Professional Documents
Culture Documents
COMPANY PRE-QUALIFICATION
1|Page
1. INTRODUCTION . ………………………………………………………………3-4
2. COMPANY PROFILE……………………………………………………………..5
3. COMPANY ADDRESS……………………………………………………….......6
4. ORAGANIZATION CHART…………………………………………………...7-9
5. HUMAN RESOURCES SUMMARY.……………………………………….……10
6. PRODUCTION.
A. PRODUCTION FACILITIES…………………………………………......11-12
B. PRODUCTS RANGE…………………………………………………………13
7. MANUFACTURING CHART.……………………………………………………14
8. QUALITY:
A. QUALITY MANAGEMENT SYSTEM………………………………………….15
B. QUALITY CONTROL…………………………………………………………..16
C. TESTING FACILITIES……………………………………………………....16-17
D. TYPE TEST APPROVALS……………………………………………………….18
F. QUALITY MANUAL…………………………………………………………….19
9. TURN KEY PROJECTS …………………………………………….....................19
10. HEALTH & SAFETY POLICY.……………………………………………………20
11. REGISTRATION .…………………………………………………………………21
12. REFERENCES LISTS.………………………………………………………………21
13. ANNEX A TYPE TEST CERTIFICATES
14. ANNEX B QUALITY MANUAL
15. ANNEX C REGISTRATION
16. ANNEX D REFFERANCE LIST
2|Page
Giza Power industry (GPI) was established in 2016. GPI
bought the factory of Giza cable Elsewedy which established 1984
to produce different varieties of power cables over total landscape
of 81,745 m2 at industrial zone of Abo Rawash Giza, EGYPT.
Plant kick off was on May 1985. Factory was legally
commissioned for commercial production in March 1988 under
license No. 986.
Since 1988 the plant succeeded to be one of the most
modern cable plants and equipment’s are microprocessors and
computer controlled.
The plant succeeded to cover Egypt , MENA , Africa and
Europe regions, also opened different markets in Qatar , Ethiopia ,
Yemen , Tanzania , Libya , France , Italy , Romania …….etc.
GPI success story is based on our employees whom we can
call family working on team work base, Safety and employee
satisfaction is one of main key points that we make sure we fulfil
during our manufacturing process. We are able to fulfil customer
needs by working hard on customer development satisfaction
points and requirements achieving client’s specifications and
quality.
Client’s perception is one of most important role we make
sure to achieve. Different governmental, international and private
authorities audits are done on continues time frame. We are
3|Page
updated with most recent modern technicians and certificates, ISO,
Safety, KEMA, and Ministry of electricity.
GPI production range is covering ranges from 0.6/1kv up to
220 KV, low, medium, high voltage cables copper or aluminum
conductor material.
4|Page
Company name Giza Power Industry
Head office & Plant address Abo Rawash Giza, Kilo 28 Cairo- Alex desert road
- 690 Industrial Area, Giza, Egypt.
Head office & Plant telephone +(202) 35390023
Head office & Plant fax +(202) 35390021
Sales Office address 40 Talaat Harb Street, Cairo, Egypt
5|Page
Factory Office in Egypt:
Giza Office:
Abo Rawash Giza, Kilo 28 Alexandria Desert Road, 690 Industrial Area
Giza, Egypt. Tel.: +202 35390023
Fax: +202 35390021
6|Page
7|Page
1. Planning Department:
The Planning Department is responsible for the following tasks:
• Planning the machine loading program for the plant composing production orders based on
sales requirements.
• Informing the Sales Department of the time needed to produce a product and the planned
delivery date prior to order acceptance.
• Checking the progress of orders through the manufacturing processes and modifying of
production plans for efficient use of the factory.
• Preparing requirements plan for raw material.
2. Production Department:
The Production Department is responsible for the following tasks:
• Carrying out production orders for the plant after passing through both Product Engineering
and Planning Departments according to the highest quality levels.
