You are on page 1of 2

Test Package Status TOTAL 34

Project Name: HSVC OL1 Project

No. Test Package No. Line No. Team Area Dia. ISO Medium Test Punch Status Testing Remark
Q'ty Pressure
Issue Est. Date Mr. Thang Plan (YSE) Tested

1 2 3 4 5 6 7 9 10 12 13 14 16 17 18

1 6100-CA-02-HT-018 6"-CA-61053-BBR51-W40 Dat 6000 36 1 HYDRO 8.4 30/Dec/1899 15/Apr/2021 14/Apr/2021 16/Apr/2021 Sent to prepare on 14/4 (Holding due to A
Punch
Sent to prepare on 14/4 (Holding due to A
2 6100-CA-02-HT-042 6"-CA-61089-BBR51-W40 Dat 6000 36 1 HYDRO 7.5 30/Dec/1899 14/Apr/2021 14/Apr/2021 15/Apr/2021 Punch
Sent to prepare on 14/4 (Holding due to A
3 6100-CA-02-HT-067 6"-CA-61125-BBR51-W40 Dat 6000 76 2 HYDRO 6.9 30/Dec/1899 15/Apr/2021 14/Apr/2021 15/Apr/2021 Punch

4 6100-CA-02-HT-092 6"-CA-61160-BBR51-W40 Dat 6000 36 1 HYDRO 6.3 30/Dec/1899 14/Apr/2021 14/Apr/2021 15/Apr/2021 Sent to prepare on 14/4 (Holding due to A
Punch

5 6500-C2-01-HT-012-02 2"-C2O-69462-BER61-N MAIN PIPE RACK 40 1 HYDRO 51 N/A OK 11/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind

6 6500-C2-01-HT-023-02 6"-HC-65001-BER61-C50 MAIN PIPE RACK 114 1 HYDRO 48 N/A OK 27/Mar/2021 27/Mar/2021 17/Apr/2021 No Blind

7 6900-PSA-06-HT-003-02 6"-HC-69183-BAR61-C32 Dat MAIN PIPE RACK 109.5 2 HYDRO 37.5 N/A OK 12/Apr/2021 4/Apr/2021 17/Apr/2021 Blind Already

8 1102-CH-04-HT-001-02 1"-HS-11208-CBR61-W60 Dat MAIN PIPE RACK 920.75 45 HYDRO 23.25 N/A OK 13/Apr/2021 4/Apr/2021 17/Apr/2021 Blind Already

10 1102-HS-01-HT-002-02 16"-HS-11202-CBR61-W110 MAIN PIPE RACK 3846.75 41 HYDRO 78 30/Dec/1899 16/Apr/2021 1/Apr/2021 17/Apr/2021 Combine DAE

12 1103-BFW-01-HT-001-02 3"-BFW-11280-CBR61-W30 MAIN PIPE RACK 772.75 16 HYDRO 135 30/Dec/1899 13/Apr/2021 16/Mar/2021 17/Apr/2021 Combine DAE

15 1701-WBD-01-HT-001-02 42"-FL-17501-AAR61-N Binh MAIN PIPE RACK 8386.5 135 PNEUMATIC 0.84 30/Dec/1899 14/Apr/2021 15/Apr/2021 17/Apr/2021 Ongoing to preparing

16 1701-WBD-01-HT-007 18"-FL-17608-AAR61-N Binh MAIN PIPE RACK 2545.75 36 PNEUMATIC 0.84 30/Dec/1899 13/Apr/2021 31/Mar/2021 16/Apr/2021 Sent to prepare on 15/4

17 6000-FG-05-HT-013-02 8"-FG-62186-AAR61-WD30 Dat MAIN PIPE RACK 1962 22 HYDRO 9 A: D-6206 Outlet Valve Low Point Drain Missig (refer to P&ID) REJ 14/Apr/2021 8/Apr/2021 15/Apr/2021 Filling Water

28 6100-CA-02-HT-016 8"-H2-61050-BKR66-W40 Dat 6000 74 2 HYDRO 19.5 30/Dec/1899 15/Apr/2021 30/Dec/1899 15/Apr/2021 Sent to prepare on 14/4

32 6100-CA-02-HT-070 2"-FL-61133-AAR61-N Dat 6000 131.5 7 HYDRO 21 30/Dec/1899 12/Apr/2021 14/Apr/2021 16/Apr/2021 Sent to prepare on 14/4

35 6100-CA-02-HT-122 6"-CA-61194-BBR51-PP20 Tung 6000 66.25 2 HYDRO 21 30/Dec/1899 15/Apr/2021 15/Apr/2021 16/Apr/2021 Sent to prepare on 14/4

