LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work:


Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

-:oOo:-

Gopalapuram - Katakoteswaram road from km 0.00 to 8.00

Reach proposed in the present estimate: km 0 / 000 to 8 / 000 = 8.000 kms


Centre KM of the Working Reach = 0.000 + (0.000 -8.000)/2 4.000 kms
= 4.000 K.M.

A) For HBG metal:


HBG metal quarry at km 69/4 of EGK road
a) Cart track length = = 0.225 kms
b) Metalled road length:
From km 63 / 800 to 69 / 400 of EGK road = 5.200 kms
From km 181 / 700 to 174 / 200 of Tallada - Deverapalli road = 7.500 kms
From km 15 / 800 to 14 / 980 of Prakkilanka - Koyyalagudem road = 0.820 kms
G.K road Working K.M. 0 / 000 to 8 / 000 = 4.000 kms

c) Total lead = 17.745 kms


Or say: 18.000 kms

B) For Gravel:
Gravel from Gopalapuram Quarry
a) Cart track length = 0.5 1.100 = 0.550 kms
b) Metalled road length:

From km 16/ / 200 to 15 / 800 of Prakkilanka - Koyyalagudem road = 0.400 kms


G.K road Working K.M. 0 / 000 to 8 / 000 = 4.000 kms

c) Total lead = 4.400 kms


Or say: 4.000 kms

C) For Sand :
Sand Quarry at River Godavari at AGRB road at km 3/2
a) Cart track length = 0.5 1.100 = 0.550 ###
kms
From km 10 / 200 to 3 / 200 of AGRB road = 7.000 kms
From km 83 / 121 to 63 / 800 of EGK road = 19.321 kms
From km 181 / 700 to 174 / 200 of Tallada - Deverapalli road = 7.500 kms
From km 15 / 800 to 14 / 980 of Prakkilanka - Koyyalagudem road = 0.820 kms
G.K road Working K.M. 0 / 000 to 8 / 000 = 4.000 kms
Total lead = 39.191 kms
Or say: 40.000 kms
###
E) For Bitumen & Emulsion :
a) Lead from ex-factory at Visakhapatnam Refinery
b) Metalled road length:
From km / to / of AGRB road at km 7.500 = 213.000 kms
From km 10 / 200 to 3 / 200 of AGRB road = 7.000 kms
From km 83 / 121 to 63 / 800 of EGK road = 19.321 kms
From km 181 / 700 to 174 / 200 of Tallada - Deverapalli road = 7.500 kms
From km 15 / 800 to 14 / 980 of Prakkilanka - Koyyalagudem road = 0.820 kms
G.K road Working K.M. 0 / 000 to 8 / 000 = 4.000 kms

c) Total lead 252.000 K.M. = 251.641 kms


Or say: 252.000 kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

-:oOo:-
Gopalapuram - Dondapudi road from km 0.00 to 12.200

Reach proposed in the present estimate: km 0 / 0 to 12 / 200 = 12.200 kms


0.00-12.200/2
Centre KM of the Working Reach = 6.100

A) For HBG metal:

a) Cart track length = = 0.225 kms


b) Metalled road length:
From km 63 / 800 to 69 / 400 of EGK road = 5.200 kms
From km 181 / 700 to 172 / 600 of Tallada - Deverapalli road = 9.100 kms

G.D road Working K.M. 0 / 000 to 12 / 200 = 6.100 kms

c) Total lead = 20.625 kms


Or say: 21.000 kms
B) For gravel:
Gravel from Gopalapuram Quarry
a) Cart track length = 0.5 1.100 = 0.550 kms
b) Metalled road length:

From km 16/ / 200 to 15 / 800 of Prakkilanka - Koyyalagudem road = 0.400 kms


G.D road Working K.M. 0 / 000 to 12 / 200 = 6.100 kms

c) Total lead = 7.050 kms


Or say: 7.000 kms

C) For Sand :
Sand Quarry at River Godavari at AGRB road at km 3/2
a) Cart track length = 0.5 1.100 = 0.550 kms
From km 10 / 200 to 3 / 200 of AGRB road = 7.000 kms
From km 83 / 121 to 63 / 800 of EGK road = 19.321 kms
From km 181 / 700 to 172 / 600 of Tallada - Deverapalli road = 9.100 kms

G.D road Working K.M. 0 / 000 to 12 / 200 = 6.100 kms


42.071
Or say: 43.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakhapatnam Refinery
b) Metalled road length:
From km / to / of AGRB road at km 7.500 = 213.000 kms
From km 10 / 200 to 3 / 200 of AGRB road = 7.000 kms
From km 83 / 121 to 63 / 800 of EGK road = 19.321 kms
From km 181 / 700 to 174 / 200 of Tallada - Deverapalli road = 7.500 kms
From km 15 / 800 to 14 / 980 of Prakkilanka - Koyyalagudem road = 0.820 kms
G.D road Working K.M. 0 / 000 to 12 / 200 = 6.100 kms
Add lead for the center of reach = 253.741 kms
Or say: 254.000 kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

-:oOo:-

Loop road on A.B road to connect NH 5 junction at Ravulapalem from km 0.00 to 0.595

Reach proposed in the present estimate: km 0 / 0 to 0 / 595 = 0.595 kms

Centre KM of the Working Reach = 0.297

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 / 000 to 160 / 850 of Lalacheruvu to Ravulapalem NH5 = 34.150 kms
working km of Loop Road = 0.297 kms
c) Total lead = 36.647 kms
Or say: 36.000 kms

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 55 / 600 to 60 / 200 of Kakinada - Rajahmundry Road = 4.600 kms
From km 183 / 200 to 160 / 850 of Vemagiri to Ravulapalem road = 22.350 kms
working km of Loop Road = 0.297 kms
c) Total lead = 27.247 kms
Or say: 27.000 kms

C) For Sand :
Sand quarry at River Godavari to Bridge road point
a) Cart track length = = 2.000 kms
b) Metalled road length: 0.200 kms
From km 162 / 100 to 160 / 850 of Bridge to Ravulapalem Loop road junction = 1.250 kms
working km of Loop Road = 0.297 kms
c) Total lead = 3.747 kms
Or say: 3.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakhapatnam
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 160 / 850 of Vijayawada - Visakhapatnam road (NH.5) = 221.550 kms
working km of Loop Road = 0.297 kms
Add lead for the center of reach = 223.447 kms
Or say: 223.000 kms
Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2013-14

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

1) Sub-Division : (R&B) Sub Division, Kovvur

2) Section : (R&B) Section, Gopalapuram

3) Name of the Road : 0

4) Classification : R.R

5) Length of the road : 8.000 Kms.

6) Road width : S.L. :8.00 Kms I.L. :0.000 Kms D.L. : -

7) Surface of the road : C.C. : 0.00 kms B.T. : 8.00 Kms. WBM : -

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Total 0.000 Kms.

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane/ Intermediate lane 8.000 Kms. Rs. 12,000 /-
b) Double Lane / Other Multi lane - Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Kovvur Division


10) Any other Remarks :
Checkslip accompanying the detailed estimate for Road Maintenance worksfor the year 2013-14

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

1) Sub-Division : (R&B) Sub Division, Kovvur

2) Section : (R&B) Section, Gopalapuram

3) Name of the Road : 0

4) Classification : M.D.R.

5) Length of the road : 12.200 Kms.

6) Road width : S.L. : -12.200 Kms I.L. : -- 0.000km D.L. : -- 0.000 km

7) Surface of the road : C.C. : -- B.T. : 12.200 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted - -
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane/ Intermediate 12.200 Kms. Rs. 12,000 /-
b) Double Lane / Other Multi lane Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Kovvur Division

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance worksfor the year 2013-14

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

1) Sub-Division : (R&B) Sub Division, Kovvur

2) Section : (R&B) Section, Gopalapuram

3) Name of the Road : 0

4) Classification : M.D.R.

5) Length of the road : 4.00 Kms.

6) Road width : S.L. : - I.L. : -- 4.00 Kms D.L. : --

7) Surface of the road : C.C. : -- B.T. : 4.00 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted - -
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 4.000 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Kovvur Division


10) Any other Remarks :

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

1) Sub-Division : (R&B) Sub Division, Kovvur

2) Section : (R&B) Section, Gopalapuram

3) Name of the Road : 0

4) Classification : M.D.R.

5) Length of the road : 3.00 Kms.

6) Road width : S.L. : - I.L. : -- 3.00 Kms D.L. : --

7) Surface of the road : C.C. : -- B.T. : 3.00 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted - -
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 3.000 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Kovvur Division


10) Any other Remarks :
Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

1) Sub-Division : (R&B) Sub Division, Kovvur

2) Section : (R&B) Section, Gopalapuram

3) Name of the Road : 0

4) Classification : M.D.R.

5) Length of the road : 2.20 Kms.

6) Road width : S.L. : - I.L. : -- 2.20 Kms D.L. : --

7) Surface of the road : C.C. : -- B.T. :2.20 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted - -
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 2.200 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Kovvur Division


10) Any other Remarks :
ABSTRACT
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East
Name of work : Godavari District.

Eligibility amount
Sl. Classifi- as per G.O.
No. Name of the road cation (including 50%
Addl. Grant)

1 0 D.O.R. Rs.144,000 /-

2 0 MDR Rs.219,600 /-

3 0 MDR Rs.72,000 /-

4 0 MDR Rs.54,000 /-

5 0 MDR Rs.39,600 /-

6 0 D.O.R. ---

7 0 D.O.R. Rs.0 /-

8 D.O.R. Rs.0 /-

9 D.O.R. Rs.0 /-

-------------------------
TOTAL Rs.5,29,200 /-
Restricted to Or Say Rs.5,29,000 /-
-------------------------

Assistant Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Gopalapuram (R&B) Sub-divn., : Kovvur
nce works

7.600 in East Godavari

UM: -

During the year

Amount
required

Rs. 96,000 /-
-

---

Rs. 96,000 /-

Rs.144,000 /-
for the year 2013-14

7.600 in East Godavari

.000 km

UM:

During the year

Amount
required

Rs.146,400 /-
---

---

Rs.146,400 /-

Rs.219,600 /-
for the year 2013-14

7.600 in East Godavari

UM:

During the year

Amount
required

Rs.48,000 /-

Rs.0 /-

---

Rs.48,000 /-

Rs.72,000 /-
7.600 in East Godavari

UM:

During the year

Amount
required

Rs.36,000 /-

Rs.0 /-

---

Rs.36,000 /-

Rs.54,000 /-
7.600 in East Godavari

UM:

During the year

Amount
required

Rs.26,400 /-

Rs.0 /-

---

Rs.26,400 /-

Rs.39,600 /-
000 to 7.600 in East

Restricted to
75% amount

--------------------------
-

--------------------------
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Ganti - Gopalapuram road from K.M. 0.000 to 4.725

Convey- Net rate


Nature of Initial rate Segnior-
Sl. ance Blasting (excluding
Name of the material the Source Lead less stacking 25% for M/C age Per
No (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 44 368.50 491.30 70.00 - 0.00 929.80 Cum

1a 40 mm to 45 mm IRC metal HBG katheru 44 359.80 491.30 70.00 - 0.00 921.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 44 359.80 821.30 70.00 205.33 0.00 1,456.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 44 359.80 836.30 70.00 209.08 0.00 1,475.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 44 359.80 681.30 70.00 170.33 0.00 1,281.43 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 44 368.50 551.30 70.00 137.83 0.00 1,127.63 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,118.93


5(a) HBG 44 359.80 70.00 137.83 0.00 Cum

5.00 mm to 7.00 mm IRC m/c metal " " 421.30 956.43


6 HBG 44 359.80 70.00 105.33 0.00 Cum
5.00 mm to 2.36 mm IRC m/c metal " " 225.30 711.43
6 HBG 44 359.80 70.00 56.33 0.00 0.00

7 HBG Stone chips 2.36mm and below HBG " " 44 359.80 216.30 - - 0.00 576.10 Cum

8 40 mm SS-5 metal HBG " " 44 359.80 491.30 70.00 122.83 0.00 1,043.93 Cum

9 20 mm SS-5 metal HBG " " 44 359.80 836.30 70.00 209.08 0.00 1,475.18 Cum

10 Gravel Gravel Kadium 34 277.70 50.50 -- -- 0.00 328.20 Cum

11 Sand (for Mortar) Sand Ramp 5 118.50 169.50 -- -- 0.00 288.00 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 231 693.00 37,870.00 5,460.85 2,166.54 -- 46,190.39 MT
(ED 14.42%) (VAT 5%)

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Vedireswaram - Devarapalli Road from K.M. 0.000 to 2.960

Convey- Net rate


Nature of Initial rate Segnior-
Sl. Lead in ance Blasting (excluding
Name of the material the Source less stacking 25% for M/C age Per
No Km.2 (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 39 341.00 491.30 70.00 -- 0.00 902.30 Cum

1(a) 40 mm to 45 mm IRC metal HBG katheru 39 332.30 491.30 70.00 -- 0.00 893.60 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 39 332.30 821.30 70.00 205.33 0.00 1,428.93 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 39 332.30 836.30 70.00 209.08 0.00 1,447.68 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 39 332.30 681.30 70.00 170.33 0.00 1,253.93 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 39 341.00 551.30 70.00 137.83 0.00 1,100.13 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,091.43


5 HBG 39 332.30 70.00 137.83 0.00 Cum

5.00 mm to 7.00 mm IRC m/c metal " " 421.30 928.93


6 HBG 39 332.30 70.00 105.33 0.00 Cum

6 5.00 mm to 2.36 mm IRC m/c metal HBG " " 39 332.30 225.30 70.00 56.33 0.00 683.93 Cum

HBG Stone chips 2.36mm and below " " 216.30 548.60
7 HBG 39 332.30 -- -- 0.00 Cum

8 40 mm SS-5 metal HBG " " 39 332.30 491.30 70.00 122.83 0.00 1,016.43 Cum

9 20 mm SS-5 metal HBG " " 39 332.30 836.30 70.00 209.08 0.00 1,447.68 Cum

10 Gravel Gravel Kadium 30 258.50 50.50 -- -- 0.00 309.00 Cum

11 Sand (for Mortar) Sand River 7 130.50 169.50 -- -- 0.00 300.00 Cum

12 Bitumen 80/100 Grade (Bulk) Visakhapatnam 226 678.00 37,870.00 5,460.85 2,166.54 -- 46,175.39 MT
(ED 14.42%) (VAT 5%)

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Lolla - Utchili Road from K.M.0.000 to 5.200

Convey- Net rate


Nature of Initial rate Segnior-
Sl. Lead in ance Blasting (excluding
Name of the material the Source less stacking 25% for M/C age Per
No Km.3 (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 34 313.50 491.30 70.00 -- 0.00 874.80 Cum

40 mm to 45 mm IRC metal HBG katheru 34 304.80 491.30 70.00 -- 0.00 866.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 34 304.80 821.30 70.00 205.33 0.00 1,401.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 34 304.80 836.30 70.00 209.08 0.00 1,420.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 34 304.80 681.30 70.00 170.33 0.00 1,226.43 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 34 313.50 551.30 70.00 137.83 0.00 1,072.63 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,063.93


HBG 34 304.80 70.00 137.83 0.00 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 34 304.80 421.30 70.00 105.33 0.00 901.43 Cum

5.00 mm to 2.36 mm IRC m/c metal " " 225.30 656.43


HBG 34 304.80 70.00 56.33 0.00 Cum

HBG Stone chips 2.36mm and below " " 216.30 521.10
7 HBG 34 304.80 -- -- 0.00 Cum

8 40 mm SS-5 metal HBG " " 34 304.80 491.30 70.00 122.83 0.00 988.93 Cum

9 20 mm SS-5 metal HBG " " 34 304.80 836.30 70.00 209.08 0.00 1,420.18 Cum

10 Gravel Gravel Kadium 23 223.50 50.50 -- -- 0.00 274.00 Cum

11 Sand (for Mortar) Sand River 1 94.50 169.50 -- -- 0.00 264.00 Cum

12 Bitumen 80/100 Grade (Bulk) Visakhapatnam 221 663.00 37,870.00 5,460.85 2,166.54 -- 46,160.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Ryali - Ankampalem Road from K.M. 0.000 to 6.510

Convey- Net rate


Nature of Initial rate Segnior-
Sl. Lead in ance Blasting (excluding
Name of the material the Source less stacking 25% for M/C age Per
No Km.3 (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 42 357.50 491.30 70.00 -- 0.00 918.80 Cum

