You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


MACTAN CEBU INTERNATIONAL AIRPORT
LAPU-LAPU CITY

RECOMMENDING APPROVAL:

·
·
ARCHITECTURAL SECTION DATE
·

APPROVED:

·
BUILDING OFFICIAL DATE
·

1 2 3
CHILLED WATER PACU (UP-BLAST) CONTROL DIAGRAM CHILLED WATER FAN COIL UNIT CONTROL DIAGRAM KITCHEN VENTILATION CONTROL DIAGRAM

4 5 6
FRESH AIR FAN UNIT CONTROL DIAGRAM TYPICAL EXHAUST FAN CONTROL DIAGRAM AIR HANDLING UNIT CONTROL DIAGRAM

1 19OCT18 100% DESIGN DEVELOPMENT MCT

0 21SEP18 100% DESIGN DEVELOPMENT MCT

SCALE @ A0
PROJECT ARCHITECT: DESIGN CONSULTANT: DESIGN SUB-CONSULTANT: DESIGN PHASE: NAME & SIGNATURE OF ENGINEER PROJECT: GRANTORS: CONCESSIONAIRE: CONTRACTOR: DRAWING TITLE:
DESIGN DEVELOPMENT MECHANICAL SERVICES
Drawn by: Date: 19OCT18
OSCAR V. RELUCIO Department of Transportation
AME
Meinhardt Philippines, Inc. MACTAN - CEBU INTERNATIONAL AIRPORT Mactan Cebu International Airport Authority CONTROL DIAGRAM
BUDJI ROYAL 25th Floor Chatham House 116 Valero cor. Checked by: MCT Date: 19OCT18 P.R.C. NO. 2886 P.T.R. NO. 6619159 SEAL TERMINAL 1- REFURBISHMENT
V.A. Rufino St. Salcedo Village, Makati City Republic of the Philipplines DWG NO: REV:
G/F W TOWER, 1117 39th STREET BONIFACIO TRIANGLE, BONIFACIO GLOBAL CITY, TAGUIG 1634 PHILIPPINES Tels. (632) 887-1391 E-mail mpi@meinhardt.com.ph M3-03
TEL: (632) 403 55 02 / 403 55 03 / 403 55 04
E-MAIL: budjilayug@budjiroyal.com / royalpineda@budjiroyal.com
Fax (632) 887-1172 Authorized by: Date: 19OCT18 DATE: 31OCT18 DATE: 05JAN18 T.I.N. 112-191-886

You might also like