- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1
Set
- Inspection for trickle valve CY-1505 : 1 Set Check & repair (if required) trickle valve
2 Drum 15 CY-1505/D-1505 -Repair trickle valve ( if required) following of cyclone in D-1505 due to loss of WP-AW-20-A2-052 Mr.Trí
Inspection report : 1 SET catalyst during loading catalyst
- Fit- up, Welding and NDT for weld joint ( if
required) : 1 SET
- Reinstal the cyclone CY-1505 : 1 Set
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1
Set
- Inspection for trickle valve CY-1507 : 1 Set Check & repair (if required) trickle valve
3 Drum 15 CY-1507/ D-1507 - Repair trickle valve ( if required) following of cyclone in D-1507 due to loss of WP-AW-20-A2-053 Mr.Trí
Inspection report : 1 SET catalyst during loading catalyst
- Fit- up, Welding and NDT for weld joint ( if
required) : 1 SET
- Reinstal the cyclone CY-1507 : 1 Set
- Scaffolding Installation /Removal : 756 M3
- Insulation remove/re-install : 1 Point
- Cleaning for checking condition of flange joint
( inside and outside) : 1 Point
- Remove the old bolts&nuts to disconnect the
4 Piping 15 Piping flange joint : 1 Point Fix leaking flue gas at ESP1 inlet WP-AW-20-A2-067
- Cleaning the flange face by hand tool : 1 Point
- Insert Glass Fibre Tape with silicon into the gap
of flange joint : 1 Point
- Replace all bolts and nuts of flange joint by new
one and tightening : 1 Point
- Scaffolding Installation /Removal : 12 M3
- Insulation remove/re-install : 1 Point
- Insspection for leaking point and issue inspection
report : 1 Point
5 Piping 15 ESP - Repair leak following inspection report by Fix leak at ESP-1 inlet (under insulation) WP-AW-20-A2-071
welding : 1 Point
- Fit- up, Welding and NDT for repair work : 1
Point
- Repainting : 1 M2
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 6
inch for replacement (1 location: PR28-L1): 01
Repair the corroded location on pipe
12 Auxiliary 15 015-AUX-035 Point WP-AW-19-A2-021 Mr.Khanh
(PR28-L1)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR28-L1) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 01 M2
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR39-L3) : 1
Repair the corroded location on pipe
13 Auxiliary 15 015-AUX-037 Point WP-AW-19-A2-023 Mr.Khanh
(PR39-L3)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR39-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2
- Blind/Deblind : 01 set
-Scaffolding Installation /Removal: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR34-L3) : 01
Repair the corroded location on pipe
14 Auxiliary 15 015-AUX-038 Point WP-AW-19-A2-024 Mr.Khanh
(PR34-L3)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR349-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2
- Blinding and deblinding
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 4 Repair the corroded location on pipe
15 Auxiliary 15 015-AUX-039 WP-AW-19-A2-025 Mr.Khanh
inch for replacement (01 location): 2 M (PR20-L1)
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.6 M2
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal : 80 M3
- Cut to remove the damaged point from line 3
inch for replacement (01 location: PR35-L1) : 01
Point Repair the corroded location on pipe
16 Auxiliary 15 015-AUX-040 WP-AW-19-A2-026 Mr.Khanh
- Replace the 2 m new pipe 3” with protection (PR35-L1)
shield by welding (01 locations: PR35-L1): 02 M
- Fit-up Welding and NDT for weld joint: 02
Joints
- Repainting:
Blinding and0.5 M2
deblinding : 1 Set
- Scaffolding Installation /Removal: 180 M3
- Insulation remove/re-install: 01 Set
- Cut to remove 03 damaged elbows size 2 inch
for replacement : 03 PCS
17 Auxiliary 15 015-AUX-041 Repair the eroded pipe/elbow sections WP-AW-19-A2-027 Mr.Khanh
- Replace 03 new elbows and 6m pipe size 2 inch
by welding : 03 PCS
- Fit-up, Welding and NDT for weld joint : 08
Joints
- Repainting : 0.9 M2
- Scaffolding Installation /Removal : 120 m3
- Remove temporary blind : 01 set
- Remove and reinstall insulation :64 M2
Replace the expansion joint at inlet C-
18 Auxiliary 15 015-AUX-042 - Remove damaged expantion joint from line WP-AW-19-A2-028
1502A
( inlet C-1502A) : 01 Set
- Install new expantion joints ( inlet C-1502A,
inlet and outlet C-1502B) : 03 Set
- Blind/Deblind : 01 Set
- Scaffolding Installation /Removal: 320 M3
- Cut to remove the damaged points from line 6
inch for replacement (2 locations:PR21-L3, PR30-
L3) : 02 Point Repair the corroded location on pipe
19 Auxiliary 15 015-AUX-036 WP-AW-19-A2-022 Mr.Khanh
- Replace the 4 m new pipe 6” with 2 protection (PR21-L3, PR30-L3)
shields by welding (2 locations:PR21-L3, PR30-
L3): 4 M
- Fit-up Welding and NDT for weld joint: 4 Joints
- Repainting: 1.9 M2
Install/remove scaffolding
CO/WHB Remove rain hoof from the FDF inlet line by crane
20 Boiler 15 H-1503 Dismantle the rain hoof cover CO/WHB Boiler Package WP-AW-19-A2-003
Package Install inverse cone as original design