40 mm to 45 mm IRC metal HBG katheru 42 348.80 491.30 70.00 -- 0.00 910.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 42 348.80 821.30 70.00 205.33 0.00 1,445.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 42 348.80 836.30 70.00 209.08 0.00 1,464.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 42 348.80 681.30 70.00 170.33 0.00 1,270.43 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,116.63


5 HBG 42 357.50 70.00 137.83 0.00 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,107.93


HBG 42 348.80 70.00 137.83 0.00 Cum

5.00 mm to 7.00 mm IRC m/c metal " " 421.30 945.43


6 HBG 42 348.80 70.00 105.33 0.00 Cum

5.00 mm to 2.36 mm IRC m/c metal " " 225.30 700.43


HBG 42 348.80 70.00 56.33 0.00 Cum

HBG Stone chips 2.36mm and below " " 216.30 565.10
7 HBG 42 348.80 -- -- 0.00 Cum

8 40 mm SS-5 metal HBG " " 42 348.80 491.30 70.00 122.83 0.00 1,032.93 Cum

9 20 mm SS-5 metal HBG " " 42 348.80 836.30 70.00 209.08 0.00 1,464.18 Cum

10 Gravel Gravel Kadium 33 272.90 50.50 -- -- 0.00 323.40 Cum

11 Sand (for Mortar) Sand River 6 124.50 169.50 -- -- 0.00 294.00 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 229 687.00 37,870.00 5,460.85 2,166.54 -- 46,184.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013

R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Kothapeta - Ethakota Road from K.M. 0.000 to 6.810

Convey- Net rate


Nature of Initial rate Segnior-
Sl. Lead in ance Blasting (excluding
Name of the material the Source less stacking 25% for M/C age Per
No Km.4 (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 44 368.50 491.30 70.00 -- 0.00 929.80 Cum

HBG katheru 44 359.80 491.30 70.00 -- 0.00 921.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 44 359.80 821.30 70.00 205.33 0.00 1,456.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 44 359.80 836.30 70.00 209.08 0.00 1,475.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 44 359.80 681.30 70.00 170.33 0.00 1,281.43 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 44 368.50 551.30 70.00 137.83 0.00 1,127.63 Cum

9.50 mm to 11.2 mm IRC m/c metal " " 551.30 1,118.93


5 HBG 44 359.80 70.00 137.83 0.00 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 44 368.50 421.30 70.00 105.33 0.00 965.13 Cum

5.00 mm to 7.00 mm IRC m/c metal " " 225.30 720.13


HBG 44 368.50 70.00 56.33 0.00 Cum

7 HBG Stone chips 2.36mm and below HBG " " 44 359.80 216.30 -- -- 0.00 576.10 Cum

8 40 mm SS-5 metal HBG " " 44 359.80 491.30 70.00 122.83 0.00 1,043.93 Cum

9 20 mm SS-5 metal HBG " " 44 359.80 836.30 70.00 209.08 0.00 1,475.18 Cum

10 Gravel Gravel Kadium 35 282.50 50.50 -- -- 0.00 333.00 Cum

11 Sand (for Mortar) Sand River 6 124.50 169.50 -- -- 0.00 294.00 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 231 693.00 37,870.00 5,460.85 2,166.54 -- 46,190.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013
0.00

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana Mandapam & Adilaxmi puntha from
K.M.0.000 to 6.500

Convey- Net rate


Nature of Initial rate Segnior-
Sl. Lead in ance Blasting (excluding
Name of the material the Source less stacking 25% for M/C age Per
No Km. (excl. charges stacking
material charges charges
stacking) charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 40 346.50 491.30 70.00 -- 0.00 907.80 Cum

HBG katheru 40 337.80 491.30 70.00 -- 0.00 899.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 40 337.80 821.30 70.00 205.33 0.00 1,434.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 40 337.80 836.30 70.00 209.08 0.00 1,453.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 40 337.80 681.30 70.00 170.33 0.00 1,259.43 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 40 346.50 551.30 70.00 137.83 0.00 1,105.63 Cum

HBG " " 40 337.80 551.30 70.00 137.83 0.00 1,096.93 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 40 337.80 421.30 70.00 105.33 0.00 934.43 Cum

5.00 mm to 2.36 mm IRC m/c metal " " 225.30 689.43


HBG 40 337.80 70.00 56.33 0.00 Cum

7 HBG Stone chips 2.36mm and below HBG " " 40 337.80 216.30 -- -- 0.00 554.10 Cum

8 40 mm SS-5 metal HBG " " 40 337.80 491.30 70.00 122.83 0.00 1,021.93 Cum

9 20 mm SS-5 metal HBG " " 40 337.80 836.30 70.00 209.08 0.00 1,453.18 Cum

10 Gravel Gravel Kadium 30 258.50 50.50 -- -- 0.00 309.00 Cum

11 Sand (for Mortar) Sand River 7 130.50 169.50 -- -- 0.00 300.00 Cum

12 Bitumen 80/100 Grade (Bulk) Visakhapatnam 227 681.00 37,870.00 5,460.85 2,166.54 -- 46,178.39 MT
(ED 14.42%) (VAT 5%)

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05-2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Rajavaram - Podalada Road from K.M. 0.000 to 36.000

Net rate
Sl. Nature of Lead in Convey- Initial rate Blasting Segnior- (excluding
No Name of the material the Source Km. ance (excl. less stacking charges 25% for M/C age stacking Per
material stacking) charges charges charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 (a) 40 mm to 45 mm IRC metal HBG katheru 36 324.50 491.30 70.00 -- 0.00 885.80 Cum

1(b) 40 mm to 45 mm IRC metal HBG katheru 36 315.80 491.30 70.00 -- 0.00 877.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 36 315.80 821.30 70.00 205.33 0.00 1,412.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 36 315.80 836.30 70.00 209.08 0.00 1,431.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 36 315.80 681.30 70.00 170.33 0.00 1,237.43 Cum

5(a) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 36 324.50 551.30 70.00 137.83 0.00 1,083.63 Cum

5(b) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 36 315.80 551.30 70.00 137.83 0.00 1,074.93 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 36 315.80 421.30 70.00 105.33 0.00 912.43 Cum

6 5.00 mm to 2.36 mm IRC m/c metal HBG " " 36 315.80 225.30 70.00 56.33 0.00 667.43 Cum

7 HBG Stone chips 2.36mm and below HBG " " 36 315.80 216.30 - -- 0.00 532.10 Cum

8 40 mm SS-5 metal HBG " " 36 315.80 491.30 70.00 122.83 0.00 999.93 Cum

9 20 mm SS-5 metal HBG " " 36 315.80 836.30 70.00 209.08 0.00 1,431.18 Cum

10 Gravel Gravel Kadium 27 243.50 50.50 -- -- 0.00 294.00 Cum

11 Sand (for Mortar) Sand River 4 71.50 169.50 -- -- 0.00 241.00 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 223 669.00 37,870.00 5,460.85 2,166.54 -- 46,166.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05.2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.
Ubalanka - Ryali road from K.M. 0.000 to 3.400

Nature of Convey- Initial rate Segnior- Net rate


Sl. Name of the material the Source Lead in ance (excl. less stacking Blasting 25% for M/C age (excluding Per
No material Km. stacking) charges charges charges stacking
charges)

1 2 3 4 5 6 7 8 9 10 11 12

1 (a) 40 mm to 45 mm IRC metal HBG katheru 41 352.00 491.30 70.00 -- 0.00 913.30 Cum

1(b) 40 mm to 45 mm IRC metal HBG katheru 41 343.30 491.30 70.00 -- 0.00 904.60 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 41 343.30 821.30 70.00 205.33 0.00 1,439.93 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 41 343.30 836.30 70.00 209.08 0.00 1,458.68 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 41 343.30 681.30 70.00 170.33 0.00 1,264.93 Cum

5(a) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 41 352.00 551.30 70.00 137.83 0.00 1,111.13 Cum

5(b) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 41 343.30 551.30 70.00 137.83 0.00 1,102.43 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 41 343.30 421.30 70.00 105.33 0.00 939.93 Cum

6 5.00 mm to 2.36 mm IRC m/c metal HBG " " 41 343.30 225.30 70.00 56.33 0.00 694.93 Cum

7 HBG Stone chips 2.36mm and below HBG " " 41 343.30 216.30 - -- 0.00 559.60 Cum

8 40 mm SS-5 metal HBG " " 41 343.30 491.30 70.00 122.83 0.00 1,027.43 Cum

9 20 mm SS-5 metal HBG " " 41 343.30 836.30 70.00 209.08 0.00 1,458.68 Cum

10 Gravel Gravel Kadium 32 268.10 50.50 -- -- 0.00 318.60 Cum

11 Sand (for Mortar) Sand River 7 130.50 169.50 -- -- 0.00 300.00 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 228 684.00 37,870.00 5,460.85 2,166.54 -- 46,181.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05.2013
R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Loop road on A.B. Road to connect NH 5 Junction at Ravulapalem from K.M. 0.000 to 0.595

Net rate
Sl. Nature of Lead in Convey- Initial rate Blasting Segnior- (excluding
No Name of the material the Source Km. ance (excl. less stacking charges 25% for M/C age stacking Per
material stacking) charges charges charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 (a) 40 mm to 45 mm IRC metal HBG katheru 36 324.50 491.30 70.00 -- 0.00 885.80 Cum

1(b) 40 mm to 45 mm IRC metal HBG katheru 36 315.80 491.30 70.00 -- 0.00 877.10 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 36 315.80 821.30 70.00 205.33 0.00 1,412.43 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 36 315.80 836.30 70.00 209.08 0.00 1,431.18 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 36 315.80 681.30 70.00 170.33 0.00 1,237.43 Cum

5(a) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 36 324.50 551.30 70.00 137.83 0.00 1,083.63 Cum

5(b) 9.50 mm to 11.2 mm IRC m/c metal HBG " " 36 315.80 551.30 70.00 137.83 0.00 1,074.93 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 36 315.80 421.30 70.00 105.33 0.00 912.43 Cum

6 5.00 mm to 2.36 mm IRC m/c metal HBG " " 36 315.80 225.30 70.00 56.33 0.00 667.43 Cum

7 HBG Stone chips 2.36mm and below HBG " " 36 315.80 216.30 - -- 0.00 532.10 Cum

8 40 mm SS-5 metal HBG " " 36 315.80 491.30 70.00 122.83 0.00 999.93 Cum

9 20 mm SS-5 metal HBG " " 36 315.80 836.30 70.00 209.08 0.00 1,431.18 Cum

10 Gravel Gravel Kadium 27 243.50 50.50 -- -- 0.00 294.00 Cum

11 Sand (for Mortar) Sand River 3 58.90 169.50 -- -- 0.00 228.40 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 223 669.00 37,870.00 5,460.85 2,166.54 -- 46,166.39 MT
(ED 14.42%) (VAT 5%)
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.01-05.2013
ABOUT ESTIMATE

1 Name of the work Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District.

2 Names of the roads

3 Section Assistant Engineer (R&B),


(R&B) Section : Gopalapuram

4 Sub - Division Dy. Executive Engineer (R&B),


(R&B) Sub-divn., : Kovvur

5 Division Executive Engineer (R&B),


(R&B) Division : Eluru

6 Circle Superintending Engineer (R&B),


(R&B) Circle :Eluru
ROADS & BUILDINGS DEPARTMENT

WORKING ESTIMATE

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km


0.000 to 7.600 in East Godavari District.

Sanctioned Estimate Amount : 1212.00 Lakhs

Working Estimate Amount : 1330.00 Lakhs

(R&B) Section : Gopalapuram

(R&B) Sub-divn., : Kovvur

(R&B) Division : Eluru

(R&B) Circle :Eluru

WEST GODAVARI DISTRICT


Specification report accompany the Working Estimate for the work of
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.
Sanctioned Estimate : 205.00 Lakhs
Working Estimate : 240.23 Lakhs

The Estimate for the work “Special Repairs to Kovvur to Chagallu road from Km. 0.00 to 8.600 in
West Godavari District” Estimate for Rs. 205.00 lakhs. The Kovvur to Chagallu (v) Nandamuru road from Km.
0.00 to 8.600 is important MDR in West Godavari District, which connects the two SH roads i.e., EGK road
and Martair – Prakkilanka road and the stretch from Km 0.00 to 8.600 is badly damaged due to heavy Rains.
The road is in Agricultural corridor. Mostly Rice and other Agricultural produce are transported from this
corridor to other places. The work was sanctioned for Rs: 205.00 Lakhs and entrusted to M/S Sri Maruthi
Constructions, Ravulapalem at 4.36555% Excess on tenders on ECV for Rs: 1,74,84,779.00 /- for Tender
Contact value for Rs: 1,82,48,086 /-.

The Sanctioned estimate provisions of the work BT Patch work with 40-45 mm HBG Metal, Tack
coat with 80/100 grade Bitumen and B M And BC and C C road with provisions of Earth work , GSB, VCC
1:4:8, M35 grade concrete.

During the execution of this work as per the site condition some deviations are necessiated i.e.,
The Bituminous Mecadam and 40-45 mm B T Patch work quantity increased due to formed pot holes with
heavy traffic and Bitumenous Concrete and Tack Coat and Earten Shoulders quantity dicreased .

Hence the working estimate is prepared duly incorporating the above deviations as per the
condition of the roads.

Provision.

3 Providing BT patch work with 40mm HBG


4 Providing tack coat with 80/100 grade Bitumen
5 Providing BM with 50 mm thick
6 Providing BC with 30 mm thick
7 Providing Eart work for CC road
8 Providing GSB for CC Road
9 Providing VCC 1:4:8
10 Providing seperation Mambrane
11 Providing M35 grade concrete
12 Providing Mastic pad
13 Provision for GST @ 12%
14 Provision for NAC
15 Provision for Seignorage charges
16 Provision for D.T.P. Charges, Xerox charges, Advertisement charges and other unforeseen items

RATES:

The working estimate is prepared based on sanctioned estimate rates and the work will be carried
out as per standard specifications of MORT&H, Specifiction 5 th revision, circulars and latest G.O's
communicated from time to time.

Assistant Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Kovvur (R&B) Sub-divn., :Kovvur
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

-:oOo:-

Ganti - Gopalapuram road from K.M. 0.000 to 4.725

Reach proposed in the present estimate: km 0 / 0 to 4 / 725 = 4.725 kms


Centre KM of the Working Reach = 2.363 Or 2.000 K.M.

