 Gate Valve 10K


- dia. 50 mm bh 16.00

7 Check Valve 10K


- dia. 50 mm bh 16.00

8 Vent Cup
- dia. 80 mm bh 3.00

SUB TOTAL PEMIPAAN UTAMA

B.3 Pekerjaan Instalasi Pipa Air Kotor, Kotor & Vent dalam bangunan
B.3.1 Lantai 1
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 94.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 27.00
- dia. 80 mm m 117.00
- dia. 50 mm m 83.00
- dia. 40 mm m 20.00

3 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 51.00
- dia. 40 mm m 86.00
- dia. 32 mm m 96.00

4 Floor Clean Out :


- dia. 100 mm bh 3.00
- dia. 80 mm bh 4.00
- dia. 50 mm bh 2.00

5 Vent Cup
- dia. 50 mm bh 1.00

Sub Total Lantai 1

B.3.2 Lantai 2
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 45.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 39.00
- dia. 50 mm m 99.00
- dia. 40 mm m 73.00
- Gater AHU 200x50 mm m 74.00

3 Instalasi Pipa Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 19.00
- dia. 80 mm m' 40.00
- dia. 50 mm m' 53.00
- dia. 40 mm m' 11.00
- dia. 25 mm m' 87.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 40.00
- dia. 40 mm m 77.00
- dia. 32 mm m 79.00

5 Floor Clean Out :


- dia. 100 mm bh 3.00
- dia. 80 mm bh 3.00
- dia. 50 mm bh 1.00

Sub Total Lantai 2

B.3.3 Lantai 3
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 70.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 49.00
- dia. 50 mm m 31.00
- dia. 40 mm m 18.00

3 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 19.00
- dia. 40 mm m 48.00
- dia. 32 mm m 25.00

4 Floor Clean Out :


- dia. 100 mm bh 3.00
- dia. 80 mm bh 4.00

Sub Total Lantai 3

SUB TOTAL AIR KOTORAN, KOTOR DAN VENT DALAM BANGUNAN

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan


1 Roof Drain :
- dia.100 mm bh 11.00
- dia. 80 mm bh 8.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia .100 mm m' 431.00
- dia . 80 mm m' 101.00

SUB TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XIV.A Peralatan Utama

TOTAL PERALATAN UTAMA

XIV.B Instalasi Utama

INSTALASI UTAMA

XIV.C Instalasi dalam Bangunan


C.1 Lantai 1
1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O2)
- dia. 15,88 mm m 57.00
- dia. 12,7 mm m 92.00
- dia. 12,7 mm Droper m 24.00

Instalasi Jaringan Vacuum  (VAC)
- dia. 19,05 mm m -
- dia. 15,88 mm m -
- dia. 15,88 mm Droper m -

2 Outlet Gas Medis


- Wall Outlet Oxygen (O), pin index, push type Buah 8.00
- Wall Outlet Vacuum (V), pin index, push type, slide base Buah -

3 Zona Valve 1 Gas (O,V) + Alarm Set 1.00

4 Bedhead Unit Aluminium 1200mm Unit 4.00

5 Ball Valve 15 mm Buah 1.00

6 Ball Valve 20 mm Buah -

Sub Total Lantai 1

C.2 Lantai 2
1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O)
- dia. 19,05 mm m 69.00
- dia. 15,88 mm m 90.00
- dia. 12,7 mm m 72.00

Instalasi Jaringan Vacuum  (V)
- dia. 28,58 mm m 69.00
- dia. 22,23 mm m 60.00
- dia. 19,05 mm m 49.00
- dia. 15,88 mm m 72.00

Instalasi Jaringan Medical Air 4 bar (A4)
- dia. 28,58 mm m 69.00
- dia. 19,05 mm m 45.00
- dia. 15,88 mm m 63.00
- dia. 12,7 mm m 72.00

2 ICU Pendant, Single Arm Unit 34.00

3 Quick Connect Valve bh 102.00

4 Zona Valve 3 Gas (O, A,V) + Alarm Set 1.00

5 Ball Valve 15 mm Buah 104.00

6 Ball Valve 20 mm Buah 3.00

Sub Total Lantai 2

TOTAL INSTALASI DALAM BANGUNAN

XIV.E Pekerjaan Testing & Commissioning


1 Testing & Commissioning Peralatan dan Instalasi Medical Gas lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Instalasi Pemipaan Riser Tegak


A.1 Fire Hydrant
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting, gantungan/hanger/ssupport dan aksesoriesnya :
- dia. 100 mm Dari Pipa Site Plan ke Shaft dan Ged m' 67.00
- dia. 100 mm Tegak (Shaft) m' 40.00
- dia. 25 mm m' 3.00

2 Gate Valve Non Rising Steam 16K :


- dia. 100 mm (Lokasi masuk bangunan) bh 2.00
- dia. 25 mm bh 2.00

3 Air Release Vent (ARV) dia. 25 mm bh 2.00

4 Pressure Gauge + gate valve bh 2.00


A.2 Sprinkler
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting dan aksesoriesnya :
- dia. 150 mm Tegak (Shaft) + dari site plant m' 75.00
- dia. 80 mm Pipa tegak Shaft test drain m' 40.00
- dia. 25 mm m' 2.00

2 Main Control Valve dia. 150 mm + Alarm Gong


- dia. 150 mm set 1.00

3 Gate Valve Non Rising Steam class 16K :


- dia. 150 mm (Lokasi masuk bangunan)
bh 1.00
- dia. 25 mm bh 1.00

4 Air Release Vent (ARV) dia. 25 mm bh 1.00

5 Vent Out dia. 80 mm bh 1.00

TOTAL PEMIPAAN DAN KATUP-KATUP RISER TEGAK


HARGA SATUAN JUMLAH HARGA

366,892 366,892
80,325 240,975
533,800 1,601,400
26,775 1,392,300

3,601,567

261,548 261,548
80,325 160,650
533,800 1,067,600
26,775 1,874,250

3,364,048

533,108 533,108
366,892 366,892
1,658,475 1,658,475
80,325 481,950
533,800 3,202,800
26,775 2,811,375

9,054,599

16,020,213

750,000 750,000

750,000

16,770,213

27,276 3,164,016
27,276 3,273,120
27,276 3,082,188

9,519,324

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 17,703,900
139,500,000 139,500,000

936,100 3,744,400
171,799,500

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 23,605,200

936,100 3,744,400

38,200,800

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 29,506,500

936,100 4,680,500

45,038,200

255,038,500

2,500,000 2,500,000

2,500,000

267,057,824

225,000,000 225,000,000

1,760,000 52,800,000

277,800,000

15,698 1,789,572

51,424 12,650,348

14,439,920
928,000 2,784,000
928,000 2,784,000
1,677,000 5,031,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 8,352,000
928,000 8,352,000

928,000 7,424,000
928,000 7,424,000
928,000 14,848,000

928,000 3,712,000
928,000 3,712,000
928,000 7,424,000

928,000 1,856,000
928,000 1,856,000
928,000 3,712,000

928,000 1,856,000
928,000 1,856,000
928,000 3,712,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000

928,000 5,568,000
928,000 5,568,000
1,677,000 10,062,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000
928,000 3,712,000
928,000 3,712,000

928,000 1,856,000
928,000 1,856,000
1,677,000 3,354,000

928,000 1,856,000
928,000 1,856,000

144,867,000

2,500,000 2,500,000

2,500,000

439,606,920

94,000,000 94,000,000
1,450,000 4,350,000
3,200,000 9,600,000
8,500,000 17,000,000
1,250,000 2,500,000
725,000 7,250,000

134,700,000

94,000,000 -
1,450,000 2,900,000
3,200,000 6,400,000
8,500,000 17,000,000
1,250,000 1,250,000
725,000 5,075,000

32,625,000

5,000,000 5,000,000

5,000,000

172,325,000

132,320 25,802,400

132,320 2,381,760
89,540 2,238,500
64,860 3,048,420
46,250 2,173,750
28,830 1,700,970
22,590 3,072,240
380,783 761,565
288,330 2,018,310
211,523 634,568
163,380 490,140

204,645 204,645

Scope Arsitek

44,527,268

89,540 2,328,040
64,860 4,345,620
46,250 878,750
28,830 720,750
22,590 1,536,120

46,250 4,208,750
28,830 201,810
22,590 1,197,270

504,840 504,840
380,783 761,565
288,330 864,990
211,523 -
163,380 1,470,420

Scope Arsitek

19,018,925

177,620 14,920,080
132,320 11,511,840
89,540 1,253,560
64,860 3,372,720
46,250 92,500
28,830 1,585,650
22,590 1,671,660

37,020 962,520
26,460 105,840

46,250 4,717,500

504,840 1,009,680
380,783 1,523,130
211,523 1,692,180

2,799,020 11,196,080
Scope Arsitek

55,614,940

22,590 1,739,430
163,380 163,380

SKOPE ARSITEK

1,902,810

121,063,943

121,063,943

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000

skope sipil

108,800,000 108,800,000

skope sipil
108,800,000 108,800,000

skope sipil

90,000,000 90,000,000

skope sipil

90,000,000 90,000,000

skope sipil

832,800,000

288,460 9,230,720

153,900 6,309,900

105,190 35,449,030
63,440 253,760

288,460 8,653,800

153,900 3,539,700
105,190 2,419,370

692,030 4,152,180
425,060 11,051,560

425,060 8,501,200

333,500 111,055,500
234,680 938,720
105,190 4,102,410
63,440 570,960

563,063 3,378,375

1,065,960 17,055,360

1,840,650 29,450,400

341,250 1,023,750

257,136,695

153,900 14,466,600

153,900 4,155,300
105,190 12,307,230
63,440 5,265,520
48,250 965,000

63,440 3,235,440
48,250 4,149,500
40,840 3,920,640

409,500 1,228,500
286,650 1,146,600
259,350 518,700

211,575 211,575

51,570,605

153,900 6,925,500

105,190 4,102,410
63,440 6,280,560
48,250 3,522,250
SKOPE SIPIL

425,060 8,076,140
333,500 13,340,000
234,680 12,438,040
189,520 2,084,720
215,500 18,748,500

63,440 2,537,600
48,250 3,715,250
40,840 3,226,360

409,500 1,228,500
286,650 859,950
259,350 259,350

87,345,130

153,900 10,773,000

105,190 5,154,310
63,440 1,966,640
48,250 868,500

63,440 1,205,360
48,250 2,316,000
40,840 1,021,000

409,500 1,228,500
286,650 1,146,600

25,679,910

164,595,645

1,254,532,340

296,888 3,265,763
279,825 2,238,600

153,900 66,330,900
105,190 10,624,190

82,459,453

2,500,000 2,500,000

2,500,000

1,460,555,735

194,080 11,062,560
133,120 12,247,040
133,120 3,194,880

215,780 -
194,080 -
194,080 -

2,005,200 16,041,600
2,005,200 -

28,355,000 28,355,000

skope arsitek

250,000 250,000

300,000 -

71,151,080

215,780 14,888,820
194,080 17,467,200
133,120 9,584,640

472,850 32,626,650
259,840 15,590,400
215,780 10,573,220
194,080 13,973,760

472,850 32,626,650
215,780 9,710,100
194,080 12,227,040
133,120 9,584,640

skope ALKES

785,000 80,070,000

37,298,640 37,298,640

250,000 26,000,000

300,000 900,000

323,121,760

394,272,840

1,500,000 1,500,000

1,500,000

395,772,840

457,940 30,681,980
457,940 18,317,600
85,310 255,930

7,248,245 14,496,489
867,710 1,735,419

2,613,517 5,227,034

479,145 958,291
800,660 60,049,500
328,950 13,158,000
85,310 170,620

38,949,826 38,949,826

10,864,886 10,864,886
- -

2,613,517 2,613,517

341,250 341,250

197,820,341
NO. JENIS PEKERJAAN SAT. VOLUME

XV.B Instalasi Fire Hydrant Dalam Bangunan


B.1 Lantai 1
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 21.00
- dia. 40 mm m' 2.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve :
- dia. 65 mm bh 2.00

Sub Total Lantai 1

B.2 Lantai 2
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 9.00
- dia. 40 mm m' 11.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve :
- dia. 65 mm bh 2.00

Sub Total Lantai 2

B.3 Lantai 3
1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 10.00
- dia. 40 mm m' 14.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

4 Gate Valve :
- dia. 65 mm bh 2.00

Sub Total Lantai 3

TOTAL INSTALSI FIRE HYDRANT DALAM BANGUNAN

XV.C Instalasi Sprinkler pada Bangunan


C.1 Lantai 1
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 150 mm m' 13.00
- dia. 100 mm m' 24.00
- dia. 80 mm m' 15.00
- dia. 65 mm m' 10.00
- dia. 50 mm m' 50.00
- dia. 40 mm m' 38.00
- dia. 32 mm m' 39.00
- dia. 25 mm m' 214.00
- dia. 25 mm Drooper m' 56.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 80 mm dari riser Ke saluran m' 14.00
- dia. 25 mm m' 8.00

3 Branch Control Valve dia. 150 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 150 mm = 1 bh
- Flow Switch dia. 150 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh

4 Head Splinker type Pendant bh 101.00

Sub Total Lantai 1

C.2 Lantai 2
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 150 mm m' -
- dia. 100 mm m' 7.00
- dia. 80 mm m' 3.00
- dia. 65 mm m' 68.00
- dia. 50 mm m' 96.00
- dia. 40 mm m' 13.00
- dia. 32 mm m' 21.00
- dia. 25 mm m' 89.00
- dia. 25 mm Drooper m' 36.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 8.00

3 Branch Control Valve dia. 100 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 100 mm = 1 bh
- Flow Switch dia. 100 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh

4 Head Splinker type Pendant bh 65.00

Sub Total Lantai 2

C.3 Lantai 3
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 150 mm m' 8.00
- dia. 100 mm m' 18.00
- dia. 80 mm m' 22.00
- dia. 65 mm m' 14.00
- dia. 50 mm m' 13.00
- dia. 40 mm m' 18.00
- dia. 32 mm m' 47.00
- dia. 25 mm m' 264.00
- dia. 25 mm Drooper m' 53.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 8.00

3 Branch Control Valve dia. 150 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 150 mm = 1 bh
- Flow Switch dia. 150 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh

4 Head Splinker type Pendant bh 97.00

Sub Total Lantai 3

TOTAL INSTALASI FIRE SPLINKER DALAM BANGUNAN

XV.D Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 7.00
Lantai 2 bh 8.00
Lantai 3 bh 7.00

2 Fire Extingusher type CO2 5 kg


Lantai 1 bh 4.00
Lantai 2 bh 2.00
Lantai 3 bh 1.00

3 Fire Extingusher type CO2 kapasitas 25 kg lengkap dengan kereta

TOTAL FIRE EXTINGUISHER

XV.E Pekerjaan Fire Supression


E.1 Fire Supression System
1 Cylinder 80-300 M25 UL&FM 24m³ ea 23.00
2 Ci IV8-300 Manosw w/ Low Pressure Switch ea 23.00
3 Discharge Hose ea 23.00
4 Ci IS8 Solenoid Actuator w/ manual ea 4.00
5 Nozzles ea 23.00
6 SV22 Zone kit set 5.00
7 SV CiV Start kit set 4.00
8 SV22 Next Kit (Connecting Hose) ea 22.00
9 SV22 Manifold and Orifice MT 7 set 1.00
10 SV22 Manifold and Orifice MT 8 set 2.00
11 SV Test Port ea 5.00
12 End Plug Kit ea 1.00
13 Discharge Pressure Switch ea 4.00
14 Fire Rated Pressure Relief A 250-ø200 ea 2.00
15 Fire Rated Pressure Relief A 1000-ø400 ea 2.00

Sub Total Fire Supression System

E.2 Sistem Deteksi


1 Addressable Fire Suppression Control Unit VS4 ea 1.00
2 Input Module ea 6.00
3 Releasing Module ea 4.00
4 Output Module ea 8.00
5 Intelligent Photoelectric Smoke Detector ea 36.00
6 Manual Release - Single Action ea 5.00
7 Abort Switch ea 5.00
8 Bell ea 5.00
9 Horn & Strobe ea 5.00
10 Warning Lamp (Gas Discharge) ea 5.00
11 Warning Lamp (Evacuate) ea 5.00
12 Service Disconnect Switch ea 1.00

Sub Total Sistem Deteksi

E.3 Instalasi
1 Pipe ASTM A53/A106 Seamless Sch. 40
- dia. 65 mm m 436.00
- dia. 80 mm m 198.00
- dia. 100 mm m 259.00

2 Pengkabelan STP AWG #18 dalam konduit mtr 624.00

3 Pengkabelan NYA 2 x 1,5 mm dalam konduit mtr 1,440.00

4 Transportasi, akomodasi dan biaya supervisi ls 1.00


testing commissioning dan training

Sub Total Instalasi

TOTAL Pekerjaan Fire Supression

XV.F Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL Testing Commissioning

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER


HARGA SATUAN JUMLAH HARGA

4,773,510 9,547,020

259,530 5,450,130
133,880 267,760

1,548,708 3,097,416

4,884,868 9,769,736

28,132,062

4,773,510 9,547,020

259,530 2,335,770
133,880 1,472,680

1,548,708 3,097,416

4,884,868 9,769,736

26,222,622

4,773,510 9,547,020

259,530 2,595,300
133,880 1,874,320

1,548,708 3,097,416

4,884,868 9,769,736

26,883,792

81,238,475

800,660 10,408,580
457,940 10,990,560
328,950 4,934,250
259,530 2,595,300
178,730 8,936,500
133,880 5,087,440
112,210 4,376,190
85,310 18,256,340
85,310 4,777,360

328,950 4,605,300
85,310 682,480

14,023,800 14,023,800

80,010 8,081,010

97,755,110

800,660 -
457,940 3,205,580
328,950 986,850
259,530 17,648,040
178,730 17,158,080
133,880 1,740,440
112,210 2,356,410
85,310 7,592,590
85,310 3,071,160

85,310 682,480

11,025,000 11,025,000

80,010 5,200,650

70,667,280

800,660 6,405,280
457,940 8,242,920
328,950 7,236,900
259,530 3,633,420
178,730 2,323,490
133,880 2,409,840
112,210 5,273,870
85,310 22,521,840
85,310 4,521,430

85,310 682,480

14,023,800 14,023,800

80,010 7,760,970

85,036,240

253,458,630
819,000 5,733,000
819,000 6,552,000
819,000 5,733,000

1,365,000 5,460,000
1,365,000 2,730,000
1,365,000 1,365,000

27,573,000

40,873,140 940,082,220
10,644,480 244,823,040
1,898,820 43,672,860
11,240,460 44,961,840
1,732,500 39,847,500
38,309,040 191,545,200
6,181,560 24,726,240
1,871,100 41,164,200
18,142,740 18,142,740
18,577,440 37,154,880
2,813,580 14,067,900
4,490,640 4,490,640
10,117,800 40,471,200
12,668,040 25,336,080
26,443,440 52,886,880

1,763,373,420

38,808,000 38,808,000
1,316,700 7,900,200
8,523,900 34,095,600
1,940,400 15,523,200
1,690,920 60,873,120
1,968,120 9,840,600
1,912,680 9,563,400
1,386,000 6,930,000
1,843,380 9,216,900
2,772,000 13,860,000
2,772,000 13,860,000
1,912,680 1,912,680

222,383,700

249,600 108,825,600
302,400 59,875,200
448,000 116,032,000

51,424 32,088,689

22,995 33,112,800

125,000,000 125,000,000

474,934,289

2,460,691,409

15,000,000 15,000,000

15,000,000

3,035,781,854
NO. JENIS PEKERJAAN SAT. VOLUME

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Unit AHU


Pengadaan dan Pemasangan unit AHU / FCU lengkap dengan remote control
gantungan/hanger/support dan akseories lainnya

A.1 Lantai 2 (ICU, PICU, NICU)


1 AHU-GD.E.2.1 unit 1.00
- Type : HDT-DS, Floor Standing (c/w Pre Filter)

- Kapasitas : min. 258.000 BTUH

- Sensible : min. 180.600 BTUH

- Air Flow : 7.450 CFM

- ESP : 3,5 in wg

- Motor : 23,0 Kw / 380V / 3Ph / 50Hz

2 AHU-GD.E.2.2 unit 1.00


- Type : HDT-DS, Floor Standing (c/w Pre Filter)

- Kapasitas : min. 117.000 BTUH

- Sensible : min. 81.900 BTUH

- Air Flow : 3.400 CFM

- ESP : 3,5 in wg

- Motor : 10,3 Kw / 380V / 3Ph / 50Hz

Sub Total Lantai 2 (ICU, PICU, NICU)

TOTAL PERALATAN UTAMA AHU

XVI.B Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

B.1 Lantai 1 (RADIOLOGI & FARMASI)


1 IU-OU.GD.E.1.1 s/d GD.E.1.3 unit 3.00
- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : R. Penyimp. Alat Kesehatan, R. Penyimp. Obat,
R. Penyimp. Bahan Baku Obat

2 IU-OU.GD.E.1.4 s/d GD.E.1.5 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : R. Penyimp. Obat Kemo, R. Penyimp. Obat Vaksin

3 IU-OU.GD.E.1.6 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 750 cfm
- Lokasi : Koridor

4 IU-OU.GD.E.1.7 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : R. Perpustakaan & Arsip

5 IU-OU.GD.E.1.8 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Ruang Labeling

6 IU-OU.GD.E.1.9 s/d GD.E.1.11 unit 3.00


- Type : Ceiling Concealed c/w Pre Filter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Panel, Ruang Persiapan 1 & 2

b Pre Filter lengkap dengan housing set 3.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

7 IU-OU.GD.E.1.12 s/d GD.E.1.13 unit 2.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Koridor

8 IU-OU.GD.E.1.14 s/d GD.E.1.15 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : R. Staff, R. Diskusi

9 IU-OU.GD.E.1.16 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang KA

10 IU-OU.GD.E.1.17 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Koridor

11 IU-OU.GD.E.1.18 s/d GD.E.1.22 unit 5.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : R. QC, R. Obat, R. Racik Obat Oral,
R. Penyimp. Obat Khusus, R. Penyimp. Nutrisi Parenteral

12 IU-OU.GD.E.1.23 s/d GD.E.1.23A unit 2.00


- Type : Ceiling Concealed c/w Pre Filter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : X-Ray 1

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

13 IU-OU.GD.E.1.24 s/d GD.E.1.26 unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Dental X-Ray, Digital Panoramic, R. Konsultasi

14 IU-OU.GD.E.1.27 s/d GD.E.1.32 unit 6.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 750 cfm
- Lokasi : Koridor

15 IU-OU.GD.E.1.33 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Ruang Staff

16 IU-OU.GD.E.1.34 s/d GD.E.1.34A unit 2.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : X-Ray 2

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

17 IU-OU.GD.E.1.35 / GD.E.1.35A / GD.E.1.36 unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Mamography, USG

18 IU-OU.GD.E.1.37 s/d GD.E.1.37A unit 2.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : CT-Scan

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

19 IU-OU.GD.E.1.38 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Operator

20 IU-OU.GD.E.1.379 s/d GD.E.1.39A unit 2.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Flouroscopy

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

21 IU-OU.GD.E.1.40 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Ruang Tunggu

22 IU-OU.GD.E.1.41 s/d GD.E.1.42 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : R. Adm, R. Arsip
23 IU-OU.GD.E.1.43 unit 1.00
- Type : Cassette Inverter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Ruang Baca, R. Konsultasi CR/PACS

24 IU-OU.GD.E.1.44 unit 5.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : R. Prosessing Radiology

25 IU-OU.GD.E.1.45 / GD.E.1.45A / GD.E.1.45B unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : R. UPS

26 IU-OU.GD.E.1.46 / GD.E.1.46A unit 2.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 50.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.500 cfm
- Lokasi : MRI

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

27 IU-OU.GD.E.1.47 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang FCC

28 IU-OU.GD.E.1.48 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang FCC

Sub Total Lantai 1 (RADIOLOGI & FARMASI)

B.2 Lantai 2 (ICU, PICU, NICU)


1 IU-OU.GD.E.2.1 unit 1.00
- Type : Split Duct c/w Pre Filter
- Kapasitas : 60.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 2.000 cfm
- Lokasi : Koridor R. Laktasi

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

2 IU-OU.GD.E.2.2 s/d GD.E.2.2A unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Trafo Isolasi 1

3 IU-OU.GD.E.2.3 s/d GD.E.2.4 unit 2.00


- Type : Split Duct c/w Pre Filter, Medium Filter
- Kapasitas : 20.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : R. Isolasi, Airlock

b Pre Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 2.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

4 IU-OU.GD.E.2.5 s/d GD.E.2.5A unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Trafo Isolasi 2

5 IU-OU.GD.E.2.6 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Dokter / Ruang Konsul

6 IU-OU.GD.E.2.7 unit 1.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 50.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.450 cfm
- Lokasi : CVCU

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

7 IU-OU.GD.E.2.7 unit 1.00


- Type : Split Duct c/w Pre Filter
- Kapasitas : 60.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 2.000 cfm
- Lokasi : PICU

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

8 IU-OU.GD.E.2.9 s/d GD.E.2.11 unit 3.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Trafo Isolasi 2

9 IU-OU.GD.E.2.12 s/d GD.E.2.14 unit 3.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 750 cfm
- Lokasi : Ruang Tunggu

10 IU-OU.GD.E.2.15 s/d GD.E.23 unit 9.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Koridor

Sub Total Lantai 2 (ICU, PICU, NICU)

B.3 Lantai 3 (Manajemen, Serbaguna)


1 IU-OU.GD.E.3.1 unit 1.00
- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Tidur Direktur Utama

2 IU-OU.GD.E.3.2 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Ruang Direktur Utama

3 IU-OU.GD.E.3.3 s/d GD.E.3.5 unit 3.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 750 cfm
- Lokasi : Ruang Direktur 1 & 2

4 IU-OU.GD.E.3.6 s/d GD.E.3.8 unit 3.00


- Type : Cassette Inverter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 900 cfm
- Lokasi : Ruang Rapat, Koridor, Ruang Sekretaris

5 IU-OU.GD.E.3.9 s/d GD.E.3.14 unit 6.00


- Type : Wall Mounted Inverter
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Kepala Bagian

6 IU-OU.GD.E.3.15 s/d GD.E.3.20 unit 6.00


- Type : Cassette Inverter
- Kapasitas : 40.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.050 cfm
- Lokasi : Ruang Kerja

7 IU-OU.GD.E.3.21 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 600 cfm
- Lokasi : Lobby

8 IU-OU.GD.E.3.22 s/d GD.E.3.31 unit 10.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 750 cfm
- Lokasi : Ruang Tunggu

Sub Total Lantai 3 (Manajemen, Serbaguna)

TOTAL PERALATAN UTAMA AC SPLIT

XVI.C Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

C.1 Lantai 1
1 EF-GD.E.1.1 unit 1.00
- Type : In Line c/w Prefilter & Medium Filter
- Kapasitas : 1.250 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

2 EF-GD.E.1.2 unit 1.00


- Type : In Line
- Kapasitas : 300 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

3 EF-GD.E.1.3 unit 1.00


- Type : In Line
- Kapasitas : 375 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

4 EF-GD.E.1.4 unit 1.00


- Type : In Line
- Kapasitas : 250 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

5 EF-GD.E.1.5 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 50 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : sesuai seleksi unit

6 EF-GD.E.1.6 unit 1.00


- Type : Circular
- Kapasitas : 150 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

7 EF-GD.E.1.7 unit 1.00


- Type : In Line
- Kapasitas : 500 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

Sub Total Lantai 1

C.2 Lantai 2
1 EF-GD.E.2.1 unit 1.00
- Type : Axial, Fan Box
- Kapasitas : 2.200 CFM
- Static Pressure : 3,5 In Wg
- Putaran : 2.205 RPM
- Power : sesuai seleksi unit

2 EF-GD.E.2.2 unit 1.00


- Type : Propeller
- Kapasitas : 200 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

3 EF-GD.E.2.3 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 200 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 1.320 RPM
- Power : sesuai seleksi unit

4 EF-GD.E.2.4 unit 1.00


- Type : Circular
- Kapasitas : 200 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.409 RPM
- Power : sesuai seleksi unit

5 EF-GD.E.2.5 unit 1.00


- Type : Circular
- Kapasitas : 150 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.590 RPM
- Power : sesuai seleksi unit

6 EF-GD.E.2.6 s/d GD.E.2.7 unit 2.00


- Type : In Line
- Kapasitas : 200 CFM
- Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

7 IF-GD.E.2.1 unit 1.00


- Type : In Line
- Kapasitas : 450 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Tunggu

Sub Total Lantai 2

C.3 Lantai 3
1 EF-GD.E.3.1 unit 1.00
- Type : Ceiling Fan
- Kapasitas : 50 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : sesuai seleksi unit

2 EF-GD.E.3.2 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 100 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 1.320 RPM
- Power : sesuai seleksi unit

3 EF-GD.E.3.2 unit 1.00


- Type : In Line
- Kapasitas : 450 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

4 EF-GD.E.3.4 s/d GD.E.3.6 unit 3.00


- Type : Ceiling Fan
- Kapasitas : 50 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : sesuai seleksi unit

5 EF-GD.E.3.7 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 250 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 1.320 RPM
- Power : sesuai seleksi unit

6 EF-GD.E.3.8 unit 1.00


- Type : In Line
- Kapasitas : 450 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

7 IF-GD.E.3.1 unit 1.00


- Type : In Line
- Kapasitas : 900 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

8 IF-GD.E.3.2 unit 1.00


- Type : In Line
- Kapasitas : 1.000 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

9 IF-GD.E.3.3 unit 1.00


- Type : In Line
- Kapasitas : 1.200 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit

Sub Total Lantai 3

C.4 Lantai Atap


1 PF-GD.E.LA.1 unit 1.00
- Type : Axial
- Kapasitas : 10.000 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Tangga Kebakaran

Sub Total Lantai Atap

TOTAL PERALATAN UTAMA FAN

XVI.D Pekerjaan Pemipaan


D.1 Lantai 1
Pengadaan dan pemasangan pipa AC lengkap dengan
gantungan, support dan akseories lainnya sesuai dengan
gambar dan spesifikasi teknis

Bahan :
Pipa Refrigerant : Cooper Tube ASTM B 280
Pipa Drain : PVC kelas AW 10 kg/cm2
Isolasi Pipa : Elestomeric Nitrile Rubber Class 0

D.1 Lantai 1 ( RADIOLOGI & FARMASI )


1 Pipa AC Split + Isolasi
- dia. 9,52 mm & 19,05 mm IU-OU-GD.E.1.1 mtr 11.00
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.2 mtr 15.95
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.3 mtr 16.50
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.4 mtr 13.20
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.5 mtr 14.30
- dia. 9,52 mm & 19,05 mm IU-OU-GD.E.1.6 mtr 20.35
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.7 mtr 18.15
- dia. 6,4 mm & 19,05 mm IU-OU-GD.E.1.8 mtr 20.35
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.9 mtr 23.10
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.10 mtr 23.10
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.11 mtr 23.65
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.12 mtr 20.90
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.13 mtr 20.90
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.14 mtr 17.60
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.15 mtr 19.80
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.16 mtr 19.80
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.17 mtr 25.85
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.18 mtr 23.65
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.19 mtr 26.40
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.20 mtr 19.80
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.21 mtr 12.65
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.22 mtr 6.05
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.23 mtr 12.65
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.23A mtr 15.95
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.24 mtr 17.05
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.25 mtr 18.70
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.26 mtr 20.35
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.27 mtr 19.80
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.28 mtr 32.45
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.29 mtr 22.55
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.30 mtr 29.70
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.31 mtr 24.75
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.32 mtr 12.10
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.33 mtr 15.95
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.34 mtr 18.70
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.34A mtr 21.45
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.35 mtr 29.15
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.35A mtr 31.35
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.36 mtr 24.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.37 mtr 11.00
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.37A mtr 12.65
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.38 mtr 30.80
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.39 mtr 25.30
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.39A mtr 26.40
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.40 mtr 27.50
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.41 mtr 14.85
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.42 mtr 22.55
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.1.43 mtr 20.90
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.1.44 mtr 11.00
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.45 mtr 10.45
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.45A mtr 20.35
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.1.45B mtr 24.20
- dia. 9,52 mm & 19 mm IU-OU-GD.E.1.46 mtr 18.70
- dia. 9,52 mm & 19 mm IU-OU-GD.E.1.46A mtr 18.15
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.47 mtr 5.50
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.1.47A mtr 7.70

