You are on page 1of 1

M/s AKASHGANGA

INFRAVENTURES INDIA LTD.


PILING WORKS-II, A & B FOR RESIDUAL UTILITIES AND
OFFSITE (RU&O) FACILITIES FOR HRRL PROJECT
Doc No. AGIIL/QA-QC/EIL/B229/ITP-04,Rev.00

INSPECTION TEST PLAN FOR EXCAVATION


AGENCY REMARKS
SNO ACTIVITY/NATURE OF CHECK/TEST
AGIL EIL
a) Review of calibration certificates of
WC HP YES/ B-015/AGIL/PILING/F-04
1 instruments/ testing equipments
b) Field Calibration, if any WC W YES

Layout checking
2 WC S B-015/AGIL/PILING/F-02
3 Taking initial levels WC W YES
Slopes of excavation, benching, overburden,
4 WC S -
shoring & strutting (in case of deep excavation)
Check for sub-soil water, dewatering requirements
5 WC S -
as per specifications
6 Bottom level of excavation and compaction WC S -
7 Stacking of different type of soils separately WC S -
List of obstacles encountered (cables, pipes,
8 WC S YES
conduits etc)
Barricading of excavated pits for safety &
9 WC S -
protection from rain
INSPECTION & TEST DOCUMENTS
Review Test and Inspection Documents WC RW Yes

LEGEND:

HP – HOLD POINT (FIELD INSPECTION NOTE TO BE ISSUED BY CONTRACTOR)


W – WITNESS (FIELD INSPECTION NOTE TO BE ISSUED BY CONTRACTOR)
RW– REVIEW OF DOCUMENTS
S – SURVELLANCE INSPECTION BY PMC/OWNER
WC – 100% EXAMINATION BY CONTRACTOR