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 / 000 to 154 / 250 of NH 5 Lalacheruvu to Gopalapuram = 40.750 kms
Working K.M. = 1.000 kms
c) Total lead = 43.950 kms
Or say: 44.000 kms

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length: 4.600 Kms
Quarry at Kadium Quarry
From km 183 / 200 to 154 / 250 of NH 5 Lalacheruvu to Gopalapuram = 28.950 kms
Working K.M. = 1.000 kms
c) Total lead = 34.550 kms
Or say: 35.000 kms

C) For Sand :
Sand Quarry at River Godavari at Ravulapalem
River Bed to NH 5 road = = 2.200 kms 2.200
From km 154 / 250 to 152 / 700 of NH5 to Gopalapuram Jn ### = 1.550 kms 1.550
Working K.M. = 1.000 kms 1.000
Total lead = 4.750 kms
Or say: 5.000 kms 5.000
E) For Bitumen & Emulsion :
a) Lead from ex-factory at Visakhapatnam Refinery
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 154 / 250 of Vijayawada - Visakhapatnam road (NH.5) = 228.150 kms
Working K.M. = 1.000 kms
c) Total lead = 230.750 kms
Or say: 231.000 kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

-:oOo:-

Vedireswaram - Devarapalli Road from K.M. 0.000 to 2.960

Reach proposed in the present estimate: km 0 / 0 to 2 / 960 = 2.960 kms

Centre KM of the Working Reach = 1.480 KM

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 / 000 to 159 / 410 of Lalacheruvu to Ravulapalem NH5 = 35.590 kms
ZP Road = 0.910 kms
Working K.M. = 1.480 kms
c) Total lead = 40.180 kms
Or say: 40.000 kms

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 55 / 600 to 60 / 200 of Kakinada - Rajahmundry Road = 4.600 kms
From km 183 / 200 to 159 / 410 of Lalacheruvu to Ravulapalem NH5 = 23.790 kms
ZP Road = 0.910 kms
Working K.M. = 1.480 kms
c) Total lead = 30.780 kms
Or say: 30.000 kms
C) For Sand :
Sand Quarry at River Godavari at Ravulapalem
River Bed to NH 5 road = = 2.200 kms
Bridge to Ravulapadu 162.100 - 159.410 ### = 2.690 kms
ZP Road = 0.910 Kms
Working K.M. = 1.480 kms
Total lead = 7.280 kms
Or say: 7.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakhapatnam
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 159 / 410 of Vijayawada - Visakhapatnam road (NH.5) = 222.990 kms
ZP Road = 0.910 Kms
Working K.M. = 1.480 kms
Add lead for the center of reach = 226.980 kms
Or say: 226.000 kms
Lolla -Utchili Road from km 0.000 to 5.200

Reach proposed in the present estimate: km 0 / 0 to 5 / 200 = 5.200 kms

Centre KM of the Working Reach = 2.600 KM

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 / 000 to 183 / 200 of NH 5 Lalacheruvu to Vemagiri = 11.800 kms
From km 62 / 085 to 60 / 200 of kakinada - Rajahmundry Road = 1.885 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 / 645 to 47 / 380 of Amalapuram - Bobbarlanka Road = 12.265 kms
Z.P road 0.200 kms
Working K.M. = 2.600 kms
c) Total lead = 34.775 kms
Or say: 34.000 kms

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 60 / 200 to 55 / 600 of Kakinada - Rajahmundry Road = 4.600 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 / 645 to 47 / 380 of Amalapuram - Bobbarlanka Road = 12.265 kms
Z.P road 0.200 kms
Working K.M. = 2.600 kms
c) Total lead = 23.490 kms
Or say: 23.000 kms

C) For Sand :
Sand Quarry at River Godavari at Atreyapuram
River to Z.P Road Point = = 1.100 kms 1.100
Working K.M. (2.890-2.600) = 0.458 kms 0.458
Total lead = 1.558 kms
Or say: 2.000 kms 2.000
E) For Bitumen & Emulsion :
a) Lead from ex-factory at Visakhapatnam Refinery
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 183 / 200 of Vijayawada - Visakhapatnam road (NH.5) = 199.200 kms
(up to vemagiri)
From km 62 / 085 to 60 / 200 of kakinada - Rajahmundry Road = 1.885 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 / 645 to 47 / 380 of Amalapuram - Bobbarlanka Road = 12.265 kms
Z.P road 0.200 kms
Working K.M. = 2.600 kms
c) Total lead = 221.575 kms
Or say: 221.000 kms
Ryali - Ankampalem Road from km 0.000 to 6.510

Reach proposed in the present estimate: km 0 / 0 to 6 / 510 = 6.510 kms

Centre KM of the Working Reach = 3.255 or 3.000

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 / 000 to 183 / 200 of NH 5 Lalacheruvu to Vemagiri = 11.800 kms
From km 62 / 085 to 60 / 200 of kakinada - Rajahmundry Road = 1.885 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 645 to 51 / 388 of Amalapuram - Bobbarlanka Road = 8.257 kms
AB Road to RP Road (via) Pulidindi bridge 0.099 kms
From km 21 215 to 9 / 703 RP Road = 11.512 kms
Working K.M. = 3.255 kms
c) Total lead = 42.833 kms
Or say: 43.000 kms

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 55 / 600 to 60 / 200 of Kakinada - Rajahmundry Road = 4.600 kms
From km 62 085 to 60 200 Vemagiri to Dowleswram barraige = 1.885 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 645 to 51 / 388 of Amalapuram - Bobbarlanka Road = 8.257 kms
AB Road to RP Road (via) Pulidindi bridge 0.099 kms
From km 21 215 to 9 / 703 RP Road = 11.512 kms
Working K.M. = 3.255 kms
c) Total lead = 33.433 kms
Or say: 33.000 kms
C) For Sand : Ankampalem Sand ramp
Sand quarry at River Godavari at Ankampalem
a) Cart track length = River to RP road point = 2.200 kms
From km 21 / 215 to 20 / 350 of Rajavaram - Podalada Road = 0.865 kms
Working K.M. (6.510-3.255) = 3.255 kms
c) Total lead = 6.320 kms
Or say: 6.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakha to Divili - F.K. Palem road
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 183 / 200 of Vijayawada - Visakhapatnam road (NH.5) = 199.200 kms
From km 62 085 to 60 200 Vemagiri to Dowleswram barraige = 1.885 kms
From km 3 / 825 to 0 / 000 of Dowleswram Barraige road at AB Rd Jn. = 3.825 kms
From km 59 645 to 51 / 388 of Amalapuram - Bobbarlanka Road = 8.257 kms
AB Road to RP Road (via) Pulidindi bridge 0.099 kms
From km 21 215 to 9 / 703 RP Road = 11.512 kms
Add lead for the center of reach = 3.255 kms
229.378 kms
Or say: 229.000 kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

-:oOo:-

Kothapeta - Ethakota Road from K.M. 0.000 to 6.810

Reach proposed in the present estimate: km 0 / 0 to 6 / 810 = 6.810 kms

Centre KM of the Working Reach = 3.405 or 3.405

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 000 to 156 690 Lalacheruvu to Ethakota = 38.310 kms
From km 32 652 to 31 735 RP Road = 0.917 kms
Working K.M. = 3.405 kms
c) Total lead = 44.832 kms
Or say: 45.000 kms

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 55 / 600 to 60 / 200 of Kakinada - Rajahmundry Road = 4.600 kms
From km 183 200 to 156 690 Vemagiri to Ethakota Road = 26.510 kms
From km 32 652 to 31 735 RP Road = 0.917 kms
Working K.M. = 3.405 kms
c) Total lead = 35.432 kms
Or say: 35.000 kms
C) For Sand :
Sand quarry at River Godavari at Kothapeta
a) Cart track length = River to KB to KF Road = 0.660 kms
From km 2 / 090 to 0 / 000 of KB to KF Road to Ab road = 2.090 kms
From km 28 / 880 to 27 / 913 of KB to KF Road to Ab road = 0.967 kms
Working K.M. = 3.405 kms
c) Total lead = 7.122 kms
Or say: 7.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakha
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 156 / 690 of Vijayawada - Visakhapatnam road (NH.5) = 225.710 kms
From km 32 652 to 31 735 RP Road = 0.917 kms
Working K.M. = 3.405 kms
Add lead for the center of reach = 231.632 kms
Or say: 231.000 kms
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

-:oOo:-

Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana Mandapam & Adilaxmi puntha from K.M.0.000 to
6.500

Reach proposed in the present estimate: km 0 / 0 to 6 / 500 = 6.500 kms

Centre KM of the Working Reach = 3.250 or 3.250

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length = = 2.200 kms
b) Metalled road length:
From km 195 000 to 160 200 Lalacheruvu to Ravulapalem = 34.800 kms
Working K.M. = 3.250 kms
c) Total lead = 40.250 kms
Or say: 40.000 kms

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length = = 0.000 kms
b) Metalled road length:
Quarry at Kadium Quarry
From km 55 / 600 to 60 / 200 of Kakinada - Rajahmundry Road = 4.600 kms
From km 183 200 to 160 200 Vemagiri to Ravulapalem Road = 23.000 kms
Working K.M. = 3.250 kms
c) Total lead = 30.850 kms
Or say: 30.000 kms
C) For Sand :
Sand quarry at River Godavari at Ravulapalem

a) Cart track length = = 0.200 kms


River to NH 5 = 2.000 kms
From km 162 / 100 to 160 / 200 of bridge to Ravulapalem = 1.900 kms
Working K.M. = 3.250 kms
c) Total lead = 7.350 kms
Or say: 7.000 kms

D) For Bitumen & Emulsion :


a) Lead from ex-factory at Visakha
b) Metalled road length:
From km / to / of Refinery to V-V road (NH.5) = 1.600 kms
From km 382 / 400 to 160 / 200 of Vijayawada - Visakhapatnam road (NH.5) = 222.200 kms
Working K.M. = 3.250 kms
Add lead for the center of reach = 227.050 kms
Or say: 227.000 kms
R.M.R

Name of the work:


Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Ganti - Gopalapuram road from K.M. 0.000 to 4.725

Nature of Convey- Initial rate Segnior- Net rate


Sl. Name of the material the Source Lead ance (excl. less stacking Blasting 25% for M/C age (excluding Per
No material stacking) charges charges charges stacking
charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 44 546.10 491.30 70.00 -- 50.00 1,157.40 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 44 537.40 821.30 70.00 205.33 50.00 1,684.03 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 44 537.40 836.30 70.00 209.08 50.00 1,702.78 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 44 537.40 681.30 70.00 170.33 50.00 1,509.03 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 44 546.10 551.30 70.00 137.83 50.00 1,355.23 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 44 537.40 421.30 70.00 105.33 50.00 1,184.03 Cum

7 HBG Stone chips 2.36mm and below HBG " " 44 546.10 216.30 -- -- 50.00 812.40 Cum

8 40 mm SS-5 metal HBG " " 44 546.10 491.30 70.00 122.83 50.00 1,280.23 Cum

9 20 mm SS-5 metal HBG " " 44 546.10 836.30 70.00 209.08 50.00 1,711.48 Cum

10 Gravel Gravel Kadium 35 435.60 50.50 -- -- 22.00 508.10 Cum

11 Sand (for Mortar) Sand Ramp 5 66.00 169.50 -- -- 40.00 275.50 Cum

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 231 693.00 33,700.00 4,859.54 1,542.38 -- 40,794.92 MT
(ED 14.42%) (VAT 4%)

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16-03-2012
R.M.R

Name of the work: Maintenance of a) Ganti - Gopalapuram road from K.M. 0.000 to 4.725 (b) Vedireswaram - Devarapalli Road from K.M. 0.000
to 2.960 (c) Lolla - Utchili Road from K.M.0.000 to 5.200 (d) Ryali - Ankampalem Road from K.M. 0.000 to 6.510 ( e)
Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 ( f) Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500 for the year 2009-2010.

Vedireswaram - Devarapalli Road from K.M. 0.000 to 2.960

Nature of Convey- Initial rate Segnior- Net rate


Sl. Name of the material the Source Lead in ance (excl. less stacking Blasting 25% for M/C age (excluding Per
No Km.2 charges stacking
material stacking) charges charges charges)

1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 40 504.10 491.30 70.00 -- 50.00 1,115.40 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 40 504.10 821.30 70.00 205.33 50.00 1,650.73 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 40 504.10 836.30 70.00 209.08 50.00 1,669.48 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 40 504.10 681.30 70.00 170.33 50.00 1,475.73 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 40 504.10 551.30 70.00 137.83 50.00 1,313.23 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 40 504.10 421.30 70.00 105.33 50.00 1,150.73 Cum

7 HBG Stone chips 2.36mm and below HBG " " 40 504.10 216.30 -- -- 50.00 770.40 Cum

8 40 mm SS-5 metal HBG " " 40 504.10 491.30 70.00 122.83 50.00 1,238.23 Cum

9 20 mm SS-5 metal HBG " " 40 504.10 836.30 70.00 209.08 50.00 1,669.48 Cum

10 Gravel Gravel Kadium 31 404.10 50.50 -- -- 22.00 476.60 Cum

11 Sand (for Mortar) Sand River 7 103.80 169.50 -- -- 40.00 313.30 Cum

12 Bitumen Emulsion Medium setting (Bulk) Visakhapatnam 227 681.00 21,122.00 3,046 966.72 -- 25,815.72 MT
(ED 14.42%) (VAT 4%)

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 227 681.00 32,600.00 4,700.92 1,492.04 -- 39,473.96 MT
(ED 14.42%) (VAT 4%)
For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1.03.2009
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.1.03.2009

R.M.R

Name of the work: Maintenance of a) Ganti - Gopalapuram road from K.M. 0.000 to 4.725 (b) Vedireswaram - Devarapalli Road from K.M. 0.000
to 2.960 (c) Lolla - Utchili Road from K.M.0.000 to 5.200 (d) Ryali - Ankampalem Road from K.M. 0.000 to 6.510 ( e)
Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 ( f) Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500 for the year 2009-2010.

Lolla - Utchili Road from K.M.0.000 to 5.200

Nature of Convey- Initial rate Segnior- Net rate


Sl. Name of the material the Source Lead in ance (excl. less stacking Blasting 25% for M/C age (excluding Per
No Km.3 charges stacking
material stacking) charges charges charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 34 441.10 491.30 70.00 -- 50.00 1,052.40 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 34 441.10 821.30 70.00 205.33 50.00 1,587.73 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 34 441.10 836.30 70.00 209.08 50.00 1,606.48 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 34 441.10 681.30 70.00 170.33 50.00 1,412.73 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 34 441.10 551.30 70.00 137.83 50.00 1,250.23 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 34 441.10 421.30 70.00 105.33 50.00 1,087.73 Cum

7 HBG Stone chips 2.36mm and below HBG " " 34 441.10 216.30 -- -- 50.00 707.40 Cum

8 40 mm SS-5 metal HBG " " 34 441.10 491.30 70.00 122.83 50.00 1,175.23 Cum

9 20 mm SS-5 metal HBG " " 34 441.10 836.30 70.00 209.08 50.00 1,606.48 Cum

10 Gravel Gravel Kadium 24 318.00 50.50 -- -- 22.00 390.50 Cum

11 Sand (for Mortar) Sand River 2 38.60 169.50 -- -- 40.00 248.10 Cum

12 Bitumen Emulsion Medium setting (Bulk) Visakhapatnam 226 678.00 21,122.00 3,046 966.72 -- 25,812.72 MT
(ED 14.42%) (VAT 4%)

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 226 678.00 32,600.00 4,700.92 1,492.04 -- 39,470.96 MT
(ED 14.42%) (VAT 4%)

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1.03.2009
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.1.03.2009
R.M.R

Name of the work: Maintenance of a) Ganti - Gopalapuram road from K.M. 0.000 to 4.725 (b) Vedireswaram - Devarapalli Road from K.M. 0.000
to 2.960 (c) Lolla - Utchili Road from K.M.0.000 to 5.200 (d) Ryali - Ankampalem Road from K.M. 0.000 to 6.510 ( e)
Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 ( f) Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500 for the year 2009-2010.

Ryali - Ankampalem Road from K.M. 0.000 to 6.510

Net rate
Sl. Nature of Convey-
Lead in ance Initial rate Blasting Segnior- (excluding
Name of the material the Source (excl. less stacking 25% for M/C age Per
No material Km.3 stacking) charges charges charges stacking
charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 42 525.10 491.30 70.00 -- 50.00 1,136.40 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 42 525.10 821.30 70.00 205.33 50.00 1,671.73 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 42 525.10 836.30 70.00 209.08 50.00 1,690.48 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 42 525.10 681.30 70.00 170.33 50.00 1,496.73 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 42 525.10 551.30 70.00 137.83 50.00 1,334.23 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 42 525.10 421.30 70.00 105.33 50.00 1,171.73 Cum

7 HBG Stone chips 2.36mm and below HBG " " 42 525.10 216.30 -- -- 50.00 791.40 Cum

8 40 mm SS-5 metal HBG " " 42 525.10 491.30 70.00 122.83 50.00 1,259.23 Cum

9 20 mm SS-5 metal HBG " " 42 525.10 836.30 70.00 209.08 50.00 1,690.48 Cum

10 Gravel Gravel Kadium 33 425.10 50.50 -- -- 22.00 497.60 Cum

11 Sand (for Mortar) Sand River 6 91.20 169.50 -- -- 40.00 300.70 Cum

12 Bitumen Emulsion Medium setting (Bulk) Visakhapatnam 230 690.00 21,122.00 3,046 966.72 -- 25,824.72 MT
(ED 14.42%) (VAT 4%)

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 230 690.00 32,600.00 4,700.92 1,492.04 -- 39,482.96 MT
(ED 14.42%) (VAT 4%)

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1.03.2009
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.1.03.2009

R.M.R
Name of the work: Maintenance of a) Ganti - Gopalapuram road from K.M. 0.000 to 4.725 (b) Vedireswaram - Devarapalli Road from K.M. 0.000
to 2.960 (c) Lolla - Utchili Road from K.M.0.000 to 5.200 (d) Ryali - Ankampalem Road from K.M. 0.000 to 6.510 ( e)
Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 ( f) Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500 for the year 2009-2010.

Kothapeta - Ethakota Road from K.M. 0.000 to 6.810

Nature of Convey- Initial rate Segnior- Net rate


Sl. Name of the material the Source Lead in ance (excl. less stacking Blasting 25% for M/C age (excluding Per
No Km.4 charges stacking
material stacking) charges charges charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 45 556.60 491.30 70.00 -- 50.00 1,167.90 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 45 556.60 821.30 70.00 205.33 50.00 1,703.23 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 45 556.60 836.30 70.00 209.08 50.00 1,721.98 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 45 556.60 681.30 70.00 170.33 50.00 1,528.23 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 45 556.60 551.30 70.00 137.83 50.00 1,365.73 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 45 556.60 421.30 70.00 105.33 50.00 1,203.23 Cum

7 HBG Stone chips 2.36mm and below HBG " " 45 556.60 216.30 -- -- 50.00 822.90 Cum

8 40 mm SS-5 metal HBG " " 45 556.60 491.30 70.00 122.83 50.00 1,290.73 Cum

9 20 mm SS-5 metal HBG " " 45 556.60 836.30 70.00 209.08 50.00 1,721.98 Cum

10 Gravel Gravel Kadium 35 446.10 50.50 -- -- 22.00 518.60 Cum

11 Sand (for Mortar) Sand River 7 103.80 169.50 -- -- 40.00 313.30 Cum

12 Bitumen Emulsion Medium setting (Bulk) Visakhapatnam 232 696.00 21,122.00 3,046 966.72 -- 25,830.72 MT
(ED 14.42%) (VAT 4%)

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 232 696.00 32,600.00 4,700.92 1,492.04 -- 39,488.96 MT
(ED 14.42%) (VAT 4%)

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1.03.2009
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.1.03.2009
R.M.R

Name of the work: Maintenance of a) Ganti - Gopalapuram road from K.M. 0.000 to 4.725 (b) Vedireswaram - Devarapalli Road from K.M. 0.000
to 2.960 (c) Lolla - Utchili Road from K.M.0.000 to 5.200 (d) Ryali - Ankampalem Road from K.M. 0.000 to 6.510 ( e)
Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 ( f) Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500 for the year 2009-2010.

Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana Mandapam & Adilaxmi puntha from K.M.0.000 to 6.500

Nature of Net rate


Sl. Lead in Convey- Initial rate Blasting Segnior- (excluding
No Name of the material the Source Km. ance (excl. less stacking charges 25% for M/C age stacking Per
material stacking) charges charges charges)
1 2 3 4 5 6 7 8 9 10 11 12

1 40 mm to 45 mm IRC metal HBG katheru 40 504.10 491.30 70.00 -- 50.00 1,115.40 Cum

2 25 mm to 27 mm IRC m/c metal HBG " " 40 504.10 821.30 70.00 205.33 50.00 1,650.73 Cum

3 19 mm to 22 mm IRC m/c metal HBG " " 40 504.10 836.30 70.00 209.08 50.00 1,669.48 Cum

4 12 mm to 14 mm IRC m/c metal HBG " " 40 504.10 681.30 70.00 170.33 50.00 1,475.73 Cum

5 9.50 mm to 11.2 mm IRC m/c metal HBG " " 40 504.10 551.30 70.00 137.83 50.00 1,313.23 Cum

6 5.00 mm to 7.00 mm IRC m/c metal HBG " " 40 504.10 421.30 70.00 105.33 50.00 1,150.73 Cum

7 HBG Stone chips 2.36mm and below HBG " " 40 504.10 216.30 -- -- 50.00 770.40 Cum

8 40 mm SS-5 metal HBG " " 40 504.10 491.30 70.00 122.83 50.00 1,238.23 Cum

9 20 mm SS-5 metal HBG " " 40 504.10 836.30 70.00 209.08 50.00 1,669.48 Cum

10 Gravel Gravel Kadium 31 404.10 50.50 -- -- 22.00 476.60 Cum

11 Sand (for Mortar) Sand River 8 116.40 169.50 -- -- 40.00 325.90 Cum

12 Bitumen Emulsion Medium setting (Bulk) Visakhapatnam 227 681.00 21,122.00 3,046 966.72 -- 25,815.72 MT
(ED 14.42%) (VAT 4%)

13 Bitumen 80/100 Grade (Bulk) Visakhapatnam 227 681.00 32,600.00 4,700.92 1,492.04 -- 39,473.96 MT
(ED 14.42%) (VAT 4%)

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.1.03.2009
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.1.03.2009
Specification Report to accompany the estimate “Strangthaning of Gajjaram -
Hukumpeta road from Km 0.000 to 7.600 in East Godavari District”
Estimate Amount :- 1212.00 Lakhs
Working Estimate Amount :- 1330.00 Lakhs

The Work "Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
District" was sanctioned administratively sanctioned for Rs.1212.00 lakhs duly dividing the estimate into
Part-A & Part - B i.e., Part - A for an amount of Rs.303.13 Lakhs funded by the Andhra sugars Limited and
Part - B for an amount of Rs.908.87 Lakhs (SRP Grant) funded by the Government of Andhrapradesh. The
work was technically sanctioned for Rs.1212.00 lakhs by the Engineer-In-Chief (R&B) MDR's, Vijayawada
and the work was entrusted to the M/s KSR & Company, Ravulapalem at 4.36555% Excess over the ECV
vide CR Agreement No.83/2022-23, Dt.12.09.2022 with an completion perid of 12 months.

During execution of work, some deviations are necessiated. Due to urgency, the actual quantity of
GSB was not assessed at the time of preparation of estimate. During execution premeasurements of the pot
holes and sunken portions were taken and actual quantity of GSB is arrived. Further, loose pockets were
identified and removed and refilled with GSB. Hence, Quantity of GSB is increased.
The forming shoulders quantity is increased due to increase in width and thickness of the shoulder
inorder to have lateral support to the newly laid FDR layer.
In the original estimate, Bitumen VG-10 at the rate of 1.50 Kgs/Sqm and chips of size 11.2mm is
applied at the rate of 0.12 Cum/Sqm is proposed for stress absorbing membrane interlayer over a cracked
road surface. In the working estimate Bitumen VG-10 at the rate of 1.10 Kgs/Sqm is proposed and chips of
size 11.2mm is applied at the rate of 0.10 Cum/ 10 Sqm as per the IRC 37-2018 for stress absorbing
membrane interlayer over a cracked road surface.
In the original estimate, Bitumen VG-10 at the rate of 0.20 Kg/sqm is proposed for tack coat. In the
working estimate, Bitumen emulsion (RS1) Bulk is proposed in two coats at the rate of 0.25 Kgs/Sqm for
each coat in order to have coating the 11.2mm chips completely.

KM & HM stones were newly proposed in the working estimateas per site requirement.

Road safety interventions were newly proposed as Ls provision in the original estimate. In the working
estimate detailed measurements of road sfaety interventions are proposed.

Other minor deviations are explained in the comparitive statement. Hence, the working etsimate is
prepared with the following provisions.

Road Work Provisions:-


Part - A from
Scarifying Km 4.770
the existing B.Ttosurface
7.600 to a depth of 50 mm by Mechanical means and disposal of
1 scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn.
uniform
No.305.4.3layers with motor grader or by approved means on prepared surface mixing by mix in
2
place method
smooth wheeled with Rotavator
roller / approved
to achieve desiredmeans
proctoratdenisty
OMC and compacting
as per with &
IRC 37-2012 vibratory roller
2018 and to
complete
3
in all respect and curing with water as required including all materials, labour, machienry etc. The

Part - B from
Scarifying Km 0.000
the existing B.Ttosurface
7.600 to a depth of 50 mm by Mechanical means and disposal of
4 scarified layers
uniform material
withwith all leads
motor graderandor lifts upto 1000means,
by approved Mtrs asonper MoRT&H
prepared (5thmixing
surface Revision) Specn.
by mix in
5 No.305.4.3
place method with Rotavator / approved means at OMC and compacting with vibratory roller to
smooth
achieve wheeled roller
the desired to achieve
density desired proctor
etc., complete denisty
for finished itemas of
perwork
IRCas 37-2012 & 2018Specification
per MoRT&H and complete
6 distributor onand
prepared
in all respect curingsurface of granular
with water base including
as required including allclearing of road
materials, surface
labour, and spraying
machienry etc. The
7 emulsion
crack widthat above
the rate of 0.70
9 mm andkg/sqm
crackedusing
area emulsion pressure
above 50 per distributor
cent after cleaning forwith
finished item of work
a mechanical
8 etc.,
broom,complete
using as per MoRT&H Specification 502 (5th521,
revision) and
at as
thedirected by kg
the Engineer-in-
distributor on modified
prepared binder
surfacecomplying
of granularwithbaseclause
including sprayed
clearing of road rate of 11
surface and per 10 sqm
spraying
9 and spreading
emulsion 11.2
at the ratemm crushed
of 0.25 stoneinaggregates
kg/sqm @ 0.10
two coats using cum perpressure
emulsion 10 sqm,distributor
sweeping thefor surface
finishedfor
premixed
item of workwithetc.,
Bituminous
complete binder
as per of VG 30 Grade
MoRT&H @ 5.4 %502
Specification of mix
(5thand filler, and
revision) transporting
as directedtheby
hot
10
mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and
depositing the soils on the embankment, spreading soils, breaking clods, sectioning and
11 top soil, excavation of soils atroad
borrowed area, conveyance of soil, depositing
consolidation with vibratory roller @ OMC to meet requirement of tablethe soil of
300-2 onMORT&H
the
12 embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including
Road Safety
approved Interventions
panel. In case of any major deviation, beyond acceptance limit, department reserve the
13 right to cancel or reject the total supplied consignment of the said material and will compell the
25x25x3mm
vendor has toall roundthe
replace andfull
fixing with 35x35x4mm
consignment and mounted
by the desired materialonasaper
MSapproved
angle post of size
panel at his own
14 fixing with 35x35x4mm and mounted on than
a MS2.1angle post the
of size 75x75x6mm with clear of
height
75x75x6mm with clear height of not less m from ground level to the bottom the of
15 not less than 2.1 m from the ground level to the bottom of the board. The signpost
circular no RW/NH -33023/10-97 - DO III dated 11-6-1997. The height, width and length shall not should be
16 painted
exceed with
50 mm,one100coatmmof and
red oxide paint
100Aluminium
mm andminimum
with 2 coats ofreflective
synthetic area
enamel paint
of 13 sqmBlack and White
on each side and of
having minimum 0.30 mm thick skin on both sides with standard supports consisting
17 the slope to the base shall be 35 +/ - 5 degree. The strength of detachment of the
alternately black and Yellow with black stripes in screen printing sloping downward at an angle of integrated
retro-reflective
45 degrees towards unit the
consisting
side of of
thewhite color micro
obstruction prismatic
on which non metallic
the traffic is to passretro-reflective
and buried intosheeting
the
18
on both sides having a minimum exposed area of 125 cm2 each side and bottom retro-reflective

Ls Provisions Part - A
19 Provision for seigniorage charges
20 Provision for GST @ 18%
21 Provision for Unforseen and rounding off

Ls Provisions Part - B
22 Provision for Price adjustment Charges
23 Provision for Seignorage Charges
24 Provision for Corpus fund of NAC @ 0.1%
25 Provision for GST @ 18%
26 Provision for QC Charges
27 Provision for Avagahana Sadassu
28 Provision for RSI
29 Provision Contingencies and Rounding off

The working estimate is prepared based on approved SOR 2022-23. The work will be carried out as
per standard specifications and relevent circulars issued from time to time.

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
GENERAL ABSTRACT

N.W:- Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

As per Sanctioned Estimate As per Working Estimate


S. No Description
Amount in Rs. Amount in Rs.

PART - A (Andhra Sugars Deposit)


a Road work 25648007 25648007

Ls Provisions
1 Provision for seigniorage charges 31104 31104

2 Provision for GST @ 18% 4622240 4622240

3 Provision for Unforseen and rounding off 11864 11864

Part - A Total 30313215 30313215

PART - B ( SRP Grant )


a Road work 75573099 78939384
b Road Safety Items - 1470204
Sub Total 75573099 80409588
Add TP @ 4.36555 % - 3510321
Sub Total 75573099 83919909
Ls Provisions
1 Provision for Price adjustment Charges 400000 2000000

2 Provision for Seignorage Charges 393402 692116

3 Provision for Corpus fund of NAC @ 0.1% 76367 86612

4 Provision for GST @ 18% 13759716 15605755

5 Provision for QC Charges 377865 370000

6 Provision for Avagahana Sadassu 5000 5000

7 Provision for RSI 300000 0

8 Provision Contingencies and Rounding off 1336 7393

Part - B Total 90886785 102686785

Grand Total 121200000 133000000

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
WORKING ESTIMATE
Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East
Godavari District.
Sl. Description of item No Length Breadth Depth Quantity Rate / per Amount
No
1 2 3 4 5 6 7 8 9

1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet
Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all
materials and including premixing the material with water at OMC in Mechanical mix plant
carriage of mixed material by tipper to site , laying in uniform layers with paver in base
courses on well prepared surface and compacting with Vibratory roller to acheive the
desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work.

162.00 9.80 1,587.60


Cum. / 1 Cum.
2 Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion
pressure distributor on prepared surface of granular base including clearing of road surface
and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for
finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as
directed by the Engineer-in-charge

1650.00 1,981.00 3,268,650.00


Sqm / 1 sqm.
3 Providing B.T. patch work for pot holes using 40 to 45mm HBG metal with required
quantity of 10 to 12mm size HBG key chips and 42 Kgs of bitumen VG-10 (80/100) grade per
one cum of work for filling the pot holes including removal of loose material in the pot holes
trimming the edges to provide form vertical faces cleaning applying tack coat filling the pot
holes compacting and finishing including cost and conveyance of materials, T&P charges
and all labour charges for all operations etc., complete for finished item of work as directed
by the Engineer-in-charge in the following reaches.

166.00 4,193.00 696,038.00


Cum. / 1 Cum.

4 Providing and applying tack coat with bitumen 80/100 grade (VG-10) (Bulk) using Bitumen
pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous / granular
surface cleaned with mechanical broom for finished item of work as per MoRT&H
Specification 503 (5th revision) and as directed by the Providing and applying tack coat with
bitumen 80/100 grade (VG-10) (Bulk) using Bitumen pressure distributor at the rate of 0.20
kgs per sqm on the prepared bituminous / granular surface cleaned with mechanical broom
for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by
the Engineer-in-Charge.

0.00 0.00 0.00


sqm / 1 Sqm
5 Providing, laying of close graded premix surfacing material (Mixed seal surfacing) of 20 mm
thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2 mm to
0.09 mm (Type 'B') as per table 500-19 of specification 508 of MoRT&H (5th Rev.),
premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg per 10 Sqm area,
including cost of all materials and transporting the hot mix to work site, laying with out
paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller
8 to 10 Tonnes as per MoRT&H (5th Rev.) Spec. No. 508 complete for finished item of work
in all respects as directed by Engineer-in-charge.

0.00 #NAME? #NAME?


Cum. / 1 Cum.

#NAME?
6 Provision for Tender Premium @ 2.34 % Less #NAME?
2,046,072.00
7 Provision for GST @ 12% 245,529.00
8 Provision for Seignorage charges 692,116.00
Provision for NAC @ 0. 10% #NAME?
9 Unforeseen items such as DTP charges, Xerox charges, Advt. charges etc. 7,393
Total #NAME?