2 Pipa Drain + Isolasi :


- dia. 40 mm mtr 17.05
- dia. 32 mm mtr 114.40
- dia. 25 mm mtr 129.80
- dia. 20 mm mtr 149.05

Sub Total Lantai 1

D.2 Lantai 2
1 Pipa AC Split + Isolasi
Ruang AHU
- dia. 15,9 mm & 35 mm AHU-OU-GD.E.2.1 mtr 16.50
- dia. 15,9 mm & 28,6 mm AHU-OU-GD.E.2.2 mtr 14.85

- dia. 12,7 mm & 25,4 mm IU-OU-GD.E.2.1 mtr 24.75


- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.2 mtr 12.10
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.2A mtr 15.40
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.3 mtr 15.95
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.4 mtr 9.35
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.5 mtr 15.40
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.5A mtr 18.70
- dia. 6,4 mm & 12,7 mm IU-OU-GD.E.2.6 mtr 18.70
- dia. 9,52 mm & 19 mm IU-OU-GD.E.2.7 mtr 21.45
- dia. 12,7 mm & 25,4 mm IU-OU-GD.E.2.8 mtr 32.45
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.9 mtr 23.10
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.10 mtr 22.55
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.2.11 mtr 21.45
- dia. 9,52 mm & 19 mm IU-OU-GD.E.2.12 mtr 23.10
- dia. 9,52 mm & 19 mm IU-OU-GD.E.2.13 mtr 13.20
- dia. 9,52 mm & 19 mm IU-OU-GD.E.2.14 mtr 19.80
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.15 mtr 10.45
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.16 mtr 17.60
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.17 mtr 18.70
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.18 mtr 14.85
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.19 mtr 14.30
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.20 mtr 14.30
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.21 mtr 11.55
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.22 mtr 13.20
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.2.23 mtr 14.85

2 Pipa Drain + Isolasi :


- dia. 40 mm mtr 23.10
- dia. 32 mm mtr 96.80
- dia. 25 mm mtr 77.00
- dia. 20 mm mtr 38.50

Sub Total Lantai 2

D.3 Lantai 3
1 Pipa AC Split + Isolasi
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.1 mtr 19.80
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.2 mtr 14.85
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.3 mtr 24.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.4 mtr 15.40
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.5 mtr 12.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.6 mtr 19.25
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.7 mtr 18.15
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.8 mtr 17.60
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.9 mtr 14.30
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.10 mtr 11.00
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.11 mtr 8.80
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.12 mtr 9.35
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.13 mtr 7.15
- dia. 6,4 mm & 9,5 mm IU-OU-GD.E.3.14 mtr 11.55
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.15 mtr 13.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.16 mtr 13.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.17 mtr 12.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.18 mtr 16.50
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.19 mtr 17.60
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.20 mtr 17.60
- dia. 6,4 mm & 15,9 mm IU-OU-GD.E.3.21 mtr 13.75
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.22 mtr 11.55
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.23 mtr 20.35
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.24 mtr 8.25
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.25 mtr 12.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.26 mtr 30.25
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.27 mtr 25.30
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.28 mtr 8.25
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.29 mtr 13.20
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.30 mtr 23.65
- dia. 9,52 mm & 15,9 mm IU-OU-GD.E.3.31 mtr 18.70

2 Pipa Drain + Isolasi :


- dia. 40 mm (Pipa Tegak) mtr 36.30
- dia. 32 mm (Pipa Tegak) mtr 19.80
- dia. 40 mm mtr 60.50
- dia. 32 mm mtr 71.50
- dia. 25 mm mtr 77.00
- dia. 20 mm mtr 38.50

Sub Total Lantai 3

TOTAL PEKERJAAN PEMIPAAN

XVII.E Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya

E.1 Lantai 1 (RADIOLOGI & FARMASI)


1 Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
Ducting Supply
- BjLS 60 m2 -
- BjLS 50 m2 86.00

Ducting Return
- BjLS 60 m2 -
- BjLS 50 m2 102.00

2 Ducting tanpa isolasi bahan BjLS lengkap dengan


gantungan/hanger/support dan aksesories lainya
Fresh Air
- BjLS 60 m2 -
- BjLS 50 m2 195.00

Exhaust Air
- BjLS 60 m2 36.00
- BjLS 50 m2 119.00

3 Supply Air Difuser (SAD) bahan alumunium annodized


- uk. 350 mm x 350 mm bh 9.00
- uk. 300 mm x 300 mm bh 4.00
- uk. 200 mm x 200 mm bh 2.00

4 Return Air Grille (RAG) bahan alumunium annodized


- uk. 600 mm x 300 mm bh 2.00
- uk. 500 mm x 250 mm bh 5.00
- uk. 400 mm x 250 mm bh 1.00
- uk. 400 mm x 200 mm bh 2.00
- uk. 250 mm x 200 mm bh 2.00

5 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 300 mm x 300 mm bh 1.00
- uk. 250 mm x 250 mm bh 3.00
- uk. 200 mm x 200 mm bh 9.00
- uk. 150 mm x 150 mm bh 12.00

6 Intake Air Grille (IG) bahan alumunium annodized


- uk. 250 mm x 250 mm bh 2.00
- uk. 150 mm x 150 mm bh 30.00

7 Intake Air Louver (IAL) lengkap dengan Pre Filter


- uk. 500 mm x 300 mm bh 1.00
- uk. 450 mm x 350 mm bh 2.00
- uk. 450 mm x 250 mm bh 1.00
- uk. 350 mm x 300 mm bh 2.00
- uk. 250 mm x 250 mm bh 2.00

8 Exhaust Louver (EL)


- uk. 700 mm x 300 mm bh 1.00
- uk. 600 mm x 350 mm bh 1.00
- uk. 400 mm x 300 mm bh 1.00
- uk. 300 mm x 250 mm bh 1.00
- uk. 250 mm x 200 mm bh 1.00
- uk. 200 mm x 200 mm bh 1.00

9 Back Drop Damper (BDD)


- uk. 500 mm x 300 mm bh 2.00
- uk. 350 mm x 250 mm bh 6.00

10 Volume Damper (VD)


- uk. 250 mm x 200 mm bh 2.00
- uk. 200 mm x 200 mm bh 4.00
- uk. 200 mm x 150 mm bh 2.00
- uk. 150 mm x 150 mm bh 40.00

11 Plenum Box
- uk. 1.000 mm x 500 mm bh 6.00
- uk. 900 mm x 500 mm bh 2.00
- uk. 550 mm x 300 mm bh 4.00

12 Kitchen Hood
- uk. 1.150 mm x 400 mm bh 1.00

Sub Total Lantai 1 (RADIOLOGI & FARMASI)

E.2 Lantai 2 (IC, PICU, NICU)


1 Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
Ducting Supply
- BjLS 80 m2 80.00
- BjLS 60 m2 138.00
- BjLS 50 m2 242.00

Ducting Return
- BjLS 60 m2 264.00
- BjLS 50 m2 197.00

2 Ducting tanpa isolasi bahan BjLS lengkap dengan


gantungan/hanger/support dan aksesories lainya
Fresh Air
- BjLS 60 m2 -
- BjLS 50 m2 29.00

Exhaust Air
- BjLS 60 m2 11.00
- BjLS 50 m2 53.00

3 Supply Air Difuser (SAD) bahan alumunium annodized


- uk. 400 mm x 400 mm bh 22.00
- uk. 350 mm x 350 mm bh 2.00
- uk. 300 mm x 300 mm bh 9.00
- uk. 250 mm x 250 mm bh 13.00
- uk. 200 mm x 200 mm bh 5.00

4 Return Air Grille (RAG) bahan alumunium annodized


- uk. 500 mm x 300 mm bh 14.00
- uk. 500 mm x 250 mm bh 4.00
- uk. 450 mm x 250 mm bh 3.00
- uk. 400 mm x 250 mm bh 5.00
- uk. 400 mm x 200 mm bh 5.00
- uk. 400 mm x 150 mm bh 8.00
- uk. 300 mm x 200 mm bh 7.00
- uk. 250 mm x 200 mm bh 1.00
- uk. 250 mm x 150 mm bh 5.00

5 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 250 mm x 100 mm bh 2.00
- uk. 150 mm x 150 mm bh 7.00

6 Intake Air Grille (IG) bahan alumunium annodized


- uk. 150 mm x 150 mm bh 2.00

7 Intake Air Louver (IAL) lengkap dengan Pre Filter


- uk. 650 mm x 300 mm bh 1.00
- uk. 400 mm x 300 mm bh 1.00
- uk. 350 mm x 300 mm bh 4.00
- uk. 300 mm x 200 mm bh 2.00
- uk. 250 mm x 200 mm bh 1.00

8 Exhaust Louver (EL)


- uk. 950 mm x 400 mm bh 1.00
- uk. 250 mm x 200 mm bh 5.00

9 Motorized Volume Damper (MVD)


- uk. 600 mm x 300 mm bh 1.00

10 Volume Damper (VD)


- uk. 800 mm x 350 mm bh 1.00
- uk. 700 mm x 350 mm bh 2.00
- uk. 450 mm x 350 mm bh 1.00
- uk. 350 mm x 250 mm bh 3.00
- uk. 300 mm x 200 mm bh 1.00
- uk. 250 mm x 200 mm bh 7.00
- uk. 200 mm x 200 mm bh 1.00
- uk. 200 mm x 150 mm bh 1.00
- uk. 150 mm x 150 mm bh 6.00

11 Plenum Box
- uk. 2.150 mm x 700 mm bh 1.00
- uk. 1.350 mm x 700 mm bh 1.00
- uk. 1.100 mm x 600 mm bh 1.00
- uk. 1.000 mm x 500 mm bh 2.00
- uk. 900 mm x 500 mm bh 1.00

Sub Total Lantai 2 (IC, PICU, NICU)

E.3 Lantai 3 (MANAJEMEN, SERBAGUNA)


1 Ducting tanpa isolasi bahan BjLS lengkap dengan
gantungan/hanger/support dan aksesories lainya
Fresh Air
- BjLS 60 m2 29.00
- BjLS 50 m2 145.00

Exhaust Air
- BjLS 60 m2 -
- BjLS 50 m2 46.00

2 Exhaust Air Grille (EAG) bahan alumunium annodized


- uk. 300 mm x 300 mm bh 1.00
- uk. 150 mm x 150 mm bh 6.00
3 Intake Air Grille (IG) bahan alumunium annodized
- uk. 150 mm x 150 mm bh 6.00

4 Intake Air Louver (IAL) lengkap dengan Pre Filter


- uk. 600 mm x 450 mm bh 1.00
- uk. 600 mm x 400 mm bh 1.00
- uk. 600 mm x 350 mm bh 1.00

5 Exhaust Louver (EL)


- uk. 350 mm x 250 mm bh 2.00
- uk. 300 mm x 250 mm bh 1.00
- uk. 200 mm x 200 mm bh 1.00

6 Volume Damper (VD)


- uk. 200 mm x 150 mm bh 1.00
- uk. 150 mm x 150 mm bh 29.00

Sub Total Lantai 3 (MANAJEMEN, SERBAGUNA)

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVII.F Pekerjaan Listrik / Pengkabelan


F.1 Lantai 1
1 Pengkabelan unit AC & Fan dari P.AC-1E ke masing-masing unit
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.1 m 41.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.2 m 49.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.3 m 46.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.4 m 45.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.5 m 43.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.6 m 47.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.7 m 46.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.8 m 43.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.9 m 74.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.10 m 45.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.11 m 74.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.12 m 44.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.13 m 85.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.14 m 75.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.15 m 75.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.16 m 86.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.17 m 84.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.18 m 86.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.19 m 85.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.20 m 50.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.21 m 49.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.22 m 47.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.23 m 50.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.23A m 51.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.24 m 54.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.25 m 52.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.26 m 51.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.27 m 52.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.28 m 105.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.29 m 104.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.30 m 106.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.31 m 81.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.32 m 78.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.33 m 49.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.34 m 79.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.34A m 81.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.35 m 103.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.35A m 104.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.36 m 106.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.37 m 75.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.37A m 77.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.38 m 103.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.39 m 108.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.39A m 107.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.40 m 108.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.41 m 105.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.42 m 107.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.43 m 105.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.44 m 124.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.45 m 85.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.45A m 79.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.1.45B m 80.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.46 m 77.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.1.46A m 76.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.47 m 86.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.1.47A m 88.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.1
m 30.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.2
m 59.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.3
m 62.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.4
m 62.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.5
m 77.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.6
m 97.00
- NYM 3 x 2,5 mm² ke EF-GD.E.1.7
m 107.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 1,087.90

Sub Total Lantai 1

F.2 Lantai 2
1 Pengkabelan unit AC & Fan dari P.AC-2E ke masing-masing unit
- NYY 4 x 70 mm² ke AHU.GD.E.2.1 m 32.00
- NYY 4 x 10 mm² ke AHU.GD.E.2.2 m 31.00
- NYY 4 x 10 mm² ke IU-OU.GD.E.2.1 m 33.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.2 m 31.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.2A m 34.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.2.3 m 80.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.2.4 m 81.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.5 m 83.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.5A m 84.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.6 m 79.00
- NYY 4 x 10 mm² ke IU-OU.GD.E.2.7 m 59.00
- NYY 4 x 10 mm² ke IU-OU.GD.E.2.8 m 89.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.9 m 85.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.10 m 87.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.11 m 88.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.2.12 m 84.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.13 m 86.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.14 m 90.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.15 m 82.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.16 m 61.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.17 m 60.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.18 m 34.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.19 m 32.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.20 m 34.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.21 m 35.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.22 m 60.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.2.23 m 58.00
- NYY 4 x 4 mm² ke EF-GD.E.2.1
m 28.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.2
m 8.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.3
m 13.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.4
m 77.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.5
m 79.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.6
m 79.00
- NYM 3 x 2,5 mm² ke EF-GD.E.2.7
m 62.00
- NYM 3 x 2,5 mm² ke IF-GD.E.2.1
m 71.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 468.60

Sub Total Lantai 2

F.3 Lantai 3
1 Pengkabelan unit AC & Fan dari P.AC-3E ke masing-masing unit
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.1 m 27.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.2 m 28.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.3 m 29.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.4 m 35.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.5 m 33.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.6 m 52.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.7 m 35.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.8 m 35.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.9 m 53.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.10 m 54.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.11 m 55.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.12 m 60.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.13 m 61.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.E.3.14 m 60.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.15 m 52.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.16 m 54.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.17 m 59.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.18 m 59.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.19 m 53.00
- NYY 4 x 4 mm² ke IU-OU.GD.E.3.20 m 52.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.21 m 51.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.22 m 51.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.23 m 51.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.24 m 74.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.25 m 73.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.26 m 91.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.27 m 92.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.28 m 83.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.29 m 83.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.30 m 89.00
- NYM 3 x 4 mm² ke IU-OU.GD.E.3.31 m 90.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.1
m 19.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.2
m 17.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.3
m 7.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.4
m 14.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.5
m 17.00
- NYM 4 x 2,5 mm² ke EF-GD.E.3.6
m 16.00
- NYM 4 x 2,5 mm² ke EF-GD.E.3.7
m 71.00
- NYM 3 x 2,5 mm² ke EF-GD.E.3.8
m 81.00
- NYM 3 x 2,5 mm² ke IF-GD.E.3.1
m 29.00
- NYM 3 x 2,5 mm² ke IF-GD.E.3.2
m 46.00
- NYM 3 x 2,5 mm² ke IF-GD.E.3.3
m 66.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 480.70
dalam konduit PVC HI dia. 20 mm

Sub Total Lantai 3

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVII.G Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG

XVIII PEKERJAAN PNEUMATIC TUBE


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

XVIII.A JARINGAN INSTALASI MAIN LINE DAN SELASAR


1 STATIONS & DIVERTERS AND ACCESSORIES
Diverter 3-Way Unit 6.00

2 TUBE AND LINE SYSTEM


Tubes PVC - Diam. 110 MM RAL 7000 M 472.00
Bend R=800, RAL 7001, Grey Buah 32.00
Sleeve Buah 262.00
Cable 2x2x0.23 + 3x2.5F M 528.00

Sub Total JARINGAN INSTALASI MAIN LINE DAN SELASAR

XVIII.B PERALATAN UTAMA DAN PENDUKUNG


B.1 LANTAI 1
A TRANSFER ROOM, MAIN CONTROL & CABLES
1 Central Control Unit Dual Line System and Power Supply Unit Set 1.00
2 Blower incl. assesories Pkt 1.00
3-Phase Blower 2 Unit
Blower Connecting Set 2 Set
Blower Mounting Buffer 4 Buah
Blower Sound Absorber 2 Buah
Blower Controller 2 Buah
Air/Transfer Diverter 4 Unit
Bypass 2 Buah
Cable YMM-J 4x2.5 gr 20 M
Hilti Pipe Clamp 10 Buah
Hose Clamp 50-70 8 Buah
Air Hose 2M
Air Lid 2 Buah
Air Bow 10 Buah
Reduction Air Diverter 4 Buah
Connecting Tube 2 Buah
3 PC-Monitoring and Programing System RFID, 2-Line System Buah 1.00

B STATIONS & DIVERTERS AND ACCESSORIES


1 Diverter 3-Way Unit 2.00
2 MultiLab Station with 2 fully automatic sending dispatchs Unit 2.00
All Stations incl.: Basket, Cushion and Carrier Rack

C TUBE AND LINE SYSTEM


1 Tubes PVC - Diam. 110 MM RAL 7000 M 261.00
2 Tubes PVC - Diam. 110 MM Transparent M 5.00
3 Bend R=800, RAL 7001, Grey Buah 22.00
4 Bend R=800, RAL 7001, Transparent Buah 2.00
5 Sleeve Buah 152.00
6 Cable 2x2x0.23 + 3x2.5F M 299.00

D CARRIERS AND ACCESSORIES


1 Long Carrier With Chip Buah 2.00
2 Short Carrier With Chip Buah 8.00

Sub Total LANTAI 1

B.2 LANTAI 2
A STATIONS & DIVERTERS AND ACCESSORIES Unit 2.00
Bottom Loading Station
All Stations incl.: Basket, Cushion and Carrier Rack

B TUBE AND LINE SYSTEM M 180.00


Tubes PVC - Diam. 110 MM RAL 7000 M 5.00
Tubes PVC - Diam. 110 MM Transparent Buah 14.00
Bend R=800, RAL 7001, Grey Buah 2.00
Bend R=800, RAL 7001, Transparent Buah 102.00
Sleeve M 208.00
Cable 2x2x0.23 + 3x2.5F

C CARRIERS AND ACCESSORIES Buah 2.00


Long Carrier With Chip Buah 8.00
Short Carrier With Chip

Sub Total LANTAI 2

XVIII.C TESTING COMMISSIONING


1 Testing Commissioning Pneumatic TUbe ls 1.00

Sub Total TESTING COMMISSIONING

TOTAL PEKERJAAN PNEUMATIC TUBE


HARGA SATUAN JUMLAH HARGA

87,550,000 87,550,000

67,525,000 67,525,000

155,075,000

155,075,000

5,940,000 17,820,000

4,944,000 9,887,999

18,421,364 18,421,364

5,940,000 5,940,000

16,218,818 16,218,818

15,317,100 45,951,300
2,700,000 8,100,000

16,218,818 32,437,636

5,940,000 11,880,000

3,708,000 3,708,000

16,218,818 16,218,818

5,940,000 29,700,000

15,317,100 30,634,200

2,700,000 5,400,000

4,944,000 14,831,999

18,421,364 110,528,183

16,218,818 16,218,818
16,144,364 32,288,728

2,700,000 5,400,000

4,944,000 14,831,999

24,247,636 48,495,272

2,700,000 5,400,000

4,944,000 4,944,000

24,247,636 48,495,272

2,700,000 5,400,000

20,289,272 20,289,272

4,944,000 9,887,999
20,289,272 20,289,272

5,940,000 29,700,000

9,024,000 27,072,001

31,386,272 62,772,545

2,700,000 5,400,000

3,708,000 3,708,000

20,289,272 20,289,272

758,560,769

54,557,182 54,557,182

2,700,000 2,700,000

4,944,000 9,887,999

16,144,364 32,288,728
2,700,000 5,400,000

4,050,000 8,100,000

4,944,000 9,887,999

16,218,818 16,218,818

31,386,272 31,386,272

2,700,000 2,700,000

54,557,182 54,557,182

2,700,000 2,700,000

6,592,000 19,775,999

18,421,364 55,264,091
16,218,818 145,969,363

451,393,634

3,708,000 3,708,000

20,289,272 20,289,272

18,421,364 55,264,091

20,289,272 60,867,817

3,708,000 22,248,000

33,624,818 201,748,909

16,218,818 16,218,818

18,421,364 184,213,638

564,558,546

1,774,512,949
7,350,000 7,350,000

2,700,000 2,700,000

4,050,000 4,050,000

2,352,000 2,352,000

3,528,000 3,528,000

2,352,000 2,352,000

776,160 776,160

2,352,000 2,352,000

4,557,000 4,557,000

30,017,160

20,619,060 20,619,060

7,350,000 7,350,000
1,261,260 1,261,260

1,764,000 1,764,000

1,764,000 1,764,000

3,528,000 7,056,000

3,528,000 3,528,000

43,342,320

776,160 776,160

970,200 970,200

7,350,000 7,350,000

776,160 2,328,480

4,032,000 4,032,000
7,350,000 7,350,000

6,762,000 6,762,000

7,350,000 7,350,000

7,350,000 7,350,000

44,268,840

36,198,050 36,198,050

36,198,050

153,826,370

419,780 4,617,580
273,470 4,361,847
273,470 4,512,255
248,800 3,284,160
248,800 3,557,840
419,780 8,542,523
273,470 4,963,481
363,780 7,402,923
248,800 5,747,280
248,800 5,747,280
248,800 5,884,120
339,210 7,089,489
339,210 7,089,489
273,470 4,813,072
273,470 5,414,706
248,800 4,926,240
339,210 8,768,579
273,470 6,467,566
273,470 7,219,608
273,470 5,414,706
273,470 3,459,396
273,470 1,654,494
248,800 3,147,320
248,800 3,968,360
248,800 4,242,040
248,800 4,652,560
248,800 5,063,080
395,210 7,825,158
395,210 12,824,565
395,210 8,911,986
395,210 11,737,737
395,210 9,781,448
395,210 4,782,041
339,210 5,410,400
339,210 6,343,227
339,210 7,276,055
248,800 7,252,520
248,800 7,799,880
248,800 6,020,960
395,210 4,347,310
395,210 4,999,407
248,800 7,663,040
395,210 9,998,813
395,210 10,433,544
395,210 10,868,275
248,800 3,694,680
248,800 5,610,440
395,210 8,259,889
273,470 3,008,170
339,210 3,544,745
339,210 6,902,924
339,210 8,208,882
419,780 7,849,886
419,780 7,619,007
248,800 1,368,400
248,800 1,915,760

98,760 1,683,858
87,250 9,981,400
68,940 8,948,412
61,550 9,174,028

374,058,834

783,000 12,919,500.00
680,480 10,105,128.00

513,430 12,707,393
248,800 3,010,480
248,800 3,831,520
339,210 5,410,400
339,210 3,171,614
248,800 3,831,520
248,800 4,652,560
273,470 5,113,889
419,780 9,004,281
513,430 16,660,804
248,800 5,747,280
248,800 5,610,440
248,800 5,336,760
419,780 9,696,918
419,780 5,541,096
419,780 8,311,644
339,210 3,544,745
339,210 5,970,096
339,210 6,343,227
339,210 5,037,269
339,210 4,850,703
339,210 4,850,703
339,210 3,917,876
339,210 4,477,572
339,210 5,037,269

98,760 2,281,356
87,250 8,445,800
68,940 5,308,380
61,550 2,369,675

193,097,894

248,800 4,926,240
395,210 5,868,869
395,210 9,564,082
395,210 6,086,234
395,210 4,999,407
395,210 7,607,793
395,210 7,173,062
395,210 6,955,696
248,800 3,557,840
248,800 2,736,800
248,800 2,189,440
248,800 2,326,280
248,800 1,778,920
248,800 2,873,640
395,210 5,216,772
395,210 5,216,772
395,210 4,999,407
395,210 6,520,965
395,210 6,955,696
395,210 6,955,696
339,210 4,664,138
395,210 4,564,676
395,210 8,042,524
395,210 3,260,483
395,210 4,999,407
395,210 11,955,103
395,210 9,998,813
395,210 3,260,483
395,210 5,216,772
395,210 9,346,717
395,210 7,390,427

98,760 3,584,988.00
87,250 1,727,550.00
98,760 5,974,980.00
87,250 6,238,375.00
68,940 5,308,380.00
61,550 2,369,675.00

202,413,096

769,569,823

400,880 -
372,650 32,047,900.00

400,880 -
372,650 38,010,300.00

204,930 -
184,580 35,993,100.00

204,930 7,377,480.00
184,580 21,965,020.00

391,300 3,521,700.00
335,400 1,341,600.00
223,600 447,200.00

444,600 889,200.00
370,500 1,852,500.00
321,100 321,100.00
296,400 592,800.00
222,300 444,600.00

296,400 296,400.00
247,000 741,000.00
197,600 1,778,400.00
148,200 1,778,400.00

247,000 494,000.00
148,200 4,446,000.00

395,200 395,200.00
395,200 790,400.00
345,800 345,800.00
321,100 642,200.00
247,000 494,000.00

624,000 624,000.00
592,800 592,800.00
436,800 436,800.00
343,200 343,200.00
280,800 280,800.00
249,600 249,600.00

832,000 1,664,000.00
624,000 3,744,000.00

468,000 936,000.00
416,000 1,664,000.00
364,000 728,000.00
312,000 12,480,000.00

526,500 3,159,000.00
491,400 982,800.00
298,350 1,193,400.00

14,300,000 14,300,000.00

200,384,700

476,100 38,088,000.00
400,880 55,321,440.00
372,650 90,181,300.00

400,880 105,832,320.00
372,650 73,412,050.00

204,930 -
184,580 5,352,820.00
204,930 2,254,230.00
184,580 9,782,740.00

447,200 9,838,400.00
391,300 782,600.00
335,400 3,018,600.00
279,500 3,633,500.00
223,600 1,118,000.00

395,200 5,532,800.00
370,500 1,482,000.00
345,800 1,037,400.00
321,100 1,605,500.00
296,400 1,482,000.00
271,700 2,173,600.00
247,000 1,729,000.00
222,300 222,300.00
197,600 988,000.00

172,900 345,800.00
148,200 1,037,400.00

148,200 296,400.00

469,300 469,300.00
345,800 345,800.00
321,100 1,284,400.00
247,000 494,000.00
222,300 222,300.00

842,400 842,400.00
280,800 1,404,000.00

1,080,000 1,080,000.00

1,196,000 1,196,000.00
1,092,000 2,184,000.00
832,000 832,000.00
624,000 1,872,000.00
520,000 520,000.00
468,000 3,276,000.00
416,000 416,000.00
364,000 364,000.00
312,000 1,872,000.00

1,000,350 1,000,350.00
719,550 719,550.00
596,700 596,700.00
526,500 1,053,000.00
491,400 491,400.00

439,083,400

204,930 5,942,970.00
184,580 26,764,100.00

204,930 -
184,580 8,490,680.00

296,400 296,400.00
148,200 889,200.00
148,200 889,200.00

518,700 518,700.00
494,000 494,000.00
469,300 469,300.00

374,400 748,800.00
343,200 343,200.00
249,600 249,600.00

364,000 364,000.00
312,000 9,048,000.00

55,508,150

694,976,250

15,698 643,618
15,698 769,202
15,698 722,108
15,698 706,410
15,698 675,014
24,150 1,135,050
15,698 722,108
24,150 1,038,450
15,698 1,161,652
15,698 706,410
15,698 1,161,652
24,150 1,062,600
24,150 2,052,750
15,698 1,177,350
15,698 1,177,350
15,698 1,350,028
24,150 2,028,600
15,698 1,350,028
15,698 1,334,330
15,698 784,900
15,698 769,202
15,698 737,806
15,698 784,900
15,698 800,598
15,698 847,692
15,698 816,296
24,150 1,231,650
24,150 1,255,800
24,150 2,535,750
24,150 2,511,600
24,150 2,559,900
24,150 1,956,150
24,150 1,883,700
24,150 1,183,350
24,150 1,907,850
15,698 1,271,538
15,698 1,616,894
15,698 1,632,592
36,225 3,839,850
36,225 2,716,875
15,698 1,208,746
36,225 3,731,175
36,225 3,912,300
36,225 3,876,075
15,698 1,695,384
15,698 1,648,290
32,603 3,488,521
15,698 1,648,290
24,150 2,994,600
24,150 2,052,750
24,150 1,907,850
24,150 1,932,000
36,225 2,789,325
36,225 2,753,100
15,698 1,350,028
15,698 1,381,424
15,698 470,940
15,698 926,182
15,698 973,276
15,698 973,276
15,698 1,208,746
15,698 1,522,706
15,698 1,679,686

15,698 17,077,854

117,822,127

536,130 17,156,160
80,903 2,507,993
80,903 2,669,799
15,698 486,638
15,698 533,732
36,225 2,898,000
36,225 2,934,225
15,698 1,302,934
15,698 1,318,632
15,698 1,240,142
76,073 4,488,307
76,073 6,770,497
15,698 1,334,330
15,698 1,365,726
15,698 1,381,424
15,698 1,318,632
24,150 2,076,900
24,150 2,173,500
24,150 1,980,300
24,150 1,473,150
24,150 1,449,000
24,150 821,100
24,150 772,800
24,150 821,100
24,150 845,250
24,150 1,449,000
24,150 1,400,700
36,225 1,014,300
15,698 125,584
15,698 204,074
15,698 1,208,746
15,698 1,240,142
15,698 1,240,142
15,698 973,276
15,698 1,114,558

15,698 7,356,083

79,446,876

15,698 423,846
36,225 1,014,300
24,150 700,350
24,150 845,250
24,150 796,950
36,225 1,883,700
36,225 1,267,875
36,225 1,267,875
15,698 831,994
15,698 847,692
15,698 863,390
15,698 941,880
15,698 957,578
15,698 941,880
36,225 1,883,700
36,225 1,956,150
36,225 2,137,275
36,225 2,137,275
36,225 1,919,925
36,225 1,883,700
24,150 1,231,650
24,150 1,231,650
24,150 1,231,650
24,150 1,787,100
24,150 1,762,950
24,150 2,197,650
24,150 2,221,800
24,150 2,004,450
24,150 2,004,450
24,150 2,149,350
24,150 2,173,500
15,698 298,262
15,698 266,866
15,698 109,886
15,698 219,772
15,698 266,866
20,528 328,448
20,528 1,457,488
15,698 1,271,538
15,698 455,242
15,698 722,108
15,698 1,036,068

15,698 7,546,029

59,477,358

256,746,361

5,000,000 5,000,000

5,000,000

3,809,706,752

29,454,660 176,727,960

178,200 84,110,400
3,852,810 123,289,920
65,520 17,166,240
136,620 72,135,360

473,429,880

163,794,960 163,794,960
295,824,960 295,824,960
192,024,000 192,024,000

29,454,660 58,909,320
82,882,800 165,765,600

178,200 46,510,200
1,128,600 5,643,000
1,230,030 27,060,660
3,852,810 7,705,620
65,520 9,959,040
136,620 40,849,380

3,028,680 6,057,360
2,375,730 19,005,840

1,039,109,940

39,637,440 79,274,880

178,200 32,076,000
1,128,600 5,643,000
1,230,030 17,220,420
3,852,810 7,705,620
65,520 6,683,040
136,620 28,416,960

3,028,680 6,057,360
2,375,730 19,005,840

202,083,120

25,000,000 25,000,000

25,000,000

1,739,622,940
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNAN
KORIDOR
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNAN : GEDUNG
KORIDOR
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
UPANG NTT BANGUNAN : GEDUNG F : LOBBY,

TOTAL
168,625,597
-
-
-
21,245,270
67,899,000
-
764,717,100
-
-
-
46,913,240
-
-
86,078,610
15,706,144
1,555,000,000

2,726,184,961
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNAN
KORIDOR
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


