Quality Assurance Plan

ITEAM OILCOOLER QUANTITY 6Nos QAP NO HEPL/QAP:06


82.1KW & 16 KW Date: 07.01.2022
PO. NO. 8421007743 CAPACTIY 82.1 KW

16 KW
APPROVED DRD-2100M07-26 ,R0 ,(82.1KW) CONSTRUCTION HORIZONTAL
DRAWING NO DRD-2100M07-27 ,R0 ,(16 KW)

CUSTOMER IDMC LTD.

MANUFACTIOR HEAT CHEM ENGINEERS PVT LTD

INSPECTION BY IDMC at our Works

PROJECT

NO STAGE DESCRIPTION FORMAT OF RECORD AGENCY

HEPL IDMC

1 Material Identification and Test Report(MTC / W W


Testing Lab Test)
2 Dish forming check MTC W W
3 Nozzle marking and Cutting Dimension report W R
4 Tube sheet and Baffle Final Dimension Report/ W W
inspection visual inspection
5 Tube inspection Test at Manufacture W W
works /MTC
6 Tube Bundle Dimension Report W W
7 Visual Examination of All weld Inspection Report W W NDT -100%
joint DP- All Weld Joint
8 DP Test of All weld Joint Inspection Report W R RT-100% BUTT JOINT

9 Final Dimension and Finish Dimension Report W W TEST MEDIA –


Check Pneumatic Test :
10 Pneumatic Test Inspection Report W W 24 Kg/cm2 (SHELL SIDE)
11 Documentations of Records W R Pneumatic Test :
24 Kg/cm2 (TUBE SIDE)
12 Name Plate Verification & Rub-off W W
Stamp
Prepared By : ACCEPT BY : W – Witness , R – Review
HEAT CHEM ENGINEERS PVT LTD IDMC LTD M- Manufacturer , I- IDMC ,
MTC-Material Test Certificate
Note:
WPS/PQR/WPQ – Record- Review.
Gauge will be use with calibrated during the inspection.
Weld Consumable shall be of approved make of IDMC.
Tubes will be of approved make of IDMC.