Assistant Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Gopalapuram (R&B) Sub-divn., : Kovvur
Average R.M.R

Name of the work: Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Rate

5.00 mm HBG
Sl. Name of the road 40 mm to 40 mm to 25 mm to 19 mm to 12 mm to 9.50 mm to 9.50 mm to 7.00 5.00 mm
11.2 mm to 11.2 to 2.36
Stone
chips 40 mm SS- 20 mm SS- Bitumen
No. 45 mm IRC 45 mm IRC 27 mm IRC 22 mm IRC 14 mm IRC IRC m/c mm IRC mm IRC mm IRC 2.36mm 5 metal 5 metal Gravel Sand 80/100
metal metal m/c metal m/c metal m/c metal metal m/c
m/c metal metal m/c metal and Grade
below
1 2 3 3 4 5 5 6 7 8 9 10 12

Rajavaram - Podalada Road from 885.80 877.10 1,412.43 1,431.18 1,237.43 1,083.63 1,074.93 912.43 667.43 532.10 999.93 1,431.18 294.00 241.00 46,166.39
1 K.M. 0.000 to 36.000

2 Ubalanka - Ryali road from K.M. 913.30 904.60 1,439.93 1,458.68 1,264.93 1,111.13 1,102.43 939.93 694.93 559.60 1,027.43 1,458.68 318.60 300.00 46,181.39
0.000 to 3.400

3 Loop road on A.B. Road to connect 885.80 877.10 1,412.43 1,431.18 1,237.43 1,083.63 1,074.93 912.43 667.43 532.10 999.93 1,431.18 294.00 228.40 46,166.39
NH 5 Junction at Ravulapalem
from K.M. 0.000 to 0.595

4 Ganti - Gopalapuram road from 1,157.40 921.10 1,456.43 1,475.18 1,281.43 1,127.63 1,118.93 956.43 711.43 576.10 1,043.93 1,475.18 328.20 288.00 46,190.39
K.M. 0.000 to 4.725

5 Vedireswaram - Devarapalli Road 902.30 893.60 1,428.93 1,447.68 1,253.93 1,100.13 1,091.43 928.93 683.93 548.60 1,016.43 1,447.68 309.00 300.00 46,175.39
from K.M. 0.000 to 2.960

6 Lolla - Utchili Road from 874.80 866.10 1,401.43 1,420.18 1,226.43 1,072.63 1,063.93 901.43 656.43 521.10 988.93 1,420.18 274.00 264.00 46,160.39
K.M.0.000 to 5.200

7 Ryali - Ankampalem Road from 918.80 910.10 1,445.43 1,464.18 1,270.43 1,116.63 1,107.93 945.43 700.43 565.10 1,032.93 1,464.18 323.40 294.00 46,184.39
K.M. 0.000 to 6.510

8 Kothapeta - Ethakota Road from 929.80 921.10 1,456.43 1,475.18 1,281.43 1,127.63 1,118.93 965.13 720.13 576.10 1,043.93 1,475.18 333.00 294.00 46,190.39
K.M. 0.000 to 6.810

9 Janakamma Ravi to Ravulapalem 907.80 899.10 1,434.43 1,453.18 1,259.43 1,105.63 1,096.93 934.43 689.43 554.10 1,021.93 1,453.18 309.00 300.00 46,178.39
Road (via) Kapula kalyana
Mandapam & Adilaxmi puntha
from K.M.0.000 to 6.500

8,375.80 8,069.90 12,887.87 13,056.62 11,312.87 9,928.67 9,850.37 8,396.57 6,191.57 4,964.90 9,175.37 13,056.62 2,783.20 2,509.40 415,593.51
930.64 896.66 1,431.99 1,450.74 1,256.99 1,103.19 1,094.49 932.95 687.95 551.66 1,019.49 1,450.74 309.24 278.82 46,177.06
Average Rate
/ Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / Cum. / MT

Asst. Executive Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section, Ravulapalem (R&B) Sub-divn., : Kothapeta
Supplemental DATAS
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

3 Providing W.B.M. patch work with 40-45 mm HBG metal including cost of all materials like metal and Stone
dust, and labour charges for all operations such as picking the existing metalled surface 50mm to 100mm deep
and spreading metal and blindage with stone dust, watering and tamping, etc., complete for finished item of
work as directed by the Engineer-in-charge.

Materials
40-45 mm HBG metal 1 Cum. 1.00 cum 820.65 /1Cum 820.65
Stone dust for blindage 1 Cum. / 4 0.25 cum 512.65 /1 cum 128.16
Labour Charges
248.80 /1Cum 248.80

56.00
1,253.61
say 1,254.00
/ 1 Cum.

Assistant Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Gopalapuram (R&B) Sub-divn., : Kovvur
DETAILED CUM ABSTRACT ESTIMATE
N.
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.
W:
PART - A (Andhra Sugars Deposit)
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and
disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H
(5th Revision) Specn. No.305.4.3

Km 4/ 770 to 7/ 600 ( 1 x 1 ) 2830.00 7.00 19810.00


19810.00
19810.00 9.80 194138
Sqm Sqm

2 Construction of Granular sub-base by providing HBG material confirming to Grading -


V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site
and spreading in uniform layers with motor grader or by approved means on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density etc., complete for finished
item of work as per MoRT&H Specification 401 (5th revision) and as directed by the
Engineer-in-charge.

km 4/ 770 to 7/ 600 270.00

say 270.00 1981.00 534870


Cum Cum

3 Stabilisation of insitu ( existing pavement crust ) or soil or otherwise sub base / base
course up to the required depth by cold in situ recycling using cement and chemical
additives / other wise providing pulverizing, spreading, milling and mixing of chemical
additives at the appropiate rates as per job in mix design in accordance with IRC SP 72 -
2015, IRC 37-2012 & 2018 and IRC SP 89 (Part II) 2018. Cementitious additive of rate
of a minimum of 5-7% and CCS/CS additive should be spread on the existing pavement
using a mobile truck mounted containerized cement / additive spreader with micro
processor controlled weighing and spreading system. The additive spreader shall have
variable working width sufficient to cover whole pavement lane. The in situ stabilisation
process shall be carried out by a mobile and self propelled stabiliser / reclaimer of
working width of 2.4m and with minimum engine horse power 440KW with a variable
working depth up ot 50cm. The resultant stabilised mix then would be profiled to the
required grade, level and thickness using motor grader and the mix would be compacted
using 20 tonne pad foot roller in combination with smooth wheeled roller to achieve
desired proctor denisty as per IRC 37-2012 & 2018 and complete in all respect and
curing with water as required including all materials, labour, machienry etc. The entire in
situ process would be carried out in single pass with milling and pulverising of damaged
asphalt pavement / soil/ agreegates/ soil aggregate mixture to the desired depth and with
simultaneous addition of additives and water with machine integrated spray bars fitted on
the wheeled self propelled and vibratory pad foot roller to acheive the desired proctor
density in all respects. The tandem roller should be followed by pneumatic tyre roller.
The minimum unconfined compressive strength (UC'S) of stabilized sub base / base
should be 4.5 to 7 MPa after 7/28 days of curing as per IRC SP 72- 2015 , IRC -37-2012
& 2018 also durability aspects (wet dry cycles) of stabilzed sub base should be satisfied
as per IRC 37-2012 & 2018 and IRC SP 89 ( Par II) 2018. The gradation mixes and
materials should be as per IRC 37- 2012 & 2018 and IRC SP 89 ( Part II ) 2018. The train
of equipment to be used are binder spreader- Water tanker -Additive truck - Recycler -
padfoot roller ( 20 tonne) + Single drum compactor - Grader- Tandem roller - Pneumatic
tyre roller (20 tonne)
Km 4/ 770 to 7/ 600 ( 1 x 1 ) 2830.00 7.00 0.300 5943.00
5943.00
say 5943.00 4193.00 24918999
Cum Cum

Total 25648007

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
DETAILED CUM ABSTRACT ESTIMATE
N.
Strengthening of Gajjaram-Hukumpeta road from Km 0.000 to 7.600 in East Godavari District
W:

PART B- SRP Grant


1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

Km ( 1 x 1 ) 10.00 16.0+10.5/2 130.00


Km Bell Mouth ( 1 x 1 ) 16.0+13.0/2 16.0+0.0/2 116.00
Km ( 1 x 1 ) 30.00 10.5+8.0/2 277.50
Km ( 1 x 1 ) 50.00 8.0+7.0/2 375.00
Km 0 / 090 to 4 / 770 ( 1 x 1 ) 4680.00 7.00 32760.00
Approach Road ( 1 x 1 ) 55.00 7.0+3.75/2 295.63
Deduct Bridge portion
Km 3 / 4 ( 1 x 1 ) 27.60 7.00 -193.20
33760.93

or Say 33761.00 9.80 330858


Sqm Sqm

2 Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H


Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers
with motor grader or by approved means, on prepared surface mixing by mix in place method with
Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density
etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed
by the Engineer-in-charge. (For deep pot holes and sunken portions)

Km 0 / 000 to 4/ 770 1767.00


( Details enclosed)
or Say 1767.00 1981.00 3500427
Cum Cum

3 Stabilisation of insitu ( existing pavement crust ) or soil or otherwise sub base / base course up to the required depth by
cold in situ recycling using cement and chemical additives / other wise providing pulverizing, spreading, milling and
mixing of chemical additives at the appropiate rates as per job in mix design in accordance with IRC SP 72 - 2015, IRC
37-2012 & 2018 and IRC SP 89 (Part II) 2018. Cementitious additive of rate of a minimum of 5-7% and CCS/CS
additive should be spread on the existing pavement using a mobile truck mounted containerized cement / additive
spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable
working width sufficient to cover whole pavement lane. The in situ stabilisation process shall be carried out by a
mobile and self propelled stabiliser / reclaimer of working width of 2.4m and with minimum engine horse power
440KW with a variable working depth up ot 50cm. The resultant stabilised mix then would be profiled to the required
grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in
combination with smooth wheeled roller to achieve desired proctor denisty as per IRC 37-2012 & 2018 and complete
in all respect and curing with water as required including all materials, labour, machienry etc. The entire in situ process
would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ agreegates/ soil
aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated
spray bars fitted on the wheeled self propelled and vibratory pad foot roller to acheive the desired proctor density in all
respects. The tandem roller should be followed by pneumatic tyre roller. The minimum unconfined compressive
strength (UC'S) of stabilized sub base / base should be 4.5 to 7 MPa after 7/28 days of curing as per IRC SP 72- 2015 ,
IRC -37-2012 & 2018 also durability aspects (wet dry cycles) of stabilzed sub base should be satisfied as per IRC 37-
2012 & 2018 and IRC SP 89 ( Par II) 2018. The gradation mixes and materials should be as per IRC 37- 2012 & 2018
and IRC SP 89 ( Part II ) 2018. The train of equipment to be used are binder spreader- Water tanker -Additive truck -
Recycler - padfoot roller ( 20 tonne) + Single drum compactor - Grader- Tandem roller - Pneumatic tyre roller (20
tonne)

Km ( 1 x 1 ) 10.00 16.0+10.5/2 0.300 39.75


Km Bell Mouth ( 1 x 1 ) 16.0+13.0/2 16.0+0.0/2 0.300 34.80
Km ( 1 x 1 ) 30.00 10.5+8/2 0.300 83.25
Km ( 1 x 1 ) 50.00 8+7/2 0.300 112.50
Km 0 / 090 to 4 / 770 ( 1 x 1 ) 4680.00 7.00 0.300 9828.00
Approach Road ( 1 x 1 ) 55.00 7.0+3.75/2 0.300 88.69
Deduct Bridge portion
Km 3 / 4 ( 1 x 1 ) 27.60 7.00 0.300 -57.96

10129.03

Limited to say 10099.00 4193.00 42345107


Cum Cum

4 Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor
on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate
of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per
MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge

Km Bell Mouth ( 1 x 1 ) 14.0+16.0/2 16.0+0.0/2 120.00


Km ( 1 x 1 ) 15.00 4.0+10.6/2 109.50
Km ( 1 x 1 ) 10.00 10.6+10.30/2 104.50
Km ( 1 x 1 ) 10.00 10.3+8.40/2 93.50
Km ( 1 x 1 ) 10.00 8.40+8.0/2 82.00
Km ( 1 x 1 ) 10.00 8.0+7.50/2 77.50
Km ( 1 x 1 ) 10.00 7.50+7.1/2 73.00
Km ( 1 x 1 ) 5.00 7.10+7.0/2 35.25
Km 0/ 070 to 0/ 200 ( 1 x 1 ) 130.00 7.00 910.00
Km 0 / 200 to 0 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 400 to 0 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 600 to 0 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 800 to 1 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 0 to 1 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 200 to 1 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 400 to 1 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 600 to 1 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 800 to 2 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 0 to 2 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 200 to 2 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 400 to 2 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 600 to 2 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 800 to 3 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 0 to 3 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 200 to 3 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 400 to 3 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 600 to 3 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 800 to 4 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 0 to 4 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 200 to 4 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 400 to 4 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 600 to 4 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 800 to 5 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 0 to 5 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 200 to 5 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 400 to 5 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 600 to 5 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 800 to 6 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 0 to 6 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 200 to 6 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 400 to 6 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 600 to 6 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 800 to 7 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 0 to 7 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 200 to 7 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 400 to 7 / 600 ( 1 x 1 ) 200 7.00 1400.00
Approch road at Bemolu road ( 1 x 1 ) 25 (7.00+3.75)/2 134.38
Approch road at saggunda road ( 1 x 1 ) 45 (7.00+3.75)/2 241.88
53781.50
Deduct Bridge portion
Km 3 / 4 ( 1 x 1 ) 27.60 7.00 -193.20

53588.30

or say 53589.00 39.50 2116766


Sqm Sqm

5 Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack
width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using
modified binder complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2
mm crushed stone aggregates @ 0.10 cum per 10 sqm, sweeping the surface for uniform spread of
aggregates and surface finished to conform to clause 902.

Km Bell Mouth ( 1 x 1 ) 14.0+16.0/2 16.0+0.0/2 120.00


Km ( 1 x 1 ) 15.00 4.0+10.6/2 109.50
Km ( 1 x 1 ) 10.00 10.6+10.30/2 104.50
Km ( 1 x 1 ) 10.00 10.3+8.40/2 93.50
Km ( 1 x 1 ) 10.00 8.40+8.0/2 82.00
Km ( 1 x 1 ) 10.00 8.0+7.50/2 77.50
Km ( 1 x 1 ) 10.00 7.50+7.1/2 73.00
Km ( 1 x 1 ) 5.00 7.10+7.0/2 35.25
Km 0/ 070 to 0/ 200 ( 1 x 1 ) 130.00 7.00 910.00
Km 0 / 200 to 0 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 400 to 0 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 600 to 0 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 800 to 1 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 0 to 1 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 200 to 1 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 400 to 1 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 600 to 1 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 800 to 2 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 0 to 2 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 200 to 2 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 400 to 2 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 600 to 2 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 800 to 3 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 0 to 3 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 200 to 3 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 400 to 3 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 600 to 3 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 800 to 4 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 0 to 4 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 200 to 4 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 400 to 4 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 600 to 4 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 800 to 5 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 0 to 5 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 200 to 5 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 400 to 5 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 600 to 5 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 800 to 6 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 0 to 6 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 200 to 6 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 400 to 6 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 600 to 6 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 800 to 7 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 0 to 7 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 200 to 7 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 400 to 7 / 600 ( 1 x 1 ) 200 7.00 1400.00
Approch road at Bemolu road ( 1 x 1 ) 25 (7.00+3.75)/2 134.38
Approch road at saggunda road ( 1 x 1 ) 45 (7.00+3.75)/2 241.88
53781.50
Deduct Bridge portion
Km 3 / 4 ( 1 x 1 ) 27.60 7.00 -193.20

53588.30

or say 53589.00 82.90 4442528


Sqm Sqm

6
Providing and applying tack coat with bitumen emulsion (RS1) Bulk using emulsion pressure distributor
on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate
of 0.25 kgs/sqm in two coats using emulsion pressure distributor for finished item of work etc., complete
as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge

For BC 40 mm Thick
Km Bell Mouth ( 1 x 1 ) 14.0+16.0/2 16.0+0.0/2 120.00
Km ( 1 x 1 ) 15.00 4.0+10.6/2 109.50
Km ( 1 x 1 ) 10.00 10.6+10.30/2 104.50
Km ( 1 x 1 ) 10.00 10.3+8.40/2 93.50
Km ( 1 x 1 ) 10.00 8.40+8.0/2 82.00
Km ( 1 x 1 ) 10.00 8.0+7.50/2 77.50
Km ( 1 x 1 ) 10.00 7.50+7.1/2 73.00
Km ( 1 x 1 ) 5.00 7.10+7.0/2 35.25
Km 0 / 070 to 0/ 200 ( 1 x 1 ) 130.00 7.00 910.00
Km 0 / 200 to 0 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 400 to 0 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 600 to 0 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 0 / 800 to 1 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 0 to 1 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 200 to 1 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 400 to 1 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 600 to 1 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 1 / 800 to 2 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 0 to 2 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 200 to 2 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 400 to 2 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 600 to 2 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 2 / 800 to 3 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 0 to 3 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 200 to 3 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 400 to 3 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 600 to 3 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 3 / 800 to 4 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 0 to 4 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 200 to 4 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 400 to 4 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 600 to 4 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 4 / 800 to 5 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 0 to 5 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 200 to 5 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 400 to 5 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 600 to 5 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 5 / 800 to 6 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 0 to 6 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 200 to 6 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 400 to 6 / 600 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 600 to 6 / 800 ( 1 x 1 ) 200 7.00 1400.00
Km 6 / 800 to 7 / 0 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 0 to 7 / 200 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 200 to 7 / 400 ( 1 x 1 ) 200 7.00 1400.00
Km 7 / 400 to 7 / 600 ( 1 x 1 ) 200 7.00 1400.00
Approch road at Bemolu road ( 1 x 1 ) 25 (7.00+3.75)/2 134.38
Approch road at saggunda road ( 1 x 1 ) 45 (7.00+3.75)/2 241.88

53781.50

or say 53782.00 26.90 1446736


Sqm Sqm

Providing and laying of 40 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant
producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading
– II as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous
binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with
hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th
revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

Km Bell Mouth ( 1 x 1 ) 14.0+16.0/2 16.0+0.0/2 0.040 4.80


Km ( 1 x 1 ) 15.00 4.0+10.6/2 0.040 4.38
Km ( 1 x 1 ) 10.00 10.6+10.30/2 0.040 4.18
Km ( 1 x 1 ) 10.00 10.3+8.40/2 0.040 3.74
Km ( 1 x 1 ) 10.00 8.40+8.0/2 0.040 3.28
Km ( 1 x 1 ) 10.00 8.0+7.50/2 0.040 3.10
Km ( 1 x 1 ) 10.00 7.50+7.1/2 0.040 2.92
Km ( 1 x 1 ) 5.00 7.10+7.0/2 0.040 1.41
Km 0/ 070 to 0/ 200 ( 1 x 1 ) 130.00 7.00 0.040 36.40
Km 0 / 200 to 0 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 0 / 400 to 0 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 0 / 600 to 0 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 0 / 800 to 1 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 1 / 0 to 1 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 1 / 200 to 1 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 1 / 400 to 1 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 1 / 600 to 1 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 1 / 800 to 2 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 2 / 0 to 2 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 2 / 200 to 2 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 2 / 400 to 2 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 2 / 600 to 2 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 2 / 800 to 3 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 3 / 0 to 3 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 3 / 200 to 3 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 3 / 400 to 3 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 3 / 600 to 3 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 3 / 800 to 4 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 4 / 0 to 4 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 4 / 200 to 4 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 4 / 400 to 4 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 4 / 600 to 4 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 4 / 800 to 5 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 5 / 0 to 5 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 5 / 200 to 5 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 5 / 400 to 5 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 5 / 600 to 5 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 5 / 800 to 6 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 6 / 0 to 6 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 6 / 200 to 6 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 6 / 400 to 6 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 6 / 600 to 6 / 800 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 6 / 800 to 7 / 0 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 7 / 0 to 7 / 200 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 7 / 200 to 7 / 400 ( 1 x 1 ) 200 7.00 0.040 56.00
Km 7 / 400 to 7 / 600 ( 1 x 1 ) 200 7.00 0.040 56.00
Approch road at Bemolu road ( 1 x 1 ) 25 (7.00+3.75)/2 0.040 5.38
Approch road at saggunda road ( 1 x 1 ) 45 (7.00+3.75)/2 0.040 9.68

2151.26

say 2152.00 10751.00 23136152


Cum Cum

8 Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from
outside road boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow
area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on
the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @
OMC to meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P ,
complete for finished item of work as per MORT&H specification 305 (5th revision) (Payment will be
made based on levels for finished item of work)

Km 0/ 020 to 0/ 200 ( 1 x 2 ) 180.00 1.50 0.150 81.00


Km 0 / 200 to 0 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 0 / 400 to 0 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 0 / 600 to 0 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 0 / 800 to 1 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 1 / 0 to 1 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 1 / 200 to 1 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 1 / 400 to 1 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 1 / 600 to 1 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 1 / 800 to 2 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 2 / 0 to 2 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 2 / 200 to 2 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 2 / 400 to 2 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 2 / 600 to 2 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 2 / 800 to 3 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 3 / 0 to 3 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 3 / 200 to 3 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 3 / 400 to 3 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 3 / 600 to 3 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 3 / 800 to 4 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 4 / 0 to 4 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 4 / 200 to 4 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 4 / 400 to 4 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 4 / 600 to 4 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 4 / 800 to 5 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 5 / 0 to 5 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 5 / 200 to 5 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 5 / 400 to 5 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 5 / 600 to 5 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 5 / 800 to 6 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 6 / 0 to 6 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 6 / 200 to 6 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 6 / 400 to 6 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 6 / 600 to 6 / 800 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 6 / 800 to 7 / 0 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 7 / 0 to 7 / 200 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 7 / 200 to 7 / 400 ( 1 x 2 ) 200 1.50 0.150 90.00
Km 7 / 400 to 7 / 600 ( 1 x 2 ) 200 1.50 0.150 90.00
Deduct Bridge portion
Km 3 / 4 ( 1 x 2 ) 27.60 1.50 0.150 -12.42
Deduct Culverts ( 12 x 2 ) 4.00 1.50 0.150 -21.60
3376.98

3377.00 470.00 1587190


Cum Cum

9 Cost, supply and fixing of KM stones of size 111x35x25cm with RCC(1:2:4) and fixing in CC(1:4:8)
conforming to I.S specifications including cost and conveyance of all materials all labour charges for
finished item of work

From Km 0.000 to 7.600 ( 1 x 7 ) 7.00


7.00

7.00 2438.00 17066


No No

10 Cost, supply and fixing of HM stones of size 65X15X10cm with RCC(1:2:4) and fixing in CC(1:4:8)
conforming to I.S specifications including cost and conveyance all materials and all labour charges for
finished item of work

From Km 0.000 to 7.600 ( 7 x 4 ) 28.00


( 1 x 3 ) 3.00
31.00

31.00 534.00 16554


No No

Total Amount 78939384

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
Detailed Cum Abstract Estimate
Name of Work :
Special Repairs to Kovvur - Chagallu road from Km. 0.00 to 8.600 in West Godavari
District.

S.N Measurments
Decription of work Nos Quantity Rate/ per Amount
o L B D

1 Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of
Type – IV of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting
and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen
printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium
Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back
side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and
fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of
not less than 2.1 m from the ground level to the bottom of the board. The signpost should be
painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White
colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle
35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost
and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading
chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.
At curve s, Speed brakers, Schools, Junctions, Narrow culverts, Dips etc..

From km. 0/00 to 8/600 x 2 x 4 8.00


x 2 x 2 0.00
Total 8.00 6958 55664
Nos Each

2 Providing and fixing Village name board size 900x450 mm made out of Type – IV of ASTMD 4956-
09 High Intensity Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full
background of Green Colour & White Letters and fixed over 3MM Alluminium Composite Material
sheet having minimum 0.30 mm thick Aluminium skin on both sides with back side painted grey
colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with
35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than
2.1 m from the ground level to the bottom of the board. The signpost should be painted with one
coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of
30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the
ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all
materials equipment, machinery and labour with all leads and lift, loading charges necessary for
satisfactory completion of the work as directed by Engineer –in-Charge

From km. 8/0 to 16/0 2 x 2 -- -- -- 4.00


1 x 1 -- -- -- 0.00
Total 4.00 6046 24184
Nos Each
3 Supply and installation of hazard Markers / Delineators Using M.S. Angle of size 55x55x6 mm and
120 cm high above ground level painted with two coats of black & white stripes of 15 cm wide with
first quality synthetic enamel paint over one coat of appropriate primer of approved brand ,colour
with 30 cm X 90 cm type – IV of ASTMD 4956-09 wide angle cube cornered micro prismatic retro
reflective sheeting of yellow colour and confirming to IRC 67:2012 fixed over 3MM aluminum
composite material having minimum 0.30 mm thick aluminum skin on both side with standard
supports consisting of ultimately black and yellow with black stripes in screen printing sloping
downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to
pass and buried into the ground in a trench of size 30 cm X 30 cm and 50 cm depth filled with CC
M-20 including cost and conveyance of all material equipment , machinery and labour with all
leads and lifts, loading and unloading charges necessary for successful completion of the work any
road division as directed by engineer – in charges and conforming to IRC 67 – 2012 & MORT&H
specification No.805 and approved drawings etc., complete for finished item of work
From km. 8/0 to 16/0
At bridge 2 1 x 2 4.00
1 1 x 1 0.00
Total 4.00 4438 17752
Nos Each

Total 97600

Assistant Engineer (R&B) Deputy Executive Engineer,


(R&B) Section, Kovvur (R&B) Sub-Division, Kovvur
DETAILED CUM ABSTRACT ESTIMATE

N. W:- Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Road Safety Interventions

Measurements
Sl No Description Nos Contents Rate/Per Amount
L B D
1 2 3 4 5 6 7 8 9
1 Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including
reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous
Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass
bead as per IRC: 35, the material should be of BERGER Company/ BERGER Equivalent
and must comply with the following: a) White index for the product should be in the range
of 60-70 when measured against standard reference. The applied panel 7/8 number must be
submitted for checking up the white index in the department lab. In case the department
approves the white index of any vendor, the department engineer may carryout random
checking of the applied products at site against the approved panel. In case of any major
deviation, beyond acceptance limit, department reserve the right to cancel or reject the total
supplied consignment of the said material and will compell the vendor has to replace the full
consignment by the desired material as per approved panel at his own cost and additional
demurrages may be claimed due to loss of man days (as per the rules of the department). b)
Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade
as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under
ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at
the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E)
Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night
Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st
revision reaffirmed in 1986) and clause conforming to IRC 35-1997

From Km 0.000 to 7.600 = 1015 3.00 0.10 304.50


(7600/7.50)=1013.33 -
Solid lines for Curves 2 1600.00 0.15 - 480.00

For Zebra crossings at Junctions 10x2x7 3.00 0.50 - 210.00

994.50

Limited to 1000.00 560.00 560000


Sqm 1Sqm

2 Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle
made out of Type - IV of ASTMD 4956-09 High Intensity Prismatic Retro reflective
sheeting and confirming to IRC 67:2012 for full background of White colour and
letters/logos done by screen printing in Black colour, boarders by screen printing in Red
colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm
thick Aluminium skin on both sides with back side painted grey colour and fixed over back
support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted
on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the
ground level to the bottom of the board. The signpost should be painted with one coat of red
oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of
30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to
the ground by M-15 Concrete foundation of size 450x450x600mm including cost and
conveyance of all materials, equipment, machinery and labour with all leads and lift, loading
chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

From km 0.000 to 7.600 20 5756.00 115120


Nos Nos
Measurements
Sl No Description Nos Contents Rate/Per Amount
L B D
1 2 3 4 5 6 7 8 9
3 Providing and fixing Village name board size 900x450 mm made out of Type - IV of
ASTMD 4956-09 High Intensity Prismatic Retro reflective sheeting and confirming to IRC
67:2012 for full background of Green Colour & White Letters and fixed over 3MM
Alluminium Composite Material sheet having minimum 0.30 mm thick Aluminium skin on
both sides with back side painted grey colour and fixed over back support frame of M.S
angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post
of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the
bottom of the board. The signpost should be painted with one coat of red oxide paint and 2
coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The
signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15
Concrete foundation of size 450x450x600mm including cost and conveyance of all
materials, equipment, machinery and labour with all leads and lift, loading charges necessary
for satisfactory completion of the work as directed by Engineer-in-Charge.

From km 0.000 to 7.600 6 6046.00 36276


Nos Nos

4 Supplying & Fixing of Molded Shanks Raised Pavement Markers made of polycarbonate
and ABS molded body and reflective panels with micro prismatic lens capable of providing
total internal reflection of the light entering the lens face and shall support a load of 16000
kg tested in accordance to ASTM D 4280, type H complying to Specifications of Category A
of by MoRT&H circular no RW/NH -33023/10-97 - DO III dated 11-6-1997. The height,
width and length shall not exceed 50 mm, 100 mm and 100 mm with minimum reflective
area of 13 sqm on each side and the slope to the base shall be 35 +/ - 5 degree. The strength
of detachment of the integrated cylindrical shanks ( of diameter not less than 19 +/-2 mm
and height not less than 30+/-2 mm ) from the body is to be a minimum value of 700 kgs.
Fixing will be by drilling holes on the road for the twin shanks to go inside without nails and
using epoxy resin based adhesive as per manufacturer's recommendation and complete as
directed by the Engineer-in-Charge

From km 0.000 to 7.600 508 - - - 508.00


Solid lines for Curves 2x270 - - - 540.00
For Zebra crossings at Junctions 10x2x7 2.00 - 400.00
Or Say 1448.00 336.00 486528
Nos 1 No

5 Supplying and installation of Hazard Markers using M.S. angle of size 55x55x6 mm and
120cm high above ground level painted with two coats of black & white stripes of 15cm
wide with first quality synthetic enamel paint over one coat of appropriate primer of
approved brand,colour, with 30cm x 90cm Type - IV of ASTMD 4956-09 High Intensity
Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed
over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium
skin on both sides with standard supports consisting of alternately black and Yellow with
black stripes in screen printing sloping downward at an angle of 45 degrees towards the side
of the obstruction on which the traffic is to pass and buried into the ground in a trench of
size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all
materials, equipment, machinery and labour with all leads and lifts, loading and un-loading
charges necessary for successfull completion of the work on any road in division as directed
by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805
and approved drawings etc., complete for finished item of work.
From km 0.000 to 7.600 15 x 4 60.00 3514.00 210840
No /No
Measurements
Sl No Description Nos Contents Rate/Per Amount
L B D
1 2 3 4 5 6 7 8 9
6 Supplying and installation of delineators (Roadway indicators) not less than 800mm high
above ground level. The delineator shall have a core and shell construction which shall be
made of tough, high impact resistant, injection-moulded, thermoplastic outer body. The
inner core shall consist of powder coated or painted Mild steel of minimum thickness
1.0mm. The delineator should have top retro-reflective unit consisting of white color micro
prismatic non metallic retro-reflective sheeting on both sides having a minimum exposed
area of 125 cm2 each side and bottom retro-reflective unit consisting of red color micro
prismatic non metallic retro-reflective sheeting on both sides having minimum exposed area
of 35 cm2 each side confirming to ASTM D4956 type XI standards. The delineators shall be
fixed to the ground by inserting the root of the delineator up to the marked portion and by
firm concrete filling as per the instructions by Engineer-in-charge.
From km 0.000 to 7.600 15 x 2 30 2048.00 61440
Nos 1 No

Total 1470204

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
Name of Work :- District.

Statement showing the Seigniorage charges


Theoritical requirement
Seignorage charges per
of Material per Unit as Seignor-
Cum.
per Data (in Cum.) age Amount of
Description of Item Unit Gravel Gravel / charges Quantity
Metal Sand Metal Sand Seigniorage
/ Earth Earth per Unit

PART - A

G.S.B. 1 Cum. 1.28 -- -- 90.00 -- -- 115.20 270.00 31,104

Total Rs. 31,104

TOTAL 31,104

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
Name of Work :- Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.
Statement showing the Seigniorage charges

Theoritical requirement of
Seignorage charges per Seignor-
Material per Unit as per Data (in
Cum. age
Description of Item Unit Cum.) Quantity
charges
Gravel / Gravel / per Unit
Metal Sand Metal Sand
Earth Earth

PART - B

Formingh
Embankment with 1 Cum. -- -- 1.00 -- -- 45.00 45.00 0.00
Excavated Earth
Single Coat Surface
1 Sqm. 0.010 -- -- 90.00 -- -- 0.90 53,589.00
Dressing
B.C. 40mm thick 1 Cum. 1.486 -- -- 90.00 -- -- 133.74 2,152.00
Construction of
1 Cum. -- -- 1.00 -- -- 45.00 45.00 3,377.00
Gravel Shoulders
G.S.B. 1 Cum. 1.28 -- -- 90.00 -- -- 115.20 1,767.00
Km Stones
Earthwork 1 Cum. -- -- 0.215*1 -- -- 45.00 9.68 7.00
VCC (1:4:8) 1 Cum. 0.175*0.9 0.175*0.45 -- 90.00 100.00 -- 22.05 7.00
VRCC (1:2:4) 1 Cum. 0.101*0.9 0.101*0.45 -- 90.00 100.00 -- 12.73 7.00

Hm Stones
Earthwork 1 Cum. -- -- 0.042*1 -- -- 45.00 1.89 31.00
VCC (1:4:8) 1 Cum. 0.0375*0.9 0.0375*0.45 -- 90.00 100.00 -- 4.73 31.00
VRCC (1:2:4) 1 Cum. 0.010*0.9 0.010*0.45 -- 90.00 100.00 -- 1.26 31.00

Total Rs.

