FORMAT No.

:
HOT INSULATION INSPECTION REPORT PLL/M/RF-25
Project: OHCU / HGU, IOCLHaldia Rev.0

LINE / EQUIPMENT NO: Report No.:


DESIGN TEMPERATURE: Date:
TYPE OF INSULATION/ THICKNESS:

OBSERVATIONS:

S. NO. ACTIVITY DESCRIPTION OBSERVATION PLL LI


1 CLEANING

2 WRAPPING OF AL. FOIL (IF APPLICABLE)

3 FIXING OF SPACER RING, WHEREEVER REQUIRED

4 FIXING OF INSULATION MATERIAL

5 THICKNESS OF INSULATION

6 SECUREMENT OF INSULATION

APPLICATION OF MOISTURE BARRIER, WHERE


7 REQUIRED

8 INSTALLATION OF AL. JACKET

A SECUREMENT OF AL. JACKET

REMARKS OF LI (IF ANY)

PERFORMED BY (PLL) CHECKED BY (PLL) REVIEWED BY (LI / IOCL)

SIGN : SIGN : SIGN :

NAME : NAME : NAME :

DATE : DATE : DATE :