You are on page 1of 18

1 2 3 4 5 6 7 8 9

3a
9400 6000 6000 6000 6000 6000 6000 12216
3350 2650

A
FENCE

26167

FUTURE
EXPANSION
B

FENCE FENCE

23400

C
STP
EMPLOYEE'S CABLE
PULLING
6000
PARKING ROOM

D
14500 2500 EE

E ROOM

EQUIPMENT
6000
BUILDING
UP
F

VICINITY MAP 9590


MOBILE
GENSET MOBILE
GENSET

UP

G GENSET
AND

GENSET
GENSET

MOBILE
MOBILE
GUARD STAFF
11000
HOUSE HOUSE
PUMP
ROOM

H
6420

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE VICINITY MAP & SITE DEVELOPMENT CE-01
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE PLAN
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
1 2 3 4 5 6 7 8 9
3a
92300 6101 3350 2650 5905 6094 6000 6075 12140

A
FENCE

26355

FENCE

PROP. NEW GENSET ROOM


23319
UNDER TNT PH2
FENCE 13750

4100 5050 4100

4150

2000

8800 ROOFDECK

5200

4150

1500

C
3000
FS FLOOR SLOT
ACCU 10 & 2 1890 PROP. PACU 1 PROP. PACU 2
FLOOR

995
ECB
ACCU

186 180
110 10TR (WORKING) 10TR (STANDBY)

SLOT

500
342

ECB
180

600
455
BATTERY BANK BATTERY BANK BATTERY BANK
DPC RECTIFIER SYSTEM 2

1200

1200

1200
110 1740 1090 200 1090

OPEN

DCPDB
305

362
BATTERY &

219
914 914

RECTI
180 600 600 600 600

600

ECB
180

DEHUMIDIFIER
NO LABEL
ACCU 5 &
110

500
TO BELOW

PANEL
505
1100

120

DCPDB DCPDB
FCU 5TR

762

762
1000 1000 1000 1000 1000 (WORKING)
0205

730
CONTROL ROOM
1890
0105

600
210

ECB
180

355
ECB

600
200
DPC RECTIFIER SYSTEM 1

110
110

762

762
0104 0204

357
BATTERY ROOM
210
COLD AISLE
875 600 600 600 600

600
ACCU 6 & 7
BATTERY

ECB
STP

180

(WORKING)
ECB

355
(STANDBY)
FCU 5TR

DCPDB
6175

FCU 5TR

FCU 5TR

315
UPS (STANDBY)

1100
110 RECTIFIER PANEL

LOADING

362
100
6000

ECB RECTIFIER

762

762
ROOM 0103

ECB
225 180
0203

ROOM

600
DOCK
110
DPC RECTIFIER DPC RECTIFIER

195
1000
1000A EXP. 2000A1000A EXP. 2000A

ECB
180
110
1000
110 SYSTEM A SYSTEM B
HOT AISLE

ECB JUPITER

339

762

762
ACCU 8 & 9
0102 0202
FCU 5TR
HOT AISLE

600
SMOCK
(STANDBY)

ECB
1100

180 186 180


110
RECTIFIER

150

150
1804

ECB
ROOM ROOM

483

483
110 PROPOSED PROPOSED 0101 0201
500AH 500AH

419

600
460
BATTERY BATTERY 300 169 300

150

150
BANK BANK

600 600

ECB MAIN

600

600
UPS UPS

600

695
D

1000
218
210

PROPOSED
10TR
ACCU-1 & 2

2420 CORRIDOR

950
EE

E
3000
ROOM 1000

STAIRS PROP.
FE
FS

STORAGE
JUPITER
2500
ROOM 995
600 600

400
PDU PDU

PROP PACU 1 10TR


PROP PACU 1 10TR
FEED A FEED B

(DOWNBLAST)
(DOWNBLAST)
170

TTC

1130
1130
600
CO-LOCATION
6175

1400
PROP.

OFFICE SD

995

995

ELECTRICAL

PROP PACU 1 10TR


PROP PACU 1 10TR

(DOWNBLAST)
(DOWNBLAST)