46 6100-RP-01-HT-001 4"-H2-60010-BKR66-W150 Tung 6000 475.5 11 HYDRO 19.5 30/Dec/1899 16/Apr/2021 15/Apr/2021 Sent to prepare on 14/4 (Est. testing on 15/4)

48 6100-RP-01-HT-015 8"-H2-61013-AAR66-W40 Binh SUB PIPE RACK-05 1101 19 HYDRO 19.5 30/Dec/1899 16/Apr/2021 30/Dec/1899 16/Apr/2021 Sent to prepare on 14/4

49 6100-RP-01-HT-016 8"-H2-61005-AAR66-W40 Dat SUB PIPE RACK-05 751.75 15 HYDRO 19.5 N/A OK #N/A 30/Dec/1899 15/Apr/2021 Sent to prepare on 14/4

50 6100-RP-01-HT-017 4"-H2-61016-AAR66-W40 Binh 6000 610.75 10 HYDRO 19.5 30/Dec/1899 16/Apr/2021 30/Dec/1899 16/Apr/2021 Sent to prepare on 14/4

51 6100-RP-01-HT-018 6"-H2-61020-AAR66-W40 Binh 6000 690 16 HYDRO 19.5 30/Dec/1899 15/Apr/2021 16/Apr/2021 Sent to prepare on 14/4

57 6300-CAU-02-HT-040-02 4"-CAU-63207-AAR62-N Tung 6300 140.5 4 HYDRO 21 30/Dec/1899 12/Apr/2021 2/Apr/2021 17/Apr/2021 Blind Already

64 6300-EFF-03-HT-009-02 6"-C3P-63130-AAR61-N Dat MAIN PIPE RACK 1827 24 HYDRO 18 30/Dec/1899 12/Apr/2021 11/Mar/2021 17/Apr/2021 Combine DAE

67 6500-C2-01-HT-001-02 8"-C3P-62139-BAR61-N Binh MAIN PIPE RACK 1017 11 HYDRO 94.5 N/A OK 4/Apr/2021 4/Apr/2021 17/Apr/2021 Blind Already

68 6500-C3-02-HT-005-02 8"-C3O-65207-AER61-C32 MAIN PIPE RACK 139.75 1 HYDRO 24 N/A OK 12/Apr/2021 4/Apr/2021 17/Apr/2021 No Blind

69 6500-C3-02-HT-007-02 8"-C3O-65280-BAR61-N Dat 3000 107.75 1 HYDRO 67.5 N/A OK 12/Apr/2021 4/Apr/2021 17/Apr/2021 Sent to prepare on 15/4

70 6500-C3-02-HT-009-02 6"-C3O-65218-AAR61-N Dat MAIN PIPE RACK 420.5 5 HYDRO 24 N/A OK 13/Apr/2021 26/Mar/2021 17/Apr/2021 Combine DAE

1. submit hydro pkg combine DAEAH/YSE interconnection line


71 6500-C3-02-HT-050-02 8"-C3O-65323-AER61-C32 MAIN PIPE RACK 104 1 HYDRO 24 (this line YSE portion from DAEAH - YSE - DAEAH) OK 13/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind
2. No pipe support
3. No Punch from YSE and eTEC (punch list None)

73 6700-QT-01-HT-006-02 10"-HC-69436-AAR61-C32 MAIN PIPE RACK 100 1 HYDRO 6 N/A OK 11/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind

74 6700-QT-01-HT-058-02 2"-PYG-67193-AAR65-N MAIN PIPE RACK 24 1 HYDRO 22.5 N/A OK 11/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind

75 6800-CG-03-HT-001-02 6"-HC-69105-BER61-C50 MAIN PIPE RACK 120 3 HYDRO 55.5 N/A OK 11/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind

77 6900-C2-04-HT-010-02 4"-C2O-69140-BJR76-C100 Binh MAIN PIPE RACK 234 5 HYDRO 37.5 30/Dec/1899 13/Apr/2021 9/Mar/2021 17/Apr/2021 Blind Already

78 6900-C2-04-HT-046-02 4"-C2O-69374-CJR61-C25 Dat 3000 116.75 1 HYDRO 102 30/Dec/1899 13/Apr/2021 9/Mar/2021 17/Apr/2021 Sent to prepare on 15/4

79 6900-ME-02-HT-016-02 1"-ME-17547-BAR61-N MAIN PIPE RACK 33 1 HYDRO 28.5 A : FW 34 Not yet Welded OK 11/Apr/2021 30/Dec/1899 17/Apr/2021 No Blind
Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority

Priority