You are on page 1of 1

INSPECTION TEST PLAN FOR

WRAPPING AND
COATING
Project : HGU, IOCL ,HALDIA REFINERY DOC. NO : PLL/IOCL/EPC/
Client : Indian Oil Corporation Limited PEIN 05/JP/M-08/ITP-08
Consultant : Lurgi India Company Pvt.Limited REV. 0
Contractor: Punj Lloyd Limited

SL. VERIFICATION /
INSPECTION ACTIVITY
NO. INSPECTION BY
PLL LI / IOCL
A MATERIAL

1 Inspection of Wrapping /Coating Tapes W Rw

2 Inspection of Primer W Rw

B STAGE INSPECTION

1 Cleaning of Pipe Surface and surface preparation W S

2 Application of W/C Primer W S

3 Wrapping and Coating W S

4 Calibration of Holiday Tester W Rw

5 Holiday Testing W Rw

6 Inner wrap applicaton check W S

7 Outer wrap applicaton check W S

8 Adhesion Test ( As per manufacture's recommended) W W

9 Lifting Arrangements W S

LEGENDS : S = SURVLILANCE HP = HOLD POINTS W = WITNESS


Rw = REVIEW WC=100% EXAMINATION BY PLL

PREPARED & CHECKED BY PLL APPROVED BY LI / IOCL

Sign. : Sign. :

Name : Name :

Date : Date :