4. Engineering Department:
In charge of maintaining the factory machinery, utilities, and equipment to
keep it all up and running all the time and installing new equipment.
5. Purchasing Department:
In charge of developing new suppliers and placing orders for goods, raw
materials and equipments related to plant and office supplies.
7. Safety Department:
In charge of development and maintenance of the personal safety
procedures and standards for all employees in the company.
9|Page
Others,
1. Total Number of Employees: 277. 88
2. Number of Technical Labor: 169. Engine
3. Number of Engineers: 20. ers, 20
10 | P a g e
Giza Power Industry has the latest and state-of-the-art technology within its
production line. The existing machines in our factory are as follows:
11 | P a g e
Screen
SECTRA Corinovis
(AL) (37 wire) Maillfer 120 (04) Stolberger (Armored)
SINOLEADER Sinoleader
(AL) (37 wire) Maillfer 150 (05) Pourtier (Armored)
SYNCHRO Sinoleader
(CU) (61wire) Maillfer 120 (06) Pourtier (STA)
12 | P a g e
Giza Power Industry has a wide products range and we are expanding.
13 | P a g e
14 | P a g e
The Quality Dept. aims at presenting a range of products to the customers that is
characterized by quality, speed, and accuracy and at the same time, provide the after
sales services and follow up in the least time possible.
Giza Power Industry Company uses the best production means that is suitable for
our high quality materials that we get from the best resources. We always perform
check-up on raw materials and products either during production or when
finished. Products quality assurance follows the quality system standards of ISO
9001:2015, which is applied through experienced employees and the execution of
correct managing process.
-ISO 9001:2015 certificate has been granted to Giza Power Industry in Dec.
2017& it is valid until Jan. 2020.
-BS OHSAS 18001:2007 certificate has been granted to Giza Power Industry Jan
2017& it is valid until Jan. 2020.
15 | P a g e
Giza power Industry Quality labs
16 | P a g e
Receiving Control Chart Exp.
X Chart
PVC VI01 (Density)
1.510
1.505 UCL 1.506
1.500
Gm/cm3
1.495
1.490
CL 1.492
1.485
1.480
LCL 1.478
1.475
1.470
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Sample
1.90
CL 1.59
1.40
0.90
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88
Sample
17 | P a g e
Giza Power Industry’s products are certified from the 3rd laboratories as per type test
certificates indicated in annex A
A) Overhead transmission conductors
Lab Name Size (mm2) Description Certificate date Certificate No. Voltage rate
(KV)
1 High Voltage Research center 380/50 ACSR 27/10/2015 214/2015 NO
2 High Voltage Research center 506.7 AAAC 13/1/2016 3/2016 NO
3 High Voltage Research center 405 AAAC 23/3/2016 102/2016 NO
4 High Voltage Research center 490/50 ACSR 17/8/2016 267/2016 NO
5 High Voltage Research center 4X16 AL/XLPE+2.5% C.B 12/4/2017 134/2017 0.6/1 KV
6 High Voltage Research center 4X35 AL/XLPE+2.5% C.B 11/4/2017 132/2017 0.6/1 KV
7 High Voltage Research center 4X70 AL/XLPE+2.5% C.B 11/4/2017 133/2017 0.6/1 KV
8 High Voltage Research center 4X95 AL/XLPE+2.5% C.B 11/4/2017 131/2017 0.6/1 KV
18 | P a g e
Giza power industry quality Manual is indicated in Annex B in details
19 | P a g e
- It is the policy of the company to maintain a healthy and safe
working environment. We are committed to conduct all
operations safely to prevent damage t o health or the
environment, injuries to persons, fire and damage to
property all reasonable safe guards will be taken.
20 | P a g e
The Registration certificates are attached in Annex C
A Commercial Register
B Industrial Registry
C Registration of VAT
D Tax card
21 | P a g e
Annex A
Annex A
Table (1)
Table (2)
1|Page
C) Medium Voltage cables
Table (3)
Table (4)
2|Page
3|Page
4|Page
5|Page
6|Page
7|Page
8|Page
9|Page
10 | P a g e
11 | P a g e
12 | P a g e
13 | P a g e
14 | P a g e
15 | P a g e
16 | P a g e
17 | P a g e
18 | P a g e
19 | P a g e
20 | P a g e
21 | P a g e
22 | P a g e
23 | P a g e
24 | P a g e
25 | P a g e
26 | P a g e
27 | P a g e
Annex B
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 1 of 26
Quality Manual
QM-01
Name
Signature
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 2 of 26
Table of Contents
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 3 of 26
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 4 of 26
Section 1
Company Profile
A. Company introduction
- Giza power Industry Co. is a pioneer of wires and cables producer in Egypt and Middle East.
- Giza power Industry Co. has an important share in the national economy of Egypt, and its production
was increased for all types of wires and cables to meet all demand in Egypt and abroad.
- Giza power Industry Co. available research and development efforts and its up-to-date production
techniques according to international standards as IEC, DIN, BS … etc., have lead to a lot of products
which took an excellent position in the cable market.
- Giza power Industry Co. implements the QMS according to ISO 9001:2015 by selected and highly
qualified personnel.
B. Types of products
1- Low Voltage power cables up to 0.6/1 kv
2- Medium Voltage cables up to 19/33 kv.
3- High & Extra High Voltage cables up to 220 kv.
4- Overhead Conductors.
D. Communication :
Factory:
Address : Abo Rowash Giza, kilo 28 Alexandria Desert Road, 690 Industrial Area, EGYPT
Tel. : 0020235390023
FAX : 0020235390021
Email : gpi@gizapowerindustry.com
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 5 of 26
E. Company Structure
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 6 of 26
MV
&
LV
HV
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 7 of 26
Section 2
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 8 of 26
a) Determining the inputs required and the outputs expected from these processes;
b) Determining the sequence and interaction of these processes;
c) Determining and apply the criteria and methods (including monitoring, measurements
and related performance indicators) needed to ensure the effective operation and
control of these processes;
d) Determining the resources needed for these processes and shall ensure their availability;
e) Assigning the responsibilities and authorities for these processes;
f) Addressing the risks and opportunities as determined in accordance with the
requirements of 6.1;
g) Evaluating these processes and implement any changes needed to ensure that these
processes achieve their intended results;
h) Improving the processes and the QMS.
All managers are responsible to:
a. Maintain documented information to support the operation of its processes;
b. Retain documented information to have confidence that the processes are being carried
out as planned.
Related Procedures.
Context of Giza power Industry Co. OP-01-03
5. Leader ship
5.1.1 General
Giza power Industry Co. top management demonstrated leadership and commitment with respect
to the quality management system by:-
a) Taking account ability for the effectiveness of the QMS;
b) Ensuring that the quality policy and quality objectives are established for the QMS and
are compatible with the context and strategic direction of the Company;
c) Ensuring the integration of the QMS requirements into Giza power Industry Co. business
processes;
d) Promoting the use of the process approach and risk-based thinking;
e) Ensuring that the resources needed for the QMS are available;
f) Communicating the importance of effective quality management and of conforming to
the QMS requirements;
g) Ensuring that the QMS achieves its intended results;
h) Engaging, directing and supporting persons to contribute to the effectiveness of the
QMS;
i) Promoting improvement;
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 9 of 26
5.2 Policy
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 10 of 26
Q. Policy Statement
Quality Policy
Giza power Industry Co. is the pioneer Company in producing high quality products in A.R.E. through
application of the Quality Management System ISO 9001: 2015.
Giza power Industry Co. is Maintaining a mutually beneficial relationship with the company's customers,
and strategic directions, taking into consideration changes in internal, external and interested parties
requirements.
