02-
0 March. Quality Inspection & Work Methodology For Application of Non-metallic
2013 Hardener
Name
Designation
Signature
Date
Prepared By:
Mohan K Shaha
Asst Manager QA/QC Civil
Simplexinfrastructureltd Checked By Approved BY
Company: Simplex Infrastructures Limited
Client: Doosan Projects India Pvt. Ltd.
CONTENT
1)Purpose
2)Scope
3)Reference
4)Ref Codes
6)Process
7) EHS
Prepared By:
Mohan K Shaha
Asst Manager QA/QC Civil
Simplexinfrastructureltd Checked By Approved BY
Company: Simplex Infrastructures Limited
Client: Doosan Projects India Pvt. Ltd.
1) Purpose:
Provision Hardened floor using Non Metallic Hardener.
2) Scope:
Provision of Non-Metallic Hardened Floor for STB Buildings.
3) Reference
GMR specification Volume: IIG/2, Section-X
4 ) Ref Codes :
IS 5491
IS 1237
IS 456
IS 2386
IS 8112
IS 383
6 ) Process :
i) Surface Preparation:
The mix is to be laid on the prepared surface as mentioned earlier that are well
protected at the edges using proper shuttering.
Leveling of the surface is to be done using wooden float when the concrete is still
green enough to just make a thumb impression on it without adhering.
Prepared By:
Mohan K Shaha
Asst Manager QA/QC Civil
Simplexinfrastructureltd Checked By Approved BY
Company: Simplex Infrastructures Limited
Client: Doosan Projects India Pvt. Ltd.
7) EHS
Proper sign boards indicating, running work, diversion etc. is to be used indicated
with proper signs, symbols and language known by the majority.
Proper barricading of work area is to be done.
All the labours and worker should use their Safety PPE’S such as safety shoe, nose
mask, safety helmet, gloves, goggles etc.
Prepared By: