You are on page 1of 2

INSPECTION AND TEST PLAN FOR

GROUTING OF EQUIPMENTS / STRUCTURES

Examination Inspection by
Sl. No. Activity Recording Format
by PLL LI

I PAINTING

1 Supplier material test certificate WC Rw

2 Confirm Completion of

a. Hydro testing of pipe WC Rw

b.Mechanical clearance of structure and


equpments
WC Rw

3 Performance test of paint and applicator WC W

4 Check surface preparation WC S

5 DFT after each coat WC S

6 Inspect painting film thickness WC W

Visual Inspection of painting surface & it's repair for


7
equipment and piping
WC W

8 Identification , colour bands , direction marking WC S

9 Acceptance WC HP

INSPECTION & TEST DOCUMENTS WC Rw

Review Test and Inspection Documents HP Rw

Legend : HP : Hold Point , W : Witness Point , Rw : Review of PLL's Documentation ,


S : surveillance Inspection by IOCL / LI , WC : 100 % Examination by PLL

PL
0 17.05.2004 Issued for Lurgi Comments
Rev no. Date Revision Description Prepared by Checked by Approved by