Re-install back to the line
- Install/remove scaffolding
- Remove/re-install insulation Replace the corroded 0.75" Tee section of
44 Auxiliary 21 021-AUX-011 - Cutting the weldolet and pipe 3/4" 3-F-218039-A1GR1-ST1 follow report WP-AW-19-A2-003 Mr.Khanh
- Replace new weldolet and pipe 3/4" by welding 18-223/IR-INS (TA4 job)
- NDT (PT/RT)
- Install/remove scaffolding
Repair the LP steam leak on the pipe 1.5-
- Install/remove insulation
45 Auxiliary 21 021-AUX-010 SL-214658-A1AS-HS follow report 18- WP-AW-19-A2-003 Mr.Khanh
- Replace 3/4" pipe about 3m
092/IR-INS
- NDT (PT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
46 Auxiliary 21 021-AUX-012 - Cutting and Replace 1m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 25/4/2019
welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
- Cutting the 6m corrosion pipe 3/4"; Replace the corroded drain pipe follow
47 Auxiliary 21 021-AUX-013 WP-AW-19-A2-003 Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
48 Auxiliary 21 021-AUX-014 - Cutting and Replace 2m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 06/5/2019
welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
49 Auxiliary 21 021-AUX-015 - Cutting and Replace 2.2m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 25/4/2019
welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
- Cutting the 6m corrosion pipe 3/4"; Replace the corroded drain pipe follow
50 Auxiliary 21 021-AUX-016 WP-AW-19-A2-003 Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)
- Blind/Deblind;
- Cut the 02 welding joint 2" on Tee 2"x3/4 and
Repair the crack on pipe wall 2-SH-
51 Auxiliary 21 021-AUX-017 flange 2"; WP-AW-19-A2-003 Mr.Khanh
154047-B0K6-HS
- Replace 01 spool pipe 304H material by welding
- RT
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind
- Bending and replace two 90 deg elbow 3/4" by Repair the corroded pipe section and the
52 Auxiliary 21 021-AUX-018 WP-AW-19-A2-003 Mr.Khanh
welding on line 0.75-F-218075-A1GR1-ST1 elbows
- Cut and Replace 0.5m new straight pipe by
welding on line 0.75-F-218075-A1GR1-ST1
- RT 4 joints ( ¾” )
- Install/remove scaffolding
- Dismantle the valve from the line
- Pre-cleaning and install temporary cover;
55 M. VALVE 17 PSV019A-BLV-001 - Transfer the valve to Workshop and handover to Remove and Reinstall valve at site WP-AW-19-A2-003
P6
- Receive the valve from P6
- Re-install back valve to the line with new gasket
Blind/Deblind
Scaffolding Installation/Removal
Cut to remove the damaged weld joint from line 1-
86 Piping 21 1/2inch for repair WP-AW-20-A2-075 Mr.Khanh
Re-weld to repair welding joint
Fit-up, welding and NDT for welding joint
Repainting
Blind/Deblind
Scaffolding Installation/Removal
Fabricate and install temporary supports for repair
work
Remove original clamp supports for further
inspection CUI
87 Piping 15 WP-AW-20-A2-077
Repair the corroded areas following inspection
report
Fit-up, welding and NDT for repair work
Reinstall original clamp supports and remove
temporary supports
Repainting
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
88 Piping 15 WP-AW-20-A2-078 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Insulation remove/re-install
Scaffolding Installation/Removal
Checking condition of the spring supports 015-
HV-188, 015-HC-020/045/046/056 after shut
89 Support 15 Spring support WP-AW-20-A2-079
down
Cutting and welding to repair spring support if
required (anticipated work)
Painting
Blind/Deblind
Insulaiton remove/re-install
E-1524 feed outlet block Remove the damaged valve from line 10" and
90 M. VALVE 15 WP-AW-20-A2-080
valve transfer the damaged valve to WS
Repair and test valve at WS
Reinstall valve with new gasket at site
Install/remove scaffolding
Remove the old vapor distributor pipes
91 Tower 15 T-1501 Install new vapor distributor pipes WP-AW-15-A2-011 Mr.Trí
Install pipe stiffeners by welding
NDT to check quality of pipe stiffeners welding
Install/remove scaffolding
Remove/install insulation
Inspect Pipe support point
92 Support 15 Support WP-AW-20-A2-081 Mr.Khanh
Modify piping support
NDT to check quality of welding work
Do painting
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
93 Piping 21 WP-AW-20-A2-083 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
94 Piping 21 WP-AW-20-A2-084 Mr.Khanh
lind 3 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
96 Piping 15 015-SCC-902 WP-20-1164138 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Insulation remove/re-install
Blind/Deblind
Cut and Replace the 2m length pipe with 4 elbow Unplug for the MP steam line to steam
99 Piping 15 WP-AW-20-A2-092 Mr.Khanh
90 and Steam trap size 3/4 inch by welding trap no 1337
Fit-up, welding and NDT for weld joint
Repainting
Blind/Deblind
Insulation remove/re-install
Replace the bypass valve and
Cut to remove the damaged valves size 3/4" and
100 Piping 15 downstream B/V of steam trap on E- WP-AW-20-A2-094 Mr.Khanh
replace by new ones.
1503C export line are passing
Fit-up and rewelding and NDT for weld joints
Repainting
Blind/Deblind
Insulation remove/re-install
Scaffolding Installation / Removal
Fix steam tracing is leaking (under
Cut to remove the damaged point including 1
101 Tracing 21 insulation) on this pipe (between P- WP-AW-20-A2-095 Mr.Khanh
elbow and 1m pipe size 3/4" and replace by new
2102A/B)
ones.
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind
Insulation remove/re-install
Cut to remove the damaged points
Repair weld defect of 2 vents/drains (item
102 Piping 15 Replace 01 weldolet 10"x3/4" for line 10"-PL- WP-AW-20-A2-096 Mr.Khanh
3,9) follow IAT report
150804-B2AP-ST1
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind
INPECTION REPORT: Remove
Scaffolding Installation / Removal
clamping supports for pipe 10-PL-
103 Piping 15 Removing Support / Re-install WP-AW-20-A2-098
150534-A2AQ-NI for detail inspection
Preparation for inspection
follow IAT report
Repainting
104 M. VALVE 15 Replace new valve E01-BLV-017 in TA4 WP-AW-20-A2-100 Mr.Khanh
Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Cut to remove the damaged valve size 1" and
Replace new valve E01-MTV-001 in
105 M. VALVE 15 replace by new one. WP-AW-20-A2-101 Mr.Khanh
TA4
Contractor supply new globe valve 1"#800, SW,
body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting
WORK PLANNING QUALITY TEST PACK SAFETY PLAN ENGINEERING DOC. BSR
SAFETY
Waste management
P & ID mark up of
Inspection and test
Procedure/Method
List of mandatory
Reduplicate
Refractory /Weld
Ventilation plan
PIR/SEIP/SPIP.
statement/Work
position (like as
Management of
Isometric/detail
SPECIAL PPE
Job plan (From
Bill of material
Interim box up
(Blind/LOTO)
manufacturing
Equipment Equipment
Isolation plan
Material Test
drawing with
No. Work scope WORKS DESCRIPTION WP NO.
Watchman )
Rescus plan
Type Name
Scaffolding
Acceptance
Utility plan
WP Complete QCA/QC Mr Binh-Khanh
Data Sheet
checksheet
drawing of
equipment
equipment
Certificate
Zero leak
Plan Person in charge
drawing
markup
MSDS.
change
Other
WO)
steps
JSA.
Map
OIA
plan
plan
plan
Unit
106.00 44 1 1 2 1 1
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1
Check & repair (if
Set
required) trickle valve
- Inspection for trickle valve CY-1505 : 1 Set
of cyclone in D-1505
2 Drum 15 CY-1505/D-1505 -Repair trickle valve ( if required) following WP-AW-20-A2-052 1 R R Mr.Trí
due to loss of catalyst
Inspection report : 1 SET
during loading
- Fit- up, Welding and NDT for weld joint ( if
catalyst
required) : 1 SET
- Reinstal the cyclone CY-1505 : 1 Set
R X X R R X X R X R R R R R R R
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1
Check & repair (if
Set
required) trickle valve
- Inspection for trickle valve CY-1507 : 1 Set
of cyclone in D-1507
3 Drum 15 CY-1507/ D-1507 - Repair trickle valve ( if required) following WP-AW-20-A2-053 1 R R Mr.Trí
due to loss of catalyst
Inspection report : 1 SET
during loading
- Fit- up, Welding and NDT for weld joint ( if
catalyst
required) : 1 SET
- Reinstal the cyclone CY-1507 : 1 Set
R X X R R X X R X R R R R R R R
- Blind/Deblind : 01 Set
- Scaffolding Installation /Removal: 320 M3
- Cut to remove the damaged points from line 6
inch for replacement (2 locations:PR21-L3, PR30-
Repair the corroded
L3) : 02 Point
19 Auxiliary 15 015-AUX-036 location on pipe WP-AW-19-A2-022 1 R Mr.Khanh
- Replace the 4 m new pipe 6” with 2 protection
(PR21-L3, PR30-L3)
shields by welding (2 locations:PR21-L3, PR30-
L3): 4 M
- Fit-up Welding and NDT for weld joint: 4 Joints
- Repainting: 1.9 M2
R X X R R X X R X R X R R X R R R R X X X
Install/remove scaffolding
CO/WHB Remove rain hoof from the FDF inlet line by crane
CO/WHB Boiler
20 Boiler 15 H-1503 Dismantle the rain hoof cover WP-AW-19-A2-003 1
Package
Package Install inverse cone as original design
Re-install back to the line
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
21 Auxiliary 15 015-AUX-013 working and WP-AW-19-A2-003 2 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X X X R X R X R R X R R R X R R
performance
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
22 Auxiliary 15 015-AUX-012 working and WP-AW-19-A2-003 3 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X R X R X R R R R R X R R
performance
- Remove ejector from lines_x000D_
23 Equipment 15 C-1501-J-02A Replace ejector WP-AW-19-A2-003 4 R Mr.Huy
- Install new ejector with new gasket R X X R X X X X R X R X R R R R X R X
