This document summarizes the installation and leak test of the fuel tank return flow meter (FE/FIT-585) at the Ibigwe Field Refinery project. It lists the instrument tag number, serial number, P&ID diagram, pipe information, and location. A checklist is included to verify that the mechanical installation meets requirements such as proper direction of flow, easy readability, secure mounting, tagging, clean installation, neat installation, accessibility, and adequate protection from mechanical and environmental damage. The document requires sign-off from the owner, contractor, and instrumentation technician to confirm the installation passed inspection.
This document summarizes the installation and leak test of the fuel tank return flow meter (FE/FIT-585) at the Ibigwe Field Refinery project. It lists the instrument tag number, serial number, P&ID diagram, pipe information, and location. A checklist is included to verify that the mechanical installation meets requirements such as proper direction of flow, easy readability, secure mounting, tagging, clean installation, neat installation, accessibility, and adequate protection from mechanical and environmental damage. The document requires sign-off from the owner, contractor, and instrumentation technician to confirm the installation passed inspection.
This document summarizes the installation and leak test of the fuel tank return flow meter (FE/FIT-585) at the Ibigwe Field Refinery project. It lists the instrument tag number, serial number, P&ID diagram, pipe information, and location. A checklist is included to verify that the mechanical installation meets requirements such as proper direction of flow, easy readability, secure mounting, tagging, clean installation, neat installation, accessibility, and adequate protection from mechanical and environmental damage. The document requires sign-off from the owner, contractor, and instrumentation technician to confirm the installation passed inspection.
LOCATION: FUEL TANK RETURN FLOW METER (ENDRESS HAUSER)
SCHEDULE (CONNECTION) MAX PRESS (Test)
MAXIMUM OPERATING PRESSURE LOOP DRAWING N°
DESCRIPTION TEST RESULT COMMENTS
MECHANICAL INSTALATION DIAGRAM □P □F □ NA
DIRECTION OF FLOW □P □F □ NA EASLY READ □P □F □ NA MOUNTS □P □F □ NA TAGGED □P □F □ NA INSTALLED IN A CLEAN □P □F □ NA INSTALLED IN A NEAT MANNER □P □F □ NA ACCESSIBLE □P □F □ NA ADEQUATELY PROTECTED FROM MECHANICAL DAMAGE □P □F □ NA ADEQUATELY PROTECTED FROM ENVIROMENTAL DAMAGE □P □F □ NA REMARKS: