CLIENT Project Name TSR F44SL Project Phase 1 (B) CONTRACTOR

Document No. ITR-PI-001


Document Title
WELD HISTORY SUMMARY SHEET
Revision B Doc Class Z Page

Date : Test Package No. : TP-TRIM-T1241AB-0001 System: TRIM

WELDER NO. FIT UP / VISUAL NDT (RT/PT)

REV. SHEET SPOOL JOINT JOINT DIA SCH /


DWG NO. MATERIAL WELDCAT ROOT CAP Report No. DATE Report No. Result Report No. R1 Result R1 REMARK
NO. NO. NO. NO. TYPE INCH CLASS
TRIM-T1241A-N8 0 1 OF 1 N/A J1 BW 2 10S SS304/304L FIELD 085 085 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J2 BW 2 10S SS304/304L FIELD 082 082 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J3 BW 2 10S SS304/304L FIELD 069 069 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J4 BW 2 10S SS304/304L FIELD 082 082 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J5 SW 3/4 40S SS304/304L FIELD 082 082 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J6 THR 3/4 40S SS304/304L FIELD 104 104 GFC-FV-3505 6-Dec-22

TRIM-T1241A-N8 0 1 OF 1 N/A J7 THR 3/4 40S SS304/304L FIELD 104 104 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J1 BW 2 10S SS304/304L FIELD 073 073 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J2 BW 2 10S SS304/304L FIELD 073 073 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J3 BW 2 10S SS304/304L FIELD 069 069 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J4 BW 2 10S SS304/304L FIELD 082 082 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J5 SW 3/4 40S SS304/304L FIELD 082 082 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J6 THR 3/4 40S SS304/304L FIELD 104 104 GFC-FV-3505 6-Dec-22

TRIM-T1241B-N8 0 1 OF 1 N/A J7 THR 3/4 40S SS304/304L FIELD 104 104 GFC-FV-3505 6-Dec-22

Remarks:

GFC MIE IPMT

Name : Name : Name :

Sign : Sign : Sign :

Date : Date : Date :

Page 1 of 1