1200
EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE
EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT

ROOM

1130
1130
600 600 600 600 600 600 600 600 600 600

RISER DOWN TO
995 GROUND FLR

1200
F
115
365 175 415 570 355 365
160

FM200 ECB
140

210

135

4900

5710

MOBILE
9590 1900
GENSET MOBILE
1710
GENSET

6200

UP
2390
9000

G GENSET
4029

9410 AND
GUARD 7020

HOUSE
STAFF
11000 11000

HOUSE
1560 8810
14230
PUMP
EXISTING 3-167 KVA ROOM
TRANSFORMER
H
6420

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE PROPOSED SITE DEVELOPMENT PLAN CE-02
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6 7 8

11368

5106 6262

D1

E 1000

PROP.
FE
FS
CEILING HEIGHT = 3.8M
F.F.L TO CABLE LADDER = 2.6M

600 600

995

400
PDU PDU

PROP PACU 1 10TR


PROP PACU 1 10TR
FEED A FEED B

(DOWNBLAST)
(DOWNBLAST)

1130
1130

1400
PROP.
6136 SD

995

995

PROP PACU 1 10TR


PROP PACU 1 10TR

(DOWNBLAST)
(DOWNBLAST)

1200

1200
EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE EDGE
EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT

1130
1130

600 600 600 600 600 600 600 600 600 600

995

1200
F

PROPOSED EQUIPMENT ROOM


SCALE: 1:115MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE GENERAL NOTES, VICINITY MAP & SITE CE-03
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE DEVELOPMENT PLAN
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
GENERAL NOTES: PARTITION
PARTITIONS EXTENDING TO THE STRUCTURE ABOVE SHALL BE
TIGHTLY SEALED. THE INTEGRITY OF RATED ASSEMBLIES AND
SMOKE BARRIERS SHALL BE MAINTAINED AT CORNERS AND
INTERSECTIONS OF LOWER PRIORITY PARTITIONS. ALL
HORIZONTAL AND VERTICAL FIRE AND/OR SMOKE BARRIERS,
INCLUDING ALL FLOOR STRUCTURES, SHALL BE CONTINUOUS
FROM OUTSIDE WALL TO OUTSIDE WALL, FROM ONE BARRIER
TO ANOTHER, OR COMBINATION THEREOF. BARRIERS MUST 80
BE CONTINUOUS THROUGH CONCEALED SPACES AND
FICEM BOARD 0
INTERSTITIAL SPACES. SEAL COMPLETELY ALL OPENINGS WITH 80
0
UL (OR OTHER TESTING AGENCY) APPROVED ASSEMBLIES
WHERE FIRE BARRIERS ARE PENETRATED OR ABUT OTHER FIRE 80
0
BARRIERS, EXTERIOR WALLS, AND FLOORS ABOVE AND BELOW
BARRIER. ALL FIRE BARRIERS ARE TO BE CONSTRUCTED
ACCORDING TO THE TESTING LABORATORY SPECIFICATIONS.
FICEM BOARD
ALL SMOKE BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE

400
FICEM BOARD
RESISTANT CONSTRUCTION. CORRIDOR PARTITIONS, SMOKE
STOP PARTITIONS, HORIZONTAL EXIT PARTITIONS, EXIT
ENCLOSURES, AND ALL FIRE RATED WALLS SHALL BE
PERMANENTLY IDENTIFIED WITH STENCILING. SUCH

400
IDENTIFICATION SHALL BE ABOVE ANY DECORATIVE CEILING
AND IN CONCEALED SPACES. STENCILING TO BE IN RED

VARIES
LETTERS, NO LESS THAN 4" TALL WITH A RED BAND EXTENDING
THE LENGTH OF THE PARTITION. STENCILED IDENTIFICATION

400
TO READ "(X) HOUR RATED FIRE AND/OR SMOKE BARRIER,
PROTECT ALL OPENINGS". STENCILED IDENTIFICATION TO BE
POSITIONED TO BE READILY VISIBLE FROM BOTH SIDES OF THE
BARRIER AND SUCH THAT FROM ANY ACCESS POINT AT LEAST

400
ONE IDENTIFICATION MARKER MAY BE READ.

NOTES:
1
2" FICEM DOUBLE WALL ON GA 22 35mmx76mmx.80mm METAL
STUDS SPACED AT .40M ON CENTER VERTICAL AND .80m ON
CENTER HORIZONTAL.

