You are on page 1of 6
HEUT IAL he INDREL HUN REPU | IEQPT. DESCRIPTION : BRA CKiS4) TANK R SCoG |DATE OF PURCHASE : 2508 ‘SSETCODE t)Be003 4 [HRS/KMS RUN (TOTAL): 323121 IEGPT.SCNOTREGNO: 2535 AK [PRESENT LOCATION = nim lot) TAKING Yael IRECD. FROM/DESP TO: [Suike of wichover pot appScabie) MACHINE UNDER: RECEIPT [DESPATCH IDATE OF INSPECTION : 01/02/2022 * AOT RONAING" PRESENT CONDITION a DESCRIPTION CONDITION REMARKS: INO. STR [US 1 PRIME MOVER, TTENGINE: (For (A), give details In rom (@) [GENERAL Col ENGINE OVERHEATING [ENGINE OIL PRESSURE NOE JENGINE BLOW - BY EXHAUST SMOKE INOISE panes IENGINE O1L CONSUMPTION ‘column oni [BATTERY “ischasged ISTARTER MOTOR. DYNAMO / ALTERNATOR. f (@_JAIR INTAKE SYSTEM [AIR CLEANER (S) /ACCUUM INDICATOR. IRBO CHARGER. t Leakage (D) JFUEL INJECTION SYSTEM. [FUEL FILTER (S) iP & GOVERNOR ECTORS. AOE SK EL LINES & HOSES OOLING SYSTEM f IR BLOWER [RADIATOR Hot Ava;CanIS IWATER PUMP. lot Avattabte [CORROSION RESISTOR, al IWATER LINES & HOSES AoE AVaILGRS (F)_[LUB. OL SYSTEM LUB OIL FILTER (S) [LUB. OIL COOLER, | ILUB. OIL LINES & HOSES: (G_[ENGINE MOUNTINGS |" ton NOE AVARARS. Fea tI SL CONDITION No. DESCRIPTION Ae REMARKS: 2 [ELECTRICAL MOTORS : (Specify motors & give condition considering the bearing condition, winding, operating temperature and noise etc.) | TRANSMISSION (POWER TRAIN) IN CLUTCH IPOWR TAKE OFF [MAIN GEAR BOX. )RQUE CONVERTER ASSY_ [TRANSMISSION (Give condition considering noise, il pressure etc. FRANSMISSION PUMP. INSMISSION OlL COOLER, ROPELLER SHAFT ASSY. E ISM E DRIVE, [BELT DRIVE [DRIVE COUPLING. HAIN DRIVE REDUCTI Ill. STEERING STEERING CLUTCH ELECTRO CLI (For TELCO crawler cranes: STEERING BRAKE EERING LINKAGES. EERING GEAR BOX [STEERING PUMP. ISTEERING CYLINDERS: [ORBITOL VALVE WV. FINAL DRIVE [DIFFERENTIAL IREAR AXLE. PLANETARY REDUCTION PROPELLER MECHANISM (For crawler cranes) PROPELLER DRIVE CHAIN SPROCKETS. LEGEND: $- SERVICEABLE R-REPAIRABLE U/S - UNSERVICEABLE \V. UNDER CARRIAGE / WHEELS: [TRAVEL MOTORS: [TRACK SHOES [TRACK LINKS. [TRACK CARRIER ROLLERS: IDLER RACK TENSIONER EQUALISER [TYRES VI. OPERATING SYSTEMS ECHANICAL SYSTEMS : (For Cranes) HOIST MECHANISM BOOM MECHANISM, ING MECHANISM. ELEBOOM MECHANISM, POWER LOWERING MECHANISM. ICAM CLUTCH / SPRAG CLUTCH. [PAWL & RATCHET LOCK WUXILIARY HOIST MECHANISM, vi SYSTEM: HYDRAULIC PUMPS. [HYDRAULIC MOTORS HYDRAULIC CYLINDERS (- WALVES & VALVE BLOCKS: /_|HYD. COOLER. IHYD. FILTER’ IROTARY COLUMN | |HYD. HOSES & JOINTS: PNEUMATIC SYSTEM: [AIR