TOTAL

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.
showing the Seigniorage charges

Amount of
Seigniorage

PART - B

48,230

287,808

151,965

203,558

68
154
89

59
146
39

692,116

692,116
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Seignorages charges

1 40mm BT patch work


62 cum x 1.33 x Rs.75.00 6184.50

2 9.50mm to 11.20mm patch work


24.00 cum x 1.33 x Rs.75.00 2394.00

3 WBM patchwork
Metal 130.00 cum x 1.33x RS.75 12967.50
Dust 130.00 cum x 0.165 x Rs.75 1608.75
Gravel 130.00 cum x 0.165 x Rs.30 643.50

4 K M & H M Stones
Metal 0.90 2 0.269 75 36.32
Sand 0.45 2 0.269 50 12.11
Metal 0.90 2 0.048 75 6.48
Sand 0.45 2 0.048 50 2.16
23855.31
Say 23855.00

Assistant Executive Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Kovvur (R&B) Sub-divn., :Kovvur
COMPARTIVE STATEMENT
N. W:- Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

Sl. As per Sanctioned estimate As per Working estimate


Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11

PART - A (Andhra Sugars Deposit)


1 Scarifying the existing B.T surface to a depth
of 50 mm by Mechanical means and disposal
of scarified material with all leads and lifts 19810.00 9.80 194138 19810.00 9.80 194138 - - No Change
upto 1000 Mtrs as per MoRT&H (5th
Revision) Specn. No.305.4.3 Sqm / 1 Sqm sqm / 1 sqm

2 Construction of Granular sub-base by


providing HBG material confirming to
Grading - V of MoRT&H Table 400-1
including cost and conveyance of all materials
to work site and spreading in uniform layers
with motor grader or by approved means, on 270.00 1981.00 534870 270.00 1,981.00 534870 - - --do--
prepared surface mixing by mix in place Cum / 1 Cum Cum / 1 Cum
method with Rotavator / approved means at
OMC and compacting
3 Stabilisation of insitu (with vibratory
existing rollercrust
pavement to
)achieve
or soil the desired density
or otherwise etc.,/ base
sub base complete
courseforup
finished item ofdepth
to the required workbyas cold
per MoRT&H
in situ recycling
Specification 401 (5th revision)
using cement and chemical additives and/ as
other
directed by the Engineer-in-charge.
wise providing pulverizing, spreading, milling
and mixing of chemical additives at the 5943.00 4193.00 24918999 5943.00 4,193.00 24918999 - - --do--
appropiate rates as per job in mix design in Cum / 1 Cum Cum / 1 Cum
accordance with IRC SP 72 - 2015, IRC 37-
2012 & 2018 and IRC SP 89 (Part II) 2018.
Cementitious additive of rate of a minimum of 25648007 25648007 0 0 No Change
5-7% and CCS/CS additive should be spread
4 Provision for seigniorage
on the existing charges
pavement using a mobile truck 31104 31104 - - --do--
mounted containerized cement / additive
spreader with micro processor controlled
5 Provision
weighing and for GST @ 18%
spreading system. The additive 4622240 4622240 - - --do--
spreader shall have variable working width
6 sufficient
Provision to forcover
Unforseen
wholeand rounding
pavement offThe in
lane. 11864 11864 - - --do--
situ stabilisation process shall be carried out by
a mobile and self propelled stabiliser /
PART
reclaimer of-working
A TOTAL width of 2.4m and with 30313215 30313215 0 0
minimum engine horse power 440KW with a
variable working depth up ot 50cm. The
resultant stabilised mix then would be profiled
to the required grade, level and thickness using
motor grader and the mix would be compacted
using 20 tonne pad foot roller in combination
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11
PART - B - SRP Grant
1 Scarifying the existing B.T surface to a depth
of 50 mm by Mechanical means and disposal
of scarified material with all leads and lifts As per actual measurements
upto 1000 Mtrs as per MoRT&H (5th and bellmouths
Revision) Specn. No.305.4.3 33525.00 9.80 328545 33761.00 9.80 330858 2313 -
Sqm / 1 Sqm sqm / 1 sqm

2 Construction of Granular sub-base by


providing HBG material confirming to
Grading - V of MoRT&H Table 400-1
including cost and conveyance of all materials
to work site and spreading in uniform layers
with motor grader or by approved means, on
prepared surface mixing by mix in place
method with Rotavator / approved means at Patchwork for deep pot holes
550.00 1981.00 1089550 1767.00 1,981.00 3500427 2410877 -
OMC and compacting with vibratory roller to and sunken portions
achieve the desired density etc., complete for Cum / 1 Cum Cum / 1 Cum
finished item of work as per MoRT&H
3 Specification
Stabilisation of401 (5th
insitu revision)
( existing and as crust
pavement
directed by the Engineer-in-charge.
) or soil or otherwise sub base / base course up
to the required depth by cold in situ recycling
using cement and chemical additives / other
wise providing pulverizing, spreading, milling
and mixing of chemical additives at the 10058.00 4193.00 42173194 10099.00 4,193.00 42345107 171913 - Increased due to bellmouths
appropiate rates as per job in mix design in Cum / 1 Cum Cum / 1 Cum
accordance with IRC SP 72 - 2015, IRC 37-
2012 & 2018 and IRC SP 89 (Part II) 2018.
Cementitious additive of rate of a minimum of
4 5-7% and CCS/CS
Providing additive
and applying prime should
coat be
withspread
on the existing pavement using a
bitumen emulsion (SS1) Bulk using emulsionmobile truck
mounted distributor
pressure containerized cement /surface
on prepared additiveof
spreader base
granular with including
micro processor
clearingcontrolled
of road surface
weighing
and andemulsion
spraying spreadingatsystem.
the rateThe additive
of 0.70
spreaderusing
kg/sqm shall emulsion
have variable working
pressure width for 53335.00
distributor Minor variaitions due to
39.50 2106733 53589.00 39.50 2116766 10033 -
sufficient
finished itemto cover whole
of work etc.,pavement
completelane. The in
as per bellmouths
situ stabilisation process shall be carried out by Sqm / 1 Sqm sqm / 1 sqm
MoRT&H Specification 502 (5th revision) and
aasmobile
directedandbyself
the propelled stabiliser /
Engineer-in-charge
reclaimer of working width of 2.4m and with
minimum engine horse power 440KW with a
variable working depth up ot 50cm. The
resultant stabilised mix then would be profiled
to the required grade, level and thickness using
motor grader and the mix would be compacted
using 20 tonne pad foot roller in combination
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11
5 Providing and laying a single coat of a stress
absorbing membrane over a cracked road
surface, with crack width above 9 mm and
cracked area above 50 per cent after cleaning
with a mechanical broom, using modified
binder complying with clause 521, sprayed at
the rate of 15 kg per 10 sqm and spreading 11.2
mm crushed stone aggregates @ 0.12 cum per
10 sqm, sweeping the surface for uniform
spread of aggregates and surface finished to
conform to clause 902. 53335.00 108.10 5765514 - - - - 5765514 Deleted
Sqm / 1 Sqm

6 Providing and laying a single coat of a stress


absorbing membrane over a cracked road
surface, with crack width above 9 mm and
cracked area above 50 per cent after cleaning Bitumen VG-10 at the rate of
with a mechanical broom, using modified 1.10 Kgs/Sqm is proposed
binder complying with clause 521, sprayed at instead of 1.50 Kgs/Sqm and
the rate of 11 kg per 10 sqm and spreading 11.2 chips of size 11.2mm is
mm crushed stone aggregates @ 0.10 cum per applied at the rate of 0.10
10 sqm, sweeping the surface for uniform Cum/Sqm as per the IRC 37-
spread of aggregates and surface finished to 2018
conform to clause 902.

- - - 53589.00 82.90 4442528 4442528 -


Sqm / 1 Sqm
7 Providing and applying tack coat with bitumen
emulsion (RS1) Bulk using emulsion pressure
distributor on prepared surface of granular base
including clearing of road surface and spraying Tack coat of two coats with
emulsion at the rate of 0.25 kgs/sqm in two emulsion RS1 of 0.25
coats using emulsion pressure distributor for Kgs/Sqm is proposed. Hence,
finished item of work etc., complete as per new item
MoRT&H Specification 502 (5th revision) and
as directed by the Engineer-in-charge
- - - 53782.00 26.90 1446736 1446736 -
sqm / 1 sqm
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11
8 Providing and applying tack coat with bitumen
VG-10 (Bulk) using Bitumen pressure
distributor at the rate of 0.20 kgs per sqm on
the prepared bituminous surface cleaned with
mechanical broom for finished item of work as
per MoRT&H Specification 503 (5th revision)
and as directed by the Engineer-in-Charge. 53335.00 13.40 714689 - - - - 714689 Deleted
Sqm / 1 Sqm

9 Providing and laying of 40 mm thick


Bituminous Concrete with 100 - 120 TPH
batch type hot mix plant producing an average
output of 75 tones per hour using hard blasted Variation due to bellmouths
granite crushed aggregates of Grading – II as
per Table 500-17 of specification 507 of 2134.00 10751.00 22942634 2152.00 10,751.00 23136152 193518 -
MoRT&H (5th revision), premixed with
Cum / 1 Cum Cum / 1 Cum
Bituminous binder of VG 30 Grade @ 5.4 % of
mix and filler, transporting the hot mix to work
10 Forming
site, layingshoulders with borrowed
with hydrostatic sensoruseful
paver
seclected
finisher toearth having MDD
the required grade,oflevel
not and
less than Increased due to increase in
1.75 gms/ccrolling
alignment, from outside road boundary
with smooth wheeled, by width and thickness of
mechnical
vibratory and means withrollers
tandem all leads and liftsthe
to achieve shoulders to provide lateral
including pre-watering
desired compaction of soil
as per at borrow area,
MoRT&H 912.00 470.00 428640 3377.00 470.00 1587190 1158550 - support
removal of top507
Specification soil, excavation
(5th revision)of soils at for
complete Cum / 1 Cum Cum / 1 Cum
borrowed
finished itemarea,ofconveyance of soil, depositing
work in all respects as directed
the soils on the embankment, spreading soils,
by Engineer-in-Charge
11 Forming
breaking embankment
clods, sectioningwithand
borrowed useful
consolidation
earth from outside road boundary
with vibratory road roller @ OMC to meet by
mechanical
requirementmeansof tableupto SDR
300-2 of with
MORT&Hall leads and
lifts including pre-watering of soil
including all hire and operational charges at borrowof
area, removal of top soil, excavation
T&P , complete for finished item of work of soils
as at
borrowed
per MORT&H area, specification
conveyance of 305soil,
(5thdepositing
revision)
the soil onwill
(Payment the be
embankment,
made basedspreading
on levels soil,
for
breaking clods, sectioning,
finished item of work) grading and
consolidation with 8 to 10 Tonnes Vibratory 80.00 295.00 23600 - - - - 23600 Deleted
Road Roller @ OMC to meet requirement of Cum / 1 Cum
table 300-2 of MoRT&H, including all hire
and operational charges of T&P , complete for
12 Cost, supply and fixing of KM stones of size
finished
111x35x25cmitem ofwithwork as per MoRT&H
RCC(1:2:4) and fixing in
specification 305 (5th revision) (Payment will
CC(1:4:8) conforming to I.S specifications Newly proposed as per site
be made based
including on level
cost and for finished
conveyance of allitem of
materials requirement
work). - - - 7.00 2,438.00 17066 17066 -
all labour charges for finished item of work
No / 1 No
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11
13 Cost, supply and fixing of HM stones of size
65X15X10cm with RCC(1:2:4) and fixing in
CC(1:4:8) conforming to I.S specifications Newly proposed as per site
including cost and conveyance all materials requirement
and all labour charges for finished item of work - - - 31.00 534.00 16554 16554 -
No / 1 No

Road Safety Interventions


14 Supplying of hot applied thermoplastic road
marking compound, 2.5mm thick including
reflectorising glass beads @ 250gms with Detailed measurements
Reflectorising Glass Beads on Bituminous proposed for RSI items as per
Surface at 250 gms per sqm area, thickness of actual requirement
- - - 1000.00 560.00 560000 560000 -
2.5mm is exclusive of surface applied glass
bead as per IRC: 35, the material should be of Sqm / 1 Sqm
BERGER Company/ BERGER Equivalent and
15 must comply
Providing andwith fixing theCautionary
following: /a)Warning White
index for the product should
sign boards size 900 mm equilateral triangle be in the range of
60-70 when measured
made out of Type - IV of ASTMD 4956-09 against standard
--do--
reference.
High Intensity The applied
Prismatic panel
Retro 7/8reflective
number must
be submitted
sheeting for checkingtoup
and confirming IRC the67:2012
white index for in
the - - - 20.00 5,756.00 115120 115120 -
full department
backgroundlab. In casecolour
of White the department
and
approves
letters/logos the done
whiteby index
screen of any
printingvendor, the
in Black Nos / 1 No
department engineer may
colour, boarders by screen printing in Red carryout random
checking
colour andof the applied
fixed overVillage
4MMproducts
Aluminiumat site against
16 Providing and fixing name board size
the approved
Composite panel.
Material In
sheetcase of any major 0.5
900x450 mm made out of having
Type - IV minimum
of
deviation,
mm thick beyond acceptance
Aluminium skin on limit,
both department
sides with
ASTMD 4956-09 High Intensity Prismatic --do--
reserve
back side thepainted
right togrey cancel or reject
colour and the total
fixed over
Retro reflective sheeting and confirming to
supplied
back supportconsignment
frame of theangle
said material and
IRC 67:2012 for fullofbackground
M.S 25x25x3mm
of Green - - - 6.00 6,046.00 36276 36276 -
will
all compell
round the vendor has to replace the full
Colour & andWhite fixingLetterswith and
35x35x4mm
fixed overand 3MM
consignment
mounted by
on aCompositethe desired
MS angle Material material
post of size as per Nos / 1 No
Alluminium sheet having
approved
75x75x6mm panel with at his own costof and notadditional
minimum 0.30 mmclear thickheight
Aluminium less
skinthan
on
demurrages
2.1 msides
fromwith mayground
the be claimed level duethe
to tobottom
loss of of man
17 both
Supplying back side painted grey colour
the (as per&
daysboard. The
Fixing
the rules of
signpost
Molded
of the
should
Shanks Raised
department).
be painted b)with
and fixed over
Pavement Markers back made support of frame of M.S
polycarbonate
Luminance
one coat factor
of red oxideof the material
paint and shouldofbe in
2 fixing
coats
angle
and 25x25x3mm
ABS ofmolded all
body round
and and
reflective with
panels --do--
the range
synthetic 80-85%
enamel paint at Black
45 degree centigrade as
35x35x4mm
with micro and mounted
prismatic lens on and
a MS
capable
White
of angle colour
providingpost
per
with AASTHOM
bands of 30cm of249. c) Crack
height. resistance:
The signpost The
of size
total 75x75x6mm
internal reflection with ofclear height
the light of not
entering - - - 1448.00 336.00 486528 486528 -
applied be panel
shallthan firmly cured
fixed for
with7 days
MS base under ambientthe
angle
less
lens face 2.1
and m from
shall the
support grounda loadlevelof to the
condition
35x35x4ofmm and then
in to should
theThe be tested
ground by M-15 as per kg
16000 Nos / 1 No
bottom
tested the
in accordance board. signpost should be
BS3262,
Concrete Part-1,
foundation 1989to and
ofof
ASTM
sizeshould Dpass
450x450x600mm
4280, type
at the
painted
H complying with one coat
to Specifications red oxide paint and 2
range
including of '0'cost
degree centigrade
andenamel
conveyance toof
of
Category
'-10' degreeA
all materials,
coats
of of
by MoRT&H synthetic circular:no paint
RW/NH Black - and
centigrade
equipment, D) Adhesion
machinery and Strong E)withSoftening
White
33023/10-97colour -with bands
DOcentigrade
III dated oflabour
30cm
11-6-1997. of height.all leads
The
point:
and 102
lift, degree
loading chages necessaryF) Dried
for film
The signpost
height, width shall
and be firmly
length shallfixed
not with
exceed MS50
finish :
satisfactory Smooth and
completion uniform G) Night Vision:
base
mm, angle
100 mm35x35x4
andby100 mmofinthe to work
theminimumas directed
ground by
High as directed
by Engineer -in-Charge. the mm with
Engineer-in-Charge
M-15
reflectiveConcretearea of foundation of size
and confirming to 13
IS:sqm 164-1961on each (1stside and the
revision
450x450x600mm
slope to theinbase including
shall be cost and
35conforming
+/ - 5 degree.
reaffirmed 1986) and clause to
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11
18 Supplying and installation of Hazard Markers
using M.S. angle of size 55x55x6 mm and
120cm high above ground level painted with --do--
two coats of black & white stripes of 15cm
wide with first quality synthetic enamel paint 60.00 3,514.00 210840 210840 -
over one coat of appropriate primer of - - - Nos / 1 No
approved brand,colour, with 30cm x 90cm
Type - IV of ASTMD 4956-09 High Intensity
19 Supplying and installation
Prismatic Retro reflective of delineators
sheeting of Yellow
(Roadway indicators) not
colour and confirming to IRC 67:2012less than 800mm fixed
high
over above ground level.Composite
3MM Alluminium The delineator shall
Material --do--
have
having a core and shell
minimum 0.30construction
mm thick Aluminiumwhich shall
be
skinmade of tough,
on both high standard
sides with impact resistant,
supports - - - 30.00 2,048.00 61440 61440 -
injection-moulded,
consisting of alternately thermoplastic
black andouter Yellowbody.with Nos / 1 No
The inner core shall consist of
black stripes in screen printing sloping powder coated
or painted Mild
downward at an steel
angleofofminimum
45 degrees thickness
towards
1.0mm.
the side of the obstruction on which top
Sub The
Totaldelineator should have the retro-
traffic 75573099 80409588 11340292 6503803
reflective unitburied
is to pass and consisting
into ofthewhite
ground color
in amicro
trench
prismatic
of size nonxmetallic
30cm 30cm retro-reflective
and 50cm depth sheeting
filled
Tender Premium @ 4.36555 % Excess - 3510321 3510321 -
on
withboth
CCsides
M-20having a minimum
including cost andexposed
conveyance area
of 125 cm2 each side and bottom
of all materials, equipment, machinery and retro-
reflective
labourSubwithunit
allconsisting
Total of redloading
leads and lifts, color micro
and un- 75573099 83919909 14850613 6503803
prismatic non metallic retro-reflective
loading charges necessary for successfull sheeting
on both sides
completion ofhaving
the workminimum
on any exposed
road in area of
division
12 Provosion
35 cm2 each forside
Price Adjustment
confirming to ASTM 400000 2000000 1600000 -
as directed by Engineer-in-Charge and D4956
13 type XI standards.
conforming
Provosion for IRCThe
toSeignorage delineators
67-2012 &MORT&H
charges shall be 393402 692116 298714 -
fixed to the ground by inserting
specification No.805 and approved drawings the root of the
delineator
14 etc., complete
Provision up to the marked
for finished
for NAC @ 0. 10% portion
item of work.and by firm 76367 86612 10245 -
concrete filling as per the instructions by
15 Provision for GST @ 18%
Engineer-in-charge. 13759716 15605755 1846039 -
16 Provision for QC Charges 377865 370000 - 7865

17 Provision for Avagahana Sadassu 5000 5000 - -


18 Provision for RSI Detailed measurements
300000 - - 300000 incorporated in the working
estimate against Ls provision
Sl. As per Sanctioned estimate As per Working estimate
Description of item More Less Remarks
No Quantity Rate / per Amount Quantity Rate / per Amount
1 2 3 4 5 6 7 8 9 10 11

19 Provision for unforseen and Rounding off 1336 7393 6057 -


PART - B TOTAL 90886785 102686785 18611668 6811668
GRAND TOTAL (PART- A + PART- B) 121200000 133000000 18611668 6811668

Assistant Engineer (R&B) Deputy Executive Engineer (R&B)


(R&B) Section - Gopalapuram (R&B) Sub Division - Tanuku

Executive Engineer (R&B) Superintending Engineer (R&B)


(R&B) Division - Eluru (R&B) Circle - Eluru
AUTHORISED OMMISSIONS AND EXTRAS

As per agreement As per Execution


Sl.
Description of item More Less
No Quantity Rate / Amount Quantity Rate / per Amount
per
1 2 7 8 9 7 8 9 10 11

1 Providing B.T. patch work with 40-45 mm HBG metal using 80/100 Grade Bitumen at Q
42Kgs / 1Cum including cost of materials and cost of Bitumen and labour charges for all n
operations such as trimming the edges of the pot holes, cleaning the surface, applying t
tack coat with hot Bitumen, carrying and spreading stone ballast by hand tamping with y
rammers, spreading Bitumen to the required consistency including fuel charges for
heating Bitumen and hire and all other incidental charges and operations charges of i
Bitumen boiler, etc., complete for finished item of work. n
c
r
4.00 3989.00 15,956.00 20 3,989.00 79,780.00 63824.00 -- e
Err:509 a
s
8.00 3908.00 31,264.00 0 3,908.00 0.00 -- 31264.00 e
0.00
d
5.00 3746.00 18,730.00 0 3,746.00 0.00 -- 18730.00
Err:509 i
n
10.00 3,938.00 39,380.00 0 3,938.00 0.00 -- 39380.00
Err:509
M
Cum. / 1 Cum. Cum. / 1 Cum. a
d
Q
d
2 Providing B.T. patch work with 10-11.20 mm HBG machine crushed chips using 80/100 n
u
Grade Bitumen at 72Kgs / 1Cum including cost of materials and cost of Bitumen and tr
labour charges for all operations such as trimming the edges of the pot holes, cleaning y
u
the surface, applying tack coat with hot Bitumen, carrying and spreading stone ballast by
hand tamping with rammers, spreading Bitumen to the required consistency including sB
fuel charges for heating Bitumen and hire and all other incidental charges and lr
operations charges of Bitumen boiler, etc., complete for finished item of work. ii
gd
h
g
te
l
y
Err:509 4.00 4932.00 19728.00 4.86 4,932.00 23,969.52 4241.52 -- t
o
i
0.00 7.00 4851.00 33957.00 0 4,851.00 0.00 -- 33957.00 n C
ch
r
Err:509 5.00 4690.00 23450.00 0 4,690.00 0.00 -- 23450.00 ae
n
ad
s
Err:509 10.00 4,855.00 48550.00 0 4,855.00 0.00 -- 48550.00 re
a
d
v
Cum. / 1 Cum. Cum. / 1 Cum. a
ir
n
a
m
M
ar
d
o
d
a
1 2 7 8 9 7 8 9 10 11
3 Providing W.B.M. patch work with 40-45 mm HBG metal including cost of all materials Q
like metal and Stone dust, and labour charges for all operations such as picking the n
existing metalled surface 50mm to 100mm deep and spreading metal and blindage with t
stone dust, watering and tamping, etc., complete for finished item of work as directed by y
the Engineer-in-charge.
i
n
c
Err:509 0.00 0.00 0 0 0.00 0.00 -- r
e
a
0.00 4.00 1651.00 6604.00 60 1,651.00 99,060.00 92,456.00 s
e
d
Err:509 4.00 1476.00 5904.00 20 1,476.00 29,520.00 23,616.00
d
Err:509 0.000 1,681.00 0.00 23.63 1,681.00 39,722.03 39,722.03 u
e
t
Cum. / 1 Cum. Cum. / 1 Cum. o
i
4 Stripping the excess soil from the shoulder surface / Making up loss of material / N
n
irregularities on the shoulder to the design level by adding fresh approved soil and o
c
compacting with appropriate equipment for sectioning the berms / shoulders as per e
MORT& D
s
es
Err:509 500.00 v
e
in
0.00 1300.00 at
Err:509 1000.00 t
ir
Err:509 1500.00 o
a
4300 9.70 41,710.00 4300.00 9.70 41,710.00 -- -- n i
Sqm. / 1 Sqm. Sqm. / 1 Sqm. n
s

5 Clearing light Jungle / Scrub Jungle from berms of the road embankment Q
in
n
t
Err:509 700.00 700.00
y
t
h
s
0.00 2500.00 2500.00 el
i
m
g
Err:509 3200.00 3150.00 o
h
n
t
tl
Err:509 11000.00 6600.00 h
y
o
d
f
17400.00 2.80 48,720 12950.00 2.80 36,260.00 -- 12,460.00 e
c
rj
u
e
la
y
s
1 2 7 8 9 7 8 9 10 11
Sqm. / 1 Sqm. Sqm. / 1 Sqm.
1 2 7 8 9 7 8 9 10 11
6 Earth work Excavation N
o
Err:509 24.00 53.00 1272.00 0.00 53.00 0.00 -- 1272.00 t
e
x
Cum / 1 cum. Cum / 1 cum. e
7 Providing and laying of RCC humed pipes cN
u
o
t
Err:509 20.00 914.00 18280.00 0.00 914.00 0.00 -- 18280.00 te
d
e
x
RM / 1 RM. RM / 1 RM. e
8 Providing first class bedding with granular material c
N
u
o
t
Err:509 22.99 590.00 13562.00 0.00 590.00 0.00 -- 13562.00 te
d
e
x
Cum / 1 RM. Cum / 1 RM. e
9 Construction of granular sub-base c
N
u
o
t
Err:509 2.00 1381.00 2762.00 0.00 1,381.00 0.00 -- 2762.00 te
d
e
x
Cum / 1 RM. Cum / 1 RM. e
-------------------- -------------------- c
u
369,829.00 350,021.55 t
e
d

Assistant Engineer (R&B), Dy. Executive Engineer (R&B),


(R&B) Section : Gopalapuram (R&B) Sub-divn., : Kovvur
Schedule of provisions provided in the Maintenance estimate as per
G.O.Ms. No.132, T(R&B) Dept., dt.22.06.2005

Name of the road : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East
Godavari District.

Eligible amount : Rs.5,29,000 /-

Sl. Details of Provision %age of amount as Amount provided in %age of amount


the estimate provided in the
No. per G.O. (in Rs.) estimate

a B.T. Pot hole filling B.T. edge repairs, (and other 55% to 65% Err:509 Err:509
itmes on B.T. Cariageway such as crack sealing,
minor surface repair, etc.,)

b Unpaved shoulder repair (Berms) / Surface drains 7% to 13% Err:509 Err:509


maintenance / including gravelling berms

c Jungle clerance / tree and shrub trimming 4% to 6% Rs.0 /- 0.00%

d Culvert repairs / vents maintenance / parapet wall 5% to 9% Err:509 Err:509


repairs / retaining wall repair, etc.,

e Bridge repairs including expansion joints / 2% to 4% Rs.0 /- 0.00%


bearings / parapets, etc.,

f Sign maintenance / guard stones maintenance / 7% to 13% Err:509 Err:509


painting KM / HM stones

g Other Items 4% to 6% Err:509 Err:509


---------------------------- ----------------------
Rs #NAME? Err:509

h Provision for VAT @ 5% Rs.245,529 /- 46.41%

i Provosion for Seignorage charges 692,116.00 130.83%

0.00

0.00

0.00

m Unforeseen items such as DTP charges, Xerox Rs.7,393 /- 1.40%


charges, etc.

#NAME?

Note : The total of all the above items shall not exceed the
Kilometrage rates. The percentage of individual items can
be diverted to other fruitful needy items only ofter
completing the particular item in full.
Estimate Value shall be restricted to 75% of the amount
arrived based on KM War rates of the G.O.
Any other Remarks :
Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Ganti - Gopalapuram road from K.M. 0.000 to 4.725

4) Classification : D.O.R.

5) Length of the road : 4.725 Kms.

6) Road width : S.L. : 4.168 Kms I.L. : 0.557 D.L. : -

7) Surface of the road : C.C. : 1.5475 B.T. : 3.1775 Kms. WBM : -

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane/Intermediate lane 4.725 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Amalapuram

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Vedireswaram - Devarapalli Road from K.M. 0.000 to 2.960

4) Classification : D.O.R.

5) Length of the road : 2.960 Kms.

6) Road width : S.L. : - 2.960 Kms I.L. : -- - D.L. : -- -

7) Surface of the road : C.C. : -- 0.800 Kms B.T. : 2.160 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted - -
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 2.960 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane - Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra forAmalapuram Division

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Lolla - Utchili Road from K.M.0.000 to 5.200

4) Classification : D.O.R.

5) Length of the road : 5.200 Kms.

6) Road width : S.L. : - 5.200 Kms I.L. : -- - D.L. : -- -

7) Surface of the road : C.C. : -- 0.8825 KM B.T. : 4.3175 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
for last two years) KM 2.890 to 5.200 2.890 Kms

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 5.200 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane - Rs. 15,000 /-

B) WBM / Gravel / Other Roads --- Rs. 6,000 /-

TOTAL

Total Amount including 50% extra forAmalapuram Division

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Ryali - Ankampalem Road from K.M. 0.000 to 6.510

4) Classification : D.O.R.

5) Length of the road : 6.510 kms.

6) Road width : S.L. : - 4.300 Kms I.L. : -- - D.L. : -- -

7) Surface of the road : C.C. : -- B.T. : 6.510 Kms. WBM : --- 2.85 Kms

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted KM 0.000 to 6.510 6.510 Kms.
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 6.510 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane - Rs. 15,000 /-

B) WBM / Gravel / Other Roads - Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Amalapuram Division

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Kothapeta - Ethakota Road from K.M. 0.000 to 6.810

4) Classification : D.O.R.

5) Length of the road : 6.810 kms.

6) Road width : S.L. : - I.L. : -- 6.810 Kms D.L. : -- -

7) Surface of the road : C.C. : -- B.T. : 6.810 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane/Intermediate lane 6.810 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane 0.000 Kms. Rs. 15,000 /-

B) WBM / Gravel / Other Roads - Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Amalapuram Division

10) Any other Remarks :


Checkslip accompanying the detailed estimate for Road Maintenance works
for the year 2014-2015

Name of work : Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari District.

1) Sub-Division : (R&B) Sub Division, Kothapeta

2) Section : (R&B) Section, Ravulapalem

3) Name of the Road : Janakamma Ravi to Ravulapalem Road (via) Kapula kalyana Mandapam &
Adilaxmi puntha from K.M.0.000 to 6.500

4) Classification : D.O.R.

5) Length of the road : 6.500 kms.

6) Road width : S.L. : - I.L. : -- 6.500 Kms D.L. : -- -

7) Surface of the road : C.C. : -- B.T. : 6.500 Kms. WBM : ---

8) Recent improvements takenup


Stretch Length
(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted KM 0.000 to 2.635 2.635 Kms.
for last two years)

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

Length KM war
in Kms. rate per KM

A) B.T. Road
a) Single Lane 6.500 Kms. Rs. 12,000 /-

b) Double Lane / Other Multi lane - Rs. 15,000 /-

B) WBM / Gravel / Other Roads - Rs. 6,000 /-

TOTAL

Total Amount including 50% extra for Amalapuram Division

10) Any other Remarks :


ABSTRACT
Strangthaning of Gajjaram - Hukumpeta road from Km 0.000 to 7.600 in East Godavari
Name of work : District.

Eligibility amount as
Sl. Name of the road Classifi- per G.O. (including 50%
No. cation Addl. Grant)

1 Rajavaram - Podalada Road from K.M. 0.000 to MDR Rs.144,000 /-


36.000

2 Ubalanka - Ryali road from K.M. 0.000 to 3.400 MDR Rs.219,600 /-

3 Loop road on A.B. Road to connect NH 5 Junction at MDR Rs.72,000 /-


Ravulapalem from K.M. 0.000 to 0.595

4 Ganti - Gopalapuram road from K.M. 0.000 to 4.725 D.O.R. Rs.85,050 /-

5 Vedireswaram - Devarapalli Road from K.M. 0.000 D.O.R. Rs.53,280 /-


to 2.960

6 Lolla - Utchili Road from K.M.0.000 to 5.200 D.O.R. Rs.93,600 /-

7 Ryali - Ankampalem Road from K.M. 0.000 to 6.510 D.O.R. Rs.117,180 /-

8 Kothapeta - Ethakota Road from K.M. 0.000 to 6.810 D.O.R. Rs.122,580 /-

9 Janakamma Ravi to Ravulapalem Road (via) Kapula D.O.R. Rs.117,000 /-


kalyana Mandapam & Adilaxmi puntha from
K.M.0.000 to 6.500

-------------------------------
TOTAL Rs.10,24,290 /-
Restricted to Or Say Rs 13,00,000 /-
-------------------------------

Assistant Engineer(R&B), Deputy Executive Engineer(R&B),


Ravulapalem Kothapeta

Executive Engineer(R&B),
Amalapuram
orks

st Godavari District.

UM: -

During the year

Amount
required

Rs. 56,700 /-

Rs. 0 /-

---

Rs. 56,700 /-

Rs.85,050 /-
orks

st Godavari District.

UM:

During the year

Amount
required

Rs.35,520 /-

---

Rs.35,520 /-

Rs.53,280 /-
orks

st Godavari District.

200

UM:

During the year

2012-13

Amount
required

Rs.62,400 /-

---

Rs.62,400 /-

Rs.93,600 /-
orks

st Godavari District.

o 6.510

UM:

During the year

2013-14 (RDF)

Amount
required

Rs.78,120 /-

Rs.78,120 /-

Rs.117,180 /-
orks

st Godavari District.

o 6.810

UM:

During the year

Amount
required

Rs.81,720 /-

Rs.0 /-

Rs.81,720 /-

Rs.122,580 /-
orks

st Godavari District.

yana Mandapam &


00

UM:

During the year

2013-14

Amount
required

Rs.78,000 /-

Rs.78,000 /-

Rs.117,000 /-
600 in East Godavari

Restricted to
75% amount

--------------------
-

--------------------

You might also like