CONST OF MISC.

CIVIL WORK FOR CRM


PROJECTS.

INSPECTION & TEST PLAN FOR PCC WORKS

DOCUMENT NO. : PISL/QA-QC/AM/NS/5200016690/ITP-06,REV-00 Rev. No. 00 P a g e 1 of 1

AM/NS
Sr. Remarks
Inspection Activity PISL INDIA
No.
CAT B
1. Review of calibration certificates of
WC Rw
instruments/ testing
2. Field Calibration WC S/Rw
3. Checking of layout and materials,
WC S
compaction of sub -grade
4. Mix proportion WC S
5. Check for shuttering, dewatering if any. WC S
6. Concreting with proper compaction WC S
7. Checking of top level of PCC WC S
8 Curing WC -
9 Review Test and Inspection Documents WC Rw

CAT B : All buildings, foundation.

Legends: S-Surveillance, HP-Hold Point, W-Witness Point, Rw-Review of Contractor’s Document,


WC-100% Examined by Contractor

Issued for Review


00 26-06-2023 & Approval

Reviewed
Prepared
&
&
Approved By
Rev Date Description Checked By