A.1 Lobby Tengah Lantai 1
1 Down Light LED E27 13 Watt Bulb + Cover bh 23.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 5.00
3 Stop Kontak 1 Ph 200 Watt bh 2.00
4 Grid Switch 4 Gang bh 1.00
5 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 28.00
6 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00

Sub Total Lobby Tengah Lantai 1

A.2 Ramp Lantai 1


1 TLED 1 X 14 Watt (Balk) bh 8.00
2 TLED 1 X 14 Watt (Balk) + Nicad Battery bh 5.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 13.00

Sub Total Ramp Lantai 1

A.3 Lobby Tengah Lantai 2


1 Down Light LED E27 13 Watt Bulb + Cover bh 16.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 6.00
3 Stop Kontak 1 Ph 200 Watt bh 2.00
4 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 22.00
5 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00

Sub Total Lobby Tengah Lantai 2

A.4 Ramp Lantai 2


1 TLED 1 X 14 Watt (Balk) bh 8.00
2 TLED 1 X 14 Watt (Balk) + Nicad Battery bh 5.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 13.00

Sub Total Ramp Lantai 2

A.5 Lobby Tengah Lantai 3


1 Down Light LED E27 13 Watt Bulb + Cover bh 26.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 6.00
3 Stop Kontak 1 Ph 200 Watt bh 2.00
4 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 32.00
5 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00

Sub Total Lobby Tengah Lantai 3

A.6 Ramp Lantai 3


1 TLED 1 X 14 Watt (Balk) bh 8.00
2 TLED 1 X 14 Watt (Balk) + Nicad Battery bh 5.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 13.00

Sub Total Ramp Lantai 3

A.7 Lobby Tengah Lantai 4 & Atap


1 Lampu Dinding E27 Bulb 6 Watt Water Proof bh 6.00
2 Down Light LED E27 13 Watt Bulb + Cover bh 6.00
3 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 2.00
4 TLED 2x14 Watt (Balk) bh 1.00
5 TLED 2x14 Watt (Balk) + NIcad Battery bh 1.00
6 Stop Kontak 1 Ph 200 Watt bh 2.00
7 Saklar Tunggal bh 1.00
8 Saklar Ganda bh -
9 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 16.00
10 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00

Sub Total Lobby Tengah Lantai 4 & Atap

A.8 Ramp Lantai 4


1 TLED 1 X 14 Watt (Balk) bh 8.00
2 TLED 1 X 14 Watt (Balk) + Nicad Battery bh 5.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 2 titik 13.00
Sub Total Ramp Lantai 4

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.B Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis
TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET


TAN RUMAH SAKIT KUPANG NTT BANGUNAN : GEDUNG F : LOBBY,

HARGA SATUAN JUMLAH HARGA

372,527 8,568,130
1,481,731 7,408,653
52,763 105,525
227,462 227,462
321,800 9,010,400
400,900 801,800

26,121,970

483,571 3,868,570
1,526,007 7,630,035
321,800 4,183,400

15,682,005

372,527 5,960,438
1,481,731 8,890,384
52,763 105,525
321,800 7,079,600
400,900 801,800

22,837,747

483,571 3,868,570
1,526,007 7,630,035
321,800 4,183,400

15,682,005

372,527 9,685,712
1,481,731 8,890,384
52,763 105,525
321,800 10,297,600
400,900 801,800

29,781,021

483,571 3,868,570
1,526,007 7,630,035
321,800 4,183,400

15,682,005

1,967,188 11,803,126
372,527 2,235,164
1,481,731 2,963,461
881,139 881,139
1,923,663 1,923,663
52,763 105,525
44,163 44,163
48,794 -
321,800 5,148,800
400,900 801,800

25,906,841

483,571 3,868,570
1,526,007 7,630,035
321,800 4,183,400
15,682,005

167,375,597

1,250,000 1,250,000

1,250,000

168,625,597

-
NO. JENIS PEKERJAAN SAT. VOLUME

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN FIRE ALARM


HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN SAT. VOLUME

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


C.1 Lantai 1
1 Ceiling Speaker 3 Watt + Matching Transformer bh 10.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 10.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 1

C.2 Lantai 2
1 Ceiling Speaker 3 Watt + Matching Transformer bh 10.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 10.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 2

C.3 Lantai 3
1 Ceiling Speaker 3 Watt + Matching Transformer bh 10.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 10.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 3

C.4 Lantai 4
1 Ceiling Speaker 3 Watt + Matching Transformer bh 12.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 12.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 4

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis
VI.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm Lobby m 18.00

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 400 mm x 100 mm m 74.00

2 Lantai 2
Kabel Tray 400 mm x 100 mm m 46.00
Kabel Tray 300 mm x 100 mm m 15.00

3 Lantai 3
Kabel Tray 400 mm x 100 mm m 48.00

4 Lantai 4
Kabel Tray 400 mm x 100 mm m 3.00
Kabel Tray 300 mm x 100 mm m -
Kabel Tray 200 mm x 100 mm m 42.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning

TOTAL TESTING & COMMISSIONING

PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VIII.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Fixture Unit
- Indoor Fixed Dome IP Camera + thermal detector bh 5.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 5.00

Sub Total Lantai 1

B.2 Lantai 2
1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

Sub Total Lantai 2

B.3 Lantai 3
1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

Sub Total Lantai 3


B.4 Lantai 4 + Atap
1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

Sub Total Lantai 4 + Atap

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis
XII PEKERJAAN PLUMBING
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Instalasi Air Hujan


1 Roof Drain :
- dia.100 mm bh 8.00
- dia. 80 mm bh 6.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia .100 mm m' 187.00
- dia . 80 mm m' 131.00

SUB TOTAL SALURAN AIR HUJAN

XII.B Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Instalasi Sprinkler pada Bangunan


A.1 Lantai 1
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 31.00
- dia. 50 mm m' 8.00
- dia. 40 mm m' 5.00
- dia. 32 mm m' 11.00
- dia. 25 mm m' 34.00
- dia. 25 mm Drooper m' 12.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 50 mm m' -

3 Head Splinker type Pendant bh 22.00

Sub Total Lantai 1

A.2 Lantai 2
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 80 mm m' 4.00
- dia. 65 mm m' 28.00
- dia. 50 mm m' 8.00
- dia. 40 mm m' 4.00
- dia. 32 mm m' 6.00
- dia. 25 mm m' 19.00
- dia. 25 mm Drooper m' 9.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 50 mm m' -

3 Head Splinker type Pendant bh 16.00

Sub Total Lantai 2

A.3 Lantai 3
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 28.00
- dia. 50 mm m' 19.00
- dia. 40 mm m' 8.00
- dia. 32 mm m' 12.00
- dia. 25 mm m' 35.00
- dia. 25 mm Drooper m' 12.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 50 mm m' -

3 Head Splinker type Pendant bh 22.00

Sub Total Lantai 3

A.4 Lantai 4
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' 25.00
- dia. 50 mm m' 32.00
- dia. 40 mm m' 8.00
- dia. 32 mm m' 7.00
- dia. 25 mm m' 30.00
- dia. 25 mm Drooper m' 13.00
HARGA SATUAN JUMLAH HARGA

196,035 1,960,350
451,920 -
322,382 -
297,900 2,979,000

492,500 -

597,400 -

4,939,350

196,035 1,960,350
451,920 -
322,382 -
297,900 2,979,000

492,500 -

597,400 -

4,939,350

196,035 1,960,350
451,920 -
322,382 -
297,900 2,979,000

492,500 -

597,400 -

4,939,350

196,035 2,352,420
451,920 -
322,382 -
297,900 3,574,800

492,500 -

597,400 -

5,927,220

20,745,270

500,000 500,000

500,000

21,245,270
-

307,600 5,536,800

293,400 21,711,600

293,400 13,496,400
253,000 3,795,000

293,400 14,083,200

293,400 880,200
253,000 -
199,900 8,395,800

67,899,000

67,899,000

139,500,000 697,500,000

936,100 4,680,500

702,180,500

5,901,300 17,703,900

936,100 2,808,300

20,512,200

5,901,300 17,703,900

936,100 2,808,300

20,512,200
5,901,300 17,703,900

936,100 2,808,300

20,512,200

763,717,100

1,000,000 1,000,000

1,000,000

764,717,100

296,888 2,375,100
279,825 1,678,950

153,900 28,779,300
105,190 13,779,890

46,613,240

300,000 300,000

300,000

46,913,240

259,530 8,045,430
178,730 1,429,840
133,880 669,400
112,210 1,234,310
85,310 2,900,540
85,310 1,023,720

178,730 -

80,010 1,760,220

17,063,460

328,950 1,315,800
259,530 7,266,840
178,730 1,429,840
133,880 535,520
112,210 673,260
85,310 1,620,890
85,310 767,790

178,730 -

80,010 1,280,160

14,890,100

259,530 7,266,840
178,730 3,395,870
133,880 1,071,040
112,210 1,346,520
85,310 2,985,850
85,310 1,023,720

178,730 -

80,010 1,760,220

18,850,060

259,530 6,488,250
178,730 5,719,360
133,880 1,071,040
112,210 785,470
85,310 2,559,300
85,310 1,109,030
NO. JENIS PEKERJAAN SAT. VOLUME

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 47.00

3 Head Splinker type Pendant bh 23.00

Sub Total Lantai 4

TOTAL INSTALASI FIRE SPLINKER DALAM BANGUNAN

XV.B Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 2.00
Lantai 2 bh 2.00
Lantai 3 bh 2.00
Lantai 4 bh 2.00

TOTAL FIRE EXTINGUISHER

XV.C Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL PEKERJAAN PENGKABELAN

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

A.1 Lantai Atap


1 IU-OU-GD.F.LA.1 s/d GD.F.LA.1A unit 2.00
- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Mesin Lift

Sub Total Lantai Atap

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan


C.1 Lantai ATAP
1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail

IU-OU-GD.F.LA.1
6,4 mm + 12,7 mm m 4.00
IU-OU-GD.F.LA.1A
6,4 mm + 12,7 mm m 4.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis

- dia. 20 mm m 9.00

Sub Total Lantai ATAP

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Listrik / Pengkabelan


D.1 Lantai Atap
1 Pengkabelan unit AC dari P.LIFT.E ke masing-masing unit
- NYM 3 x 4 mm² ke IU-OU-GD.F.LA.1
m 9.00
- NYM 3 x 4 mm² ke IU-OU-GD.F.LA.1A
m 10.00
2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 8.00

Sub Total Lantai Atap

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.E Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

1 LIFT BED / PASSENGER (L.B/P-5 & L.B/P-6) unit 2.00


Spesifikasi :
- Type : Machine Room Bed Elevator
- Kapasitas : 1600 kg
- Kecepatan : 60 Mpm
- Travel : 9.180 mm
- Travel Height : 15.180 mm
- Jumlah pemberhentian : 3 bh
- Jumlah Pintu : 3 bh
- Hoistway Size ( W x D ) : 2.400 x 3.000 mm
- Car Size ( W x D x H ) : 1.400 x 2.400 x 2.400 mm
- Type Pintu : 2 - Side Opening Door
- Lebar Pintu : 1.300 mm
- Tinggi Pintu : 2.100 mm
- Overhead : 4.500 mm
- Pit : 1.500 mm
- Kontrol : AC Gearred (OHT) VVVF Control
- Cara Operasi : Duplex Operation
- Penggerak : Traction Drive AC - Gearless
- Car Wall Finishing : Hairline Stainless Steel
- Power : Sesuai Seleksi Unit
termasuk interfacing dengan General Fire Alarm

2 ARD berikut Kelengkapannya unit 2.00


3 Instalasi pengkabelan dari Panel Lift ke mesin dan panel kontrol lot 1.00
4 Supervisory panel lengkap terpasang di R. Kontrol unit 2.00
5 Biaya pemasangan Lift unit 2.00
6 BiayaTransportasi unit 2.00
7 Tesing Commissioning, Ijin-ijin, dll. unit 2.00
8 Biaya scapolding / perancah lot 1.00

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

178,730 8,400,310

80,010 1,840,230

27,972,990

78,776,610

819,000 1,638,000
819,000 1,638,000
819,000 1,638,000
819,000 1,638,000

6,552,000

750,000 750,000

750,000

86,078,610

5,940,000 11,880,000

11,880,000

11,880,000

273,470 1,093,880
273,470 1,093,880

61,550 553,950

2,741,710

2,741,710

24,150 217,350
24,150 241,500
15,698 125,584

584,434

584,434

500,000 500,000

500,000

15,706,144

640,000,000 1,280,000,000

termasuk
25,000,000 25,000,000
termasuk
40,000,000 80,000,000
60,000,000 120,000,000
25,000,000 50,000,000
termasuk

1,555,000,000
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BA
G. LOBBY, KORIDOR
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNAN
G. LOBBY, KORIDOR
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
T KUPANG NTT BANGUNAN : GEDUNG

TOTAL
115,458,143
-
-
-
16,305,920
109,525,300
-
-
-
-
-
116,694,245
-
-
4,595,000
-
-

362,578,608
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BA
G. LOBBY, KORIDOR
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


A.1 Koridor Lantai 1
1 Down Light LED E27 13 Watt Bulb + Cover bh 37.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 10.00
3 TLED 1 X 14 Watt (Balk) bh 33.00
4 TLED 1 X 14 Watt (Balk) + Nicad Battery bh 4.00
5 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 84.00

Sub Total Koridor Lantai 1

A.2 Koridor Lantai 2


1 Down Light LED E27 13 Watt Bulb + Cover bh 23.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 5.00
3 Exit Lamp LED 8 Watt bh 1.00
4 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 29.00

Sub Total Koridor Lantai 2

A.3 Koridor Lantai 3


1 Down Light LED E27 13 Watt Bulb + Cover bh 9.00
2 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 2.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 11.00

Sub Total Koridor Lantai 3

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.B Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


C.1 Lantai 1
1 Ceiling Speaker 3 Watt + Matching Transformer bh 19.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 19.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 1

C.2 Lantai 2
1 Ceiling Speaker 3 Watt + Matching Transformer bh 8.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 8.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 2

C.3 Lantai 3
1 Ceiling Speaker 3 Watt + Matching Transformer bh 5.00
2 Volume Control bh -
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 5.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Lantai 3

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 400 mm x 100 mm m 114.00
Kabel Tray 300 mm x 100 mm m 93.00
Kabel Tray 200 mm x 100 mm m 101.00

2 Lantai 2
Kabel Tray 400 mm x 100 mm m 31.00
Kabel Tray 300 mm x 100 mm m 28.00

3 Lantai 3
Kabel Tray 400 mm x 100 mm m 31.00
Kabel Tray 300 mm x 100 mm m 28.00
TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Instalasi Air Hujan


1 Roof Drain :
- dia. 100 mm bh 10.00
- dia. 80 mm bh 18.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia . 200 mm m' 88.00
- dia . 150 mm m' 122.00
- dia . 100 mm m' 76.00
- dia . 80 mm m' 216.00

SUB TOTAL SALURAN AIR HUJAN

XII.B Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis
TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Instalasi Sprinkler pada Bangunan


A.1 Lantai 1
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 50 mm m' -
- dia. 40 mm m' -
- dia. 32 mm m' -
- dia. 25 mm m' -
- dia. 25 mm Drooper m' -

2 Head Splinker type Pendant bh -

Sub Total Lantai 1

A.2 Lantai 2
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 65 mm m' -
- dia. 50 mm m' -
- dia. 40 mm m' -
- dia. 32 mm m' -
- dia. 25 mm m' -
- dia. 25 mm Drooper m' -

2 Head Splinker type Pendant bh -

Sub Total Lantai 2

A.3 Lantai 3
1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 50 mm m' -
- dia. 40 mm m' -
- dia. 32 mm m' -
- dia. 25 mm m' -
- dia. 25 mm Drooper m' -

2 Head Splinker type Pendant bh -

Sub Total Lantai 3

TOTAL INSTALASI FIRE SPLINKER DALAM BANGUNAN

XV.B Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 2.00
Lantai 2 bh 2.00
Lantai 3 bh 1.00

TOTAL FIRE EXTINGUISHER

XV.C Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL PEKERJAAN TESTING

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis
TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG
JUTAN RUMAH SAKIT KUPANG NTT BANGUNAN : GEDUNG

HARGA SATUAN JUMLAH HARGA

372,527 13,783,514
1,481,731 14,817,306
483,571 15,957,850
1,526,007 6,104,028
321,800 27,031,200

77,693,897

372,527 8,568,130
1,481,731 7,408,653
1,349,254 1,349,254
321,800 9,332,200

26,658,237

372,527 3,352,747
1,481,731 2,963,461
321,800 3,539,800

9,856,008

114,208,143

1,250,000 1,250,000

1,250,000

115,458,143

-
196,035 3,724,665
451,920 -
322,382 -
297,900 5,660,100

492,500 -

597,400 -

9,384,765

196,035 1,568,280
451,920 -
322,382 -
297,900 2,383,200

492,500 -

597,400 -

3,951,480

196,035 980,175
451,920 -
322,382 -
297,900 1,489,500

492,500 -

597,400 -

2,469,675

15,805,920

500,000 500,000

500,000

16,305,920

307,600 -

293,400 33,447,600
253,000 23,529,000
199,900 20,189,900

293,400 9,095,400
253,000 7,084,000

293,400 9,095,400
253,000 7,084,000
109,525,300

109,525,300

296,888 2,968,875
279,825 5,036,850

440,670 38,778,960
288,460 35,192,120
153,900 11,696,400
105,190 22,721,040

116,394,245

300,000 300,000

300,000

116,694,245

-
178,730 -
133,880 -
112,210 -
85,310 -
85,310 -

80,010 -

259,530 -
178,730 -
133,880 -
112,210 -
85,310 -
85,310 -

80,010 -

178,730 -
133,880 -
112,210 -
85,310 -
85,310 -

80,010 -

819,000 1,638,000
819,000 1,638,000
819,000 819,000

4,095,000

500,000 500,000

500,000

4,595,000
-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BAN
(ISOLASI COVID)
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII
XVIII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNA: G
(ISOLASI COVID)
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG PEKERJAAN PNEUMATIC TUBE

TOTAL
KUPANG NTT BANGUNA: GEDUNG J

TOTAL
1,324,864,549
-
-
110,017,013
41,457,271
68,749,248
16,059,113
311,798,848
368,121,100
5,689,000
-
413,083,068
-
185,606,880
148,092,649
1,611,401,740
-

4,604,940,479
NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 SDP. J unit 1.00
1 PP. J unit 1.00
2 P.AC-J unit 1.00
3 PC. COVID unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B Pekerjaan UPS


Pengadaan dan pemasangan UPS (Back up time 30 minute) lengkap dengan earthing,
bonding, support/hanger dan semua material dan alat bantu yang diperlukan
sesuai gambar dan spesifikasi

1 UPS 10 KVA / 1PH UPS PC. COVID UNIT 1.00

TOTAL PEKERAJAAN UPS

I.C Pekerjaan Isolation Transformer Medis Lengkap Dengan Panel


Sistem Isolation Transformer Medis Tunggal, Floor Standing lengkap dengan
breaker, pre-safety-system Isolation Transformer Insulation
Monitor Device, load sensor dan kelengkapan lainnya

1 PC. COVID unit 1.00


- Isolating Transformer 10 KVA/1ph with 1 pcs
Leakage current ≤0,5mA
- Insulation Monitoring 1 pcs
- LOAD Monitoring & LOAD Breaker 1 pcs
- PSU FOR RAI 1 pcs
- Fault Locator 2 pcs
- MCB 2P/50A/10Ka for main in & main out 2 pcs
- MCB 2P/10A/6Ka for Distribution 7 pcs
- Surge Arrester tipe 1/1P+N 8kA 1 pcs
- MCB 1P/6A/4,5ka for Protection Unit 1 pcs
- Wiring and ALL Acc.Components Panel 1 lot

2 Central Remote Alarm Indicator unit 1.00

3 Pengkabelan kontrol dengan STP AWG 18 1 pair ls 1.00

TOTAL PEKERAJAAN ISOLATION TRANSFORMER

I.D PEKERJAAN KABEL FEEDER


1 Dari PDTR-1 :
NYY 4 (2 x 1 x 185 mm2) ke SDP. J mtr 257.00

2 Dari SDP. J :
NYY 4 x 25 mm2 ke PP-J mtr 11.00
NYY 4 x 150 mm2 ke P.AC-J mtr 13.00
NYY 3 x 16 mm2 ke PC. COVID mtr 15.00

TOTAL PEKERJAAN KABEL FEEDER

I.E Pekerjaan Kabel Ladder dan Kabel Tray


E.1 Kabel Ladder

SUB TOTAL KABEL LADDER

E.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 37.00
- uk. 300 mm x 50 mm m 21.00

SUB TOTAL KABEL TRAY


TOTAL PEKERJAAN KABEL TRAY DAN LADDER

I.F PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 6 mm² m' 11.00
2 BCC 95 mm² m' 20.00
3 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.G PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 RM TLED 3 x 8 Watt + Cover bh 2.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 2.00
3 RM TLED 2 x 14 Watt + Cover bh 13.00
4 RM TLED 2 x 14 Watt + Cover c/w Nicad Battery bh 13.00
5 TLED 2x14 Watt (Balk) bh 1.00
6 TLED 2x14 Watt (Balk) c/w Nicad Battery bh 4.00
7 Lampu Bed TLED 8 Watt bh 12.00
8 Down Light LED E27 13 Watt Bulb + Cover bh 42.00
9 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 3.00
10 Down Light LED E27 6 Watt Bulb + Cover bh 32.00
11 Exit Lamp LED 8 Watt bh 1.00
12 Stop Kontak 1 Ph 200 Watt bh 30.00
13 Stop Kontak 1 Ph 200 Watt (Back Up UPS + Trafo Isolasi) bh 36.00
14 Stop Kontak Bed 1 Ph 200 Watt bh 12.00
15 Stop Kontak Ceiling TV 1Ph 200 Watt bh 12.00
16 Stop Kontak Ceiling Access Point 1 Ph 200 Watt bh 2.00
17 Saklar Tunggal bh 69.00
18 Saklar Ganda bh 2.00
19 Saklar Hotel bh -
20 Grid Switch 8 Gang bh 1.00
21 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 125.00
22 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 92.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.H Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama


1 Module Module :
Addressable Monitor Module u/ Detektor unit 1.00
Addressable Control Module u/ Horn & Stobe unit 1.00
Addressable Mini Module u/ Manual call point / Break Glass unit 1.00
Addressable Mini Module (2 input) Flow Switch / BCV unit 1.00
Addressable Relay Module P. AC unit 1.00

TOTAL PERALATAN UTAMA

IV.B Kabel Utama


1 Kabel STP AWG #18 1 pair dari MDFA (Loops) dalam conduit PVC HI dia. 20 mm
- TB.FA m 208.00

2 Kabel ITC 2 x 2 x dia. 0,6 mm dari MDF.FA dalam conduit PVC HI dia. 20 mm
- TB. FA m 104.00
3 Kabel NYA 3 x 1,5 mm2 untuk kabel Power Horn & Strobe
dalam conduit PVC HI dia. 20 mm m 104.00
- TB. FA

4 Kabel NYA 2 x 1,5 mm2 untuk Power Module dalam conduit PVC HI dia. 20 mm
- TB. FA m 104.00

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


1 Terminal Box (TB. FA - 1) unit 1.00
2 Horn & Strobe bh 2.00
3 Manual Break Glass bh 2.00
4 Addresable Rate of Rise Detector bh 7.00
5 Addresable Fixed Heat Detector bh 4.00
6 Addressable Smoke Detector bh 27.00
7 Smoke Detector Photoelectric bh 4.00
8 Rate of Rise Detector bh -
9 Fixed Heat Detector bh -
10 Telephone Jack bh 2.00
11 End off line bh 7.00
12 P.AC.1 bh 1.00
13 Flow Switch bh 1.00

14 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 35.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 4.00
Instalasi Horn & Strobe NYA 3 x 1,5 mm2 titik 2.00
Instalasi Manual Break Glass NYA 2 x 1,5 mm2 titik 2.00
Instalasi Telephone Jack ITC 2 x d 0,6 mm titik 2.00
Instalasi PAC NYA 3 x 1,5 mm2
titik 1.00
Instalasi Flow Switch NYA 3 x 1,5 mm2
titik 1.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - GD.J NYMHY 2(3 x 2.5 mm2) m 105.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


1 Terminal Box Sound System (TB. TS. GD.J) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 45.00
3 Volume Control bh 13.00
4 Emergency Speaker 6 Watt bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 45.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 13.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 1J m 198.00

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub 24 port bh 1.00

2 Outlet :
- Outlet Access Point RJ 45 bh 2.00
- Outlet Data RJ 45 bh 10.00
- Outlet Telepon RJ 45 bh 10.00

3 Fixture Unit
- Access Point bh 2.00
- Pesawat Telepon IP Extention bh 10.00

4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 2.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 10.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 10.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -
C.2 Kabel Tray
1 Lantai 1
Kabel Tray 200 mm x 100 mm m 68.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

Sub Total PEKERJAAN MATV

VII.B Pekerjaan Instalasi Dalam Bangunan


1 Splitter 6 Way Unit 2.00
2 Splitter 2 Way Unit 1.00
3 Booster Unit 1.00
4 Outlet TV Unit 12.00
5 Instalasi kabel Outlet TV, coaxial RG6 (5C/2 volt) dakan konduit PVC HI dia. 20 mm titik 12.00
6 Instalasi kabel Splitter, Coaxial RG-11 (7C) dalam konduit PVC HI dia. 20 mm m 185.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi MATV lot 1.00

TOTAL TESTING & COMMISSIONING


TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m 198.00

Sub Total Pengkabelan Utama

VIII.B Pekerjaan Instalasi Dalam Bangunan


1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 2.00
- Indoor Fixed Dome IP Camera + thermal detector bh 2.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 4.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IX.A Instalasi Dalam Bangunan


1 Master Terminal (with call history) Unit 1.00
2 LCD Corridor Display - Double Sided Unit 1.00
3 LED Door Light Buah 12.00
4 Bed Terminal Call Button Buah 12.00
5 Room Terminal Buah 12.00
6 Bathroom Call Button Buah 12.00
7 Instalasi Nurse Call dengan UTP Cat 6 dalam konduit PVC HI 20 mm titik 50.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

IX.B Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


Sub Total Peralatan Utama

X.B Pengkabelan DDC

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair
PANEL PP
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.AC.KITCHEN
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Peralatan Utama

1 Reverse Osmosis (RO) 2 Bed set 1.00


a Production Capacity: 800GPD / 150 LPH @ 25°C
Salt Rejection: 96-98%
Recovery Rate: 50-75%
Connection: 3/8”Feed, 1/2”Permeate, 1/2”Concentrate

b Main Components:
RO Membrane: Optional 2.5”x40”
Membrane Housing: SS304 body+ABS end caps-2054 x 1pc
Pump: Italian Rotary Vane Pump 400LPH 12Bar + 1/2HP
Frame: Electro-Plated SS304
Pre-Filter: (20” KF Housing + PP Cartridge 5um) x 2 sets
Solenoid Valve x 2
Low Pressure Switch x 1
Concentrate Recycling Valve x 1
Product Storage Tank SUS 304 500 L

c Control Panel Components


RO Controller: Pre-programmed RO working procedures
+ permeate TDS monitor
Pressure Gauges x 2: Filter Feed + RO Feed
Flow Meters x 2: RO Permeate + RO Concentrate
Pressure Regular: SS316
Main Power Switch x 1

SUB TOTAL PERALATAN UTAMA

A.2 Pekerjaan instalasi pipa air bersih dan panas


1 Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 57.00
- dia. 50 mm m' 13.00
- dia. 40 mm m' 33.00
- dia. 32 mm m' 20.00
- dia. 25 mm m' 13.00
- dia. 20 mm m' 220.00
- dia. 15 mm m' 80.00

2 Instalasi pipa RO System cabang dan toilet dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 25 mm m' 7.00
- dia. 20 mm m' 25.00
- dia. 15 mm m' 63.00
3 Instalasi pipa gravitasi dari Roof Tank Lantai Atap Gd. C ke Gd. J dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 201.00

4 Instalasi pipa air panas cabang dan toilet dengan PPR80 - PN20
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 97.00
- dia. 15 mm m' 9.00

5 Gate Valve 10K


- dia. 65 mm bh 2.00

6 Ball Valve 10K :


- dia. 32 mm bh 17.00
- dia. 25 mm bh 2.00
- dia. 20 mm bh 36.00
- dia. 15 mm bh 6.00

6 Check Valve 10K


- dia. 65 mm bh 1.00

7 Water Heater Elektrik


Kapasitas : 15 Liter bh 16.00

8 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

SUB TOTAL PEKERJAAN INST. AIR BERSIH DALAM BANGUNAN

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


B.1 Peralatan Utama
1 Pre Treatment Limbah Air Kotor & Bekas Irna Covid Kap.9 m3/jam Lot 1.00

- Bioreactor tank
: 1 unit
Dimensi
: Dia 2300 x 4710 (mm)
Include
: Media

- Blower
: 2 unit
Model
: LP 30
Capacity
: 30 Lpm

- Blower
: 1 unit
Model
: LP 60
Capacity
: 60 Lpm

- Chlorinenation System
: 1 Lot
Include
: Dosing Pump, Chemical Tank

- Pipes and valves


: 1 Lot
Merk PVC Pipe
: Wavin
Class PVC
: AW (10 Kg/cm2)

- Cables
: 1 Lot
Type
: NYY - 0,6/1 KV

- Electrical control panel


: 1 Lot
Component
: MCCB, MCB, Contactor, Selector Dll
Material
: Plate 2 mm with power coating
Location
: Indoor

: 1 Lot
- Testing and comissioning

Lengkap dengan petunjuk


pengoperasian
shop drawing, pelatihan,
operator
Testing and comissioning

SUB TOTAL PERALATAN UTAMA

B.2 Pekerjaan Instalasi Pipa Air Kotor, Kotor & Vent dalam bangunan
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 134.00
2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 37.00
- dia. 80 mm m 61.00
- dia. 50 mm m 63.00
- dia. 40 mm m 16.00
1 Instalasi Pipa Utama Air Kotor Kimia dengan Pipa Cast Iron
termasuk gantungan/hanger, support, fitting dan aksesories :
Dari Shaft ke Bak Sumpit
- dia. 80 mm m' 22.00
- dia. 50 mm m' 19.00

3 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m 59.00
- dia. 32 mm m 13.00

4 Floor Clean Out :


- dia. 100 mm bh 5.00
- dia. 80 mm bh 5.00

5 Vent Cup
- dia. 50 mm bh 4.00

SUB TOTAL AIR KOTORAN, KOTOR DAN VENT DALAM BANGUNAN

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan


1 Roof Drain :
- dia. 100 mm bh 4.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia .100 mm m' 32.00

SUB TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XIV.A Instalasi dalam Bangunan


1 Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan aksesories :

Instalasi Jaringan Oxygen (O)
- Diameter 15,88 mm M 54.00
- Diameter 12,7 mm M 72.00
- Diameter 12,7 mm Drooper M 36.00

Instalasi Jaringan Vacuum (V)


- Diameter 22,23 mm M 30.00
- Diameter 19,05 mm M 24.00
- Diameter 15,88 mm M 72.00
- Diameter 15,88 mm Drooper M 36.00

Instalasi Jaringan Medical Air 4 bar (A4)
- Diameter 15,88 mm M 54.00
- Diameter 12,7 mm M 72.00
- Diameter 12,7 mm Drooper M 36.00

2 Outlet Gas Medis


- Wall Outlet Oxygen (O), pin index, push type Buah 12.00
- Wall Outlet Medical Air 4 Bar (A4), pin index, push type, slide base Buah 12.00
- Wall Outlet Vacuum (V), pin index, push type, slide base Buah 12.00

3 Zona Valve 3 Gas (O, A,V) + Alarm Set 1.00

4 Bedhead Unit Aluminium 1200mm Unit 12.00

5 Ball Valve 15 mm Buah 2.00

6 Ball Valve 20 mm Buah 1.00

TOTAL INSTALASI DALAM BANGUNAN

XIV.E Pekerjaan Testing & Commissioning


1 Testing & Commissioning Peralatan dan Instalasi Medical Gas lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Instalasi Pemipaan Riser Tegak


A.1 Fire Hydrant
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting, gantungan/hanger/ssupport dan aksesoriesnya :
- dia. 80 mm Dari Pipa Site Plan ke Shaft m' 12.00
- dia. 25 mm m' 2.00

2 Gate Valve Non Rising Steam 16K :


- dia. 80 mm (Lokasi masuk bangunan) bh 1.00
- dia. 25 mm bh 1.00

3 Air Release Vent (ARV) dia. 25 mm bh 1.00

4 Pressure Gauge + gate valve bh 1.00

A.2 Sprinkler
1 Instalasi pipa utama dengan pipa Black steel Sch. 40
termasuk fitting dan aksesoriesnya :
- dia. 80 mm Dari Pipa Site Plan ke Shaft m' 12.00
- dia. 25 mm m' 2.00

2 Main Control Valve dia. 80 mm + Alarm Gong


- dia. 80 mm set 1.00

3 Gate Valve Non Rising Steam class 16K :


- dia. 80 mm (Lokasi masuk bangunan)
bh 1.00
- dia. 25 mm bh 1.00

4 Air Release Vent (ARV) dia. 25 mm bh 1.00

5 Vent Out dia. 80 mm bh 1.00

TOTAL PEMIPAAN DAN KATUP-KATUP RISER TEGAK

XV.B Instalasi Fire Hydrant Dalam Bangunan


1 Hydrant Box Type Indoor lengkap terpasang unit 2.00
ukuran : 125 x 75 x 18 cm, Cat Bakar
- 1 pc Hose Nozzle dia. 40 mm
- 1 pc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB
- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m

2 Instalasi Pipa Cabang dengan Pipa Black Steel Sch. 40


termasuk fitting, gantungan/hanger/support dan aksesories :
- dia. 80 mm m' 12.00
- dia. 65 mm m' 41.00
- dia. 40 mm m' 2.00

3 Landing Valve 16K :


- dia. 65 mm bh 2.00

3 Gate Valve :
- dia. 65 mm bh 2.00
TOTAL INSTALSI FIRE HYDRANT DALAM BANGUNAN

XV.C Instalasi Sprinkler pada Bangunan


1 Instalasi sprinkler dengan Pipa Black Steel Sch. 40 termasuk
fitting, gantungan/hanger/support dan aksesories :
- dia. 80 mm m' 25.00
- dia. 65 mm m' 25.00
- dia. 50 mm m' 4.00
- dia. 40 mm m' 6.00
- dia. 32 mm m' 19.00
- dia. 25 mm m' 132.00
- dia. 25 mm Drooper m' 25.00

2 Instalasi Pipa Test Drain Black Steel Sch. 40 termasuk


fitting, gantungan/hanger/support dan aksesories :
- dia. 25 mm m' 11.00

3 Branch Control Valve dia. 80 mm terdiri dari : set 1.00


- Butterfly Valve with Tamper Switch dia. 100 bh = 1 bh
- Flow Switch dia. 100 mm = 1 bh
- Sight Glass = 1 bh
- Test Drain Valve = 2 bh

4 Head Splinker type Pendant bh 46.00

TOTAL INSTALASI FIRE SPLINKER DALAM BANGUNAN

XV.D Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 3.00

2 Fire Extingusher type CO2 5 kg


Lantai 1 bh 3.00
TOTAL FIRE EXTINGUISHER

XV.E Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL PEKERJAAN PENGKABELAN

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

1 AHU-GD.J.1.1 & AHU-GD.J.1.2 ( 1 unit Standby ) unit 2.00


- Type : Horizontal Draw Thru - Double Skin
Floor Standing
- Kapasitas : 458.400 BTUH
- Sensible : 320.880 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 6.310 cfm
- Ext. Static Pressure : 2,5 Inch Wg
- Lokasi : Ruang AHU

2 IU-OU-GD.J.1.1 unit 1.00


- Type : Split Duct c/w Pre Filter, Medium Filter
c/w Electric Heater
- Kapasitas : 16.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 355 cfm
- Lokasi : Ruang Mobile X-Ray

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit
c Medium Filter lengkap dengan housing set 1.00
type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

3 IU-OU-GD.J.1.2 s/d IU-OU-GD.J.1.7 unit 6.00


- Type : Split Duct c/w Pre Filter, Medium Filter
c/w Electric Heater
- Kapasitas : 16.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 355 cfm
- Lokasi : Ruang Isolasi 1 s/d Ruang Isolasi 6

b Pre Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 1.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

4 IU-OU-GD.J.1.8 & IU-OU-GD.J.1.9 ( 1 Unit Standby ) unit 2.00


- Type : Wall Mounted
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Panel

5 IU-OU-GD.J.1.10 & IU-OU-GD.J.1.11 ( 1 Unit Standby ) unit 2.00


- Type : Wall Mounted
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang UPS

6 IU-OU-GD.J.1.12 s/d IU-OU-GD.J.1.17 unit 6.00


- Type : Split Duct c/w Pre Filter, Medium Filter
c/w Electric Heater
- Kapasitas : 16.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 355 cfm
- Lokasi : Ruang Isolasi 7 s/d Ruang Isolasi 12

b Pre Filter lengkap dengan housing set 6.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 80 - 85%
Material Resistance (Pa) : 75
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

c Medium Filter lengkap dengan housing set 6.00


type High Efficiency Catridge Filter Back Loading Methode
Euro Vent Standard
Everage Arrestance : 90 - 95%
Material Resistance (Pa) : 150
Face Felocity. MpM : 150
Size Frame : menyesuaikan ukuran unit

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


1 EF-GD.J.1.1 s/d EF-GD.J.1.12 unit 12.00
- Type : Ceiling Fan
- Kapasitas : 65 CFM
- Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : 0,04 KW / 220V / 1PH / 50 Hz

2 EF-GD.J.1.13A & EF-GD.J.1.13B ( 1 UNIT STANDBY ) unit 2.00


- Type : Axial - Plenum Box c/w Hepa Filter, medium Filter
- Material : Plate MS 1.5 mm
- Size : 2' x 2' x 5'
Pre Filter
- Type : G4 Washable
- Efficiency : 30 ~ 35% Based on 10 μm
- Size : 24" x 24" x 2"
HEPA Filter
- Type : H-13
- Efficiency : 99,999% Based on 0,3 μm
- Apply temperature : 80°C
- Size : 24" x 24" x 12"
- Kapasitas : 3.581 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 3,0 KW / 380V / 3PH / 50 Hz

3 EF-GD.J.1.14A & EF-GD.J.1.14B ( 1 UNIT STANDBY ) unit 2.00


- Type : Axial - Plenum Box c/w Hepa Filter, medium Filter
- Material : Plate MS 1.5 mm
- Size : 2' x 2' x 5'
Pre Filter
- Type : G4 Washable
- Efficiency : 30 ~ 35% Based on 10 μm
- Size : 24" x 24" x 2"
HEPA Filter
- Type : H-13
- Efficiency : 99,999% Based on 0,3 μm
- Apply temperature : 80°C
- Size : 24" x 24" x 12"
- Kapasitas : 3.581 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 3,0 KW / 380V / 3PH / 50 Hz
- Kapasitas : 4.010 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 3,0 KW / 380V / 3PH / 50 Hz

4 EF-GD.J.1.15 unit 1.00


- Type : Axial - Plenum Box c/w Hepa Filter, medium Filter
- Material : Plate MS 1.5 mm
- Size : 2' x 2' x 5'
Pre Filter
- Type : G4 Washable
- Efficiency : 30 ~ 35% Based on 10 μm
- Size : 24" x 24" x 2"
HEPA Filter
- Type : H-13
- Efficiency : 99,999% Based on 0,3 μm
- Apply temperature : 80°C
- Size : 24" x 24" x 12"
- Kapasitas : 3.581 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 3,0 KW / 380V / 3PH / 50 Hz
- Kapasitas : 4.010 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 3,0 KW / 380V / 3PH / 50 Hz
- Kapasitas : 1.350 CFM
- Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : 1,1 KW / 380V / 3PH / 50 Hz

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan


1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail
AHU/OU-AHU.GD.J.1.1 3/4" (19mm) + 2 1/8" (53mm) m 45.65
AHU/OU-AHU.GD.J.1.2 3/4" (19mm) + 2 1/8" (53mm) m 29.70
IU/OU-GD.J.1.1 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.2 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.3 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.4 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.5 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.6 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.7 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.8 1/4" (6,35mm) + 3/8" (9,52mm) m 11.00
IU/OU-GD.J.1.9 1/4" (6,35mm) + 3/8" (9,52mm) m 11.00
IU/OU-GD.J.1.10 1/4" (6,35mm) + 3/8" (9,52mm) m 22.00
IU/OU-GD.J.1.11 1/4" (6,35mm) + 3/8" (9,52mm) m 22.00
IU/OU-GD.J.1.12 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.13 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.14 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.15 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.16 1/4" (6,35mm) + 3/4" (16mm) m 22.00
IU/OU-GD.J.1.17 1/4" (6,35mm) + 3/4" (16mm) m 22.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis
- dia. 40 mm m 11.00
- dia. 32 mm m 4.40
- dia. 25 mm m 143.00
- dia. 20 mm m 16.50

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya

1 Unit Fan (EF-GD.J.1.13A & EF-GD.J.1.13B)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 52.00
- BjLS 60 m2 53.00
- BjLS 50 m2 97.00

b Ducting Plenum lot 1.00


Material : bjls
Size : 670 x 1340
Max : 5 m²

c Exhaust Air Grille (EAG)


- 450 mm x 250 mm bh 6.00
- 250 mm x 250 mm bh 6.00

d Exhaust Air Louvre (EAL)


- 1.600 mm x 800 mm bh 1.00

2 Unit Fan (EF-GD.J.1.14A & EF-GD.J.1.14B)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 69.00
- BjLS 60 m2 61.00
- BjLS 50 m2 95.00

b Ducting Plenum lot 1.00


Material : BJLS
Size : 670 x 1340
Max : 5 m²

c Exhaust Air Grille (EAG)


- 450 mm x 250 mm bh 9.00
- 250 mm x 250 mm bh 4.00

d Exhaust Air Louvre (EAL)


- 1.600 mm x 800 mm bh 1.00

3 Unit Fan (EF-GD.J.1.15)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 21.00
- BjLS 50 m2 38.00
b Ducting Plenum lot 1.00
Material : Polyisocyanurate Foam (PIR)
Size : 670 x 1340
Max : 5 m²

c Exhaust Air Grille (EAG)


- 300 mm x 300 mm bh 2.00
- 250 mm x 250 mm bh 2.00
- 150 mm x 150 mm bh 9.00

d Exhaust Air Louvre (EAL)


- 1.300 mm x 700 mm bh 1.00

4 Unit AC (IU-GD.J.1.1)
a Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
- BjLS 50 m2 4.00

b Supply Air Diffuser (SAD)


- 350 mm x 350 mm bh 1.00

c Volume Dumper (VD)


- 300 mm x 200 mm bh 1.00

5 Unit AC (IU-GD.J.1.2 s/d IU-GD.J.1.7)


a Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
- BjLS 50 m2 5.00

b Supply Air Diffuser (SAD)


- 300 mm x 300 mm bh 6.00
- 200 mm x 200 mm bh 6.00

c Volume Dumper (VD)


- 300 mm x 200 mm bh 6.00

6 Unit AC (IU-GD.J.1.12 s/d IU-GD.J.1.17)


a Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
- BjLS 50 m2 5.00

b Supply Air Diffuser (SAD)


- 300 mm x 300 mm bh 6.00
- 200 mm x 200 mm bh 6.00

c Volume Dumper (VD)


- 300 mm x 200 mm bh 6.00

7 Unit AC (AHU-GD.J.1.1 & AHU-GD.J.1.2)


a Ducting Bahan BJLS + isolasi elestomeric nitrille rubber class 0 lengkap dengan
gantungan/hanger/support dan aksesories lainya
- BjLS 50 m2 198.00

b Fresh Air Diffuser (FAD)


- 350 mm x 350 mm bh 1.00
- 250 mm x 250 mm bh 1.00
- 200 mm x 200 mm bh 11.00

c Intake Louvre c/w Pre Filter


- 1.400 mm x 600 mm bh 4.00

d Back Drop Damper (BDD)


- 600 mm x 600 mm bh 2.00

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER


HARGA SATUAN JUMLAH HARGA

44,255,000 44,255,000
9,457,000 9,457,000
21,330,000 21,330,000
TRAFO ISOLASI

75,042,000

120,000,000 120,000,000

120,000,000

142,375,000 142,375,000

19,125,000 19,125,000

6,162,500 6,162,500

167,662,500

2,820,720 724,925,040

205,275 2,258,025
1,135,050 14,755,650
101,430 1,521,450

743,460,165

353,000 13,061,000
211,600 4,443,600

17,504,600
17,504,600

6,893 75,823
107,494 2,149,880
14,700,000 14,700,000

16,925,703

1,360,594 2,721,188
2,403,118 4,806,236
1,205,715 15,674,295
2,248,239 29,227,107
881,139 881,139
1,923,663 7,694,652
354,799 4,257,590
372,527 15,646,151
1,481,731 4,445,192
284,327 9,098,477
1,349,254 1,349,254
52,763 1,582,875
52,763 1,899,450
52,763 633,150
52,763 633,150
52,763 105,525
44,163 3,047,247
48,794 97,587
46,242 -
361,515 361,515
321,800 40,225,000
400,900 36,882,800

181,269,581

3,000,000 3,000,000

3,000,000

1,324,864,549

1,659,000 1,659,000
1,602,694 1,602,694
1,020,863 1,020,863
1,621,463 1,621,463
1,328,670 1,328,670

7,232,689

51,424 10,696,230

61,950 6,442,800
25,305 2,631,720

22,995 2,391,480

22,162,230

630,525 630,525
795,769 1,591,538
289,013 578,025
1,092,315 7,646,205
1,092,315 4,369,260
1,373,846 37,093,849
581,805 2,327,220
491,715 -
491,715 -
487,961 975,923
6,379 44,651
by Others
by Others

550,600 19,271,000
231,500 926,000
460,000 920,000
231,500 463,000
497,000 994,000
517,700 517,700
773,200 773,200

79,122,095

1,500,000 1,500,000

1,500,000

110,017,013

51,454 5,402,636

5,402,636

800,100 800,100
196,035 8,821,575
451,920 5,874,960
322,382 -
297,900 13,405,500

492,500 6,402,500

597,400 -

35,304,635

750,000 750,000
750,000

41,457,271

27,276 5,400,648

5,400,648

2,200,000 2,200,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

135,000 270,000
135,000 1,350,000
135,000 1,350,000

1,390,000 2,780,000
1,135,000 11,350,000

936,100 1,872,200
936,100 9,361,000
936,100 9,361,000

48,805,400

307,600 -

199,900 13,593,200

13,593,200

950,000 950,000

950,000

68,749,248

533,108 1,066,215
261,548 261,548
1,658,475 1,658,475
80,325 963,900
533,800 6,405,600
26,775 4,953,375

15,309,113

750,000 750,000

750,000
16,059,113

27,276 5,400,648

5,400,648

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 11,802,600
139,500,000 279,000,000

936,100 3,744,400

305,398,200

1,000,000 1,000,000

1,000,000

311,798,848

104,907,100 104,907,100
46,285,200 46,285,200
1,458,000 17,496,000
2,721,600 32,659,200
9,448,400 113,380,800
1,324,400 15,892,800
600,000 30,000,000

360,621,100

7,500,000 7,500,000
7,500,000

368,121,100

-
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000

5,389,000

300,000 300,000

300,000

5,689,000

58,500,000 58,500,000

58,500,000

177,620 10,124,340
132,320 1,720,160
89,540 2,954,820
64,860 1,297,200
46,250 601,250
28,830 6,342,600
22,590 1,807,200

46,250 323,750
28,830 720,750
22,590 1,423,170
177,620 35,701,620

37,020 3,590,940
26,460 238,140

1,962,975 3,925,950

380,783 6,473,303
288,330 576,660
211,523 7,614,810
163,380 980,280

1,755,075 1,755,075

2,799,020 44,784,320

Scope Arsitek

132,956,338

191,456,338

157,011,530 157,011,530

157,011,530

153,900 20,622,600
153,900 5,694,300
105,190 6,416,590
63,440 3,996,720
48,250 772,000

333,500 7,337,000
234,680 4,458,920

48,250 2,846,750
40,840 530,920

409,500 2,047,500
286,650 1,433,250

211,575 846,300

57,002,850

214,014,380

296,888 1,187,550

153,900 4,924,800

6,112,350

1,500,000 1,500,000

1,500,000

413,083,068

194,080 10,480,320
133,120 9,584,640
133,120 4,792,320

259,840 7,795,200
215,780 5,178,720
194,080 13,973,760
194,080 6,986,880

194,080 10,480,320
133,120 9,584,640
133,120 4,792,320

1,704,420 20,453,040
1,704,420 20,453,040
1,704,420 20,453,040

37,298,640 37,298,640

skope arsitek

250,000 500,000

300,000 300,000

183,106,880

2,500,000 2,500,000

2,500,000

185,606,880

328,950 3,947,400
85,310 170,620

6,079,385 6,079,385
867,710 867,710

2,613,517 2,613,517

479,145 479,145

-
328,950 3,947,400
85,310 170,620

28,550,000 28,550,000

6,079,385 6,079,385
867,710 867,710

2,613,517 2,613,517

341,250 341,250

56,727,658

4,773,510 9,547,020

328,950 3,947,400
259,530 10,640,730
133,880 267,760

1,548,708 3,097,416

4,884,868 9,769,736
37,270,062

328,950 8,223,750
259,530 6,488,250
178,730 714,920
133,880 803,280
112,210 2,131,990
85,310 11,260,920
85,310 2,132,750

85,310 938,410

10,168,200 10,168,200

80,010 3,680,460

46,542,930

819,000 2,457,000

1,365,000 4,095,000
6,552,000

1,000,000 1,000,000

1,000,000

148,092,649

149,917,500 299,835,000

16,144,364 16,144,364

2,700,000 2,700,000
6,755,000 6,755,000

16,144,364 96,866,183

2,700,000 2,700,000

6,755,000 6,755,000

3,708,000 7,416,000

3,708,000 7,416,000

16,144,364 96,866,183

2,700,000 16,200,000

6,755,000 40,530,000

600,183,729

776,160 9,313,920
46,540,350 93,080,700

46,540,350 93,080,700

31,370,580 31,370,580

226,845,900
1,100,800 50,251,520
1,100,800 32,693,760
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 3,731,310
248,800 2,736,800
248,800 5,473,600
248,800 5,473,600
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620
339,210 7,462,620

98,760 1,086,360
87,250 383,900
68,940 9,858,420
61,550 1,015,575

209,718,905

267,020 13,885,040
204,930 10,861,290
184,580 17,904,260

1,500,000 1,500,000

345,800 2,074,800
247,000 1,482,000

1,497,600 1,497,600

267,020 18,424,380
204,930 12,500,730
184,580 17,535,100

1,500,000 1,500,000

345,800 3,112,200
247,000 988,000

1,497,600 1,497,600

204,930 4,303,530
184,580 7,014,040
1,500,000 1,500,000

296,400 592,800
247,000 494,000
148,200 1,333,800

1,248,000 1,248,000

372,650 1,490,600

391,300 391,300

520,000 520,000

372,650 1,863,250

335,400 2,012,400
223,600 1,341,600

520,000 3,120,000

372,650 1,863,250

335,400 2,012,400
223,600 1,341,600

520,000 3,120,000

372,650 73,784,700

391,300 391,300
279,500 279,500
223,600 2,459,600

1,248,000 4,992,000

1,248,000 2,496,000

224,728,670
T JENIS PEKERJAAN SAT. VOLUME

XVI.E Pekerjaan Kontrol


1 Magnehelic unit 12.00
2 UV Lamp unit 12.00
3 Panel Kontrol Otomatis lengkap pengkabelannya unit 12.00

TOTAL PEKERJAAN KONTROL

XVI.F Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan dari P.AC-1J ke masing-masing unit
- NYY 4 x 50 mm² ke AHU/OU-AHU.GD.J.1.1 m 32.00
- NYY 4 x 50 mm² ke AHU/OU-AHU.GD.J.1.2 m 26.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.1 m 73.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.2 m 62.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.3 m 52.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.4 m 50.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.5 m 40.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.6 m 37.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.7 m 28.00
- NYM 3 x 2,5 mm² ke IU/OU-GD.J.1.8 m 14.00
- NYM 3 x 2,5 mm² ke IU/OU-GD.J.1.9 m 13.00
- NYM 3 x 2,5 mm² ke IU/OU-GD.J.1.10 m 15.00
- NYM 3 x 2,5 mm² ke IU/OU-GD.J.1.11 m 17.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.12 m 29.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.13 m 38.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.14 m 42.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.15 m 50.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.16 m 53.00
- NYY 3 x 10 mm² ke IU/OU-GD.J.1.17 m 63.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.1 m 54.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.2 m 53.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.3 m 42.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.4 m 41.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.5 m 29.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.6 m 29.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.7 m 28.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.8 m 29.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.9 m 40.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.10 m 41.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.11 m 52.00
- NYM 3 x 2,5 mm² ke EF-GD.J.1.12 m 53.00
- NYY 4 x 4 mm² ke EF-GD.J.1.13A m 72.00
- NYY 4 x 4 mm² ke EF-GD.J.1.13B m 71.00
- NYY 4 x 4 mm² ke EF-GD.J.1.14A m 74.00
- NYY 4 x 4 mm² ke EF-GD.J.1.14B m 73.00
- NYY 4 x 4 mm² ke EF-GD.J.1.15 m 73.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 427.35

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.G Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG

XVIII PEKERJAAN PNEUMATIC TUBE

TOTAL PEKERJAAN PNEUMATIC TUBE


HARGA SATUAN JUMLAH HARGA

5,550,000 66,600,000
3,000,000 36,000,000
12,550,000 150,600,000

253,200,000

379,155 12,132,960
379,155 9,858,030
62,790 4,583,670
62,790 3,892,980
62,790 3,265,080
62,790 3,139,500
62,790 2,511,600
62,790 2,323,230
62,790 1,758,120
15,698 219,772
15,698 204,074
15,698 235,470
15,698 266,866
62,790 1,820,910
62,790 2,386,020
62,790 2,637,180
62,790 3,139,500
62,790 3,327,870
62,790 3,955,770
15,698 847,692
15,698 831,994
15,698 659,316
15,698 643,618
15,698 455,242
15,698 455,242
15,698 439,544
15,698 455,242
15,698 627,920
15,698 643,618
15,698 816,296
15,698 831,994
36,225 2,608,200
36,225 2,571,975
36,225 2,680,650
36,225 2,644,425
36,225 2,644,425

15,698 6,708,540

89,224,535

7,500,000 7,500,000

7,500,000

1,611,401,740

-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BA
INSTALASI GIZI
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII
XVIII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BANGUNAN :
INSTALASI GIZI
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG
PEKERJAAN GAS ELPIJI

TOTAL
AKIT KUPANG NT BANGUNAN : I.

TOTAL
941,752,306
-
-
57,283,107
26,551,914
50,777,948
-
30,676,648
-
109,822,179
-
89,038,590
-
-
4,914,000
291,685,743
-
140,467,005

1,742,969,440
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NT BA
INSTALASI GIZI
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 SDP KITCHEN unit 1.00
2 PP. KITCHEN unit 1.00
3 P. KITCHEN unit 1.00
4 P.AC - KITCHEN unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari PDTR-1 :
NYY 4 (3 x 1 x 185 mm2) ke SDP. KITCHEN mtr 155.00

2 Dari SDP KITCHEN


NYY 4 x 10 mm2 ke PP.KITCHEN mtr 9.00
NYY 4 x 95 mm2 ke P. KITCHEN mtr 10.00
NYY 4 x 16 mm2 ke P.AC.KITCHEN mtr 12.00

3 Dari P. KITCHEN
NYM 4 x 6 mm2 REFRIGERATOR mtr 42.00
NYM 4 x 6 mm2 MESIN CUCI mtr 35.00
NYM 4 x 4 mm2 AREA PERSIAPAN mtr 38.00
NYM 4 x 6 mm2 BOILING FAN mtr 32.00
NYM 4 x 4 mm2 BOILING FAN mtr 38.00
NYM 3 x 4 mm2 RICE COOKER mtr 32.00
NYM 3 x 4 mm2 RICE COOKER mtr 35.00
NYM 3 x 4 mm2 RICE COOKER mtr 36.00
NYM 3 x 4 mm2 RICE COOKER mtr 39.00
NYM 3 x 4 mm2 RICE COOKER mtr 42.00
NYM 3 x 4 mm2 RICE COOKER mtr 43.00
NYM 3 x 4 mm2 RICE COOKER mtr 45.00
NYM 3 x 4 mm2 RICE COOKER mtr 46.00
NYM 4 x 4 mm2 F. FAN mtr 42.00
NYM 4 x 4 mm2 F. FAN mtr 35.00
NYM 4 x 4 mm2 F. FAN mtr 9.00

TOTAL PEKERJAAN KABEL FEEDER

I.C Pekerjaan Kabel Ladder dan Kabel Tray


C.1 Kabel Ladder

SUB TOTAL KABEL LADDER

C.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 23.00
- uk. 300 mm x 50 mm m 14.00

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY DAN LADDER

I.D PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 6 mm² m' 9.00
2 BCC 10 mm² m' 12.00
3 BCC 50 mm² m' 10.00
4 BCC 95 mm² m' 20.00
5 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.E PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 RM TLED 3 x 8 Watt + Cover bh 39.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 15.00
3 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 1.00
4 Down Light LED E27 13 Watt Bulb + Cover bh 5.00
5 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 2.00
6 Down Light LED E27 6 Watt Bulb + Cover bh 5.00
7 Stop Kontak 1 Ph 200 Watt bh 27.00
8 Saklar Tunggal bh 17.00
9 Saklar Ganda bh 6.00
10 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC H titik 67.00
11 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 27.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.F Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
LANJUTAN RUMAH SAKIT KUPANG NT BANGUNAN : I.

HARGA SATUAN JUMLAH HARGA

54,264,000 54,264,000
6,461,000 6,461,000
27,114,000 27,114,000
7,632,000 7,632,000

95,471,000

4,231,080 655,817,400

80,903 728,127
736,575 7,365,750
134,033 1,608,396

45,885 1,927,170
45,885 1,605,975
32,603 1,238,914
45,885 1,468,320
32,603 1,238,914
24,150 772,800
24,150 845,250
24,150 869,400
24,150 941,850
24,150 1,014,300
24,150 1,038,450
24,150 1,086,750
24,150 1,110,900
32,603 1,369,326
32,603 1,141,105
32,603 293,427

683,482,524

353,000 8,119,000
211,600 2,962,400

11,081,400

11,081,400

6,893 62,037
19,997 239,964
47,366 473,660
107,494 2,149,880
14,700,000 14,700,000

17,625,541

1,360,594 53,063,174
2,403,118 36,046,773
881,139 881,139
372,527 1,862,637
1,481,731 2,963,461
284,327 1,421,637
52,763 1,424,588
44,163 750,771
48,794 292,761
321,800 21,560,600
400,900 10,824,300

131,091,841

3,000,000 3,000,000
NO. JENIS PEKERJAAN SAT. VOLUME
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR


HARGA SATUAN JUMLAH HARGA

3,000,000

941,752,306

-
NO. JENIS PEKERJAAN SAT. VOLUME

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama


1 Module Module :
Addressable Monitor Module u/ Detektor unit 1.00

TOTAL PERALATAN UTAMA

IV.B Kabel Utama


1 Kabel STP AWG #18 1 pair dari MDFA (Loops) dalam conduit PVC HI dia. 20 mm
- TB.FA m 258.00

2 Kabel NYA 2 x 1,5 mm2 untuk Power Module dalam conduit PVC HI dia. 20 mm
- TB. FA m 129.00

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


1 Terminal Box (TB. FA - 1.I) unit 1.00
2 Addresable Rate of Rise Detector bh 8.00
3 Addresable Fixed Heat Detector bh 4.00
4 Addressable Smoke Detector bh 8.00
5 Smoke Detector Photoelectric bh -
6 Rate of Rise Detector bh 4.00
7 Fixed Heat Detector bh -
8 End off line bh 1.00

9 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 20.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 4.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - H (GIZI) NYMHY 3(3 x 2.5 mm2) m 115.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


1 Terminal Box Sound System (TB. TS) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 25.00
3 Volume Control bh 4.00
4 Emergency Speaker 6 Watt bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 25.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 4.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub 1J m 198.00

Sub Total Pengkabelan Utama


HARGA SATUAN JUMLAH HARGA

1,659,000.00 1,659,000

1,659,000

51,424 13,267,439

22,995 2,966,355

16,233,794

630,525 630,525
1,092,315 8,738,520
1,092,315 4,369,260
1,373,846 10,990,770
581,805 -
491,715 1,966,860
491,715 -
6,379 6,379

550,600 11,012,000
231,500 926,000

38,640,314

750,000 750,000

750,000

57,283,107

77,181 8,875,759

8,875,759

800,100 800,100
196,035 4,900,875
451,920 1,807,680
322,382 -
297,900 7,447,500

492,500 1,970,000
597,400 -

16,926,155

750,000 750,000

750,000

26,551,914

27,276 5,400,648

5,400,648
NO. JENIS PEKERJAAN SAT. VOLUME

VI.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories bh 1.00
- Wiring Management 1U bh 2.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 2.00
- UTP Cat 6 Patch Cord, 1m bh 48.00
- Switch Hub 24 port bh 2.00

2 Outlet :
- Outlet Access Point RJ 45 bh 1.00
- Outlet Data RJ 45 bh 3.00
- Outlet Telepon RJ 45 bh 5.00

3 Fixture Unit
- Access Point bh 1.00
- Pesawat Telepon IP Extention bh 5.00

4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Po titik 1.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 3.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 5.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 200 mm x 100 mm m 48.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m 198.00

Sub Total Pengkabelan Utama

VIII.B Pekerjaan Instalasi Dalam Bangunan


1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 2.00
3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 2.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis
X PEKERJAAN BUILDING AUTOMATIC SYSTEM
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


1 P. DDC set 1.00
untuk 50 point

Sub Total Peralatan Utama

X.B Pengkabelan DDC


1 Kabel Power dari UPS di Ruang BAS ke: mtr 198.00
DDC : NYM 3 x 1,5 mm2 dalam Conduit PVC 20 mm

2 Kabel Data dari MCU di Ruang BAS ke: mtr 396.00


DDC STP AWG #18 dalam Conduit PVC 20 mm

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

PANEL SDP. KITCHEN


Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP. KITCHEN


Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
On - Off Digital Output Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP.AC.KITCHEN
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Pekerjaan instalasi pipa air bersih
1 Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m' 59.00
- dia. 50 mm m' 40.00
- dia. 40 mm m' 12.00
- dia. 32 mm m' 19.00
- dia. 25 mm m' 7.00
- dia. 20 mm m' 45.00
- dia. 15 mm m' 86.00

2 Instalasi pipa air panas cabang dan toilet dengan PPR80 - PN20
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 14.00
- dia. 15 mm m' 81.00

3 Ball Valve 10K


- dia. 50 mm bh 1.00
- dia. 32 mm bh 3.00
- dia. 25 mm bh 1.00
- dia. 20 mm bh 17.00

4 Water Heater Elektrik


Kapasitas : 30 Liter bh 6.00
Kapasitas : 15 Liter bh 2.00

5 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)
TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 16.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 23.00
- dia. 50 mm m 6.00

3 Instalasi Pipa Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 4.00
- dia. 80 mm m' 28.00
- dia. 50 mm m' 16.00
- dia. 40 mm m' 11.00

- Gater 200x400 mm m' 36.00


- Gater 200x200 mm m' 30.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 39.00
- dia. 40 mm m 20.00
- dia. 32 mm m 70.00

5 Floor Clean Out :


- dia. 100 mm bh 1.00
- dia. 80 mm bh 1.00

6 Vent Cup
- dia. 50 mm bh 4.00

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan

SUB TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
- Lantai 1 bh 6.00

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

1 IU-OU-GD.I.1.1
- Type : Wall Mounted Inverter unit 1.00
- Kapasitas : 15.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 450 cfm
- Lokasi : Ruang Diskusi

2 IU-OU-GD.I.1.2 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Kepala
3 IU-OU-GD.I.1.3
- Type : Wall Mounted Inverter unit 1.00
- Kapasitas : 15.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 450 cfm
- Lokasi : Ruang Diskusi

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.I.1.1 unit 1.00


- Type : Axial
- Kapasitas : 8.550 CFM
- Ext. Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Area Pengolahan

2 EF-GD.I.1.2 unit 1.00


- Type : In Line
- Kapasitas : 500 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Loading Area

3 EF-GD.I.1.3 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 250 CFM
- Static Pressure : 0,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : R. Panel

4 EF-GD.I.1.4 s/d GD.I.5 unit 2.00


- Type : Ceiling Fan
- Kapasitas : 100 CFM
- Static Pressure : 0,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet/Ruang Ganti

5 EF-GD.I.1.6 s/d GD.I.7 unit 2.00


- Type : Ceiling Fan
- Kapasitas : 50 CFM
- Ext. Static Pressure : 0,35 In Wg
- Putaran : 950 RPM
- Power : sesuai seleksi unit
- Lokasi : Janitor, R. Tabung Gas

6 IF-GD.I.1.1 unit 1.00


- Type : Axial
- Kapasitas : 7.690 CFM
- Ext. Static Pressure : 2,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Area Pengolahan

7 IF-GD.I.1.2 unit 1.00


- Type : In Line
- Kapasitas : 500 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Loading Area

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan


1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail

IU-OU-GD.I.1.1
6,4 mm + 12,7 mm m 4.00
IU-OU-GD.I.1.2
6,4 mm + 12,7 mm m 4.00
IU-OU-GD.I.1.3
6,4 mm + 12,7 mm m 4.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis
- dia. 20 mm m 14.00

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya


1 Unit Fan (EF-GD.I.1.1)
a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 32.00
- BjLS 60 m2 107.00
- BjLS 50 m2 10.00

b Ducting pipa PVC Class D lengkap dgn


gantungan/hanger/support dan aksesories lainnya :
- dia. 100 mm mtr 4.00

c Exhaust Air Grille (EAG)


- 650 mm x 350 mm bh 4.00
- 200 mm x 200 mm bh 6.00

d Exhaust Air Louvre (EAL)


- 1250 mm x 650 mm bh 1.00

2 Unit Fan (EF-GD.I.1.2)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 4.00
- BjLS 50 m2 13.00
b Exhaust Air Grille (EAG)
- 200 mm x 200 mm bh 5.00

c Exhaust Air Louvre (EAL)


- 500 mm x 350 mm bh 1.00

3 Unit Fan (EF-GD.I.1.3 s/d GD.I.1.7)


a Exhaust Air Louvre (EAL)
- 200 mm x 200 mm bh 5.00

4 Unit Fan (IF-GD.I.1.1)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 76.00
- BjLS 60 m2 112.00
- BjLS 50 m2 10.00

b Intake Air Grille (IAG)


- 650 mm x 300 mm bh 4.00
- 200 mm x 200 mm bh 5.00

c Intake Air Louvre (IAL)


- 1100 mm x 650 mm bh 1.00

5 Unit Fan (IF-GD.I.1.2)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 4.00
- BjLS 50 m2 12.00

b Intake Air Grille (IAG)


- 200 mm x 200 mm bh 5.00

c Intake Air Louvre (IAL)


- 500 mm x 350 mm bh 1.00

6 Kitchen Hood
- Material : Stainless Steel 304
- Size (W x D x H) : 5.500 x 750 x 1200 mm bh 3.00
: 1.000 x 750 x 800 mm bh 1.00
- Complete with : Gease Trap

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.E Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan dari SDP.KITCHEN ke masing-masing unit
- NYM 3 x 4 mm² ke IU-OU-GD.I.1.1
m 21.00
- NYM 3 x 2,5 mm² ke IU-OU-GD.I.1.2
m 32.00
- NYM 3 x 4 mm² ke IU-OU-GD.I.1.3
m 41.00
- NYY 4 x 6 mm² ke EF-GD.I.1.1
m 12.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.2
m 9.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.3
m 36.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.4
m 39.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.5
m 9.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.6
m 9.00
- NYM 3 x 2,5 mm² ke EF-GD.I.1.7
m 46.00
- NYY 4 x 6 mm² ke IF-GD.I.1.1
m 44.00
- NYM 3 x 2,5 mm² ke IF-GD.I.1.2
m 22.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 12.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.F Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII ERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

2,200,000 2,200,000
148,000 296,000
1,634,400 1,634,400
160,800 160,800
1,380,000 2,760,000
45,000 2,160,000
4,508,000 9,016,000

135,000 135,000
135,000 405,000
135,000 675,000

1,390,000 1,390,000
1,135,000 5,675,000

936,100 936,100
936,100 2,808,300
936,100 4,680,500

34,932,100

307,600 -

199,900 9,595,200

9,595,200

850,000 850,000

850,000

50,777,948

27,276 5,400,648

5,400,648

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 11,802,600
936,100 1,872,200

24,526,000

750,000 750,000

750,000

30,676,648

75,000,000 75,000,000

75,000,000

15,698 3,108,204

51,424 20,363,975

23,472,179

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000

9,850,000

1,500,000 1,500,000

1,500,000

109,822,179

-
177,620 10,479,580
132,320 5,292,800
89,540 1,074,480
64,860 1,232,340
46,250 323,750
28,830 1,297,350
22,590 1,942,740

37,020 518,280
26,460 2,143,260

813,750 813,750
380,783 1,142,348
288,330 288,330
211,523 3,595,883

3,677,500 22,065,000
2,799,020 5,598,040

Scope Arsitek

57,807,930

153,900 2,462,400

105,190 2,419,370
63,440 380,640

425,060 1,700,240
333,500 9,338,000
234,680 3,754,880
189,520 2,084,720

sipil
sipil

63,440 2,474,160
48,250 965,000
40,840 2,858,800

409,500 409,500
286,650 286,650

211,575 846,300

29,980,660

1,250,000 1,250,000

1,250,000

89,038,590
-

819,000 4,914,000

4,914,000

9,024,000 9,024,000

5,940,000 5,940,000

9,024,000 9,024,000

23,988,001

30,076,200 30,076,200

4,557,000 4,557,000

1,764,000 1,764,000
970,200 1,940,400

776,160 1,552,320

30,076,200 30,076,200

4,557,000 4,557,000

74,523,120

273,470 1,093,880
273,470 1,093,880
273,470 1,093,880

61,550 861,700

4,143,340

267,020 8,544,640
204,930 21,927,510
184,580 1,845,800

133,000 532,000

494,000 1,976,000
197,600 1,185,600

1,185,600 1,185,600

204,930 819,720
184,580 2,399,540
197,600 988,000

530,400 530,400

249,600 1,248,000

267,020 20,293,520
204,930 22,952,160
184,580 1,845,800

469,300 1,877,200
197,600 988,000

1,092,000 1,092,000

204,930 819,720
184,580 2,214,960

197,600 988,000

530,400 530,400

23,000,000 69,000,000
14,300,000 14,300,000

180,084,570

24,150 507,150
15,698 502,336
24,150 990,150
50,715 608,580
15,698 141,282
15,698 565,128
15,698 612,222
15,698 141,282
15,698 141,282
15,698 722,108
50,715 2,231,460
15,698 345,356

15,698 188,376

7,696,712

1,250,000 1,250,000

1,250,000

291,685,743
NO. JENIS PEKERJAAN SAT. VOLUME
Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG

XVIII PEKERJAAN GAS ELPIJI


Pengadaan dan pemasangan sistem sesuai dengan Gambar & Spesifikasi Teknik

XVIII.A Instalasi Gedung Kitchen


A INSTALASI DAN PERALATAN
1 Instalasi pemipaan LPG dg pipa Black Steel Schedule Seamless ASTM 53
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 32 mm m' 19.00
- dia. 25 mm m' 3.50
- dia. 20 mm m' 15.00
- dia. 15 mm m' 15.00
- dia. 9.54 mm m' 52.00
2 Header dia. 40 mm lengkap dengan valve untuk ke tabung elpiji set 1.00
3 Automatic Manifold Gas Elpiji untuk 12 tabung unit 1.00
4 Gas Meter unit 1.00
5 Pressure Indicator unit 2.00
6 Ball Valve :
- dia. 40 mm bh 5.00
- dia. 32 mm bh 11.00
- dia. 25 mm bh 2.00
- dia. 20 mm bh 1.00
- dia. 9.54 mm bh 13.00
7 Bal Valve dia. 9,54 mm lengkap dengan koneksi ke selang Elpiji bh 10.00
8 Pneumatic Valve
- dia. 32 mm bh 1.00
9 Selenoid Motorized Valve 12/24 V:
- dia. 40 mm bh 1.00
- dia. 32 mm bh 1.00
10 Regulator :
- dia. 25 mm bh 1.00
11 Pressure Gauge lengkap dengan Ball Valve bh 13.00
12 Flexible pipe u/ gas panjang 1.2 m lengkap dengan nepple bh 13.00
13 Control Panel Single Channel ( u/ deteksi kebocoran gas LPG ) unit 1.00
14 Detector Gas bh 6.00
15 Mechanical Exhaust Fan bh 2.00
16 Kabel control dari Control panel ke Detector gas dengan kabel ttk 6.00
Twisted Shielded AWG 18.
17 Pengkabelan Control Sensor System dengan kebel NYM 3 x 2,5 mm² ttk 1.00
18 Pengkabelan Mechanical Exhaust Fan dengan kebel NYM 3 x 2,5 mm² ttk 2.00
19 Tabung LPG kap. 50 KG tbg 12.00

Jumlah Instalasi Gedung Kitchen

XVIII.B TESTING COMMISSIONING


1 Pengujian peralatan dan instalasi gas elpiji dan detector terpasang ls 1.00

TOTAL PEKERJAAN PENGKABELAN

TOTAL PEKERJAAN GAS ELPIGI


HARGA SATUAN JUMLAH HARGA

692,260 13,152,940
368,610 1,290,135
244,250 3,663,750
204,350 3,065,250
155,000 8,060,000
2,250,000 2,250,000
8,325,000 8,325,000
635,000 635,000
755,000 1,510,000

504,840 2,524,200
380,783 4,188,608
288,330 576,660
211,523 211,523
163,380 2,123,940
87,500 875,000

22,500,000 22,500,000

15,250,000 15,250,000
15,250,000 15,250,000

425,000 425,000
350,000 4,550,000
150,000 1,950,000
12,500,000 12,500,000
325,000 1,950,000
1,250,000 2,500,000
215,000 1,290,000

250,000 250,000
250,000 500,000
550,000 6,600,000

137,967,005

2,500,000 2,500,000

2,500,000

140,467,005
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG N BAN
INSTALASI LOUNDRY
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG N BANGUNA : K
INSTALASI LOUNDRY
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
AH SAKIT KUPANG N BANGUNA : K.

TOTAL
3,144,045,220
-
-
19,302,714
9,797,865
14,320,800
-
7,337,400
-
11,078,000
-
64,313,310
-
-
3,276,000
162,860,045
-

3,436,331,353
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG N BAN
INSTALASI LOUNDRY
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 SDP. LOUNDRY unit 1.00
2 PP. LOUNDRY unit 1.00
3 P. LOUNDRY unit 1.00
4 P.AC LOUNDRY unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari PDTR :
NYY 4(5 x 1 x 240 mm2) ke SDP LOUNDRY mtr 263.00

2 Dari SDP. LOUNDRY :


NYY 4 x 4 mm2 ke PP. LOUNDRY mtr 10.00
NYY 4 (4 x 1 x 185 mm2) ke P. LOUNDRY mtr 12.00
NYY 4 x 16 mm2 ke P.AC LOUNDRY mtr 13.00

3 Dari P. LOUNDRY
NYY 4 x 70 mm2 WASHER EXTRACTOR mtr 43.00
NYY 4 x 70 mm2 WASHER EXTRACTOR mtr 40.00
NYY 4 x 70 mm2 BARRIER WASHER EXTRAC mtr 46.00
NYY 4 x 70 mm2 BARRIER WASHER EXTRAC mtr 46.00
NYY 4 x 70 mm2 TUMBLE DRYER mtr 37.00
NYY 4 x 70 mm2 TUMBLE DRYER mtr 37.00
NYY 4 x 70 mm2 TUMBLE DRYER mtr 39.00
NYY 4 x 70 mm2 TUMBLE DRYER mtr 39.00
NYY 4 x 70 mm2 FLATWORK IRONER mtr 39.00
NYY 4 x 70 mm2 FLATWORK IRONER mtr 36.00

TOTAL PEKERJAAN KABEL FEEDER

I.C Pekerjaan Kabel Ladder dan Kabel Tray


C.1 Kabel Ladder

SUB TOTAL KABEL LADDER

C.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 18.00
- uk. 500 mm x 50 mm m 8.00
- uk. 300 mm x 50 mm m 33.00

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY

I.D PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 6 mm² m' 10.00
2 BCC 10 mm² m' 13.00
3 BCC 95 mm² m' 32.00
4 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.E PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 RM TLED 3 x 8 Watt + Cover bh 37.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 7.00
3 TLED 2 x 14 Watt 2100 Lumen (Balk) bh -
4 Down Light LED E27 13 Watt Bulb + Cover bh 7.00
5 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 2.00
6 Down Light LED E27 6 Watt Bulb + Cover bh 4.00
7 Stop Kontak 1 Ph 200 Watt bh 24.00
8 Saklar Tunggal bh 10.00
9 Saklar Ganda bh 7.00
10 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI titik 57.00
11 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 24.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.F Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING


TAN LANJUTAN RUMAH SAKIT KUPANG N BANGUNA : K.

HARGA SATUAN JUMLAH HARGA

161,519,000 161,519,000
5,626,000 5,626,000
91,400,800 91,400,800
7,440,000 7,440,000

265,985,800

9,321,900 2,451,659,700

36,225 362,250
5,641,440 67,697,280
134,033 1,742,429

536,130 23,053,590
536,130 21,445,200
536,130 24,661,980
536,130 24,661,980
536,130 19,836,810
536,130 19,836,810
536,130 20,909,070
536,130 20,909,070
536,130 20,909,070
536,130 19,300,680

2,736,985,919

353,000 6,354,000
309,400 2,475,200
211,600 6,982,800

15,812,000

15,812,000

6,893 68,930
12,831 166,803
107,494 3,439,808
14,700,000 14,700,000

18,375,541

1,360,594 50,341,985
2,403,118 16,821,827
881,139 -
372,527 2,607,692
1,481,731 2,963,461
284,327 1,137,310
52,763 1,266,300
44,163 441,630
48,794 341,555
321,800 18,342,600
400,900 9,621,600

103,885,960

3,000,000 3,000,000

3,000,000
NO. JENIS PEKERJAAN SAT. VOLUME

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama

TOTAL PERALATAN UTAMA

IV.B Kabel Utama

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


1 Addresable Rate of Rise Detector bh 3.00
2 Addresable Fixed Heat Detector bh 3.00
3 Addressable Smoke Detector bh 4.00
4 Smoke Detector Photoelectric bh -
5 Rate of Rise Detector bh 4.00
6 Fixed Heat Detector bh -
7 End off line bh 1.00

8 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 7.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 4.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


1 Ceiling Speaker 3 Watt + Matching Transformer bh 15.00
2 Volume Control bh 2.00
3 Emergency Speaker 6 Watt bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 15.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 2.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan


1 Outlet :
- Outlet Access Point RJ 45 bh 1.00
- Outlet Data RJ 45 bh 5.00
- Outlet Telepon RJ 45 bh 1.00

2 Fixture Unit
- Access Point bh 1.00
- Pesawat Telepon IP Extention bh 1.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Poi titik 1.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 5.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 1.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 200 mm x 100 mm m 19.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VIII.B Pekerjaan Instalasi Dalam Bangunan


1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 1.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 1.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV


IX PEKERJAAN NURSE CALL
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


Sub Total Peralatan Utama

X.B Pengkabelan DDC

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

PANEL SDP LOUNDRY


Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP LOUNDRY
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL AC LOUNDRY, P. LOUNDRY


Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN


HARGA SATUAN JUMLAH HARGA

3,144,045,220

1,092,315 3,276,945
1,092,315 3,276,945
1,373,846 5,495,385
581,805 -
491,715 1,966,860
491,715 -
6,379 6,379

550,600 3,854,200
231,500 926,000

18,802,714

500,000 500,000

500,000

19,302,714

-
-
-

196,035 2,940,525
451,920 903,840
322,382 -
297,900 4,468,500

492,500 985,000

597,400 -

9,297,865

500,000 500,000
500,000

9,797,865

135,000 135,000
135,000 675,000
135,000 135,000

1,390,000 1,390,000
1,135,000 1,135,000

936,100 936,100
936,100 4,680,500
936,100 936,100

10,022,700

307,600 -

199,900 3,798,100

3,798,100

500,000 500,000

500,000

14,320,800

5,901,300 5,901,300

936,100 936,100

6,837,400

500,000 500,000

500,000

7,337,400
-

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 1,856,000
928,000 1,856,000

10,778,000

300,000 300,000

300,000

11,078,000

-
NO. JENIS PEKERJAAN SAT. VOLUME

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


1 Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 51.00
- dia. 40 mm m' 9.00
- dia. 32 mm m' 26.00
- dia. 25 mm m' -
- dia. 20 mm m' 30.00
- dia. 15 mm m' 10.00

2 Instalasi pipa air panas cabang dan toilet dengan PPR80 - PN20
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 13.00

3 Ball Valve 10K


- dia. 32 mm bh 2.00
- dia. 25 mm bh -
- dia. 20 mm bh 8.00
- dia. 15 mm bh 1.00

4 Water Heater Elektrik


Kapasitas : 15 Liter bh 2.00

5 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


B.1 Peralatan Utama
1 Bak Chemical Pit.K01 unit 1.00
Kapasitas : 1 m³
Ukuran : 800 x 800 x (1000+500)mm

SUB TOTAL PERALATAN UTAMA

B.2 Pekerjaan Instalasi Pipa Air Kotor, Kotor & Vent dalam bangunan
1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 16.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia.100 mm m 95.00
- dia. 80 mm m 14.00
- dia. 50 mm m 10.00
- Gater 200x100 mm m' 8.00

3 Instalasi Pipa Air Kotor Laundry Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m' 56.00
- Gater 200x200 mm m' 27.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m 3.00
- dia. 32 mm m 15.00

5 Floor Clean Out :


- dia. 80 mm bh 2.00

6 Vent Cup
- dia. 50 mm bh 1.00

SUB TOTAL AIR KOTORAN, KOTOR DAN VENT DALAM BANGUNAN

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS


XV PEKERJAAN PEMADAM KEBAKARAN
Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XVI.G Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 4.00

TOTAL FIRE EXTINGUISHER

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

1 IU-OU-GD.K.1.1 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 9.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 300 cfm
- Lokasi : Ruang Penerimaan & Pencatatan

2 IU-OU-GD.K.1.2 s/d GD.K.1.4


- Type : Wall Mounted Inverter unit 3.00
- Kapasitas : 15.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 450 cfm
- Lokasi : Ruang Penerimaan & Pencatatan, Kantor

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.K.1.1 unit 1.00


- Type : Axial
- Kapasitas : 6.290 CFM
- Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Area Laundry

2 EF-GD.K.1.2 s/d GD.K.1.3 unit 2.00


- Type : Ceiling Fan
- Kapasitas : 150 CFM
- Static Pressure : 0,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet/Ruang Ganti

3 IF-GD.K.1.1 unit 1.00


- Type : Axial
- Kapasitas : 5.435 CFM
- Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Area Laundry

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan

1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail
IU-OU-GD.K.1.1
6,4 mm + 9,5 mm m 4.00
IU-OU-GD.K.1.2
6,4 mm + 12,7 mm m 9.00
IU-OU-GD.K.1.3
6,4 mm + 12,7 mm m 5.00
IU-OU-GD.K.1.4
6,4 mm + 12,7 mm m 4.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis
- dia. 25 mm m 12.00
- dia. 20 mm m 10.00

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya


1 Unit Fan (EF-GD.K.1.1)
a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 41.00
- BjLS 60 m2 74.00
- BjLS 50 m2 12.00

b Exhaust Air Grille (EAG)


- 500 mm x 300 mm bh 8.00
- 450 mm x 300 mm bh 2.00
- 300 mm x 300 mm bh 3.00
- 200 mm x 200 mm bh 1.00
- 150 mm x 150 mm bh 2.00

c Exhaust Air Louvre (EAL)


- 1000 mm x 650 mm bh 1.00

2 Unit Fan (EF-GD.K.1.2 & 1.3)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 50 m2 7.00

b Exhaust Air Louvre (EAL)


- 350 mm x 300 mm bh 1.00

3 Unit Fan (IF-GD.K.1.1)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 45.00
- BjLS 60 m2 31.00
- BjLS 50 m2 11.00

b Intake Air Grille (IAG)


- 700 mm x 350 mm bh 4.00
- 500 mm x 250 mm bh 2.00
- 300 mm x 300 mm bh 3.00
- 200 mm x 200 mm bh 1.00

c Intake Air Louvre (IAL)


- 950 mm x 650 mm bh 1.00

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.E Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan dari PP.LAUNDRY ke masing-masing unit
- NYM 3 x 2,5 mm² ke IU-OU-GD.K.1.1
m 46.00
- NYM 3 x 4 mm² ke IU-OU-GD.K.1.2
m 44.00
- NYM 3 x 4 mm² ke IU-OU-GD.K.1.3
m 47.00
- NYM 3 x 4 mm² ke IU-OU-GD.K.1.4
m 50.00
- NYY 4 x 4 mm² ke EF-GD.K.1.1
m 15.00
- NYM 3 x 2,5 mm² ke EF-GD.K.1.2
m 44.00
- NYM 3 x 2,5 mm² ke EF-GD.K.1.3
m 41.00
- NYY 4 x 4 mm² ke IF-GD.K.1.1
m 43.00
2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 22.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.F Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

132,320 6,748,320
89,540 805,860
64,860 1,686,360
46,250 -
28,830 864,900
22,590 225,900

37,020 481,260

380,783 761,565
288,330 -
211,523 1,692,180
163,380 163,380

2,799,020 5,598,040

Scope Arsitek

19,027,765

skope sipil

153,900 2,462,400

153,900 14,620,500
105,190 1,472,660
63,440 634,400
sipil

425,060 23,803,360
siipil

48,250 144,750
40,840 612,600

286,650 573,300

211,575 211,575

44,535,545

44,535,545

750,000 750,000
750,000

64,313,310

819,000 3,276,000

3,276,000

3,276,000

4,944,000 4,944,000

9,024,000 27,072,001

32,016,001

25,031,160 25,031,160

1,261,260 2,522,520

25,031,160 25,031,160
52,584,840

248,800 995,200
273,470 2,461,230
273,470 1,367,350
273,470 1,093,880

68,940 827,280
61,550 615,500

7,360,440

267,020 10,947,820
204,930 15,164,820
184,580 2,214,960

395,200 3,161,600
370,500 741,000
296,400 889,200
197,600 197,600
148,200 296,400

1,029,600 1,029,600

184,580 1,292,060

405,600 405,600

267,020 12,015,900
204,930 6,352,830
184,580 2,030,380

518,700 2,074,800
370,500 741,000
296,400 889,200
197,600 197,600

998,400 998,400

61,640,770

15,698 722,108
24,150 1,062,600
24,150 1,135,050
24,150 1,207,500
36,225 543,375
15,698 690,712
15,698 643,618
36,225 1,557,675
15,698 345,356

7,907,994

1,350,000 1,350,000

1,350,000

162,860,045

-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUN: L.
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
KUPANG NTT BANGUN: L. IPSRS

TOTAL
277,659,526
-
-
21,160,939
21,466,002
41,722,900
-
20,812,200
-
11,078,000
-
34,002,750
-
2,916,607,926
41,580,000
490,692,881
-

3,876,783,123
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 SDP. IPSRS unit 1.00
2 PP. IPRS unit 1.00
3 P. AC-IPSRS unit 1.00
4 P. MEDICAL GAS unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari SDP. KITCHEN :
NYY 4 x 95 mm2 ke SDP. IPRS mtr 75.00

2 Dari SDP. IPRS :


NYY 4 x 10 mm2 ke PP. IPSRS mtr 11.00
NYY 4 x 70 mm2 ke P. AC-IPSRS mtr 9.00
NYY 4 x 95 mm2 ke P. MEDICAL GAS mtr 23.00

TOTAL PEKERJAAN KABEL FEEDER

I.C Pekerjaan Kabel Ladder dan Kabel Tray


C.1 Kabel Ladder

SUB TOTAL KABEL LADDER

C.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 11.00
- uk. 500 mm x 50 mm m -
- uk. 300 mm x 50 mm m 26.00

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY

I.D PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 6 mm² m' 11.00
2 BCC 35 mm² m' 9.00
3 BCC 50 mm² m' 38.00
4 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.E PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 RM TLED 3 x 8 Watt + Cover bh 29.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 11.00
3 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 2.00
4 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 2.00
5 Down Light LED E27 13 Watt Bulb + Cover bh 8.00
6 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 3.00
7 Down Light LED E27 6 Watt Bulb + Cover bh 5.00
8 Stop Kontak 1 Ph 200 Watt bh 45.00
9 Saklar Tunggal bh 8.00
10 Saklar Ganda bh 10.00
11 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 60.00
12 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 45.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.F Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING


TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET


JUTAN RUMAH SAKIT KUPANG NTT BANGUN: L. IPSRS

HARGA SATUAN JUMLAH HARGA

29,055,000 29,055,000
6,294,000 6,294,000
7,895,000 7,895,000
6,294,000 6,294,000

49,538,000

736,575 55,243,125

80,903 889,933
536,130 4,825,170
736,575 16,941,225

77,899,453

353,000 3,883,000
309,400 -
211,600 5,501,600

9,384,600

9,384,600

6,893 75,823
38,834 349,506
47,366 1,799,908
14,700,000 14,700,000

16,925,237

1,360,594 39,457,232
2,403,118 26,434,300
881,139 1,762,278
1,923,663 3,847,326
372,527 2,980,219
1,481,731 4,445,192
284,327 1,421,637
52,763 2,374,313
44,163 353,304
48,794 487,935
321,800 19,308,000
400,900 18,040,500

120,912,236

3,000,000 3,000,000

3,000,000
277,659,526

-
NO. JENIS PEKERJAAN SAT. VOLUME

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama

TOTAL PERALATAN UTAMA

IV.B Kabel Utama

TOTAL KABEL UTAMA


HARGA SATUAN JUMLAH HARGA

-
NO. JENIS PEKERJAAN SAT. VOLUME

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan

C.1 Lantai 1
1 Addresable Rate of Rise Detector bh 1.00
2 Addresable Fixed Heat Detector bh -
3 Addressable Smoke Detector bh 8.00
4 Smoke Detector Photoelectric bh -
5 Rate of Rise Detector bh 5.00
6 Fixed Heat Detector bh -
7 End off line bh 1.00

8 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 9.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 5.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - IPSRS NYMHY 2(3 x 2.5 mm2) m 157.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


1 Terminal Box Sound System Lt. 1 (TB. TS. 1C) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 13.00
3 Volume Control bh 6.00
4 Emergency Speaker 6 Watt bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 13.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 6.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan


B.1 Lantai 1
1 Outlet :
- Outlet Access Point RJ 45 bh 1.00
- Outlet Data RJ 45 bh 10.00
- Outlet Telepon RJ 45 bh 9.00
2 Fixture Unit
- Access Point bh 1.00
- Pesawat Telepon IP Extention bh 9.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 1.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 10.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 9.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m -

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 200 mm x 100 mm m 41.00

TOTAL Pekerjaan Kabel Tray dan Ladder


HARGA SATUAN JUMLAH HARGA

1,092,315 1,092,315
1,092,315 -
1,373,846 10,990,770
581,805 -
491,715 2,458,575
491,715 -
6,379 6,379

550,600 4,955,400
231,500 1,157,500

20,660,939

500,000 500,000

500,000

21,160,939

51,454 8,078,227

8,078,227

800,100 800,100
196,035 2,548,455
451,920 2,711,520
322,382 -
297,900 3,872,700

492,500 2,955,000

597,400 -

12,887,775

500,000 500,000

500,000

21,466,002

135,000 135,000
135,000 1,350,000
135,000 1,215,000
1,390,000 1,390,000
1,135,000 10,215,000

936,100 936,100
936,100 9,361,000
936,100 8,424,900

33,027,000

307,600 -

199,900 8,195,900

8,195,900
NO. JENIS PEKERJAAN SAT. VOLUME

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m -

Sub Total Pengkabelan Utama

VIII.B Pekerjaan Instalasi Dalam Bangunan


1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


Sub Total Peralatan Utama

X.B Pengkabelan DDC

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

PANEL SDP IPSRS


Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL PP IPSRS
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

PANEL AC IPSRS, MEDICAL GAS


Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)


XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN


HARGA SATUAN JUMLAH HARGA

500,000 500,000

500,000

41,722,900

27,276 -

5,901,300 17,703,900

936,100 2,808,300

20,512,200

300,000 300,000

300,000

20,812,200

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 1,856,000
928,000 1,856,000

10,778,000

300,000 300,000

300,000

11,078,000

-
NO. JENIS PEKERJAAN SAT. VOLUME

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


1 Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m' 55.00
- dia. 32 mm m' 4.00
- dia. 25 mm m' 24.00
- dia. 20 mm m' 28.00
- dia. 15 mm m' 20.00

2 Instalasi pipa air panas cabang dan toilet dengan PPR80 - PN20
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 17.00

3 Ball Valve 10K


- dia. 32 mm bh 2.00
- dia. 25 mm bh 1.00
- dia. 20 mm bh 6.00

4 Water Heater Elektrik


Kapasitas : 15 Liter bh 3.00

5 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 39.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 36.00
- dia. 50 mm m 5.00
- dia. 40 mm m 6.00

3 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m 19.00
- dia. 32 mm m 20.00

4 Floor Clean Out :


- dia. 100 mm bh 3.00
- dia. 80 mm bh 2.00

5 Vent Cup
- dia. 50 mm bh 2.00

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XIV.A Peralatan Utama


1 Automatic Medical Gas Manifold Oxygen (O), set 1.00
Type : Full Automatic Change Over Gas Manifold
Kapasitas : Double Row 2 x @ 10 tabung cylinder (tanpa Tabung)
Output Pressure : 0 - 5 Kg/cm2
~ Double Stage Pressure Regulator (Total 3 Regulators)
~ Pressure Gauge for left and right bank
Header from High Pressure Copper/Brass dia. 3/4"
~ Dual Line Regulator (NFPA)
~ Copper HP Pig Tails
~ Cylinder Valve High Pressure
~ Safety Valve
~ Regulator Emergency
~ Support & Consumable

2 Automatic Medical Gas Manifold Nitrous Oxside (N2O), set 1.00


Type : Full Automatic Change Over Gas Manifold
Kapasitas : Double Row 2 x@ 4 tabung cylinder (tanpa Tabung)
Output Pressure : 0 - 5 Kg/cm2
~ Double Stage Pressure Regulator (Total 3 Regulators)
~ Pressure Gauge for left and right bank
~ Pressure Gauge for Operating Pressure
Header from High Pressure Copper/Brass dia. 3/4"
~ Copper HP Pig Tails
~ Cylinder Valve High Pressure
~ Safety Valve
~ Regulator inlet emergency
~ Support & Consumable

3 Medical Gas Compressor Air System (A) set 1.00


tediri dari :
- 2 unit Kompressor Oil Free Reciprocating Bare Type @ 11KW
- 1 unit Receiver Tank kapasitas 500 liter
- Automatic Manifold
- After Cooler 1 unit
- Air Dyer 1 unit
- Filter Air
- Regulator
- Panel Kontrol Otomatis

4 Medical Gas Vacuum Pump System (V) set 1.00


- 2 unit Vacuum Pump Oil Sealed type @ 5,5 KW
- 1 unit Receiver Tank kapasitas 400 liter
- Sparator Tank
- Automatic System
- Filter
- Panel Kontrol Otomatis

5 Sentral Alarm Panel 5 gas Lengkap dengan Valve set 1.00

6 Tabung untuk Medical Gas


- Oksigen bh 20.00
- N20 bh 8.00

7 Pemasangan Peralatan Utama dan Instalasinya lot 1.00

8 Tabung Tunggal Oxygen Liquid unit 1.00

TOTAL PERALATAN UTAMA

XIV.B Instalasi Utama


Instalasi pipa cooper ASTM B819 termasuk gantungan/hanger/support,
fitting dan Aksesories :