- Remove ejector from lines_x000D_
24 Equipment 15 C-1501-J-03A Replace ejector WP-AW-19-A2-003 5 R Mr.Huy
- Install new ejector with new gasket R X R X R X R R R R X R
- Remove ejector from lines_x000D_
25 Equipment 15 C-1501-J-02B Replace ejector WP-AW-19-A2-003 6 R Mr.Huy
- Install new ejector with new gasket R X X R X X X R X R X R R R X R
- Remove ejector from lines_x000D_
26 Equipment 15 C-1501-J-03B Replace ejector WP-AW-19-A2-003 7 R Mr.Huy
- Install new ejector with new gasket R X R X X R X R X R R R X X R
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
27 Auxiliary 15 015-AUX-014 working and WP-AW-19-A2-003 8 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X X R X R X R R X R R R X X R
performance
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
28 Equipment 15 C-1551-J-02A then repair if it finds WP-AW-19-A2-003 9 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X X R X R X R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
29 Equipment 15 C-1551-J-03A then repair if it finds WP-AW-19-A2-003 10 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X X R X R X R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
30 Equipment 15 C-1551-J-02B then repair if it finds WP-AW-19-A2-003 11 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X R X R R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
31 Equipment 15 C-1551-J-03B then repair if it finds WP-AW-19-A2-003 12 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X R X R R R R X X R
Check/inspect two
- Dismantle the flange 3"
spray nozzles of
- Internal inspection
32 Auxiliary 15 015-AUX-015 BFW to LPS to WP-AW-19-A2-003 13 R
- Repair/replace if damaged
header. Repair or
- Install back nozzle with new gasket
replace if needed R X X R R X R X R R R R R R X X R
- Grinding the old welding seam Repair the crack of
33 Auxiliary 15 015-AUX-011 - Re-welding socket weld seam at WP-AW-19-A2-003 14 R Mr.Khanh
- NDT (PT) the elbow R X X R R X R X R X R R R R R X X R R R
Repair the corroded
pipe section of
- Cut the damaged pipe 1m from lines_x000D_
1000mm in length,
34 Auxiliary 15 015-AUX-016 - Install new pipe section by welding WP-AW-19-A2-003 15 R Mr.Khanh
reper to IR No. 19-
- NDT (PT/RT 2 points)
033-IR-INS dated
23/01/2019
R X X R R X R X R X R R X R R R X X R R R
-Install/remove scaffoding
- remove / reinstall ínulation Repair the corroded
- Cut the damaged pipe200mm from pipe section of 0.75-
35 Auxiliary 15 015-AUX-010 lines_x000D_ FG-217802-A2AD- WP-AW-19-A2-003 16 R Mr.Khanh
- Install new pipe section with flange by welding ST2 refer to 18-222-
- replace new gasket IR-INS
- NDT (PT/RT) R X X R X R X R X R R R R R X X R R R
- remove / reinstall insulation Repair leaking HC at
- Dismantle flange connection flange of slurry line
36 Auxiliary 15 015-AUX-017 WP-AW-19-A2-003 17 R
- inspect flange face from D-1515 to P-
- Repalce new gasket 1504 R X X R X R X R R X R R R X X R R
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind
Replace the corroded
- Replace new reducing Tee 1,5”x3/4” (01 pcs)
37 Auxiliary 15 015-AUX-018 drain pipe follow WP-AW-19-A2-003 18 R Mr.Khanh
and ¾” new pipe (200mm) by welding on line 1.5-
report 19-140-IR-INS
HSO-159407-A2AP-ST2
- NDT 4 joints (2 joints 1,5” and 2 joints ¾” ) to
be confirmed by INS
R X X R X R X R X R R R R R X X R R R
Repair passing of
- Remove valve from lines_x000D_ globe valves at
38 M. VALVE 15 TV616-MTV-001 WP-AW-19-A2-003 19 R
- Replace new valve downstream of
015TV616 X X X R X R X R X R R R X X R
- Dismantle flange connection
Repair leaking at flan
- Cleaning flange face and inspection
39 M. VALVE 15 E-1501B-BLV-015 ge of inlet slurry bloc WP-AW-19-A2-003 20 R
- Repair flange face if required
k valve of E-1501B
- Replace new gasket X X X R X R X R R R R X X R
Repair passing of
- Remove valve from lines_x000D_ globe valves at
40 M. VALVE 15 TV616-MTV-002 WP-AW-19-A2-003 21 R
- Replace new valve downstream of
015TV616 X X X R X X R X R X R R R X X R X
Repair process block
- Cut the damaged valve from lines_x000D_ valve upstream of 01
41 M. VALVE 15 E02-BLV-002 - Install new valve 5-PG- WP-AW-19-A2-003 22 R Mr.Khanh
- NDT (PT) 880 (it cannot operate
) R X X R X X R X R X R R R R R X X X X
Repair the globle valv
- Cut the damaged valve from lines_x000D_
e at P-
42 M. VALVE 15 P1559-MTV-003 - Install new valve WP-AW-19-A2-003 23 R Mr.Khanh
1559B (it can not clos
- NDT (PT) X X X R X X R X R X R R X R R R X X R R
e)