COMPRESSOR. IHP CASE (For Air compressor ILP CASE (For Air com IUNLOADER VALVE ISAFETY VALVE [CONTROL VALVES, CELERATOR CONTROL VALVE (For Air compressor) [PNEUMATIC CYLINDERS. ROTARY COLUMN HOSES & CONNECTIONS: LEGEND: 8-SERVICEABLE R-REPAIRABLE U/S - UNSERVICEABLE (D) |ELECTRICAL SYSTE! < (LTERNATOR. [COLLECTOR COLUMN ELECTRICAL WIRING IELECTRICAL CONTROLS. PROPEL J WHEEL BRAKE IHOIST BRAKE ASSY. IBOOM BRAKE ASSY. [SWING BRAKE Vil, STRUCTURE FOR CONSTRUCTION EQUIPMENT & VEHICI IBLADES: [BUCKETS TURRET [CHASSIS [SUSPENSION , [CABIN HOOK ROLLERS, IVE ROLLERS BOOM ISTICK. OTHERS (SPECIFY, IFA I CONCREN MEN MIXER DRUM (Blades / Liners) ISKIP ASSEMBLY. SCRAPER. [CONVEYORS / ELEVATORS: METERING CONVEYOR WEIGHING SYSTEMS. [SINS / HOPPERS / BULK HEAD LOS. IDRYERS, BURNERS IBLOWERS: ISCREEN DECKS: REED ASSY. (For Paver) IGERS (For Paver) [OTHERS (SPECIFY, IF ANY) BOOM SECTIONS ICOUNTER WEIGHT IREVOLVING FRAME, IHOOK ROLLERS. ILIVE ROLLERS [SWING PINION. [OUT RIGGERS )PEN GEARS. IGANTRY PULLEYS: ROPES, INTER NSION IRE ROPES [OTHERS (SPECIFY, IF AN) ‘LEGEND: S- SERVICEABLE —R-REPAIRABLE US - UNSERVICEABLE IX. CONTROLS, METERS AND GAUGES: [CONTROL PANELS = Nor Weseog S (Specify details) = == (Specify details) [LIMIT SWITCHES (E) [SAFETY DEVICES: ((F) JOTHERS (SPECIFY, IF ANY) GENERAL REMARKS -> Barteay discharged Tua bocharge Leakage Radiat |waxea Pumpl foal hoses not Ava;Leble b> Gane box Not Available tata chassis fully Rusted [Teqkes Fanee Patione damaged DOCUMENTATION s eleeciical AVAILABLE UPDATION WO YES To] TIREBOOK 2|LOG BOOK 3|HISTORY CARD. YES ‘Available in SAP_ CLASSIFICATION OF EQUIPMENT (Tick appropriate remarks) [A- in good mechanical condition; Can be deployed for work / sent to other site for use. | |B- Needs minor repairs before deployment or despatch to other site Needs major repairs / overhaul; To be sent to base workshop |D- Beyond economical repairs; To be disposed off. Bremer? 7 Heb beBSng Pera Mite) to be. g of site P&M inchs | Workshop Inchar ated ignature | icharge / Wor Pe ge Jearailetoass PF SePreL[4o YR ader hea Achy 7 Not AvAiL able 7 Note: head Ught Not fei; Late 1) Please fill in all relevant columns: 7 Botr Side Ue 0 6, 2) Do not Fill condition’ column to indicate performance parameters => Boate Pht. Gadtston t be chatted 3) Fil ‘condition’ column to indicate condition of components and use ‘remarks’ column to provide additional roe AcQ@ VALVE > 34/300 Ome CoSt SPENT 5 29,069 Ome een ee ee ee ee oa of 3 ie ov, Hie

You might also like