- Diameter 79,4 mm M 180.00


- Diameter 66,67 mm M 219.00
- Diameter 54,10 mm M 30.00
- Diameter 41,30 mm M 180.00
- Diameter 34,93 mm M 12.00
- Diameter 28,58 mm M 84.00
- Diameter 15,88 mm M 456.00

INSTALASI UTAMA

XIV.C Pekerjaan Pengkabelan


1 NYY 4 x 4 mm2 VACUUM M 15.00
2 NYY 4 x 4 mm2 COMPRESSOR M 15.00

TOTAL TESTING & COMMISSIONING

XIV.D Pekerjaan Testing & Commissioning


1 Testing & Commissioning Peralatan dan Instalasi Medical Gas lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 3.00

2 Fire Extingusher type CO2 5 kg


Lantai 1 bh 6.00

TOTAL FIRE EXTINGUISHER

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya
1 IU-OU.GD.L.1.1 unit 1.00
- Type : Cassette Inverter
- Kapasitas : 15.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 450 cfm
- Lokasi : Ruang Diskusi

2 IU-OU.GD.L.1.2 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 23.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Studio Gambar + Arsip Teknis

3 IU-OU.GD.L.1.3 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 28.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 800 cfm
- Lokasi : Bengkel Metal / Logam

4 IU-OU.GD.L.1.4 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 36.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.050 cfm
- Lokasi : Bengkel Bangunan / Kayu

5 IU-OU.GD.L.1.5
- Type : Wall Mounted Inverter unit 1.00
- Kapasitas : 7.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 210 cfm
- Lokasi : Ruang Kerja

6 IU-OU.GD.L.1.6 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 30.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 875 cfm
- Lokasi : Bengkel Penunjang Medik

7 IU-OU.GD.L.1.7 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 21.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 650 cfm
- Lokasi : Gudang Makan Basah

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.N.1.1 unit 1.00


- Type : In Line
- Kapasitas : 1.650 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Koridor & Toilet

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan


1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail

IU-OU.GD.L.1.1 9,5 mm + 15,9 mm m 8.00


IU-OU.GD.L.1.2 9,5 mm + 15,9 mm m 7.00
IU-OU.GD.L.1.3 9,5 mm + 15,9 mm m 10.00
IU-OU.GD.L.1.4 9,5 mm + 15,9 mm m 11.00
IU-OU.GD.L.1.5 6,4 mm + 9,5 mm m 9.00
IU-OU.GD.L.1.6 9,5 mm + 15,9 mm m 12.00
IU-OU.GD.L.1.7 9,5 mm + 15,9 mm m 7.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis
- dia. 25 mm m 46.00
- dia. 20 mm m 8.00

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya


1 Unit Fan (EF-GD.L.1.1)
a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 35.00
- BjLS 50 m2 26.00

b Exhaust Air Grille (EAG)


- 350 mm x 350 mm bh 2.00
- 250 mm x 250 mm bh 4.00
- 200 mm x 200 mm bh 2.00

c Exhaust Air Louvre (EAL)


- 750 mm x 400 mm bh 1.00

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.E Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan dari PP.IPRS ke masing-masing unit
- NYM 3 x 4 mm² ke IU-OU.GD.L.1.1 m 31.00
- NYM 3 x 6 mm² ke IU-OU.GD.L.1.2 m 27.00
- NYY 4 x 4 mm² ke IU-OU.GD.L.1.3 m 29.00
- NYY 4 x 4 mm² ke IU-OU.GD.L.1.4 m 40.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.L.1.5 m 40.00
- NYY 4 x 4 mm² ke IU-OU.GD.L.1.6 m 31.00
- NYY 3 x 4 mm² ke IU-OU.GD.L.1.7 m 31.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.1
m 33.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 64.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.G Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA


XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG
Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

89,540 4,924,700
64,860 259,440
46,250 1,110,000
28,830 807,240
22,590 451,800

37,020 629,340

380,783 761,565
288,330 288,330
211,523 1,269,135

2,799,020 8,397,060

Scope Arsitek

18,898,610

153,900 6,002,100

105,190 3,786,840
63,440 317,200
48,250 289,500

48,250 916,750
40,840 816,800

409,500 1,228,500
286,650 573,300

211,575 423,150

14,354,140

750,000 750,000

750,000

34,002,750

146,480,500 146,480,500
126,059,250 126,059,250

738,905,000 738,905,000

447,097,786 447,097,786

36,851,750 36,851,750

1,400,000 28,000,000
1,400,000 11,200,000

15,000,000 15,000,000

SKOPE PROVIDER GAS

1,549,594,286

3,112,500 560,250,000
2,008,670 439,898,730
1,483,080 44,492,400
890,430 160,277,400
649,040 7,788,480
472,850 39,719,400
194,080 88,500,480

1,340,926,890

36,225 543,375
36,225 543,375

1,086,750
25,000,000 25,000,000

25,000,000

2,916,607,926

819,000 2,457,000

6,520,500 39,123,000

41,580,000

41,580,000

20,066,728 20,066,728

24,817,091 24,817,091

25,633,636 25,633,636

299,511,826 299,511,826

4,818,000 4,818,000

25,633,636 25,633,636

22,503,272 22,503,272
422,984,189

16,611,000 16,611,000

16,611,000

395,210 3,161,680
395,210 2,766,470
395,210 3,952,100
395,210 4,347,310
248,800 2,239,200
395,210 4,742,520
395,210 2,766,470

68,940 3,171,240
61,550 492,400

27,639,390

204,930 7,172,550
184,580 4,799,080

345,800 691,600
247,000 988,000
197,600 395,200

717,600 717,600

14,764,030

24,150 748,650
15,698 423,846
36,225 1,050,525
36,225 1,449,000
15,698 627,920
36,225 1,122,975
24,150 748,650
15,698 518,034

15,698 1,004,672

7,694,272

1,000,000 1,000,000

1,000,000

490,692,881
-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
PEMULASARAAN JENAZAH & OTOPSI
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUN: M
PEMULASARAAN JENAZAH & OTOPSI
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
PANG NTT BANGUN: M. INSTALASI

TOTAL
220,515,565
-
-
48,413,551
32,592,290
174,260,680
11,073,973
41,546,380
-
3,533,000
-
67,850,243
-
-
3,276,000
247,409,041
-

850,470,722
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
PEMULASARAAN JENAZAH & OTOPSI
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 PP. JENAZAH unit 1.00
2 P. AC- JENAZAH unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari SDP. KITCHEN :
NYY 4 x 70 mm2 ke PP. JENAZAH mtr 47.00

2 Dari PP JENAZAH :
NYY 4 x 35 mm2 ke P.AC JENAZAH mtr 20.00

TOTAL PEKERJAAN KABEL FEEDER

I.C Pekerjaan Kabel Ladder dan Kabel Tray


C.1 Kabel Ladder

SUB TOTAL KABEL LADDER

C.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 13.00
- uk. 500 mm x 50 mm m 20.00
- uk. 300 mm x 50 mm m 11.00

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY

I.D PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 35 mm² m' 20.00
2 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.E PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 RM TLED 3 x 8 Watt + Cover bh 38.00
2 RM TLED 3 x 8 Watt + Cover c/w Nicad Battery bh 12.00
3 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 1.00
4 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh -
5 TLED 1 x 14 Watt 2100 Lumen (Balk) bh 2.00
6 TLED 1 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh -
7 Down Light LED E27 13 Watt Bulb + Cover bh 20.00
8 Down Light LED E27 13 Watt Bulb + Cover c/w Nicad Battery bh 7.00
9 Down Light LED E27 6 Watt Bulb + Cover bh 9.00
10 Stop Kontak 1 Ph 200 Watt bh 33.00
11 Stop Kontak Ceiling TV 1Ph 200 Watt bh 2.00
12 Saklar Tunggal bh 8.00
13 Saklar Ganda bh 10.00
14 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 89.00
15 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 35.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.F Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis
IV.A Peralatan Utama

TOTAL PERALATAN UTAMA

IV.B Kabel Utama

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


1 Addresable Rate of Rise Detector bh 7.00
2 Addresable Fixed Heat Detector bh 4.00
3 Addressable Smoke Detector bh 14.00
4 Smoke Detector Photoelectric bh -
5 Rate of Rise Detector bh 4.00
6 Fixed Heat Detector bh -
7 End off line bh 1.00

8 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk 25.00
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 4.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - R. JENAZAH NYMHY 2(3 x 2.5 mm2) m 238.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


1 Terminal Box Sound System (TB. TS.) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 29.00
3 Volume Control bh 5.00
4 Emergency Speaker 6 Watt bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 29.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk 5.00
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Speaker dengan kabel FRC 2 x 1,5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

VI.A Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m 355.00

Sub Total Pengkabelan Utama

VI.B Pekerjaan Instalasi Dalam Bangunan


1 Peralatan Distribusi
- Wall Mounted Rack 19", 15U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub 24 port bh 1.00

2 Outlet :
- Outlet Access Point RJ 45 bh 1.00
- Outlet Data RJ 45 bh 10.00
- Outlet Telepon RJ 45 bh 9.00
3 Fixture Unit
- Access Point bh 1.00
- Pesawat Telepon IP Extention bh 9.00

4 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm untuk Access Point titik 1.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Data titik 10.00
- Intalasi Kabel UTP Cat 6 dalam KOnduit PVC HI 20 mm untuk Telpon titik 9.00

TOTAL PEKERJAAN INSTALASI DALAM BANGUNAN

VI.C Pekerjaan Kabel Tray dan Ladder


C.1 Kabel Ladder
1 Kabel Ladder uk. 600 mm x 100 mm m 361.00

C.2 Kabel Tray


1 Lantai 1
Kabel Tray 200 mm x 100 mm m 41.00

TOTAL Pekerjaan Kabel Tray dan Ladder

VI.D Testing & Commissioning


1 Biaya Supervisi, Programming, Test Comm dan Training lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VII.A Peralatan Utama MATV

Sub Total Peralatan Utama MATV

VII.B Pekerjaan Instalasi Dalam Bangunan


1 Splitter 2 Way Unit 1.00
2 Booster Unit 1.00
3 Outlet TV Unit 2.00
4 Instalasi kabel Outlet TV, coaxial RG6 (5C/2 volt) dakan konduit PVC HI dia. 20 mm titik 2.00
5 Instalasi kabel Splitter, Coaxial RG-11 (7C) dalam konduit PVC HI dia. 20 mm m 268.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VII.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi MATV lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Peralatan Utama

TOTAL PERALATAN UTAMA

VIII.B Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m 355.00

Sub Total Pengkabelan Utama

VIII.C Pekerjaan Instalasi Dalam Bangunan


1 Peralatan Distribusi
- Wall Mounted Rack 19", 8U c/w Accessories bh 1.00
- Wiring Management 1U bh 1.00
- Patch Panel FO 12 port bh 1.00
- FO Connector bh 1.00
- UTP Cat 6 Patch Panel 24 Port Loaded bh 1.00
- UTP Cat 6 Patch Cord, 1m bh 24.00
- Switch Hub PoE 24 port bh 1.00

2 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

3 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


Sub Total Peralatan Utama

X.B Pengkabelan DDC

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

PANEL PP. JENAZAH


Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XIII.A Air Bersih dan Air Panas


1 Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 39.00
- dia. 40 mm m' 17.00
- dia. 32 mm m' 32.00
- dia. 25 mm m' 87.00
- dia. 20 mm m' 48.00
- dia. 15 mm m' 53.00

2 Instalasi pipa air panas cabang dan toilet dengan PPR80 - PN20
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 20 mm m' 22.00

3 Gate Valve 10K


- dia. 32 mm bh 4.00
- dia. 25 mm bh 3.00
- dia. 20 mm bh 9.00

4 Water Heater Elektrik


Kapasitas : 15 Liter bh 4.00

5 Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet &


Hand Shower, Shower, Janitor, Kran taman)

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


1 Instalasi Air Kotoran Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 48.00

2 Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia.100 mm m 15.00
- dia. 80 mm m 40.00
- dia. 50 mm m 19.00

3 Instalasi Pipa Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m' 35.00
- dia. 50 mm m' 9.00
- dia. 40 mm m' 5.00

4 Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 40 mm m 29.00
- dia. 32 mm m 47.00

5 Floor Clean Out :


- dia. 100 mm bh 2.00
- dia. 80 mm bh 3.00

6 Vent Cup
- dia. 50 mm bh 4.00

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL


AN RUMAH SAKIT KUPANG NTT BANGUN: M. INSTALASI

HARGA SATUAN JUMLAH HARGA

6,264,000 6,264,000
5,264,000 5,264,000

11,528,000

536,130 25,198,110

278,933 5,578,660

30,776,770

353,000 4,589,000
309,400 6,188,000
211,600 2,327,600

13,104,600

13,104,600

38,834 776,680
14,700,000 14,700,000

15,476,680

1,360,594 51,702,580
2,403,118 28,837,418
881,139 881,139
1,923,663 -
483,571 967,142
1,526,007 -
372,527 7,450,548
1,481,731 10,372,114
284,327 2,558,947
52,763 1,741,163
52,763 105,525
44,163 353,304
48,794 487,935
321,800 28,640,200
400,900 14,031,500

148,129,515

1,500,000 1,500,000

1,500,000

220,515,565
-

1,092,315 7,646,205
1,092,315 4,369,260
1,373,846 19,233,848
581,805 -
491,715 1,966,860
491,715 -
6,379 6,379

550,600 13,765,000
231,500 926,000

47,913,551

500,000 500,000

500,000

48,413,551

51,454 12,245,975

12,245,975

800,100 800,100
196,035 5,685,015
451,920 2,259,600
322,382 -
297,900 8,639,100

492,500 2,462,500

597,400 -

19,846,315

500,000 500,000
500,000

32,592,290

27,276 9,682,980

9,682,980

2,200,000 2,200,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

135,000 135,000
135,000 1,350,000
135,000 1,215,000

1,390,000 1,390,000
1,135,000 10,215,000

936,100 936,100
936,100 9,361,000
936,100 8,424,900

44,138,200

307,600 111,043,600

199,900 8,195,900

119,239,500

1,200,000 1,200,000

1,200,000

174,260,680

261,548 261,548
1,658,475 1,658,475
80,325 160,650
533,800 1,067,600
26,775 7,175,700

10,323,973

750,000 750,000
750,000

11,073,973

27,276 9,682,980

9,682,980

1,940,000 1,940,000
148,000 148,000
1,634,400 1,634,400
160,800 160,800
1,380,000 1,380,000
45,000 1,080,000
4,508,000 4,508,000

5,901,300 17,703,900

936,100 2,808,300

31,363,400

500,000 500,000

500,000

41,546,380

928,000 928,000
928,000 928,000
1,677,000 1,677,000

3,533,000
- -

3,533,000

132,320 5,160,480
89,540 1,522,180
64,860 2,075,520
46,250 4,023,750
28,830 1,383,840
22,590 1,197,270

37,020 814,440

380,783 1,523,130
288,330 864,990
211,523 1,903,703

2,799,020 11,196,080

Scope Arsitek

31,665,383

153,900 7,387,200

153,900 2,308,500
105,190 4,207,600
63,440 1,205,360

333,500 11,672,500
234,680 2,112,120
189,520 947,600

48,250 1,399,250
40,840 1,919,480

409,500 819,000
286,650 859,950

211,575 846,300

35,684,860

500,000 500,000
500,000

67,850,243

-
NO. JENIS PEKERJAAN SAT. VOLUME

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Fire Extinguisher


1 Fire Extinguisher type ABC Dry Chemical Multi Puposes kap. : 3 kg
lengkap dengan braket :
Lantai 1 bh 4.00

TOTAL FIRE EXTINGUISHER

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya
1 IU-OU-GD.M.1.1 unit 1.00
- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : Ruang Petugas

2 IU-OU-GD.M.1.2 unit 1.00


- Type : Wall Mounted Inverter
- Kapasitas : 5.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 150 cfm
- Lokasi : KA Unit

3 IU-OU-GD.M.1.3
- Type : Wall Mounted Inverter unit 1.00
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 525 cfm
- Lokasi : Ruang Adm

4 IU-OU-GD.M.1.4 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 25.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 700 cfm
- Lokasi : Ruang Tunggu

5 IU-OU-GD.M.1.5 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 42.600 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 1.225 cfm
- Lokasi : Ruang Duka

6 IU-OU-GD.M.1.6 unit 1.00


- Type : Cassette Inverter
- Kapasitas : 21.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 650 cfm
- Lokasi : Ruang Tunggu

7 IU-OU-GD.M.1.7 s/d GD.M.1.8 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 12.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 350 cfm
- Lokasi : KA Unit, Ruang Diskusi
8 IU-OU-GD.M.1.9 unit 1.00
- Type : Wall Mounted Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 525 cfm
- Lokasi : Ruang Mikroskop

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.M.1.1 s/d GD.M.3 unit 3.00


- Type : Ceiling Fan
- Kapasitas : 100 CFM
- Static Pressure : 0,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet/Ruang Ganti, Gudang

2 EF-GD.M.1.4 unit 1.00


- Type : In Line
- Kapasitas : 800 CFM
- Ext. Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : R. Dekontaminasi

3 EF-GD.M.1.5 unit 1.00


- Type : In Line
- Kapasitas : 1.950 CFM
- Ext. Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : R. Autopsi / Lab Umum

4 EF-GD.M.1.6 unit 1.00


- Type : Ceiling Fan
- Kapasitas : 150 CFM
- Static Pressure : 0,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Toilet/Ruang Ganti

5 IF-GD.M.1.1 unit 1.00


- Type : In Line
- Kapasitas : 700 CFM
- Static Pressure : 1,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : R. Dekontaminasi

6 IF-GD.M.1.2 unit 1.00


- Type : In Line
- Kapasitas : 1.500 CFM
- Static Pressure : 1,5 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : R. Autopsi / Lab Umum

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan


1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail

IU-OU-GD.M.1.1
6,4 mm + 12,7 mm m 11.00
IU-OU-GD.M.1.2
6,4 mm + 9,5 mm m 10.00
IU-OU-GD.M.1.3
6,4 mm + 12,7 mm m 11.00
IU-OU-GD.M.1.4
9,5 mm + 15,9 mm m 8.00
IU-OU-GD.M.1.5
9,5 mm + 15,9 mm m 8.00
IU-OU-GD.M.1.6
9,5 mm + 15,9 mm m 13.00
IU-OU-GD.M.1.7
6,4 mm + 12,7 mm m 8.00
IU-OU-GD.M.1.8
6,4 mm + 12,7 mm m 7.00
IU-OU-GD.M.1.9
6,4 mm + 12,7 mm m 4.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis
- dia. 25 mm m 39.00
- dia. 20 mm m 18.00

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya


1 Unit Fan (EF-GD.M.1.1 & EF-GD.M.1.2)
a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 50 m2 4.00

b Exhaust Air Louvre (EAL)


- 300 mm x 250 mm bh 1.00

2 Unit Fan (EF-GD.M.1.3)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 50 m2 2.00

b Exhaust Air Louvre (EAL)


- 250 mm x 250 mm bh 1.00

3 Unit Fan (EF-GD.M.1.4)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 21.00
- BjLS 50 m2 2.00

b Exhaust Air Grille (EAG)


- 350 mm x 350 mm bh 2.00
- 150 mm x 150 mm bh 1.00

c Exhaust Air Louvre (EAL)


- 450 mm x 350 mm bh 1.00

4 Unit Fan (EF-GD.M.1.5)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 27.00
- BjLS 50 m2 20.00
HARGA SATUAN JUMLAH HARGA

819,000 3,276,000

3,276,000

3,276,000

5,940,000 5,940,000

4,818,000 4,818,000

9,024,000 9,024,000

24,817,091 24,817,091

33,624,818 33,624,818

22,503,272 22,503,272

5,940,000 11,880,000
9,024,000 9,024,000

121,631,181

970,200 2,910,600

6,762,000 6,762,000

8,764,140 8,764,140

1,261,260 1,261,260

6,762,000 6,762,000

16,611,000 16,611,000

43,071,000

273,470 3,008,170
248,800 2,488,000
273,470 3,008,170
395,210 3,161,680
395,210 3,161,680
395,210 5,137,730
273,470 2,187,760
273,470 1,914,290
273,470 1,093,880

68,940 2,688,660
61,550 1,107,900

28,957,920

184,580 738,320

343,200 343,200

184,580 369,160

312,000 312,000

204,930 4,303,530
184,580 369,160

345,800 691,600
148,200 148,200

499,200 499,200

204,930 5,533,110
184,580 3,691,600
NO. JENIS PEKERJAAN SAT. VOLUME
b Exhaust Air Grille (EAG)
- 350 mm x 350 mm bh 6.00
- 200 mm x 200 mm bh 4.00

c Exhaust Air Louvre (EAL)


- 800 mm x 450 mm bh 1.00

5 Unit Fan (EF-GD.M.1.6 & EF-GD.M.1.7)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 50 m2 4.00

b Exhaust Air Louvre (EAL)


- 300 mm x 250 mm bh 1.00

6 Unit Fan (IF-1.1)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 13.00
- BjLS 50 m2 6.00

b Intake Air Grille (IAG)


- 350 mm x 350 mm bh 2.00

c Intake Air Louvre (IAL)


- 450 mm x 350 mm bh 1.00

7 Unit Fan (IF-1.2)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 60 m2 29.00
- BjLS 50 m2 8.00

b Intake Air Grille (IAG)


- 350 mm x 350 mm bh 6.00

c Intake Air Louvre (IAL)


- 750 mm x 450 mm bh 1.00

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.E Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan dari PP.JENAZAH ke masing-masing unit
- NYM 3 x 2,5 mm² ke IU-OU.GD.M.1.1 m 44.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.M.1.2 m 46.00
- NYM 3 x 4 mm² ke IU-OU.GD.M.1.3 m 59.00
- NYM 3 x 6 mm² ke IU-OU.GD.M.1.4 m 61.00
- NYM 4 x 4 mm² ke IU-OU.GD.M.1.5 m 62.00
- NYM 3 x 4 mm² ke IU-OU.GD.M.1.6 m 25.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.M.1.7 m 22.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.M.1.8 m 18.00
- NYM 3 x 4 mm² ke IU-OU.GD.M.1.9 m 10.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.1
m 37.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.2
m 39.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.3
m 53.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.4
m 59.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.5
m 31.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.6
m 27.00
- NYM 3 x 2,5 mm² ke EF-GD.M.1.7
m 30.00
- NYM 3 x 2,5 mm² ke IF-GD.M.1.1
m 38.00
- NYM 4 x 2,5 mm² ke IF-GD.M.1.2
m 8.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 80.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.F Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

345,800 2,074,800
197,600 790,400

780,000 780,000

184,580 738,320

343,200 343,200

204,930 2,664,090
184,580 1,107,480

345,800 691,600

499,200 499,200

204,930 5,942,970
184,580 1,476,640

345,800 2,074,800

748,800 748,800

36,931,380

15,698 690,712
15,698 722,108
24,150 1,424,850
35,018 2,136,098
32,603 2,021,386
24,150 603,750
15,698 345,356
15,698 282,564
24,150 241,500
15,698 580,826
15,698 612,222
15,698 831,994
15,698 926,182
15,698 486,638
15,698 423,846
15,698 470,940
15,698 596,524
20,528 164,224

15,698 1,255,840

14,817,560

2,000,000 2,000,000

2,000,000

247,409,041
-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
HOUSE
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUN : N
HOUSE
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
KUPANG NTT BANGUN : N. POWER

TOTAL
14,317,101,130
-
4,703,642,169
37,071,114
16,020,840
-
-
13,924,800
-
385,676,699
-
13,626,275
-
-
7,885,500
55,868,628
-

19,550,817,155
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
HOUSE
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Tegangan Menengah


1 Panel Incoming Tegangan Menengah CB unit 1.00
Manual and fixed type, c/w.
- Disconecting switch 630 A for double isolation
- SF6 Circuit Breaker 630 A
- 3 phase bus bar 630 A
- 3 CT's 300-600/5-5A, 30VA
- 3 Vts 6.3 kV:V3/100V:v3,50 VA CI 0,5
- Shunt Trip coil 220 Vac + Aux contact
- OCR + EF Sepam 1000+ S20 & digital amperemeter
- LV Box
- Earthing switch
- Heater 50W (220VAC)
- Digital multimeter PM820 : Kwh double tariff, ampere, volt, PF, Kvarh, Kw, Hz & etc
- dan kelengkapan lainnya sesuai standard pabrikan

2 Panel Outgoing Tegangan Menengah Load Break switch panel (LBS FUSE) unit 2.00
- Manual and fixed type, c/w
- SF6 Load Break Switch 630A
- 3 fuses solefuse with striker
- LBS operating mechanism
- 3 phase bus bar 630A
- Shunt trip coil 220 VAC + Aux. contact
- 3 neon indicator
- Earthing switch
- Heater 50 W (220 VAC)
- dan kelengkapan lainnya sesuai standard pabrikan

3 Transformator Distribusi unit 2.00


Type : Cast Resin Dry Transformator
Bahan : Tembaga
Capacity : 2000 KVA / 3 Phase
Voltage : 20 kV / 400V / 50HZ
Selubung : IP 23
Trafo dilengkapi dengan pengaman DGPT, Plug in bushing lengkap terpasang

4 Dari Gardu PLN


- N2XSY 3 x 1 x 150 mm2 ke PDTM m' 15.00

5 Dari PDTM ke Trafo


- N2XSY 3 x 120 mm2 ke Trafo-1 m 27.00
- NYM 2 x 2,5 mm2 ke Trafo-1 m 27.00
- N2XSY 3 x 120 mm2 ke Trafo-2 m 22.00
- NYM 2 x 2,5 mm2 ke Trafo-2 m 22.00

TOTAL PEKERAJAAN TEGANGAN MENENGAH

I.B Pekerjaan Panel-panel


B.1 Power House
1 PDTR-1 + ACTS unit 1.00
2 PDTR-2 + ACTS unit 1.00
3 CAPASITOR BANK-1 900 kVAR/525V unit 1.00
4 CAPASITOR BANK-2 900 kVAR/525V unit 1.00
5 PKG (Auto Start Auto Synchron) unit 1.00
6 PP.PH unit 1.00
7 PP.TAMAN unit 1.00
8 PC POMPA SOLAR unit 1.00

Sub Total Power House

TOTAL PEKERAJAAN PANEL- PANEL

I.C PEKERJAAN KABEL FEEDER


1 Dari TRAFO-1 :
NYY 10 (4 x 1 x 300 mm2) ke ACTS PDTR-1 mtr 21.00
2 Dari TRAFO-2 :
NYY 10 (4 x 1 x 300 mm2) ke ACTS PDTR-2 mtr 24.00

3 Dari PKG :
NYY 10 (4 x 1 x 300 mm2) ke ACTS PDTR-1 mtr 17.00
NYY 10 (4 x 1 x 300 mm2) ke ACTS PDTR-2 mtr 20.00

4 Dari PDTR-1 :
NYY 4 (4 x 1 x 300 mm2) CAPASITOR BANK -1 mtr 28.00
NYY 4 x 10 mm2 ke PP.PH mtr 21.00

5 Dari PDTR-2 :
NYY 4 (4 x 1 x 300 mm2) CAPASITOR BANK -2 mtr 21.00
NYY 4 x 150 mm2 ke P. ABR mtr 100.00
FRC 4 (3 x 1 x 185 mm2) ke P. HYDRANT mtr 103.00
UTAN RUMAH SAKIT KUPANG NTT BANGUN : N. POWER

HARGA SATUAN JUMLAH HARGA

256,000,000 256,000,000

84,000,000 168,000,000

924,000,000 1,848,000,000

1,093,995 16,409,925

902,004 24,354,108
12,075 326,025
902,004 19,844,088
12,075 265,650

2,333,199,796

2,718,026,100 2,718,026,100
2,696,400,000 2,696,400,000
791,596,800 791,596,800
791,596,800 791,596,800
1,566,775,800 1,566,775,800
7,256,700 7,256,700
4,521,600 4,521,600
LINGKUP GENSET

8,576,173,800

8,576,173,800

22,797,600 478,749,600
22,797,600 547,142,400

22,797,600 387,559,200
22,797,600 455,952,000

9,119,040 255,333,120
80,903 1,698,963

9,119,040 191,499,840
1,135,050 113,505,000
7,759,392 799,217,376
NO. JENIS PEKERJAAN SAT. VOLUME

6 Dari PP. POWER HOUSE :


NYY 3 x 2,5 mm2 PC. POMPA SOLAR mtr 33.00
NYY 4 x 16 mm2 P. TAMAN mtr 17.00

TOTAL PEKERJAAN KABEL FEEDER

I.D Pekerjaan Kabel Ladder dan Kabel Tray


1 Kabel Ladder
ukuran 500 mm x 100 mm m 9.00
ukuran 400 mm x 100 mm m 22.00

2 Kabel Trench :
- Uk. 1.000 mm x 600 mm m 7.00
- Uk. 600 mm x 600 mm m 52.00
- Uk. 400 mm x 400 mm m 4.00

TOTAL PEKERJAAN KABEL TRAY DAN LADDER


HARGA SATUAN JUMLAH HARGA

18,113 597,729
32,603 554,251

3,231,809,479

353,000 3,177,000
293,400 6,454,800

Skope Sipil
Skope Sipil
Skope Sipil

9,631,800
NO. JENIS PEKERJAAN SAT. VOLUME

I.E PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 50 mm² m' 121.00
2 BCC 95 mm² m' 111.00
3 NYA 1 x 95 mm2 m' 62.00
4 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 6.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.F PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


F.1 Power House
1 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 18.00
2 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 7.00
3 Lampu Baret LED E27 10,5 Watt Bulb bh 2.00
4 Lampu Baret LED E27 10,5 Watt Bulb c/w Nicad Battery bh 2.00
5 Stop Kontak 1 Ph 200 Watt bh 6.00
6 Saklar Ganda bh 1.00
7 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 29.00
8 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 6.00

Sub Total Power House

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.G Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

1 Diesel Generator Set unit 2.00


- Type : Open Type Prime Power
- Kapasitas : 1.500 KVA , 400V/ 3Ph / 50Hz
- Putaran Mesin : 1.500 RPM
- Lengkap dengan : Panel genset DC, Knalpot, Accu+Cable, Tool kit, Manual Book, dll

2 Dari PKG :
NYY 7(4 x 1C x 300 mm2) ke Genset 1 mtr 21.00
NYM 2(4 x 2,5 mm2) ke Genset 1 mtr 21.00
SHIELDED 3(2 x 1,5 mm2) ke Genset 1 mtr 21.00
NYY 7(4 x 1C x 300 mm2) ke Genset 2 mtr 23.00
NYM 2(4 x 2,5 mm2) ke Genset 2 mtr 23.00
SHIELDED 3(2 x 1,5 mm2) ke Genset 2 mtr 23.00
NYY 7(4 x 1C x 300 mm2) ke Genset 3 mtr -
NYM 2(4 x 2,5 mm2) ke Genset 3 mtr -
SHIELDED 3(2 x 1,5 mm2) ke Genset 3 mtr -

3 Tangki penyimpanan bahan bakar mingguan/ weekly tank, dengan unit 1.00
kapasitas 16.000 lt, ketebalan plat minimal 6 mm, lengkap dengan pipa
vent, pipa inlet, pipa drain, manhole, sight glass, level control, rangka besi
penyangga dan seluruh alat bantu dan aksesoris yang diperlukan.

4 Tangki bahan bakar harian/ daily tank dengan kapasitas 3.000 lt, unit 1.00
ketebalan plat min. 5 mm, lengkap dengan pipa vent, pipa inlet, pipa drain,
manhole, sight glass, level control, stair, rangka besi penyangga,
dan seluruh alat bantu dan asesoris yang diperlukan.

5 Pompa elektrik/ transfer pump Kap. 50 LPM untuk bahan bakar solar, tipe sesuai sp unit 2.00
lengkap dengan seluruh alat bantu dan aksesoris yang diperlukan.

6 Panel Kontrol Pompa Solar unit 1.00

7 Pompa Tangan (Hand pump) Kap. 10 LPM, operasi single, dengan kapasitas sesuai unit 1.00
lengkap dengan seluruh alat bantu dan aksesoris yang diperlukan.