Blind/Deblind Repair the detective
Grinding the welding joint 3" weld seam of 3 inch
43 Auxiliary 16 016-AUX-001 WP-AW-19-A2-003 24
Re-welding pipe of 16-LG-002 of
RT 1 joint 3" D-1602
Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Cut to remove the damaged valve size 1" and Replace new valve
105 M. VALVE 15 replace by new one. E01-MTV-001 in WP-AW-20-A2-101 1 R Mr.Khanh
Contractor supply new globe valve 1"#800, SW, TA4
body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting
R X X R X X R X R X R R R R X X R
Replace new valve
106 M. VALVE 15 WP-AW-20-A2-102 1 R Mr.Khanh
E01-BPV-002 in TA4 R X X R X X R X R R R X X R
R
99 0 0 104 2 31 0 0 104 0 104 0 77 104 76 0 5 0 104 0 81 0 0 100 20 0 98 41 3 27
X
5 102 101 0 33 26 36 99 0 100 0 61 1 0 0 46 0 0 0 0 0 0 0 0 81 55 6 3 4 0
F 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Additional Work List - RFQ1/2/3/4
Include Refractory
Cancle
Slide Valve & Include Refractory Received Date : 31/03/2020
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
20-Apr-00
- Blind/Deblind (9 points hot work) : 9 Set
- Scaffolding Installation /Removal : 324 M3
- Insulation removal/re-installation : 9 Set
- Fabricate new part of spools follow DCA-15-19-003 at work shop : 21 spool Modification for 9 flow
015-FT- - Cutting, repair and welding old spools at site follow DCA-15-19-003 : 16 spool metters 015-FT-
Piping works -Turnaround 20-1055782
### RFQ1-1 Additional A2 Piping ### 426/407/408/406/501/424/ - Cutting, install new part of spools and welding at site follow DCA-15-19-003 : 21 spool 426/407/408/406/501/424/42 AW-20-A2-048 WP-AW-20-A2-048 PIPING GTS 210009 015-PIP-001 1464-154 NA NA 31-Dec-99 SET Follow MOC-15-19-354
maintenance service 20-1023980
425/439/440 - Fit-up, welding, NDT and PWHT for weld joints : 193 Joints 5/439/440 follow DCA-15-19-
- Cutting, install new steam tracing and welding at site (19 points) : 66 m 003
- Repair support at site ( if required) : 1 SET
- Cutting, fit up and welding base for instrument stanchion. Remove : 09 set
- Painting : 6 M2
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1 Set Check & repair (if required)
- Inspection for trickle valve CY-1505 : 1 Set trickle valve of cyclone in D- Drum - Turnaround maintenance Can not repair in normal operation,
### RFQ1-2 Additional A2 Drum ### CY-1505/D-1505 AW-20-A2-052 WP-AW-20-A2-052 DRUM GTS 210011 D-1505 19-1562322 1464-154 NA NA 31-Dec-99 SET
-Repair trickle valve ( if required) following Inspection report : 1 SET 1505 due to loss of catalyst service backlog WO: 19-1562322
- Fit- up, Welding and NDT for weld joint ( if required) : 1 SET during loading catalyst
- Reinstal the cyclone CY-1505 : 1 Set
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1 Set Check & repair (if required)
- Inspection for trickle valve CY-1507 : 1 Set trickle valve of cyclone in D- Drum - Turnaround maintenance Can not repair in normal operation,
### RFQ1-3 Additional A2 Drum ### CY-1507/ D-1507 AW-20-A2-053 WP-AW-20-A2-053 DRUM GTS 210011 D-1507 19-1562324 1464-154 NA NA 31-Dec-99 SET
- Repair trickle valve ( if required) following Inspection report : 1 SET 1507 due to loss of catalyst service backlog WO: 19-1562324
- Fit- up, Welding and NDT for weld joint ( if required) : 1 SET during loading catalyst
- Reinstal the cyclone CY-1507 : 1 Set
- Scaffolding Installation /Removal : 756 M3
- Insulation remove/re-install : 1 Point
- Cleaning for checking condition of flange joint ( inside and outside) : 1 Point Can not repair in normal operation,
Fix leaking flue gas at ESP1 Piping works -Turnaround 19-1520170 and
### RFQ1-4 Additional A2 Piping ### Piping - Remove the old bolts&nuts to disconnect the flange joint : 1 Point AW-20-A2-067 WP-AW-20-A2-067 PIPING GTS 210009 ESP1 1464-154 NA NA 31-Dec-99 SET backlog WO: 19-1520170 and 20-
inlet maintenance service 20-1060422
- Cleaning the flange face by hand tool : 1 Point 1060422
- Insert Glass Fibre Tape with silicon into the gap of flange joint : 1 Point
- Replace all bolts and nuts of flange joint by new one and tightening : 1 Point
- Scaffolding Installation /Removal : 12 M3
- Insulation remove/re-install : 1 Point
- Insspection for leaking point and issue inspection report : 1 Point Fix leak at ESP-1 inlet (under Piping works -Turnaround Can not repair in normal operation,
### RFQ1-5 Additional A2 Piping ### ESP AW-20-A2-071 WP-AW-20-A2-071 PIPING GTS 210009 X-1507 17-1431672 1464-154 NA NA 31-Dec-99 SET
- Repair leak following inspection report by welding : 1 Point insulation) maintenance service backlog WO: 17-1431672
