Issue Date: W: WITNESS POINTS Drawing #: R: REVIEWS Issued by#: S: SURVELLANCE Approved By #: Reference Sub Cont APL site APL QA/QC S.No Activity/ Description Inspection / Test Requirements characteristic Documents superviso comments/sign Engg. ENGG. r a) Check the correctness of the specified materials used and fit up the pipe-approved drawings Raw material Fit up clearance As mentioned in the 1 verification during fit b) Fit up checked bevel end free from H W R/S drawing up c) contamination
a) Check the WPS and PQR
Check the proper electrodes and welding consumables are using or not As per the project b) Check the pre-heating temp if applicable qaulity team provied 2 Welding Welding in process, after root completion QCP need to follow / H W R/S c) proper cleaning, inter pass weld cleaning. subcon.WPS need to follow
a) Pre-fabricated spool verification
b) Verification of erected piping system for its completeness and mechanical clearance 3 Piping Erection As per the drawings H W R/S Field weld visual inspection c) a) Verification of weld neck flanges or slip on flanges to be installed and welded b) Required piping system to be checked once includes vales, flow meters blind flanges 4 Valve Erections installations before hand over to operation As per the drawings H W R/S Bolting and torqueing c) Support fabrication support erection d)
Release for hydro test , line walk and check all
hydro test procedure 5 Hydro test punch points are installed or not H W R/S to be followed Painting /Insulation If Required 6 Painting/Insulation As per the drawings H W R/S