8 Pengadaan dan pemasangan pipa solar jenis black steel sch 40 lengkap dengan lot 1.00
valve-valve, fuel oil meter, water sparator, termasuk dengan material sambungan,
penggantung, klem, bracket dan semua aksesoris pemasangan seperti diuraikan
pada spesifikasi teknis dan gambar

9 Sistem pembuangan gas (knalpot genset) menggunakan pipa hitam (black set 2.00
steel) medium class dibungkus dengan rockwool density 80 kg/m3
kemudian dibungkus dengan aluminium jacketing tebal 50 mm di
sepanjang pipa, lengkap dengan vibration isolators, hangers, flanges,
sealant, rain cap dan semua acsesoris pendukung

10 Gas exhaust silencer tipe critical sesuai spesifikasi dan gambar set 2.00
dan semua asesoris pendukung

11 Intake sound attenuator dengan ukuran 3.500 x 1.000 X1.500 mm unit 1.00
lengkap dengan semua alat bantu yang diperlukan.

12 Intake sound attenuator dengan ukuran 5.500 x 1.000 x 1.500 mm unit 1.00
lengkap dengan semua alat bantu yang diperlukan.

13 Exhaust sound attenuator dengan ukuran 2.500 x 1.000 x 1.500 mm unit 2.00
lengkap dengan semua alat bantu yang diperlukan.

14 Ducting radiator flexible / ducting exhaust plenum genset kapasitas 1.250 KVA set 2.00

15 Isolasi peredam suara di ruang genset, menggunakan rockwool m2 344.75


dengan density 80 Kg/m3 tebal 50 mm, di pasang di dinding, kolom dan plafon,
dilapisi dengan glass cloth, wire mesh dan diperkuat dengan spindle pin
serta semua alat bantu yang diperlukan.
(Luasan dinding, kolom dan plafon sesuai gambar tender)

16 Testing & Commissioning Genset termasuk pengadaan solar selama testing lot 1.00

17 Biaya Perijinan Depnaker lot 1.00

18 Biaya Uji Emisi Generator Set lot 1.00

19 Biaya Sertifikasi Laik Operasi Instalasi Genset lot 1.00

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama


1 Module Module :
Addressable Monitor Module u/ Detektor unit 1.00

TOTAL PERALATAN UTAMA

IV.B Kabel Utama


1 Kabel STP AWG #18 1 pair dari MDFA (Loops) dalam conduit PVC HI dia. 20 mm
- TB.FA m 414.00

2 Kabel NYA 2 x 1,5 mm2 untuk Power Module dalam conduit PVC HI dia. 20 mm
- TB. FA m 207.00

TOTAL KABEL UTAMA

IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan


1 Terminal Box (TB. FA - PH) unit 1.00
2 Addresable Rate of Rise Detector bh -
3 Addresable Fixed Heat Detector bh -
4 Addressable Smoke Detector bh -
5 Smoke Detector Photoelectric bh 3.00
6 Rate of Rise Detector bh 8.00
7 Fixed Heat Detector bh -
8 End off line bh 1.00

9 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector Addressable STP AWG #18 tiitk -
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 11.00
TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot 1.00

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama


1 Kabel Riser dari Peralatan Utama / MDF ke Terminal Box pada masing masing
lantai di dalam conduit PVC HI dia 20 mm :
- TB. TS - POWER HOUSE NYMHY 2(3 x 2.5 mm2) m 223.00

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


C.1 Power House
1 Terminal Box Sound System (TB. TS. PH) bh 1.00
2 Ceiling Speaker 3 Watt + Matching Transformer bh 2.00
3 Box Speaker 6 Watt bh 3.00
4 Volume Control bh -
5 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 5.00
dalam conduit PVC HI dia. 20 mm
6 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Power House

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Peralatan Utama

TOTAL PERALATAN UTAMA

VIII.B Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m -

Sub Total Pengkabelan Utama

VIII.C Pekerjaan Instalasi Dalam Bangunan


1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 2.00
2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 2.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama


1 P. DDC set 1.00
untuk 175 point

2 Room Temperature Sensor unit 1.00

3 DC Voltage Tranducer unit 3.00

4 Level Switch bh 3.00

Sub Total Peralatan Utama

X.B Pengkabelan DDC


1 Kabel Power dari UPS di Ruang BAS ke: mtr 220.00
DDC NYM 3 x 1,5 mm2 dalam Conduit PVC 20 mm

2 Kabel Data dari MCU di Ruang BAS ke: mtr 440.00


DDC AWG #18 dalam Conduit PVC 20 mm

Sub Total Pengkabelan DDC

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

1 PDTM
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Power Monitoring HLI Titik 2.00

2 TRAFO
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
HI Temp Digital Input Titik 2.00

3 PDTR
INCOMING
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
Power Monitoring HLI Titik 4.00
COUPLER
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
OUTGOING
Status Digital Input Titik 21.00
Trip Alarm Digital Input Titik 21.00

4 PKG
OUTGOING
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00
AMF
General Alarm Digital Input Titik 3.00
Battery Genset Analog Input Titik 3.00
FUEL OIL DAILY TANK
Lo Level Digital Input Titik 3.00
P POMPA SOLAR
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan


1 Roof Drain :
- dia. 100 mm bh 10.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia .100 mm m' 66.00

TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Pengkabelan

TOTAL PENGKABELAN

XII.E Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING


XIII PEKERJAAN DEEP WELL
Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Peralatan Utama

Jumlah Peralatan Utama

XV.B Instalasi Pemipaan Utama dan katup - katup Ruang Pompa

TOTAL PEMIPAAN DAN KATUP-KATUP RUANG POMPA


XV.c Fire Extinguisher
1 Fire Extingusher type CO2 5 kg
lengkap dengan braket :
R.power House bh 1.00

2 Fire Extingusher type CO2 kapasitas 25 kg lengkap dengan kereta


R.power House bh 1.00

TOTAL FIRE EXTINGUISHER

XV.D Pekerjaan Pengkabelan

TOTAL PEKERJAAN PENGKABELAN

XV.E Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot -
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL PEKERJAAN PENGKABELAN

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya
1 EF-GD.N.1.1 unit 1.00
- Type : Propeller
- Kapasitas : 300 CFM
- Static Pressure : - In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Gardu PLN

2 EF-GD.N.1.2 s/d GD.N.1.3 unit 2.00


- Type : Propeller
- Kapasitas : 500 CFM
- Ext. Static Pressure : - In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Trafo

3 EF-GD.N.1.4 s/d GD.N.1.11 unit 8.00


- Type : Propeller
- Kapasitas : 800 CFM
- Ext. Static Pressure : - In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Panel, Ruang Genset

TOTAL PERALATAN UTAMA FAN

XVI.B Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.C Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit Fan dari P.ABR ke masing-masing unit
- NYM 3 x 2,5 mm² ke EF-GD.N.1.1
m 40.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.2
m 43.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.3
m 46.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.4
m 56.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.5
m 60.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.6
m 63.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.7
m 66.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.8
m 81.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.9
m 80.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.10
m 77.00
- NYM 3 x 2,5 mm² ke EF-GD.N.1.11
m 74.00
TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.D Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN LIFT

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

47,366 5,731,286
107,494 11,931,834
175,088 10,855,456
14,700,000 88,200,000

116,718,576

881,139 15,860,502
1,923,663 13,465,641
229,996 459,992
1,339,288 2,678,575
52,763 316,575
48,794 48,794
321,800 9,332,200
400,900 2,405,400

44,567,679

44,567,679

5,000,000 5,000,000

5,000,000

14,317,101,130

1,662,000,000 3,324,000,000

15,958,320 335,124,720
41,056 862,176
55,250 1,160,250
15,958,320 367,041,360
41,056 944,288
55,250 1,270,750
15,958,320 -
41,056 -
55,250 -

96,000,000 96,000,000

22,400,000 22,400,000

22,000,000 44,000,000

4,500,000 4,500,000

6,000,000 6,000,000
49,000,000 49,000,000

31,200,000 62,400,000

18,000,000 36,000,000

2,100,000 2,100,000

2,800,000 2,800,000

1,750,000 3,500,000

7,200,000 14,400,000

435,500 150,138,625

25,000,000 25,000,000

45,000,000 45,000,000

25,000,000 25,000,000

85,000,000 85,000,000

4,703,642,169

1,659,000.00 1,659,000

1,659,000

51,424 21,289,611

22,995 4,759,965

26,049,576

630,525 630,525
1,092,315 -
1,092,315 -
1,373,846 -
581,805 1,745,415
491,715 3,933,720
491,715 -
6,379 6,379

550,600 -
231,500 2,546,500
8,862,539

500,000 500,000

500,000

37,071,114

51,454 11,474,170

11,474,170

800,100 800,100
196,035 392,070
455,000 1,365,000
451,920 -
297,900 1,489,500

492,500 -

4,046,670

4,046,670

500,000 500,000

500,000

16,020,840

27,276 -

5,901,300 11,802,600
936,100 1,872,200

13,674,800

250,000 250,000

250,000

13,924,800

262,500,000 262,500,000

2,250,000 2,250,000

1,552,500 4,657,500

1,760,000 5,280,000

274,687,500

15,698 3,453,560

51,424 22,626,639

26,080,199

928,000 1,856,000
928,000 1,856,000
1,677,000 3,354,000

928,000 1,856,000
928,000 1,856,000
928,000 1,856,000

928,000 1,856,000
928,000 1,856,000
1,677,000 6,708,000

928,000 1,856,000
928,000 1,856,000

928,000 19,488,000
928,000 19,488,000

928,000 1,856,000
928,000 1,856,000
928,000 2,784,000
1,677,000 5,031,000

928,000 2,784,000

928,000 928,000
928,000 928,000

81,909,000

3,000,000 3,000,000

3,000,000

385,676,699

296,888 2,968,875

153,900 10,157,400

13,126,275

500,000 500,000

500,000

13,626,275

-
1,365,000 1,365,000

6,520,500 6,520,500

7,885,500

- -

7,885,500

711,480 711,480

776,160 1,552,320

5,292,000 42,336,000

44,599,800

15,698 627,920
15,698 675,014
15,698 722,108
15,698 879,088
15,698 941,880
15,698 988,974
15,698 1,036,068
15,698 1,271,538
15,698 1,255,840
15,698 1,208,746
15,698 1,161,652
10,768,828

500,000 500,000

500,000

55,868,628

-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
POMPA DAN GWT
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUN : O
POMPA DAN GWT
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
KUPANG NTT BANGUN : O. RUANG

TOTAL
113,329,368
-
-
2,266,114
595,800
-
-
20,762,200
-
86,420,500
-
2,798,293,117
-
-
2,425,460,221
103,217,221
-

5,550,344,540
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANG
POMPA DAN GWT
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

TOTAL PEKERAJAAN TEGANGAN MENENGAH

I.B Pekerjaan Panel-panel


B.1 Power House

Sub Total Power House

B.2 Ruang Pompa


1 P. ABR unit 1.00
2 P. HYDRANT unit 1.00
3 PC. HYDRANT LISTRIK unit 1.00
4 PC. HYDRANT JOCKEY unit 1.00

Sub Total Ruang Pompa

TOTAL PEKERAJAAN PANEL- PANEL

I.C PEKERJAAN KABEL FEEDER


1 Dari P. HYDRANT :
FRC 4 (3 x 1 x 185 mm2) mtr 17.00
FRC 4 x 1 x 6 mm2 mtr 17.00

TOTAL PEKERJAAN KABEL FEEDER

I.D Pekerjaan Kabel Ladder dan Kabel Tray

TOTAL PEKERJAAN KABEL TRAY DAN LADDER

I.E PEKERJAAN GROUNDING / PENTANAHAN

TOTAL PEKERJAAN PENTANAHAN

I.F PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA

F.2 Ruang Pompa


1 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 14.00
2 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 2.00
3 Stop Kontak 1 Ph 200 Watt bh 4.00
4 Saklar Ganda bh 1.00
5 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 16.00
6 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 4.00

Sub Total Ruang Pompa

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.G Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET

TOTAL PEKERJAAN GENSET


IV PEKERJAAN FIRE ALARM
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

IV.A Peralatan Utama

TOTAL PERALATAN UTAMA

IV.B Kabel Utama

TOTAL KABEL UTAMA


IV.C Pekerjaan Instalasi Fire Alarm dalam Bangunan
1 Smoke Detector Photoelectric bh 1.00
2 Rate of Rise Detector bh 2.00
3 Fixed Heat Detector bh -
4 End off line bh 1.00

5 Pengadaan dan pemasangan kabel instalasi Fire Alarm lengkap dengan
conduit high impact PVC Ø 20 mm dan semua alat bantu yang diperlukan :
Instalasi Detector konvensional NYA 2 x 1,5 mm2 tiitk 3.00

TOTAL PEK. INST.FIRE ALARM DALAM BANGUNAN

IV.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi fire alarm terpasang lot -

TOTAL TESTING COMISSIONING

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan


C.2 Ruang Pompa
1 Ceiling Speaker 3 Watt + Matching Transformer bh -
2 Box Speaker 6 Watt bh 2.00
3 Volume Control bh -
4 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 ttk 2.00
dalam conduit PVC HI dia. 20 mm
5 Instalasi untuk Volume Control dengan kabel NYMHY 3 x 1.5 mm2 ttk -
dalam conduit PVC HI dia. 20 mm

Sub Total Ruang Pompa

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot -

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV


VIII PEKERJAAN CCTV
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

VIII.A Peralatan Utama

TOTAL PERALATAN UTAMA

VIII.B Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m -

Sub Total Pengkabelan Utama

VIII.C Pekerjaan Instalasi Dalam Bangunan


1 Fixture Unit
- Indoor Fixed Dome IP Camera bh 3.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 3.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

VIII.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00
TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

X.A Peralatan Utama

1 Level Switch bh 6.00


2 DC Voltage Tranducer unit 1.00

Sub Total Peralatan Utama

X.B Pengkabelan DDC

Sub Total Pengkabelan DDC


TAN RUMAH SAKIT KUPANG NTT BANGUN : O. RUANG

HARGA SATUAN JUMLAH HARGA

15,097,500 15,097,500
30,397,500 30,397,500
SKOPE POMPA
SKOPE POMPA

45,495,000

45,495,000

2,347,380
39,905,460
131,376 2,233,392

42,138,852

881,139 12,335,946
1,923,663 3,847,326
52,763 211,050
48,794 48,794
321,800 5,148,800
400,900 1,603,600

23,195,516

23,195,516

2,500,000 2,500,000

2,500,000

113,329,368

-
-

581,805 581,805
491,715 983,430
491,715 -
6,379 6,379

231,500 694,500

2,266,114

- -

2,266,114

196,035 -

451,920 -
297,900 595,800

492,500 -

595,800

595,800

- -

595,800
-

27,276 -

5,901,300 17,703,900

936,100 2,808,300

20,512,200

250,000 250,000
250,000

20,762,200

1,760,000 10,560,000
1,552,500 1,552,500

12,112,500

-
NO. JENIS PEKERJAAN SAT. VOLUME

X.C Transducer, Aktuator dan Instalasi


Instalasi point BAS pada masing -masing lantai dalam konduit PVC HI dia 20 mm

Kabel yang digunakan :


- Digital menggunakan NYA 2 x 1,5 mm2
- Analog menggunakan STP AWG 18 #1 pair
- HLI menggunakan STP AWG 18 1 # 1 pair

1 GWT
Low Level Alarm Digital Input Titik 2.00
Deepwell
Status Digital Input Titik 3.00
Trip Alarm Digital Input Titik 3.00
WTP PUMP
Status Digital Input Titik 2.00
Trip Alarm Digital Input Titik 2.00

2 ROOF TANK
Low Level Alarm Digital Input Titik 2.00
POMPA BOOSTER
Status Digital Input Titik 3.00
Trip Alarm Digital Input Titik 3.00

3 CLEAN GWT
Low Level Alarm Digital Input Titik 2.00
POMPA TRANSFER
Status Digital Input Titik 4.00
Trip Alarm Digital Input Titik 4.00

4 POMPA HYDRANT
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00
Battery Diesel Analog Input Titik 1.00

5 P. ABR
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00

6 SDP IPAL
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00

7 PP IPAL
Status Digital Input Titik 1.00
Trip Alarm Digital Input Titik 1.00
Power Monitoring HLI Titik 1.00
On off Digital Input Titik 1.00

8 P. KONTROL ABR (RECYCLING), LIMBAH


Status Digital Input Titik 4.00
Trip Alarm Digital Input Titik 4.00
Power Monitoring HLI Titik 4.00

9 FLOW SWITCH
Status Digital Input Titik 17.00

Sub Total Transducer, Aktuator dan Instalasi

X.D Testing Commissioning


Testing Commissioning BAS termasuk pelatihan dan training sistem ls 1.00

Sub Total Testing Commissioning

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


1 Pompa Transfer (TP-01 A/B) set 1.00
Debit : 2x@30 m3 / jam
Type : Centrifugal End Suction
Head : 60 meter
Power : sesuai seleksi unit
Sistem Kerja : Paralel Alternate
Sudah lengkap dengan base Frame dan pengkabelannya

Panel Kontrol Otomatis unit 1.00

2 Pompa Hydrofor (Pompa Tekan Cadangan) set 1.00


Debit : 2x@30 m3 / jam
Type : Centrifugal End Suction
Head : 60 meter
Power : sesuai seleksi unit
Sistem Kerja : Paralel Alternate
Sudah lengkap dengan base Frame dan pengkabelannya

Panel Kontrol Otomatis VSD unit 1.00

Pressure Tank Kap. 1.000 liter unit 1.00


HARGA SATUAN JUMLAH HARGA

928,000 1,856,000

928,000 2,784,000
928,000 2,784,000

928,000 1,856,000
928,000 1,856,000

928,000 1,856,000

928,000 2,784,000
928,000 2,784,000

928,000 1,856,000

928,000 3,712,000
928,000 3,712,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000

928,000 928,000
928,000 928,000
1,677,000 1,677,000
928,000 928,000

928,000 3,712,000
928,000 3,712,000
1,677,000 6,708,000

928,000 15,776,000

72,808,000

1,500,000 1,500,000

1,500,000

86,420,500

-
140,000,000 140,000,000

include

108,000,000 108,000,000

include

4,380,000 4,380,000
NO. JENIS PEKERJAAN SAT. VOLUME
3 Pompa WTP set 1.00
Debit : 2x@20 m3 / jam
Type : Centrifugal End Suction
Head : 50 meter
Power : sesuai seleksi unit
Sistem Kerja : Paralel Alternate
Lokasi
Sudah lengkap dengan base Frame dan pengkabelannya

Panel Kontrol Otomatis unit 1.00

4 Water Treatment Plant ( Ruang Pompa ) , terdiri dari peralatan : set 1.00
Sistem : Filtration
Kapasitas WTP : 20 m 3/ jam

1 Filter Pump 2 UNIT


Capacity : 20 m 3/jam
Head : 50 m
Type : Centrifugal and suction
Power : 7,5 kW / 380 V / 3 Phase
Operational : Automatic and manual
Automatic on/off by float switch
2 Sand Filter Tank 1 UNIT
Capacity : 40 m 3/jam
Material : Mild Steel
Backwash System : Manual
Media : Silica Sand

3 Carbon Filter Tank 1 UNIT


Capacity : 40 m 3/jam
Material : FRP
Backwash System : Manual
Media : Silica Sand

4 Mangan Filter Tank


Capacity : 40 m 3/jam 1 UNIT
Material : FRP
Backwash System : Manual
Media : Silica Sand

5 Pipes and valves 1 lot


Class PVC : AW ( 10 kg/cm2 )

6 Cables 1 lot
Type : NYY - 0,6/1 kV

7 Electrical control panel


Component MCCB, MCB, Contactor, Selector Dll
Material : plate 2 mm with powder coating
Location : Indoor

8 Testing and comissioning


Lengkap dengan petunjuk pengoperasian,
shop drawing, , pelatihan operator,
Testing and comissioning

5 Ground Water Tank Pemadam


Kapasitas : 284 m3 unit 1.00
Bahan : FRP
Accessories : Base frame, ladder, mainhole, air vent

6 Ground Water Tank Raw Domestic unit 1.00


Kapasitas : 198 m3
Bahan : FRP
Accessories : Base frame, ladder, mainhole, air vent

7 Ground Water Tank Domestic unit 1.00


Kapasitas : 198 m3
Bahan : FRP
Accessories : Base frame, ladder, mainhole, air vent

SUB TOTAL PERALATAN UTAMA

A.2 Pemipaan Utama dan katup-katup


A.2.1 Ruang Pompa 
1 Instalasi Pipa Galvanis Medium Class
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 250 mm Header
m 7.00
- dia. 150 mm Header
m 5.00

2 Instalasi pipa air bersih dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 150 mm Pipa dari Header ke GWT
m 24.00
- dia. 80 mm m 15.00
- dia. 65 mm m 72.00
- dia. 50 mm m 21.00

3 Gate Valve NRS class 10 K :


- dia. 150 mm bh 2.00
- dia. 80 mm bh 3.00
- dia. 65 mm bh 14.00
- dia. 50 mm bh 12.00

4 Check Valve 10K


- dia. 50 mm bh 6.00

5 Strainer 10K
- dia. 50 mm bh 6.00

6 Flexible Joint 10K


- dia. 50 mm bh 12.00
HARGA SATUAN JUMLAH HARGA
52,000,000 52,000,000

35,000,000 35,000,000

552,832,000 552,832,000

693,600,000 693,600,000

487,200,000 487,200,000

487,200,000 487,200,000

2,560,212,000
1,149,070 8,043,490
750,320 3,751,600

988,590 23,726,160
241,040 3,615,600
177,620 12,788,640
132,320 2,778,720

5,799,150 11,598,300
2,223,900 6,671,700
1,962,975 27,481,650
1,065,960 12,791,520

1,840,650 11,043,900

870,450 5,222,700

660,452 7,925,420
NO. JENIS PEKERJAAN SAT. VOLUME
7 Floater Valve
- dia. 80 mm bh 4.00

8 Foot Valve & Saringan


- dia. 150 mm bh 4.00

9 Pressure Gauge lengkap Gate Valve bh 6.00

10 WLC lengkap dengan pengkabelan set 4.00

SUB TOTAL PEMIPAAN UTAMA & KATUP-KATUP

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Instalasi Air Hujan


1 Roof Drain :
- dia. 100 mm bh 10.00

2 Instalasi Pipa Tegak Air Hujan dengan Pipa PVC kelas AW 10 kg/cm2 termasuk
gantungan/hanger, support, fitting dan aksesories :
- dia .100 mm m' 66.00

TOTAL SALURAN AIR HUJAN

XII.D Pekerjaan Pengkabelan


1 NYY 4 x 25 mm2 PC. POMPA TRANSFER m 12.00
2 NYY 4 x 16 mm2 PC. WTP m 18.00
3 NYY 4 x 16 mm2 PC. POMPA HYDROPOR m 12.00
4 NYY 4 x 4 mm2 PC. DEEPWELL 1 m 74.00
5 NYY 4 x 4 mm2 PC. DEEPWELL 2 m 101.00
6 NYY 4 x 4 mm2 PC. DEEPWELL 3 m 146.00

TOTAL PENGKABELAN

XII.E Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Peralatan Utama


1 Electric Pump unit 1.00
Type : Horizontal Split Case
Kapasitas : 1.250 USGPM
Total Head : 165 meter
Elec. Power : ± 265 KW, 380 V / 3 Ph / 50 Hz
Lengkap dengan Panel Kontrol NFPA Standard, Elektro Motor
Mounted On The Baseplate & aksesories

2 Diesel Pump unit 1.00


Type : Horizontal Split Case
Kapasitas : 1.250 USGPM
Total Head : 165 meter
Elec. Power : 360 Hp 380 V / 3 Ph / 50 Hz
C/W:
Heat Exchanger Cooling System
Lead Acid Batteries With Rack and Cable
Standart Muffer ( Silincer & Flexible Connection)
Fuel Oil Tank
Battery Charge ( Buil In The Controller)
Over Speed Shutdown Protection
Double Solenoid Stater
Lengkap dengan Panel Kontrol NFPA Standard
dan aksesories

3 Jockey Pump unit 1.00


Type : Vertikal Multi Stage In Line
Kapasitas : 25 USGPM
Total Head : 175 meter
Elec. Power : 8 KW, 380 V / 3 Ph / 50 Hz
C/W: Panel Control & Accessories

Jumlah Peralatan Utama

XV.B Instalasi Pemipaan Utama dan katup - katup Ruang Pompa


1 Instalasi pipa utama dengan pipa Black steel Sch. 40 Grid A
termasuk fitting dan aksesoriesnya :
- dia. 250 mm (header) panjang 4 meter bh 1.00
- dia. 200 mm m 45.00
- dia. 150 mm m 40.00
- dia. 50 mm m 12.00
- dia. 20 mm Pipa Solar m 8.00

2 Gate Valve Rising Steam (OS & Y) class 20 K (20 bar) :


- dia. 200 mm bh 5.00
- dia. 150 mm bh 3.00
- dia. 50 mm bh 2.00

3 Check Valve class 20 K ( 20 bar ) :


- dia. 200 mm bh 2.00
- dia. 50 mm bh 1.00

4 Strainer 20 K (20 bar) :


- dia. 200 mm bh 2.00
- dia. 50 mm bh 1.00

5 Fleksibel Joint 20K (20 bar) :


- dia. 200 mm bh 4.00
- dia. 50 mm bh 2.00

6 Safety Valve dia. 200 mm bh 1.00

7 Flow meter dia. 150 mm bh 1.00

8 Pressure Switch bh 3.00

9 Pressure Gauge + gate valve bh 3.00

10 WLC + Pengkabelan bh 1.00

TOTAL PEMIPAAN DAN KATUP-KATUP RUANG POMPA

XV.c Fire Extinguisher


1 Fire Extingusher type CO2 5 kg
lengkap dengan braket :
R. Pompa bh 1.00

2 Fire Extingusher type CO2 kapasitas 25 kg lengkap dengan kereta


R. Pompa bh 1.00

TOTAL FIRE EXTINGUISHER

XV.D Pekerjaan Pengkabelan


1 FRC 4 x 1 x 185 mm2 m 15.00
2 FRC 4 x 1 x 16 mm2 m 14.00

TOTAL PEKERJAAN PENGKABELAN

XV.E Testing Commissioning


1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait
TOTAL PEKERJAAN PENGKABELAN

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.N.1.12 unit 1.00


- Type : Axial
- Kapasitas : 6.000 CFM
- Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Pompa

2 IF-GD.N.1.1 unit 1.00


- Type : Axial
- Kapasitas : 6.000 CFM
- Static Pressure : 2,0 In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : Ruang Pompa

TOTAL PERALATAN UTAMA FAN

XVI.B Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya

1 Unit Fan (EF-GD.N.1.1)


a Ducting tanpa isolasi finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 45.00
- BjLS 60 m2 46.00

b Exhaust Air Grille (EAG)


- 700 mm x 300 mm bh 6.00

c Exhaust Air Louvre (EAL)


- 1000 mm x 650 mm bh 1.00

2 Unit Fan (IF-GD.N.1.1)


a Ducting isolasi luar finish cat zinkromat lengkap dgn
gantungan/hanger/support dan aksesories lainnya :
- BjLS 80 m2 45.00
- BjLS 60 m2 46.00

b Intake Air Grille (IAG)


- 700 mm x 300 mm bh 6.00

c Intake Air Louvre (IAL)


- 1000 mm x 650 mm bh 1.00

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.C Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit Fan dari P.ABR ke masing-masing unit
- NYM 4 x 4 mm² ke EF-GD.N.1.12
m 37.00
- NYM 4 x 4 mm² ke IF-GD.N.1.1 m 10.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.D Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis
TOTAL PEKERJAAN LIFT

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

3,786,825 15,147,300

8,634,885 34,539,540

436,015 2,616,088

2,525,000 10,100,000

199,842,327

2,760,054,327

296,888 2,968,875

153,900 10,157,400

13,126,275

205,275 2,463,300
134,033 2,412,594
134,033 1,608,396
36,225 2,680,650
36,225 3,658,725
36,225 5,288,850

18,112,515

7,000,000 7,000,000

7,000,000

2,798,293,117

755,480,000 755,480,000

1,049,070,000 1,049,070,000
80,410,000 80,410,000

1,884,960,000

7,301,088 7,301,088
1,179,710 53,086,950
800,660 32,026,400
178,730 2,144,760
60,320 482,560

26,449,369 132,246,844
16,848,783 50,546,349
5,895,624 11,791,248

12,805,758 25,611,516
2,230,772 2,230,772

22,905,923 45,811,847
2,492,385 2,492,385

4,109,280 16,437,120
541,695 1,083,390

45,525,000 45,525,000

26,676,498 26,676,498

848,778 2,546,334

479,145 1,437,436

2,500,000 2,500,000

461,978,497

1,365,000 1,365,000

6,520,500 6,520,500

7,885,500

2,586,464 38,796,960
131,376 1,839,264

40,636,224

30,000,000 30,000,000
30,000,000

2,425,460,221

25,031,160 25,031,160

25,031,160 25,031,160

50,062,320

267,020 12,015,900
204,930 9,426,780

494,000 2,964,000

1,029,600 1,029,600

267,020 12,015,900
204,930 9,426,780

494,000 2,964,000

1,029,600 1,029,600

50,872,560

32,603 1,206,311
32,603 326,030

1,532,341

750,000 750,000

750,000

103,217,221
-

-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BA
PENGOLAHAN SAMPAH
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNA
PENGOLAHAN SAMPAH
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
SAKIT KUPANG NTT BANGUNA: Q. TEMPAT

TOTAL
27,052,756
-
-
-
-
-
-
-
-
-
-
-
-
-
2,730,000
36,606,417
-

66,389,173
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BA
PENGOLAHAN SAMPAH
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 PP. R SAMPAH unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari P. ABR :
NYY 4 x 4 mm2 + BCC 6 mm2 ke PP.R mtr 72.00

TOTAL PEKERJAAN KABEL FEEDER

I.C PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 1.00
2 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 1.00
3 TLED 1 x 14 Watt 2100 Lumen (Balk) bh 8.00
4 TLED 1 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 1.00
5 Stop Kontak 1 Ph 200 Watt bh 2.00
6 Saklar Tunggal bh 1.00
7 Saklar Ganda bh 1.00
8 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 m titik 2.00
9 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


VII PEKERJAAN MATV
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XVI.G Fire Extinguisher

1 Fire Extingusher type CO2 5 kg


- Limbah Kimia bh 2.00

TOTAL FIRE EXTINGUISHER

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama AC Split


Pengadaan dan Pemasangan unit AC Split lengkap dengan isi freon,
remote control + pengkabelan, gantungan/hanger/support dan akseories lainnya

1 IU-OU.GD.R.1.1 s/d GD.R.1.2 unit 2.00


- Type : Wall Mounted Inverter
- Kapasitas : 18.000 BTUH
- Power : sesuai seleksi unit
- Air Flow Rate : 525 cfm
- Lokasi : Area Limbah Medis

TOTAL PERALATAN UTAMA AC SPLIT

XVI.B Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.R.1.1 s/d GD.R.1.2 unit 2.00


- Type : Propeller
- Kapasitas : 350 CFM
- Static Pressure : - In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : TPS

TOTAL PERALATAN UTAMA FAN

XVI.C Pekerjaan Pemipaan

1 Pengadaan dan pemasangan pipa refrigerant ASTM B280 + isolasi lengkap dengan hanger
dan aksesories pendukung lainnya sesuai dengan spesifikasi dan gambar detail

IU-OU.GD.R.1.1 6,4 mm + 12,7 mm m 6.00


IU-OU.GD.R.1.2 6,4 mm + 12,7 mm m 5.00

2 Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW


(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung
lainnya gambar dan spesifikasi teknis

- dia. 20 mm m 8.00

TOTAL PEKERJAAN PEMIPAAN

XVI.D Pekerjaan Ducting, Grille dan Diffuser dan Instalasinya

TOTAL PEKERJAAN DUCTING, GRILLE DAN DIFFUSER

XVI.E Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit AC & Fan ke masing-masing unit
- NYM 3 x 2,5 mm² ke IU-OU.GD.R.1.1 m 73.00
- NYM 3 x 2,5 mm² ke IU-OU.GD.R.1.2 m 55.00
- NYM 4 x 2,5 mm² ke EF-GD.R.1.1
m 87.00
- NYM 4 x 2,5 mm² ke EF-GD.R.1.2
m 81.00

2 Kabel kontrol dari Indoor ke outdoor dengan NYM 3 x 2,5 mm2 m 11.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.F Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