- Fit- up, Welding and NDT for repair work : 1 Point
- Repainting : 1 M2
- Blind/Deblind : 1 set
- Erect and remove scaffolding: 81 M3 If not thoroughly repair it shall be
- Cut to remove the damaged point from line 6 inch for replacement (01 location PR21-L1) : 01 leak sour water to atm, relaese H2S
Repair the corroded location Piping works -Turnaround
### RFQ1-10 Additional A2 Auxiliary ### 015-AUX-033 Point AW-19-A2-019 WP-AW-19-A2-019 PIPING GTS 210009 6-SOW-150729-B4A51-NI 19-1430142 1464-155 6"-SOW-150729-B4A51-NI 8474L-015-PID-0021-102-2 5-Jan-00 26-Oct-00 31-Dec-99 SET and impact to safe operation, RFCC
on pipe (PR21-L1) maintenance service
- Replace the 2 m new pipe 6” with protection shield by welding: 02 M to be shutdown for repair leakage
- Fit-up Welding and NDT for weld joint: 02 Joints point
- Repainting : 01 M2
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal: 1120 M3
If not thoroughly repair it shall be
- Cut to remove the damaged points from line 4 inch for replacement (7 locations:PR20-L3, PR21- Repair the corroded location
8474L-015-PID-0031-542-3 leak Nitrogen to atm, impact to N2
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and PR23-L3) : 07 Points on pipe ('PR20-L3, 'PR21-L3, Piping works -Turnaround
### RFQ1-11 Additional A2 Auxiliary ### 015-AUX-034 AW-19-A2-020 WP-AW-19-A2-020 PIPING GTS 210009 4-N-157840-A1AA-NI 19-1430135 1464-155 4"-N-157840-A1AA-NI 8474L-015-PID-0031-543-3 3-Jan-00 29-May-00 31-Dec-99 SET user(WGC, PVC, Reaction section), in
- Replace the 14 m new pipe 4” with 7 protection shields by welding(7 locations:PR20-L3, PR21- 'PR30-L3, 'PR27-L3, 'PR37-L3, maintenance service
8474L-015-PID-0031-544-3.0 the worse case, RFCC to be
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and PR23-L3) : 14 M 'PR39-L3) (6 locations)
shutdown for repair leakage point
- Fit-up Welding and NDT for weld joint : 14 Joints
- Painting: 3.7 M2
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 81 M3 If not thoroughly repair it shall be
- Cut to remove the damaged point from line 6 inch for replacement (1 location: PR28-L1): 01 leak hydrocabon to atm and impact
Repair the corroded location Piping works -Turnaround
### RFQ1-12 Additional A2 Auxiliary ### 015-AUX-035 Point AW-19-A2-021 WP-AW-19-A2-021 PIPING GTS 210009 6-PL-150718-B4A5-NI 19-1432817 1464-155 6-PL-150718-B4A5-NI 8474L-015-Pid-0021-403 5-Jan-00 26-Oct-00 31-Dec-99 SET to safe operation, In the worse case,
on pipe (PR28-L1) maintenance service
- Replace the 2 m new pipe 6” with protection shield by welding (1 location: PR28-L1) : 2 M RFCC to be shutdown for repair
- Fit-up Welding and NDT for weld joint: 2 Joints leakage point
- Repainting: 01 M2
- Blind/Deblind : 01 set
Repair the corroded location on pipe
- Erect and remove scaffolding: 160 M3
(PR39-L3)
- Cut to remove the damaged point from line 6 inch for replacement (01 location: PR39-L3) : 1
Repair the corroded location Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-13 Additional A2 Auxiliary ### 015-AUX-037 Point AW-19-A2-023 WP-AW-19-A2-023 PIPING GTS 210009 6-IA-157501-A1AA-NI 19-1432805 1464-155 6-IA-157501-A1AA-NI 8474L-015-Pid-0021-106 5-Jan-00 29-May-00 31-Dec-99 SET
on pipe (PR39-L3) maintenance service leak LA to atm and impact to LA
- Replace the 2 m new pipe 6” with protection shield by welding (1 location: PR39-L3) : 2 M
user, In the worse case, RFCC to be
- Fit-up Welding and NDT for weld joint: 2 Joints
shutdown for repair leakage point
- Repainting: 0.9 M2
- Blind/Deblind : 01 set
Repair the corroded location on pipe
- Scaffolding Installation /Removal : 80 M3
(PR35-L1)
- Cut to remove the damaged point from line 3 inch for replacement (01 location: PR35-L1) : 01
Repair the corroded location Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-16 Additional A2 Auxiliary ### 015-AUX-040 Point AW-19-A2-026 WP-AW-19-A2-026 PIPING GTS 210009 3-PL-150604-A2AP-NI 19-1432784 1464-155 3-PL-150604-A2AP-NI 8474L-015-Pid-0021-301 2-Jan-00 29-May-00 31-Dec-99 SET
on pipe (PR35-L1) maintenance service leak hydrocabon to atm, In the
- Replace the 2 m new pipe 3” with protection shield by welding (01 locations: PR35-L1): 02 M
worse case, RFCC to be shutdown
- Fit-up Welding and NDT for weld joint: 02 Joints
for repair leakage point
- Repainting: 0.5 M2
Blind/Deblind
Scaffolding Installation/Removal