Giza power Industry Co. is committed to:-
a) Doing its best to achieve customer satisfaction and expectations.
b) Satisfy applicable requirements
c) Establishing quality objectives and periodically following up their implementation and
applicability.
d) Ensuring working environment suitable to achieve our goals
e) Continual improvement for the effectiveness of the Quality Management System.
f) Compliance with all current applicable legislations ( statutory & regulatory ) and other
requirements of the Quality Management Systems
g) Achieving the Quality Management System policy & objectives..
h) Specific commitment(s) relevant to the internal &external issues and interested parties.
a) Document, implement and maintain its policy.
b) Communicate the policy to all employees, Available to relevant interested parties,
This policy is considered as a frame for the company Objectives, periodically reviewed, and was
communicated to all personnel and relevant interested parties with necessary awareness to be achieved
globally.
Approval By:
Sign. /
Mr. /
General Manager
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 11 of 26
6. Planning
Related Procedures.
Actions to Address Risks and Opportunities& Q. Objectives OP - 01 - 04
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 12 of 26
Related Procedures.
Actions to Address Risks and Opportunities& Q. Objectives OP - 01 - 04
Related Procedures.
Actions to Address Risks and Opportunities& Q. Objectives OP - 01 - 04
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 13 of 26
7. Support
7.1 Resources
7.1.1 General
Giza power Industry Co. determined and provide the resources needed for the establishment,
implementation, maintenance and continual improvement of the QMS taking into consideration
the following:-.
a) The capabilities of, and constraints on, existing internal resources;
b) What needs to be obtained from external providers.
7.1.2 People
Giza power Industry Co. determined and provide the persons necessary for the effective
implementation of its QMS and for the operation and control of its processes.
Related Procedures.
Human Resources and Training HRP-07-01
7.1.3 Infrastructure
Giza power Industry Co. determined, provide and maintained the infrastructure necessary for the
operation of its processes and to achieve conformity of products and services.
Giza power Industry Co. Infrastructure includes:
a) Buildings and associated utilities;
b) Equipment, including hardware and software;
c) Transportation resources;
d) Information and communication technology.
Related Procedures.
Maintenance OP -08
Infrastructure. OP - 09 - 10
7.1.4.1 General
Giza power Industry Co. determined and provide the resources needed to ensure valid and
reliable results when monitoring or measuring is used to verify the conformity of products and
services to requirements.
Giza power Industry Co. ensured that the resources provided:
a) Are suitable for the specific type of monitoring and measurement activities being
undertaken;
b) Are maintained to ensure their continuing fitness for their purpose.
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 14 of 26
Giza power Industry Co. retained appropriate documented information as evidence of fitness for
purpose of the monitoring and measurement resources.
Related Procedures.
Monitoring and Measuring Resources (Calibration) OP-11
Related Procedures.
Control of Documented Information OP - 05 -01
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 15 of 26
7.2 Competence
Giza power Industry Co.:-
a) Determined the necessary competence of person(s) doing work under its control that
affects the performance and effectiveness of the QMS;
b) Ensured that these persons are competent on the basis of appropriate education,
training, or experience;
c) Where applicable, take actions to acquire the necessary competence, and evaluate the
effectiveness of the actions taken;
d) Retained appropriate documented information as evidence of competence.
7.3 Awareness
Giza power Industry Co. ensured that persons doing work under the Company’s control are aware of:
a) The quality policy;
b) Relevant quality objectives;
c) Their contribution to the effectiveness of the QMS, including the benefits of improved
performance;
d) The implications of not conforming to the QMS requirements.
Related Procedures.
Human Resources and Training OP - 18 -01
7.4.1 General
Giza power Industry Co. QMS includes:-
a) Documented information required by this International Standard;
b) Documented information determined by Giza power Industry Co. as being necessary for the
effectiveness of the QMS
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 16 of 26
7.4.3.2 For the control of documented information, the Company addressed the following
activities, as applicable:
a) Distribution, access, retrieval and use;
b) Storage and preservation, including preservation of legibility;
c) Control of changes (e.g. version control);
d) Retention and disposition.
Documented information of external origin determined by the Company to be necessary for the
planning and operation of the QMS is identified as appropriate, and be controlled.
Documented information retained as evidence of conformity be protected from unintended
alterations.
Access can imply a decision regarding the permission to view the documented information only,
or the permission and authority to view and change the documented information.
Related Procedures.
Control of documented information OP - 05 -01
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 17 of 26
8. Operation
Related Procedures.
Customer Complains OP-14-02
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 18 of 26
The customer’s requirements is confirmed by the Company before acceptance, when the
customer does not provide a documented statement of their requirements.
In case of internet sales, a formal review is impractical for each order. Instead, the review can
cover relevant product information, such as catalogues.
8.1.3.2 Giza power Industry Co. manager retain documented information, as applicable:
a) On the results of the review;
b) On any new requirements for the products and services.
8.3.1 General
The Company managers ensures that externally provided processes, products and services
conform to requirements.
Purchasing and quality managers determine the controls to be applied to externally provided
processes, products and services when:
a) products and services from external providers are intended for incorporation into the
Company’s own products and services;
b) products and services are provided directly to the customer(s) by external providers on
behalf of the Company;
c) A process, or part of a process, is provided by an external provider as a result of a
decision by Purchasing and quality managers.
Purchasing and quality managers determine and apply criteria for the evaluation, selection,
monitoring of performance, and re-evaluation of external providers, based on their ability to
provide processes or products and services in accordance with requirements. Purchasing and
quality managers retain documented information of these activities and any necessary actions
arising from the evaluations.
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 19 of 26
Related Procedures.
Control of Externally Provided Processes, Products and Services (Purchasing) OP-06-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 20 of 26
Related Procedures.
Control of production and service provision OP - 14
Related Procedures.
Identification and Traceability OP-16
8.4.4 Preservation
GPI Company preserve the outputs during production and service provision, to the extent
necessary to ensure conformity to requirements.
NOTE Preservation can include identification, handling, contamination control, packaging,
storage, transmission or transportation, and protection.
Related Procedures.
Preservation (Storage) OP-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 21 of 26
Related Procedures.
Control of production and service provision OP-09
The Company retain documented information on the release of products and services. The
Documented information shall include:
a) Evidence of conformity with the acceptance criteria;
b) Traceability to the person(s) authorizing the release.
Related Procedures.
Release of Products and Services (Q.C.) OP-10
Related Procedures.
Control of Nonconforming Outputs OP - 13 -01
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 22 of 26
9. Performance Evaluation
9.1.1 General
The Company determine:
a) What needs to be monitored and measured;
b) The methods for monitoring, measurement, analysis and evaluation needed to ensure
valid results;
c) When the monitoring and measuring shall be performed;
d) When the results from monitoring and measurement are analysed and evaluated.
The Company evaluate the performance and the effectiveness of the QMS
The Company retain appropriate documented information as evidence of the results.
Related Procedures.
Performance Analysis and Evaluation OP - 20 - 02
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 23 of 26
Related Procedures.
Performance Analysis and Evaluation OP - 20 - 02
Related Procedures.
Internal Audit OP -17-01
9.3.1 General
Management representative QMS, at planned intervals, to ensure its continuing suitability,
adequacy, effectiveness and alignment with the strategic direction of the Company.
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 24 of 26
Related Procedures.
Management Review OP - 01 - 02
10. Improvement
10.1 General
The Company determine and select opportunities for improvement and implement any
necessary actions to meet customer requirements and enhance customer satisfaction. These
include:
a) Improving products and services to meet requirements as well as to address future
needs and expectations;
b) Correcting, preventing or reducing undesired effects;
c) Improving the performance and effectiveness of the QMS
Improvement may include correction, corrective action, and continual improvement, break
through change, innovation and re-organization.
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 25 of 26
Related Procedures.
Control of Nonconforming Outputs and Corrective Action OP-14-01
The Company consider the results of analysis and evaluation, and the outputs from
management review, to determine if there are needs or opportunities that shall be addressed as
part of continual improvement.