LANJUTAN RUMAH SAKIT KUPANG NTT BANGUNA: Q. TEMPAT

HARGA SATUAN JUMLAH HARGA

13,355,000 13,355,000

13,355,000

43,118 3,104,496

3,104,496

881,139 881,139
1,923,663 1,923,663
483,571 3,868,570
1,526,007 1,526,007
52,763 105,525
44,163 44,163
48,794 48,794
321,800 643,600
400,900 801,800

9,843,260

750,000 750,000

750,000

27,052,756

-
-

1,365,000 2,730,000

2,730,000

2,730,000

12,032,000 24,064,001
24,064,001

1,330,560 2,661,120

2,661,120

273,470 1,640,820
273,470 1,367,350

61,550 492,400

3,500,570

15,698 1,145,954
15,698 863,390
20,528 1,785,936
20,528 1,662,768

15,698 172,678

5,630,726

750,000 750,000

750,000

36,606,417

-
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU
PENGOLAHAN AIR LIMBAH
LOKASI: NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU : R.
PENGOLAHAN AIR LIMBAH
LOKASI: NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATIC SYSTEM
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
KUPANG NTT BANGU : R. INSTALASI

TOTAL
383,205,968
-
-
-
-
-
-
-
-
-
-
3,482,783,536
-
-
7,885,500
192,664,870
-

4,066,539,873
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU
PENGOLAHAN AIR LIMBAH
LOKASI: NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Panel-panel


1 SDP IPAL unit 1.00
2 PP IPAL unit 1.00

TOTAL PEKERAJAAN PANEL- PANEL

I.B PEKERJAAN KABEL FEEDER


1 Dari PDTR :
NYY 4 x 95 mm2 ke SDP. IPAL mtr 347.00

2 Dari SDP IPAL :


NYY 4 x 6 mm2 PC. ABR RECYCLING mtr 25.00
NYY 4 x 4 mm2 PC LIMBAH LOUNDRY mtr 33
NYY 4 x 6 mm2 PC LIMBAH LAB mtr 44.00
NYY 4 x 16 mm2 PC. IPAL mtr 54.00
NYY 4 x 6 mm2 PP IPAL mtr 9.00

TOTAL PEKERJAAN KABEL FEEDER

I.C Pekerjaan Kabel Ladder dan Kabel Tray


C.1 Kabel Ladder

SUB TOTAL KABEL LADDER

C.2 Kabel Tray


1 Lantai 1
Kabel Tray Listrik
- uk. 600 mm x 50 mm m 6.00
- uk. 500 mm x 50 mm m -
- uk. 300 mm x 50 mm m 26.00

SUB TOTAL KABEL TRAY

TOTAL PEKERJAAN KABEL TRAY

I.D PEKERJAAN GROUNDING / PENTANAHAN


1 BCC 50 mm² m' 15.00
2 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU Bar unit 1.00
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohm

TOTAL PEKERJAAN PENTANAHAN

I.E PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 TLED 2 x 14 Watt 2100 Lumen (Balk) bh 27.00
2 TLED 2 x 14 Watt 2100 Lumen (Balk) + Nicad Battery bh 3.00
3 Stop Kontak 1 Ph 200 Watt bh 5.00
4 Saklar Ganda bh 2.00
5 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 30.00
6 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 5.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.F Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis
TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

NO. JENIS PEKERJAAN SAT. VOLUME


TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

TOTAL PEKERJAAN DATA DAN TELEPON (IP SYSTEM)

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATIC SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Peralatan Utama
1 Pompa Siram Taman set 1.00
Booster Pump Packaged
Type Pompa : Centrifugal End Suction
Debit : 2 x 6 m³/ jam
Head : 70 meter
Power : ± @ 2,2 KW/380V/50Hz
Pompa Sudah Termasuk :
- 1 set terdiri dari dari 2 unit pompa
- Pressure Tank
- Pressure Switch
- Header
- Valve
- Panel Kontrol VSD Otomatis
- Base Frame

2 Pompa WTP set 1.00


Debit : @6 m3 / jam
Type : Centrifugal End Suction
Head : 30 meter
Power : sesuai seleksi unit
Sistem Kerja : Paralel Alternate
Lokasi
Sudah lengkap dengan base Frame dan pengkabelannya

Panel Kontrol Otomatis unit 1.00

3 Water Treatment Plant , terdiri dari peralatan : set 1.00


a Sand Filter
Type : Pressure Vessel 3 bar
Kapasitas : 6 m³/ jam
Jumlah : 1 unit
lengkap dengan pressure gauge & buterfly valve

b Carbon Filter
Type : Pressure Vessel 3 bar
Kapasitas : 6 m³/ jam
Jumlah : 1 unit
lengkap dengan pressure gauge & buterfly valve

NO. JENIS PEKERJAAN SAT. VOLUME


4 Ground Water Tank
Kapasitas : 10 m3 unit 2.00
Ukuran : 2 m x 5 m x 1 m + 0,5 m
Bahan : FRP

SUB TOTAL PERALATAN UTAMA

A.2 Pemipaan Utama dan katup-katup


1 Instalasi Pipa Galvanis Medium Class
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm Header m 11.00

2 Instalasi pipa air bersih dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm pipa drain m 40.00
- dia. 50 mm m 13.00
- dia. 50 mm pipa drain m 11.00
- dia. 50 mm pipa penghubung m 4.00
- dia. 40 mm m 4.00

3 Gate Valve NRS class 10 K :


- dia. 80 mm bh 2.00
- dia. 50 mm bh 7.00
- dia. 40 mm bh 8.00

4 Check Valve 10K


- dia. 40 mm bh 4.00

5 Strainer 10K
- dia. 40 mm bh 4.00

6 Flexible Joint 10K


- dia. 40 mm bh 8.00

7 WLC lengkap dengan pengkabelan set 1.00

SUB TOTAL PEMIPAAN UTAMA & KATUP-KATUP

A.2 Pekerjaan instalasi pipa air bersih

SUB TOTAL PEKERJAAN INST. AIR BERSIH DALAM BANGUNAN

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent

B.1 Peralatan Utama


1 Sewage Treatment Plan (STP) unit 1.00
a. BIOREACTOR SYSTEM / SECONDARY TREATMENT UNIT
Capacity : 150 M³ Perhari
Shapes : Silinder Horisontal
Material : FRP
Dimension : P = 520 cm, D = 240 cm
Thickness : 12 mm
Quantity : 2 Unit
Position : Aboveground
Media : Bioball
Distribusi Udara : Pipe Perforated Sparger

b. Separator
Dimension : P = 420 cm, D = 240 cm
Thickness : 12 mm
Quantity : 1 Unit
Position : Aboveground
Shapes : Silinder Horisontal
Material : FRP
Position : Aboveground

c. Chlorinasi System
Sistem : Dosing Pump
Posisi : Aboveground
Jumlah : 2 Unit

d. Ring Blower
Listrik : 7,5 pk / 3 ph
Jumlah : 2 Unit

e. Input Pump
Listrik : 0,5 pk / 1 ph
Jumlah : 2 Unit
Jenis : Submersible

f. Sludge Pump
Listrik : 0,3 pk / 1 ph
Jumlah : 1 Unit
Jenis : Submersible

g. Flow Meter
Quantity : 1 Unit
Type : Analog

h. Control Panel
AN RUMAH SAKIT KUPANG NTT BANGU : R. INSTALASI

HARGA SATUAN JUMLAH HARGA

43,255,000 43,255,000
6,355,000 6,355,000

49,610,000

736,575 255,591,525

45,885 1,147,125
32,603 1,075,899
45,885 2,018,940
134,033 7,237,782
45,885 412,965

267,484,236

353,000 2,118,000
309,400 -
211,600 5,501,600

7,619,600

7,619,600

47,366 710,490
14,700,000 14,700,000

15,410,490

881,139 23,790,753
1,923,663 5,770,989
52,763 263,813
48,794 97,587
321,800 9,654,000
400,900 2,004,500

41,581,642

1,500,000 1,500,000

1,500,000

383,205,968
-

HARGA SATUAN JUMLAH HARGA

134,920,000 134,920,000
100,080,000 100,080,000

include

146,800,000 146,800,000

HARGA SATUAN JUMLAH HARGA

36,000,000 72,000,000

453,800,000

456,400 5,020,400

241,040 9,641,600
132,320 1,720,160
132,320 1,455,520
132,320 529,280
89,540 358,160

2,223,900 4,447,800
1,065,960 7,461,720
695,625 5,565,000

997,605 3,990,420

668,098 2,672,393

498,385 3,987,083

2,550,000 2,550,000

49,399,536

503,199,536

2,249,600,000 2,249,600,000
NO. JENIS PEKERJAAN SAT. VOLUME
Cable : Standard PLN
Position : Upper Ground
Jumlah : 1 Unit
Posisi : Aboveground

Waste Water Treatment Plant (WWTP) Laundry set 1.00


2
Sistem : Chemical Proses
Kapasitas WWTP : 270 Lpm

1 Coarse And Fine Bar Screen 2 UNIT


Material : FRP
Operational : Manual

2 pH Controller 1 unit
Model : RP 1500
Include : ORP Electrode ( Sensor )

3 Dosing Pump ( pH Adjustment, Deafoming, PAC & P 4 unit


Capacity : 6 litre/hour
Pressure : 3 Bar
Accessories : Tanki PE 200 L, static mixer

4 Slow Speed Mixer 2 unit


Power : 1,5 kW / 380 V / 3 Phase
Operational : Continous

5 Sedimentation Pump 2 unit


Capacity : 150 Lpm
Head : 10 m
Type : Submersible
Power : 0.75 kw/380 V/3phase

6 Pipes and valves 1 lot


Class PVC : AW ( 10 kg/cm2 )
Merk Fitting PVC : CM
Merk Valve : Kitz (Brass Class 125 - non rising stem )
Saturated Steam Pressure : 0,86 Mpa

7 Cables 1 lot
Type : NYY - 0,6/1 kV

8 Electrical control panel 1 lot


Component MCCB, MCB, Contactor, Selector Dll
Material : plate 2 mm with powder coating
Location : Indoor

3 Waste Water Treatment Plant (WWTP) Laboratorium set 1.00


Sistem : Kimia Fisika
Kapasitas WWTP : 4 m 3/hari

1 Feed Pump 2 UNIT


Capacity : 100 Lpm
Head : 15 m
Type : Submersible
Power : 1,5 kW / 380 V / 3 Phase
Operational : Automatic and manual
Automatic on/off by float switch

2 pH Controller 1 UNIT
Include : ORP Electrode ( Sensor )

3 Dosing Pump ( pH Adjustment, PAC & Polymer ) 3 UNIT


Capacity : 6 litre/hour
Pressure : 3 Bar
Accessories : Tanki PE 200 L, static mixer

4 Slow Speed Mixer 4 UNIT


Power : 1,5 kW / 380 V / 3 Phase
Operational : Continous

5 Bak Pengaduk dan Tanki 4 UNIT


Dimention : Dia 800 x T 700 (mm)
Material : FRP
6 Sedimentation system 1 UNIT
Consist of : - Tube Settler
- Over flow weir
7 Bak Penampung 1 UNIT
Volume : 5 m3
Material : FRP

8 Filter Pump 1 UNIT


Capacity : 4 m 3/jam
Head : 40 m
Type : Centrifugal Pump
Power : 1,5 kw/380 V/3phase

9 Sand Filter Tank 1 UNIT


Capacity : 4 m 3/jam
HARGA SATUAN JUMLAH HARGA

269,040,000 269,040,000

445,944,000 445,944,000
NO. JENIS PEKERJAAN SAT. VOLUME
Material : FRP
Backwash System : Manual
Media : Silica Sand

10 Carbon Filter Tank 1 UNIT


Capacity : 4 m3/jam
Material : FRP
Backwash System : Manual
Media : Silica Sand

11 Pipes
Class PVC : AW ( 10 kg/cm2 )

12 Cables
Type : NYY - 0,6/1 kV

13 Electrical control panel


Component MCCB, MCB, Contactor, Selector Dll
Material : plate 2 mm with powder coating
Location : Indoor

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.C Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

TOTAL PEKERJAAN DEEP WELL


HARGA SATUAN JUMLAH HARGA

2,964,584,000

15,000,000 15,000,000

15,000,000

3,482,783,536

-
NO. JENIS PEKERJAAN SAT. VOLUME
XIV PEKERJAAN MEDICAL GAS
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

XV.A Fire Extinguisher


1 Fire Extingusher type CO2 5 kg
Ruang Blower bh 1.00

2 Fire Extingusher type CO2 kapasitas 25 kg lengkap dengan kereta


- Ruang IPAL bh 1.00

TOTAL FIRE EXTINGUISHER

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

XVI.A Peralatan Utama Fan


Pengadaan dan Pemasangan fan lengkap dengan hanger/support/gantungan
dan aksesories lainnya

1 EF-GD.O.1.1 s/d GD.O.1.10 unit 10.00


- Type : Propeller
- Kapasitas : 2.800 CFM
- Static Pressure : - In Wg
- Putaran : 1.440 RPM
- Power : sesuai seleksi unit
- Lokasi : TPS

TOTAL PERALATAN UTAMA FAN

XVI.B Pekerjaan Listrik / Pengkabelan


1 Pengkabelan unit Fan dari PP.IPAL ke masing-masing unit
- NYM 3 x 2,5 mm² ke EF-GD.O.1.1
m 13.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.2
m 9.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.3
m 10.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.4
m 15.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.5
m 29.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.6
m 33.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.7
m 45.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.8
m 49.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.7
m 54.00
- NYM 3 x 2,5 mm² ke EF-GD.O.1.8
m 58.00

TOTAL PEKERJAAN LISTRIK DAN PENGKABELAN

XVI.C Testing Commissioning


1 Testing & Commissioning Peralatan dan Instalasi AC dan Fan lot 1.00

TOTAL TESTING DAN COMMISSIONING

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN TRANSPORTASI DALAM GEDUNG


HARGA SATUAN JUMLAH HARGA

1,365,000 1,365,000

6,520,500 6,520,500

7,885,500

7,885,500

18,522,000 185,220,000

185,220,000

15,698 204,074
15,698 141,282
15,698 156,980
15,698 235,470
15,698 455,242
15,698 518,034
15,698 706,410
15,698 769,202
15,698 847,692
15,698 910,484

4,944,870

2,500,000 2,500,000

2,500,000

192,664,870
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU
LOKASI : NUSA TENGGARA TIMUR

NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
XVII

TOTAL
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU : SI
LOKASI : NUSA TENGGARA TIMUR

JENIS PEKERJAAN
PEKERJAAN LISTRIK ARUS KUAT
PEKERJAAN PENANGKAL PETIR
PEKERJAAN GENSET
PEKERJAAN FIRE ALARM
PEKERJAAN SOUND SYSTEM
PEKERJAAN DATA DAN TELEPON (IP SYSTEM)
PEKERJAAN MATV
PEKERJAAN CCTV
PEKERJAAN NURSE CALL
PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS)
PEKERJAAN ANTRIAN
PEKERJAAN PLUMBING
PEKERJAAN DEEP WELL
PEKERJAAN MEDICAL GAS
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN TATA UDARA
PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL
PANG NTT BANGU : SITE PLAN

TOTAL
593,757,131
127,124,000
-
-
46,322,025
-
-
26,672,200
-
-
-
2,573,111,342
1,240,431,180
-
2,244,665,293
-
-

6,852,083,171
ENGINEERING ESTIMATE (EE) PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYE : PAKET PEKERJAAN JASA KONSULTANSI KONSTRUKSI PENGADAAN JASA KONSULTAN LANJUTAN RUMAH SAKIT KUPANG NTT BANGU
LOKASI : NUSA TENGGARA TIMUR

NO. JENIS PEKERJAAN SAT. VOLUME

I PEKERJAAN LISTRIK ARUS KUAT


Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis

I.A Pekerjaan Trench

1 Kabel Trench :
- Uk. 1.000 mm x 600 mm m 181.00
- Uk. 600 mm x 600 mm m 87.00
- Uk. 600 mm x 400 mm m 87.00
- Uk. 400 mm x 600 mm m 16.00
- Uk. 400 mm x 400 mm m 198.00

TOTAL PEKERAJAAN KABEL TRENCH

I.B PEKERJAAN LAMPU / STOP KONTAK / TITIK NYALA


1 Lampu Taman LED 1 x 100 Watt (Tinggi Tiang 6 meter 1 cabang) bh 35.00
2 Lampu Taman LED 2 x 100 Watt (Tinggi Tiang 6 meter 2 cabang) bh 2.00
3 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm titik 37.00
4 kabel NYFGbY 4 x 16 mm² (Loping lampu taman) mtr 1,800.00

TOTAL PEKERJAAN LAMPU/ TITIK NYALA/ STOP KONTAK

I.C Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi elektrikal terpasang lot 1.00
termasuk panel - panel, pengkabelan, grounding dan instalasi lampu

TOTAL TESTING & COMMOSSIONING

TOTAL PEKERJAAN LISTRIK ARUS KUAT

II PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

1 Air Terminal jenis Non radioaktif Radius Perlindungan 100 meter unit 1.00
2 FRP Mast set 1.00
3 Termination Kit set 1.00
4 Pengadaan dan pemasangan Lightning Event Strike Counter (penghitung unit 1.00
sambaran petir)
5 Obstruction Light 300 Watt lengkap dengan Photo Electric Switch set 1.00
6 Batang Penyangga tinggi 20 meter, bahan GIP Medium Class unit 1.00
lengkap dengan angur dan tali pengikat
7 Down Conductor Coaxial Cable 50 mm lengkap dengan klem meter 33.00
8 Grounding system UNIT 1.00
9 Testing Commissioning ls 1.00
10 Biaya Perijinan Depnaker ls 1.00

TOTAL PEKERJAAN PENANGKAL PETIR

III PEKERJAAN GENSET


Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis

TOTAL PEKERJAAN GENSET

IV PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN FIRE ALARM

V PEKERJAAN SOUND SYSTEM


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

V.A Peralatan Utama Sound System


1 Power Mixer Amplifier 240 W unit 1.00
2 Mic Car Call unit 1.00
3 Instalasi pengkabelan peralatan Car Call unit 1.00

TOTAL PERALATAN UTAMA

V.B Pengkabelan Utama

TOTAL PENGKABELAN UTAMA

V.C Pekerjaan Instalasi Sound System Pada Bangunan

C.2 Site Plan


1 Horn Speaker 15 Watt lengkap dengan tiap Galvanis 50 mm tinggi 2.5 meter bh 14.00
2 Instalasi untuk Speaker dengan kabel NYMHY 2 x 1.5 mm2 titik 14.00
dalam conduit PVC HI dia. 20 mm

Sub Total Site Plan

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

V.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi sound system lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN SOUND SYSTEM

VI PEKERJAAN DATA DAN TELEPON (IP SYSTEM)


Pengadaan dan pemasangan sistem sesuai dengan gambar & Spesifikasi Teknis

TOTAL PEKERJAAN DATA DAN TELEPON

VII PEKERJAAN MATV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN MATV

VIII PEKERJAAN CCTV


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

III.A Peralatan Utama

TOTAL PERALATAN UTAMA

III.B Pengkabelan Utama


1 Cabling System
Kabel FO Multimode 4 core + konduit, Backbone ke Hub m -

Sub Total Pengkabelan Utama

III.C Pekerjaan Instalasi


1 Fixture Unit
- Outdoor Fixed IP Camera bh 2.00

2 Instalasi
- Intalasi Kabel UTP Cat 6 dalam Konduit PVC HI 20 mm titik 2.00

TOTAL PEKERJAAN INSTALASI PADA BANGUNAN

III.D Testing & Commissioning


1 Testing & Commissioning peralatan dan instalasi CCTV lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN CCTV

IX PEKERJAAN NURSE CALL


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN NURSE CALL

X PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS)


Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis

TOTAL PEKERJAAN BUILDING AUTOMATIC SISTEM (BAS)

XI PEKERJAAN ANTRIAN
Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN ANTRIAN

XII PEKERJAAN PLUMBING


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

XII.A Air Bersih dan Air Panas


A.1 Peralatan Utama
1 Submersible Pump (Kolam Pond-1) SET 1.00
Kapasitas : 2 x @75 LPM
Type : Submersible Sewage Pump with Cutter
Head : 8 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Kolam Pond- 01 unit 1.00


Kapasitas : - m³
Ukuran : 1000 x 1000 x (1000+500)mm

2 Submersible Pump (Kolam Pond-2) SET 1.00


Kapasitas : 2 x @75 LPM
Type : Submersible Sewage Pump with Cutter
Head : 8 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Kolam Pond- 02 unit 1.00


Kapasitas : - m³
Ukuran : 1000 x 1000 x (1000+500)mm

3 Submersible Pump (Kolam Pond-3) SET 1.00


Kapasitas : 2 x @150 LPM
Type : Submersible Sewage Pump with Cutter
Head : 5 meter
Power : sesuai seleksi unit
Jumah Pompa : 2 unit
Bekerja secara parallel
lengkap dengan katup2, panel kontrol otomatis dan Level Control

Bak Submersible Kolam Pond- 03 unit 1.00


Kapasitas : - m³
Ukuran : 2200 x 1000 x (1000+500)mm

SUB TOTAL PERALATAN UTAMA

A.2 Ruang Pompa 
1 Instalasi pipa utama air bersih dari Ruang Pompa Transfer ke Roof Tank
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 100 mm m 334.00

2 Instalasi pipa utama air bersih dari Ruang Pompa ke riser masing-masing gedung
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 689.00
- dia. 65 mm m 142.00
- dia. 50 mm m 364.00

3 Instalasi pipa utama air bersih dari Ruang Pompa Hydropur ke riser masing-masing gedung
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m 1,302.00

4 Instalasi pipa utama air bersih dari Pompa Hydropur ke dalam bangunan
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 65 mm m 79.00
- dia. 50 mm m 21.00

5 Instalasi pipa utama air bersih dari PDAM ke GWT masing-masing gedung
dengan PPR80 - PN10 termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 80 mm m 502.00

6 Gate Valve NRS class 10 K :


- dia. 65 mm bh 19.00
- dia. 50 mm bh 13.00

7 Check Valve 10K


- dia. 65 mm bh 4.00
- dia. 50 mm bh 2.00

8 PRV
- dia. 65 mm bh 4.00
- dia. 50 mm bh 3.00

Sub Total Ruang Pompa

A.3 Pekerjaan instalasi pipa air bersih site plan


1 Instalasi pipa siram tanam recycling dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 48.00
- dia. 40 mm m' -
- dia. 32 mm m' 568.00
- dia. 25 mm m' 55.00
- dia. 20 mm m' 92.00
- dia. 15 mm m' 1,594.00

2 Instalasi pipa Reject RO dengan PPR80 - PN10


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 32 mm Gedung D ke GWT Recycling m' 145.00
- dia. 15 mm Gedung J ke GWT Recycling m' 145.00

3 Kran taman bergerigi sesuai gambar lengkap bak kontrol uk. 40 x 40 cm lengkap dengan bh 35.00
tutupnya

Sub Total Pekerjaan instalasi pipa air bersih site plan

A.4 Pekerjaan Instalasi Pipa Kolam Pond


1 Instalasi pipa kolam pond dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 50 mm m' 79.00
- dia. 32 mm m' 37.00
- dia. 25 mm m' 29.00

2 Instalasi pipa Sparing dengan PVC Class AW


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 25 mm m' 70.00

3 Ball Valve class 10 K :


- dia. 50 mm bh 12.00
- dia. 32 mm bh 3.00
- dia. 25 mm bh 9.00

4 Check Valve 10K


- dia. 50 mm bh 6.00

5 Strainer 10K
- dia. 50 mm bh 2.00

6 Flexible Joint 10K


- dia. 50 mm bh 12.00

7 Floater Busa bh 1.00

8 Nozzle
- dia. 32 mm bh 8.00
- dia. 25 mm bh 3.00

Sub Total Pekerjaan Instalasi Pipa Kolam Pond

TOTAL AIR BERSIH DAN AIR PANAS

XII.B Air Kotoran, Kotor dan Vent


Pemipaan Siram Tanam :
1 Instalasi Pipa Utama Air Kotoran dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 200 mm m' 315.00
- dia. 150 mm m' 402.00
- dia. 100 mm m' 405.00
- dia. 80 mm m' 108.00

2 Instalasi Pipa Utama Air Kotor Laundry dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 150 mm m' 141.00

3 Instalasi Pipa Utama Air Kotor Dapur dengan Pipa PVC kelas AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 150 mm m' 165.00

4 Instalasi Pipa Utama Air Kotor Kimia Cast Iron


termasuk gantungan/hanger, support, fitting dan aksesories :
- dia. 200 mm m' 187.00
- dia. 150 mm m' 430.00
- dia. 100 mm m' 400.00

5 Gate Valve 10K


- dia. 80 mm bh 46.00

6 Check Valve 10K


- dia. 80 mm bh 46.00

TOTAL AIR KOTORAN, KOTOR DAN VENT

XII.c Pekerjaan Testing & Commissioning


1 Testing dan commissioning peralatan dan instalasi plambing lot 1.00

TOTAL TESTING & COMMISSIONING

TOTAL PEKERJAAN PLUMBING

XIII PEKERJAAN DEEP WELL


Pengadaan dan pemasangan sistem lengkap sesuai gambar & spesifikasi teknis

1 Pompa Deep Well unit 3.00


- Debit : 10 m³ / jam
- Total head : 70 meter
- Power : menyelesaikan seleksi unit
- Tipe : Submersible
Panel Kontrol Outdoor Otomatis unit 3.00

2 Casing Pompa Deepwell dengan pipa Galvanis Medium Class


- dia. 150 mm m 216.00
- dia. 100 mm m 144.00

3 Screen Stainless Steel


- dia. 150 mm m 18.00
- dia. 100 mm m 18.00

4 Instalasi pipa dari pompa sampai dengan water meterdengan pipa galvanis Medium
- dia 50 mm m 216.00

5 Gate Valve
- dia 50 mm bh 6.00

6 Bak Kontrol ukuran (60x80) cm dengan tutup chequer plate bh 3.00

7 WLC untuk Sumur dalam + pengkabelan (kabel power dan kabel kontrol) lot 3.00

8 Instalasi pengkabelan pompa deep well dengan kabel NYY 3 x 4 mm2 mtr 300.00

9 Instalasi kabel kontrol pompa deep well dengan kabel NYYHY 3 x 1,5 mm2 mtr 300.00

10 Mobilisasi dan demobilisasi Mesin Bor lot 1.00

11 Biaya pegeboran kedalaman ± 120 meter unit 3.00

12 Loging Test unit 3.00

13 Pumping Test unit 3.00


14 Biaya Geolistrik titik 3.00

15 Biaya Perijinan termasuk water meter 50 mm lot 1.00

16 Testing Commissioning lot 1.00

TOTAL PEKERJAAN DEEP WELL

XIV PEKERJAAN MEDICAL GAS


Pengadaan dan pemasangan sistem lengkap sesuai
gambar & spesifikasi teknis

TOTAL PEKERJAAN MEDICAL GAS

XV PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan pemasangan lengkap
sesuai gambar & spesifikasi teknis

1 Hydrant Pillar bahan Cast Iron unit 14.00


type : two way
Lengkap terpasang

2 Siamese Conection type 2 cabang bahan cast iron lengkap unit 2.00
terpasang

3 Hydrant Box Type Outdoor size ( 95 x 66 x 20) unit 14.00


lengkap dengan ;
- Color : red, oven painted
- 1 PC Hose Nozzle dia. 65 mm
- 1 roll fire house with machino coupling diameter 65 mm x 30 meter
Lengkap terpasang

4 Instalasi dengan pipa Black steel Sch. 40 termasuk fitting


dan aksesoriesnya :
- dia. 150 mm Pipa Hydrant Pilar m' 947.00
- dia. 150 mm Pipa Jalur Hydrant Gedung m' 557.00
- dia. 150 mm Pipa Jalur Sprinkler m' 539.00
- dia. 100 mm m' 173.00

5 Gate Valve Rising Steam (OS & Y) class 16 K lengkap dengan bak kontrol:
- dia. 100 mm bh 14.00

6 Check Valve 16 K lengkap dengan bak kontrol :


- dia. 100 mm bh 2.00

7 Galian dan urugan untuk pemasangan pipa dalam tanah m3 1,396.08

8 Wrapping pipa utama dalam tanah m' 2,216.00

1 Testing & Commissioning Instalasi dan Peralatan Fire Hydrant & Sprinkler, lot 1.00
Extinguisher termasuk pengurusan ijin dari dinas terkait

TOTAL PEKERJAAN FIRE HYDRANT DAN SPRINKLER

XVI PEKERJAAN TATA UDARA


Pengadaan dan pemasangan sistem lengkap sesuai
gambar. & spesifikasi teknis

TOTAL PEKERJAAN TATA UDARA

XVII PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan sistem lengkap sesuai dengan Gambar
dan Spesifikasi Teknis

TOTAL PEKERJAAN LIFT


RUMAH SAKIT KUPANG NTT BANGU : SITE PLAN

HARGA SATUAN JUMLAH HARGA

Skope Sipil
Skope Sipil
Skope Sipil
Skope Sipil
Skope Sipil

7,958,366 278,542,803
11,049,864 22,099,728
321,800 11,906,600
154,560 278,208,000

590,757,131

3,000,000 3,000,000

3,000,000

593,757,131

21,600,000 21,600,000
4,800,000 4,800,000
5,360,000 5,360,000
4,800,000 4,800,000

4,000,000 4,000,000
8,500,000 8,500,000

708,000 23,364,000
14,700,000 14,700,000
15,000,000 15,000,000
25,000,000 25,000,000

127,124,000

-
6,306,300 6,306,300
5,311,625 5,311,625
750,000 750,000

12,367,925

1,099,350 15,390,900
1,218,800 17,063,200

32,454,100

32,454,100

1,500,000 1,500,000

1,500,000

46,322,025

27,276 -

12,250,000 24,500,000

936,100 1,872,200

26,372,200

300,000 300,000

300,000

26,672,200
-

52,200,000 52,200,000

skope sipil

52,200,000 52,200,000

skope sipil

79,080,000 79,080,000

skope sipil

183,480,000

346,510 115,734,340

241,040 166,076,560
177,620 25,222,040
132,320 48,164,480

132,320 172,280,640

177,620 14,031,980
132,320 2,778,720

241,040 121,002,080

1,962,975 37,296,525
1,065,960 13,857,480

1,755,075 7,020,300
1,840,650 3,681,300

30,141,000 120,564,000
28,333,000 84,999,000

932,709,445

132,320 6,351,360
89,540 -
64,860 36,840,480
46,250 2,543,750
28,830 2,652,360
22,590 36,008,460

64,860 9,404,700
22,590 3,275,550

Scope Arsitek

97,076,660

132,320 10,453,280
64,860 2,399,820
46,250 1,341,250

30,720 2,150,400

813,750 9,765,000
380,783 1,142,348
288,330 2,594,970

1,840,650 11,043,900

1,840,650 3,681,300

660,452 7,925,420

435,500 435,500

455,000 3,640,000
355,000 1,065,000

57,638,187

1,270,904,292
440,670 138,811,050
288,460 115,960,920
153,900 62,329,500
105,190 11,360,520

288,460 40,672,860

288,460 47,595,900

1,055,840 197,442,080
692,030 297,572,900
425,060 170,024,000

2,223,900 102,299,400

2,459,520 113,137,920

1,297,207,050

5,000,000 5,000,000

5,000,000

2,573,111,342

35,000,000 105,000,000

12,000,000 36,000,000

750,320 162,069,120
456,400 65,721,600

2,500,000 45,000,000
2,000,000 36,000,000

203,300 43,912,800

1,065,960 6,395,760

3,000,000 9,000,000

3,500,000 10,500,000

27,773 8,331,900

15,000 4,500,000

50,000,000 50,000,000

162,000,000 486,000,000

15,000,000 45,000,000

4,000,000 12,000,000
10,000,000 30,000,000

75,000,000 75,000,000

10,000,000 10,000,000

1,240,431,180

5,386,500 75,411,000

4,725,000 9,450,000

5,028,555 70,399,770

800,660 758,225,020
800,660 445,967,620
800,660 431,555,740
457,940 79,223,620

9,688,697 135,641,751

4,852,386 9,704,772

75,000 104,706,000

55,000 121,880,000

2,500,000 2,500,000

2,244,665,293

You might also like