Fabricate and install temporary supports for repair work If it does not through repair, hot
Remove original clamp supports for further inspection CUI Repair the corroded areas for 48-PG- hydrocarbon shall leak out and catch
### RFQ4-3 Additional A2 Piping ### AW-20-A2-077 WP-AW-20-A2-077 PIPING GTS 24-Dec-74 015-AUX-057 20-1089884 255-KH 48-PG-150431-A2A5-PP 31-Dec-99 29-May-00 1-Jan-00 POINT
Repair the corroded areas following inspection report 150431-A2A5-PP fire. RFCC will be fired totally, unit
Fit-up, welding and NDT for repair work shutdown for longtime
Reinstall original clamp supports and remove temporary supports
Repainting
Blind/Deblind
Insulaiton remove/re-install
Repair weld defect of 2 vents/drains
Scaffolding Installation/Removal If it does not through repair,
(detail as IAT attached): 42-PG- 42-PG-150705-A2A5-BS1
### RFQ4-4 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3/4 inch for repair AW-20-A2-078 WP-AW-20-A2-078 PIPING GTS 24-Dec-74 015-AUX-058 20-1096841 255-KH 30-Dec-99 26-Oct-00 1-Jan-00 POINT hydrocarbon shall leak out and catch
150705-A2A5-BS1 and 6-PL-160002- 6-PL-16002-B2GP-NI
Re-weld to repair weldind joint fire. RFCC unit shutdown
B2GP-NI
Fit-up, welding and NDT for repair work
Repainting
Insulation remove/re-install
If does not through check & repair,
Scaffolding Installation/Removal
015-HV-188,015-HC- Fix the spring supports with rod spring support will be not function
### RFQ4-5 Additional A2 Support ### Spring support Checking condition of the spring supports 015-HV-188, 015-HC-020/045/046/056 after shut down AW-20-A2-079 WP-AW-20-A2-079 SUPPORT GTS 24-Dec-74 19-1460434 255-KH A2-PIP 4-Jan-00 POINT
020/045/046/056 bending of 05 spring supports and eqipment shall move. RFCC unit
Cutting and welding to repair spring support if required (anticipated work)
shutdown
Painting
Blind/Deblind
Insulaiton remove/re-install
E-1524 feed outlet block Disassembly, transport valve to WS If it does not through repair,
### RFQ4-6 Additional A2 M. VALVE ### Remove the damaged valve from line 10" and transfer the damaged valve to WS AW-20-A2-080 WP-AW-20-A2-080 VALVE GTS 25-Dec-74 E-1524-BLV-003 20-1161972 255-KH 9-Jan-00 31-Dec-99 PC
valve and reassembly valve at site hydrocarbon shall leak out
Repair and test valve at WS
Reinstall valve with new gasket at site
Install/remove scaffolding
Remove the old vapor distributor pipes
Replace the vapor distributors of T-
### RFQ4-7 Additional A2 Tower ### T-1501 Install new vapor distributor pipes AW-15-A2-011 WP-AW-15-A2-011 TOWER GTS 27-Dec-74 T-1501 20-1135330 AW-15-A2-011 31-Dec-99 SET
1501
Install pipe stiffeners by welding
NDT to check quality of pipe stiffeners welding
Install/remove scaffolding
Remove/install insulation
Inspect Pipe support point Install pipe shoes for insulated pipes
### RFQ4-8 Additional A2 Support ### Support 242-BB-VHSX-A2 WP-242-BB-VHSX-A2 SUPPORT GTS 24-Dec-74 A2-PIP 20-1120640 AW-20-A2-081 A2-PIP 15-Jan-00 POINT
Modify piping support as support points 242-BB-VHSX-A2
NDT to check quality of welding work
Do painting
Blind/Deblind
Insulaiton remove/re-install
Repair the weldolet defect and
Scaffolding Installation/Removal
corroded pipe section on line 0.75-
### RFQ4-9 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3/4 inch for repair AW-20-A2-083 WP-AW-20-A2-083 PIPING GTS 24-Dec-74 0.75-FG-217802-A2AD-ST2 20-1135369 AW-083-255-ITA-INS 0.75-FG-217802-A2AD-ST2 8474L-021-PID-0021-104-2 30-Dec-99 29-May-00 31-Dec-99 SET
FG-217802-A2AD-ST2 follow IAT
Re-weld to repair weldind joint
report
Fit-up, welding and NDT for repair work
Repainting
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Repair leaking point of line 3-PL-
### RFQ4-10 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3 inch for repair AW-20-A2-084 WP-AW-20-A2-084 PIPING GTS 24-Dec-74 3"-PL-210028-B1GR-ST1 20-1133377 AW-084 3"-PL-210028-B1GR-ST1 8747L-021-PID-0021-112 2-Jan-00 26-Oct-00 31-Dec-99 SET
210005-B1AP2-HC follow IAT report
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Erect and remove scaffolding
Reinstall inlet expansion joint of C-
Remove and reinstall insulation
### RFQ4-11 Additional A2 Expention jont ### C-1502B C-1502B WP-C-1502B EXPENTION GTS 24-Dec-74 C-1502B 1502B. It was damaged during 20-1164134 C-1502B V-215B-001-A-029 31-Dec-99 SET
Remove damage expasion joint
incident in June-2019
Install new expansion joint
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal Fabricate and install saturated HPS
