OCALA LOOP CHECK PROCEDURE

Project: IBIGWE FIELD REFINERY


Prepared by: Date of Record: Signature: Review: Page:
Eng. Jorge López 29 FEB 2020 0 1 of 1

febInstallation and Leak Test Record


Mechanical Code: WS-IR-CDU01-OSBL-PCS-IN-CL-040

INSTRUMENT DESCRIPTION

TAG: FE/FIT-585 SERIAL: P&ID: B18 PIPE: 1.5"‐FO‐168‐A11‐2"ET

LOCATION: FUEL TANK RETURN FLOW METER (ENDRESS HAUSER)

SCHEDULE (CONNECTION) MAX PRESS (Test)

MAXIMUM OPERATING PRESSURE LOOP DRAWING N°

DESCRIPTION TEST RESULT COMMENTS

MECHANICAL INSTALATION DIAGRAM □P □F □ NA


DIRECTION OF FLOW □P □F □ NA
EASLY READ □P □F □ NA
MOUNTS □P □F □ NA
TAGGED □P □F □ NA
INSTALLED IN A CLEAN □P □F □ NA
INSTALLED IN A NEAT MANNER □P □F □ NA
ACCESSIBLE □P □F □ NA
ADEQUATELY PROTECTED FROM
MECHANICAL DAMAGE □P □F □ NA
ADEQUATELY PROTECTED FROM
ENVIROMENTAL DAMAGE □P □F □ NA
REMARKS:

OWNER (WALTERSMITH) CONTRACTOR (VFUELS) PCS INSTRUMENT (OCALA)


NAME:

DATE:

SIGN: