UT/PT/MT REQUEST

THE 4th TURNAROUND OF DUNG QUAT REFINERY

Request No.: DIPC-BSR-PTR-0011


Package : 01 Location: 15 UNIT
Date: 22/Oct/2020

Welder ID Visual RT
Equipment Weld OD/Length Thickness
No DWG No. Welding Map. Joint No. Material Process Inspection UT MT PT Remark
Name. type (mm) (mm) 1 2 RT (0) RT (1) RT (2)
date

SA182
1 D-1503 V-2151-001-A-210 N/A CY-1504-E-004
TP304H
BW 254″ 13.0 SHP-09 GTAW N/A ○ Root Pass Welding Point(Done)

SA182
2 D-1503 V-2151-001-A-210 N/A CY-1504-E-005
TP304H
BW 254″ 13.0 SHP-10 GTAW N/A ○ Root Pass Welding Point(Night Shift)

SA182
3 D-1503 V-2151-001-A-210 N/A Dip-leg
TP304H
N/A 254″ 13.0 N/A N/A N/A ○ Surface Edge Bevel Point

SA182
4 D-1503 V-2151-001-A-210 N/A Dip-leg
TP304H
N/A 254″ 13.0 N/A N/A N/A ○ Surface Edge Bevel Point

SA182
5 D-1503 V-2151-001-A-210 N/A Trickle Valve
TP304H
N/A 254″ 13.0 N/A N/A N/A ○ Surface Edge Bevel Point

10

11

12

13

14

15

Total Point : 5

Sub-Contractor Contractor

Full Name: Jinwoo Yang

Signature:

Date: 22-Oct-20

Page 1 of 1