### RFQ4-12 Additional A2 Piping ### 015-SCC-902 Cut to remove the damaged welding joint from lind 3/4 inch for repair MOC-15-20-365 WP-MOC-15-20-365 PIPING GTS 24-Dec-74 015-SCC-902 sample point modification as per 20-1164138 MOC-15-20-365 10"-SH-154030-D1AS-HS 8474L-410-SP-1399-006 30-Dec-99 26-Oct-00 2-Jan-00 POINT
Re-weld to repair weldind joint MOC-15-20-365
Fit-up, welding and NDT for repair work
Repainting
Replace 01set seal kit for actuator Maintenance for ball joint/other
### RFQ4-13 Additional A2 Actuator ### Replace 01 coupleted set positioner AW-20-A2-089 WP-AW-20-A2-089 Actuator GTS 25-Dec-74 015-FV-901 mechanical parts of 015-FV-901/902 20-1161043 015-FV-901 1-Jan-00 SET
Painted actuator during 4th TA follow 247
Blind/Deblind
Insulaiton remove/re-install
Remove and Re-install 8 valves at site
### RFQ4-14 Additional A2 M. VALVE ### Remove the damaged valve from line 2" and transfer the damaged valve to WS AW-20-A2-090 WP-AW-20-A2-090 VALVE GTS 25-Dec-74 VAL-15 20-1168207 VAL-15 8747L-015-PID-0021-129 1-Jan-00 29-May-00 7-Jan-00 SET
015-AT-004/005/006/007/008/009
Repair and test valve at WS
Reinstall valve with new gasket at site
Insulation remove/re-install
Blind/Deblind
Unplug for the MP steam line Piping works -Turnaround
### RFQ5-1 Additional A2 Piping ### Cut and Replace the 2m length pipe with 4 elbow 90 and Steam trap size 3/4 inch by welding AW-20-A2-092 WP-AW-20-A2-092 PIPING GTS 24-Dec-74 015-PIP-001 19-1548259 329-20-2352-DH 30-Dec-99 29-May-00 31-Dec-99 SET
to steam trap no 1337 maintenance service
Fit-up, welding and NDT for weld joint
Repainting
Blind/Deblind
Replace the bypass valve and
Insulation remove/re-install
downstream B/V of steam Piping works -Turnaround
### RFQ5-2 Additional A2 Piping ### Cut to remove the damaged valves size 3/4" and replace by new ones. AW-20-A2-094 WP-AW-20-A2-094 PIPING GTS 24-Dec-74 VAL-15 20-1169205 329-20-2352-DH 30-Dec-99 29-May-00 1-Jan-00 SET
trap on E-1503C export line maintenance service
Fit-up and rewelding and NDT for weld joints
are passing
Repainting
Blind/Deblind
Insulation remove/re-install
Scaffolding Installation / Removal Fix steam tracing is leaking
Piping works -Turnaround
### RFQ5-3 Additional A2 Tracing ### Cut to remove the damaged point including 1 elbow and 1m pipe size 3/4" and replace by new (under insulation) on this pipe AW-20-A2-095 WP-AW-20-A2-095 PIPING GTS 24-Dec-74 0.75-CL-215706-A1AS-HS 19-1585083 329-20-2352-DH 30-Dec-99 29-May-00 31-Dec-99 SET
maintenance service
ones. (between P-2102A/B)
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind
Insulation remove/re-install
Repair weld defect of 2
Cut to remove the damaged points Piping works -Turnaround
### RFQ5-4 Additional A2 Piping ### vents/drains (item 3,9) follow AW-20-A2-096 WP-AW-20-A2-096 PIPING GTS 24-Dec-74 015-PIP-001 20-1194497 329-20-2352-DH 30-Dec-99 26-Oct-00 1-Jan-00 SET
Replace 01 weldolet 10"x3/4" for line 10"-PL-150804-B2AP-ST1 maintenance service
IAT report
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind INPECTION REPORT: Remove
Scaffolding Installation / Removal clamping supports for pipe
Piping works -Turnaround
### RFQ5-5 Additional A2 Piping ### Removing Support / Re-install 10-PL-150534-A2AQ-NI for AW-20-A2-098 WP-AW-20-A2-098 PIPING GTS 24-Dec-74 015-PIP-001 20-1171239 329-20-2352-DH 1-Jan-00 SET
maintenance service
Preparation for inspection detail inspection follow IAT
Repainting report
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
Replace new valve E01-BLV- Piping works -Turnaround
### RFQ5-6 Additional A2 M. VALVE ### AW-20-A2-100 WP-AW-20-A2-100 VALVE GTS 24-Dec-74 VAL-15 20-1222617 329-20-2352-DH 31-Dec-99 SET Detail 확인중
017 in TA4 maintenance service
Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Replace new valve E01-MTV- Piping works -Turnaround
### RFQ5-7 Additional A2 M. VALVE ### Cut to remove the damaged valve size 1" and replace by new one. AW-20-A2-101 WP-AW-20-A2-101 VALVE GTS 24-Dec-74 VAL-15 20-1222612 329-20-2352-DH 31-Dec-99 10-Mar-02 31-Dec-99 SET
001 in TA4 maintenance service
Contractor supply new globe valve 1"#800, SW, body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting
Replace new valve E01-BPV- Piping works -Turnaround
### RFQ5-8 Additional A2 M. VALVE ### AW-20-A2-102 WP-AW-20-A2-102 VALVE GTS 24-Dec-74 VAL-15 20-1222606 329-20-2352-DH 31-Dec-99 SET Detail 확인중
002 in TA4 maintenance service