PROP. DOUBLE WALL PARTITION


SCALE: 1:80MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE PARTITION WALL DETAILS CE-04
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
FASTENER
B
DOOR FRAME
1000

100 x 50 x 3m TABULAR

DETAIL B

2300
2100
E ENT FFL

SECTION- AA'
ES NAT N: ELEVATION
ESC T N:S N
T S L E ATE STEEL
S ANEL NE C NS LAT N C

N S S N LE A ET A A

C NA ENT ANCE E E LE E L C SECTION BB'

N N TS:
DOOR HANDLE
PROPOSED DOORS FOR EQUIPMENT ROOM 60MM THICK PLAIN METAL SHEET
100 x 50 x 3m HORIZONTAL TUBULAR
SCALE: NTS 100 x 50 x 3m VERTICAL TUBULAR
4" x 4.5"
ISOMETRIC VIEW OF DOOR
HINGE DOOR SPECS:
- LEC STEEL
DETAIL C - 1 1/2 HR FIRE RATED

PLDT SOUTH MARIKINA

DETAIL A
DOOR DETAILS
SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE DOOR DETAILS (NEW EQUIPMENT CE
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE ROOM)
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
2 3 4 5 6 7 8
3a
3350
6000 6000 6000 6000 6000 6000

C
6000

D 14500 2500

E STAIRS PROP. ACU


PROP. ELPP
PANEL
10400

654
PANEL

1273

1273
PROP. ACCU 1 PROP. ACCU 2

Prop. 20AT, Prop. 20AT,


3PCB NEMA 4X 3PCB NEMA 4X
Enclosure Enclosure

1884 1884 1000

6000

6000
SD

1800

1273

1273
PROP. ACCU 3 PROP. ACCU 4

Prop. 20AT, Prop. 20AT,


3PCB NEMA 4X 3PCB NEMA 4X
Enclosure Enclosure

F
3938 1884 1884 1000

800
PROPOSED SITE DEVELOPMENT PLAN (ROOF DECK)
SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE PROPOSED SITE DEVELOPMENT PLAN CE-06
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE (ROOF DECK)
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6' 8'
7'
5200 5200
10400
L1 L1
E'
PROP. ELPP
PANEL PROP. ACU 1 PROP. ACU 2

654
PANEL PANEL

1273

1273
PROP. ACCU 1 PROP. ACCU 2

Prop. 20AT, Prop. 20AT,


3PCB NEMA 4X 3PCB NEMA 4X
Enclosure Enclosure

1884 1884 1000

6000
1800

D1 SD

1273

1273
PROP. ACCU 3 PROP. ACCU 4

Prop. 20AT, Prop. 20AT,


3PCB NEMA 4X 3PCB NEMA 4X
Enclosure Enclosure

3938 1884 1884 1000

800
L2 L2

F'

FLOOR PLAN (NEW ACCU ROOM)


SCALE 1:70MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE FLOOR PLAN (NEW ACCU ROOM) CE-07
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
2
CE-02
CONTRACTOR'S SCOPE OF WORK

LOCATION FINISHES COLOR REMARKS BRAND

EPOXY PAINT SUBMIT COLOR SWATCH


FLOOR @ ACCU ROOM PLDT BLUE BOYSEN, DUTCH BOY OR APPROVED EQUAL
FOR APPROVAL
PLAIN CEMENT PLASTERED PAINTED FINISH
WALLS OFF WHITE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL
ALL CONC, PLASTER MIXED W/ SAHARA INTEGRAL WATERPROOFING
CEILING PLAIN CEMENT PLASTERED PAINTED FINISH OFF WHITE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL

PLDT DAET ROOF SLAB HYDROFLEX BITUMEN MEMBRANE BLACK SUBMIT SAMPLE FOR APPROVAL BOYSEN, DUTCH BOY OR APPROVED EQUAL

ISOMETRIC VIEW
SCALE: NTS
SCHEDULE OF FINISHES
SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE ISOMETRIC VIEW, CONTRACTOR'S CE-08
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE SCOPE OF WORK, SCHEDULE OF
CORPORATION
FINISHES, DESIGN NOTES
SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6' 7 8' 8' 7 6'

5200 5200 5200 5200


1050

900 900

506 2700 506 2700 300 506 2700 2700


550

4000 2000 2000 4000 2400 2400

900 900 700 700

350 350
FRONT ELEVATION REAR ELEVATION
SCALE 1:70MTS
SCALE 1:70MTS

E' F' F' E'


6000 6000

900 900

1800

4000 4000

2400

350 350
LEFT SIDE ELEVATION RIGHT SIDE ELEVATION
SCALE 1:70MTS SCALE 1:70MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE ELEVATION DETAIL CE-09
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6' 7' 8'

10400
5200 5200
E'

ROOF LINE

6000
1800

F'

ROOF PLAN (NEW ACCU ROOM)


SCALE 1:70MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE ROOF PLAN (NEW ACCU ROOM) CE-10
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6' 7' 8'

E'

400
RB-1 RB-1

RB-2
S-1 S-2

RB-2
RB-2 150mm THK. 150mm THK.

RB-1 RB-1
F'

ROOF FRAMING PLAN (NEW ACCU ROOM)


SCALE 1:70MTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE ROOF FRAMING PLAN (NEW ACCU CE-11
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE ROOM)
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
900
4.5 kg/sqm. BITUMEN WATER
PROOFING MEMBRANE

T.O.S +4.8m
125
SLAB REINFORCEMENT(SEE PLAN)
RB-1 (SEE SCHEDULE)

COLUMN LINE

150mm CMW

SECTION DETAIL
SCALE NTS
TOP STEEL AT MID SPAN TOP STEEL CURTAILED BARS TOP STEEL AT MID SPAN

L1/3 L1/3 L2/3


L2/3 L3/3

TOP STEEL AT SUPPORT TOP STEEL AT SUPPORT


CONTINUOUS REINFORCEMENT
CONTINUOUS REINFORCEMENT

STIRRUPS STIRRUPS STIRRUPS

137449(TYP.)

T25 MMØ BOTTOM STEEL BOTTOM STEEL


SPACERS@1MC/C CONTINUOUS REINFORCEMENT CONTINUOUS REINFORCEMENT
0.17 L2
0.17 L2

(TYPICAL)
400MM

BOTTOM STEEL CURTAILED BARS BOTTOM STEEL CURTAILED BARS


IF ANY IF ANY

SPAN L1 SPAN L2

TYPICAL BEAM DETAIL


SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE TYPICAL BEAM DETAIL, SCHEDULE, AND CE-12
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE SECTION
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
TYPICAL DETAIL OF C1
SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE TYPICAL COLUMN DETAIL CE-13
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
BEAM

CANTILEVER TOP LONGITUDINAL


REINFORCEMENT BARS
'U SHAPED-HAIRPIN'
CONTINOUS BARS TOP BEAM
REINFORCEMENT
EXTRA BOTTOM BARS

TOP BARS

BEAM

BEAM
500

CANTILEVER LENGTH
SIDE TORSION
PARAPET WALL REINFORCEMENT BARS SUPPORTING BEAM

BEAM
BOTTOM BEAM

PLAN
T CAL CANT LE E SLA ETA LS
TOP BARS EXTRA BOTTOM BARS NTS
SCALE
(t)

CONTINOUS BARS
BEAM L/5 L/5
BEAM
L/4 L/4

CROSS-SECTION

TWO-WAY

TYPICAL DETAIL OF RC SLAB


SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE TYPICAL SLAB DETAIL CE
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
PROPOSED COLUMN REBAR