Related Procedures.
Continual Improvement OP - 14 -03
Doc. No. : QM-01
Quality Manual
Effect. Date : 01-09-2017
Rev. No. : 01
Page No. : 26 of 26
4 Infrastructure OP-09-10
7.1.3
5 Maintenance OP-08
C1 C2
Start
OP - 09 OP - 09
OP - 12 N N
OP – 13-01 OP – 13-01
Y
Y
Assembly
N
OP – 13-01 WI-PR-18
Y OP – 15-02
OP - 09
OP - 01 WI-WH-01
N
WI-ST-01 OP – 13-01
Customer
Y
OP - 09 OP - 09
N OP – 13-01 N
OP – 13-01
Y Y
Stranding Armoring
WI-PR-07 WI-PR-21
OP - 09 OP - 09
N N OP – 13-01
OP – 13-01
Y Y
Insulation Sheathing
C1 C2
WI-PR-25 WI-PR-26
Issue no: 1
Low Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-01 Revision: 0
Page 3 of 8
Icon Define
Incoming
Inspection
Manufacturing
Decision
N Non Conformity
OP - 12 Incoming Inspection Procedure
OP - 09 In-process Inspection Procedure
OP - 13 - 01 Non Conformity Procedure
OP - 01 Preservation (Store) Procedure
OP-15-02 Finish Good Delivery Procedure
OP - 14 – 02 Customer Satisfaction Procedure
WI-ST-01 Preservation (Store) Work Instruction
WI-PR-02 Drawing Machine Work Instruction
WI-PR-07 Stranding Machine Work Instruction
WI-PR-18 Assembly Machine Work Instruction
WI-PR-22 Armouring Machine Work Instruction
WI-PR-25 Insulation Machine Work Instruction
WI-PR-26 Sheathing Machine Work Instruction
WI-WH-01 Finish Good Delivery Work Instruction
Issue no: 1
Low Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-01 Revision: 0
Page 4 of 8
A- In process Inspection
7 Variation of Elongation % ± 25
8 Material Color Black
10 Visual inspection bag
Material should be in the form of granules of uniform size, color and shape, clean and
free from any dirt.
Issue no: 1
Low Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-01 Revision: 0
Page 8 of 8
C1 C2
Start
OP - 09
OP - 09
OP - 12 N
OP – 13-01 N
OP – 13-01
Y
Y
Screening
N Sheathing
OP – 13-01 WI-PR-16
WI-PR-26
OP - 09
OP - 09
OP - 01
N N
WI-ST-01 OP – 13-01
OP – 13-01
Y
Y
Drawing Assembly
WI-PR-02 WI-PR-18
OP – 15-02
OP - 09 OP - 09
WI-WH-01
N OP – 13-01 N
OP – 13-01
Customer
Y Y
Stranding Bedding
WI-PR-26 OP – 14-02
WI-PR-07
OP - 09 OP - 09
N OP – 13-01
OP – 13-01
N
Y Y
Insulation Armoring
C1 C2
WI-PR-25 WI-PR-22
Issue no: 1
Medium Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-02 Revision: 0
Page 3 of 9
Icon Define
Incoming
Inspection
Manufacturing
Decision
N Non Conformity
OP - 12 Incoming Inspection Procedure
OP - 09 In-process Inspection Procedure
OP - 13 - 01 Non Conformity Procedure
OP - 01 Preservation (Store) Procedure
OP-15-02 Finish Good Delivery Procedure
OP - 14 – 02 Customer Satisfaction Procedure
WI-ST-01 Preservation (Store) Work Instruction
WI-PR-02 Drawing Machine Work Instruction
WI-PR-07 Stranding Machine Work Instruction
WI-PR-16 Screening Machine Work Instruction
WI-PR-18 Assembly Machine Work Instruction
WI-PR-22 Armouring Machine Work Instruction
WI-PR-25 Insulation Machine Work Instruction
WI-PR-26 Sheathing Machine Work Instruction
WI-WH-01 Finish Good Delivery Work Instruction
Issue no: 1
Medium Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-02 Revision: 0
Page 4 of 9
A- In process Inspection
7 Variation of Elongation % ± 25
8 Material Color Black
10 Visual inspection bag
Material should be in the form of granules of uniform size, color and shape, clean and
free from any dirt.
S.N
Property Unit Specifications Sample Size Standard
C1 C2
Start
OP - 09
OP - 09
OP - 12 N
OP – 13-01 N
OP – 13-01
Y
Taping (SCWB)
N
OP – 13-01 WI-PR-17
Y
OP – 15-02
OP - 09
OP - 01
WI-WH-01
N
WI-ST-01 OP – 13-01
Y Customer
OP - 09 OP - 09
N OP – 13-01 N
OP – 13-01
Y Y
Stranding Taping (SCWB)
WI-PR-07 WI-PR-22
OP - 09 OP - 09
N OP – 13-01
OP – 13-01
N
Y Y
Insulation Sheathing
C1 C2
WI-PR-24 WI-PR-26
Issue no: 1
High Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-03 Revision: 0
Page 3 of 8
Icon Define
Incoming
Inspection
Manufacturing
Decision
N Non Conformity
OP - 12 Incoming Inspection Procedure
OP - 09 In-process Inspection Procedure
OP - 13 - 01 Non Conformity Procedure
OP - 01 Preservation (Store) Procedure
OP-15-02 Finish Good Delivery Procedure
OP - 14 – 02 Customer Satisfaction Procedure
WI-ST-01 Preservation (Store) Work Instruction
WI-PR-02 Drawing Machine Work Instruction
WI-PR-07 Stranding Machine Work Instruction
WI-PR-18 Assembly Machine Work Instruction
WI-PR-22 Armouring Machine Work Instruction
WI-PR-17 Taping Machine Work Instruction
WI-PR-26 Sheathing Machine Work Instruction
WI-PR-29 Lead Sheath Machine Work Instruction
WI-WH-01 Finish Good Delivery Work Instruction
Issue no: 1
High Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-03 Revision: 0
Page 4 of 8
A- In process Inspection
2 Tape Width mm 40 ± 1
3 Tensile Strength N/Cm Min. 130 2 meter
4 Elongation % Min. 20
5 Mass per unit area (Weight) g/m² 185±25 Giza Power Industry
Specs
6 Inner Roll Diameter mm 76
coil
7 Outer Roll Diameter mm 550- 600
9 Visual inspection
Semi-conductive tape should be of uniform quality and supplied in form of coils in
coil
one continuos length without any kind of joints. Tapes should be clean, smooth and
free form any defects.
Issue no: 1
High Voltage Cables Quality Plan Issued Date: 03/12/2018
QP-03 Revision: 0
Page 7 of 8
Specifications
S.N Property Unit Sample Size Standard
SCT10 SCT14
1 Tape Thickness mm 0.2 ± 0.05 0.5 ± 0.05
2 Tape Width mm 50 ± 1 50 ± 1
3 Tensile Strength N/Cm Min. 40 Min. 40 2 meter
5 Visual inspection
Lead alloy ½ E should be in the form of ingots of uniform quality. Ingots
The material should be clean and free from any dirt
1|Page
25 Ebrahim Abd El-Samea 16/8/16 130
26 Canal Electricity Distribution Co. (Order 36 additional) 131
27 Canal Electricity Distribution Co.(Order 37 additional) 132
2|Page
55 ELSewedy Power Cables (Order 5-2017) 160
56 Alex Electricity Distribution Co. 161
57 The Arab Contractors management (Order 593) 162
58 The Arab Contractors management (Order 590) 163
3|Page
4|Page
5|Page
6|Page
7|Page
8|Page
9|Page
10 | P a g e
11 | P a g e
12 | P a g e
13 | P a g e
14 | P a g e
15 | P a g e
16 | P a g e
17 | P a g e