COLUMN

MAIN R/F AS/DETAILS


EXISTING BLDG. SLAB

COLUMN TIES
AS/DETAILS

500

300 300 MAIN BARS AS/DETAILS

EXISTING COLUMN

TYP. PLANTED COLUMN DETAILS

COLUMN TO COLUMN CONNECTION DETAILS

EXISTING BLDG TO PROPOSED BLDG CONNECTION DETAIL


SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE EXISTING BLDG TO PROPOSED BLDG CE-15
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE CONNECTION DETAIL
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
B B

BILL OF MATERIALS
MAN LADDER

75
EMBEDMENT

600

A A

1200.4800

350

ISOMETRIC VIEW (MAN LADDER) ELEVATION


SCALE: NTS SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE MAN LADDER DETAIL CE-16
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
1800 1800

2400 2400

1200mm 1200mm

EXTERIOR INTERIOR
400mm 300

D-1 ACCU ROOM EXPANDED


METAL GAUGE14

DESIGNATION:DOOR 1 CABLE LADDER CABLE LADDER


DESCRIPTION: FRAME: STAINLESS STEEL FINISH FRONT VIEW DETAILS SECTION VIEW DETAILS
REQ: 1 SCALE: NTS SCALE: NTS
CABLE TRAY
90 DEGREE ELBOW DETAILS
SCALE: NTS
SCHEDULE OF DOOR
SCALE: NTS UNISTRUT CHANNEL
45mm x 45mm x 6.00m PROVIDE APPROPRIATE LOCK/COUPLING IN
2mm THICKNESS ORDER TO SEAL FOR EVERY CONNECTION

2700 00
R=10

2700 12 25
30
0
40 16 16
0 20 30
THREADED ROD 16mm DIA.
MAX 3m LENGTH @ 1.20M O.C.
30
30 100 Foam Nuts
305.42 16 UNIT: mm EXPANDED
METAL GAUGE14

2000 139.7 L Bracket

2400

FOAM NUTS
FOAM NUTS
LONG

25 33 400

200

SCHELLE CLAMP 40
UNIT: mm
ROHR TUBE
25 Splice Assembly
FOAM NUTS
S03 Clamps for tubes Note: Install Splice Assembly
for all (3) chamber sections
CABLE TRAY

3 CHAMBER
CABLE LADDER CABLE LADDER ISOMETRIC VIEW DETAILS
SCALE: NTS

TYPE: FIXED CONCRETE ORDINARY LOUVER WINDOW TYPE: FIXED CONCRETE ORDINARY LOUVER WINDOW ISOMETRIC VIEW DETAILS MISCELLANEOUS DETAILS
SCALE: NTS SCALE: NTS
NO OF UNITS: 2 NO OF UNITS: 2

SCHEDULE OF LOUVER (L2) SCHEDULE OF LOUVER (L1)


SCALE: NTS SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE LOUVER DOOR AND WINDOW DETAIL CE-17
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE AND CABLE LADDER AND CABLE TRAY
CORPORATION
DETAIL
SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .
6' 7 8'
10400

DD DD DD
E'

2%
SL E PE 2% SLOPE
OP L OP SL
O

125
E S
2% 2%

0.125M. THICK CONCRETE ROOF WITH

6000
1800

HYDROFLEX BITUMEN MEMBRANE


WATERPROOFING

2% 2%
PE SL SL
LO O OP
2%
S PE
E DOWNSPOUT DETAILS
SCALE NTS

F' 0.10
DD DD DD
16MM HANDHOLE
HANDLE

0.40 M
0.10
0.40
L=0.60M
W=0.60M

DRAINAGE LINE & CATCH BASIN


CATCH BASIN DETAIL (CB)
SCALE: NTS SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: EDGE PROJECT DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROFESSIONAL CIVIL ENGINEER CHECKED BY: JEHAN_ENGINEER_N_CHARGE DRAINAGE LINE AND CATCH BASIN CE-18
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY: JEHAN_ENGINEER_N_CHARGE DETAILS
CORPORATION

SITE ADDRESS: CAMARINES NORTE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-18
122º 58' 50.88" PLDT SF ENGINEERING
LONGITUDE: LATITUDE: 14º 8' 24.036" PLACE ISSUE: DATE APPROVED: .