THE 4TH URNAROUNDOF DUNG QUAT REFINERY 2020

WORK PACKAGE DOCUMENT MATRIX

Assgned Final Final Dossier


No. Equipment Type Equipment Name Work scope WORKS DESCRIPTION WP NO.
Person Inspection submition to BSR

- Blind/Deblind (9 points hot work) : 9 Set


- Scaffolding Installation /Removal : 324 M3
- Insulation removal/re-installation : 9 Set
- Fabricate new part of spools follow DCA-15-19-
003 at work shop : 21 spool
- Cutting, repair and welding old spools at site
follow DCA-15-19-003 : 16 spool
015-FT- - Cutting, install new part of spools and welding at Modification for 9 flow metters 015-FT-
1 Piping 15 426/407/408/406/501/42 site follow DCA-15-19-003 : 21 spool 426/407/408/406/501/424/425/439/440 WP-AW-20-A2-048 Mr.Khanh
4/425/439/440 - Fit-up, welding, NDT and PWHT for weld follow DCA-15-19-003
joints : 193 Joints
- Cutting, install new steam tracing and welding at
site (19 points) : 66 m
- Repair support at site ( if required) : 1 SET
- Cutting, fit up and welding base for instrument
stanchion. Remove : 09 set
- Painting : 6 M2

- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1
Set
- Inspection for trickle valve CY-1505 : 1 Set Check & repair (if required) trickle valve
2 Drum 15 CY-1505/D-1505 -Repair trickle valve ( if required) following of cyclone in D-1505 due to loss of WP-AW-20-A2-052 Mr.Trí
Inspection report : 1 SET catalyst during loading catalyst
- Fit- up, Welding and NDT for weld joint ( if
required) : 1 SET
- Reinstal the cyclone CY-1505 : 1 Set

- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1
Set
- Inspection for trickle valve CY-1507 : 1 Set Check & repair (if required) trickle valve
3 Drum 15 CY-1507/ D-1507 - Repair trickle valve ( if required) following of cyclone in D-1507 due to loss of WP-AW-20-A2-053 Mr.Trí
Inspection report : 1 SET catalyst during loading catalyst
- Fit- up, Welding and NDT for weld joint ( if
required) : 1 SET
- Reinstal the cyclone CY-1507 : 1 Set
- Scaffolding Installation /Removal : 756 M3
- Insulation remove/re-install : 1 Point
- Cleaning for checking condition of flange joint
( inside and outside) : 1 Point
- Remove the old bolts&nuts to disconnect the
4 Piping 15 Piping flange joint : 1 Point Fix leaking flue gas at ESP1 inlet WP-AW-20-A2-067
- Cleaning the flange face by hand tool : 1 Point
- Insert Glass Fibre Tape with silicon  into the gap
of flange joint : 1 Point
- Replace all bolts and nuts of flange joint by new
one and tightening : 1 Point
- Scaffolding Installation /Removal : 12 M3
- Insulation remove/re-install : 1 Point
- Insspection for leaking point and issue inspection
report : 1 Point
5 Piping 15 ESP - Repair leak following inspection report by Fix leak at ESP-1 inlet (under insulation) WP-AW-20-A2-071
welding : 1 Point
- Fit- up, Welding and NDT for repair work : 1
Point
- Repainting : 1 M2

Replace refractory on hot spot area:


- Scafolding modify : 10 M3
- Remove damged refractory area on valve body
from valve’s dissimilar weld to upper cold joint by
water jet: 5.12 M2
- Remove damaged V-anchors: 43 pCS
- Repair metal loss by weld build-up (Estimated
0.5m2 due to thickness reduction from 30mm to
27.05mm) : 0.5 M2
6 Slide valve 15 SV-1501 - Install new anchor and welding : 43 PCS Regenerated catalyst slide valve WP-AW-19-A2-012
- PT for V-anchor welding : 5 Point
- Garnet/sand blasting : 5.12 M2
- Form work design/ fabrication/
installation/removal : 5.12 M2
- Casting refractory/curing (Exactly casting area to
be confirmed after refactory removal and internal
inspection) : 5.12 M3
- Dry-out by heating pad (anticipated) or process
dry-out : 5.12 M2

- Blinding and deblinding : 01 set


- Scaffolding Installation /Removal: 120 M3
- Cut to remove the damaged point from line 2
inch for replacement (01 location at PR3-L2) : 01
Points Repair the corroded location on pipe (at
7 Auxiliary 17 017-AUX-001 WP-AW-19-A2-014 Mr.Khanh
- Replace the 2 m new pipe 2” with protection PR3-L2)
shield by welding : 2 M
- Fit- up Welding and NDT for weld joints : 02
Joints
- Repainting: 0.3 M2
- Blinding and deblinding
- Scaffolding Installation /Removal: 800 M3
- Cut to remove the damaged points from line 6
inch for replacement (5 locations: PR30-L3,
''PR37-L3, PR36-L3, PR21-L3, PR23-L3): 5 Point Repair the corroded location (PR30-L3,
8 Auxiliary 15 015-AUX-031 - Replace the 10 m new pipe 6” with 5 protection ''PR37-L3, PR36-L3, PR21-L3, PR23- WP-AW-19-A2-017
shields by welding(5 locations: PR30-L3, PR37- L3 )
L3, PR36-L3, PR21-L3, PR23-L3): 10 M.
- Fit-up Welding and NDT for weld joints : 10
Joints
- Repainting : 4.6 M2

- Blinding and deblinding


- Scaffolding Installation /Removal: 405 M3
- Cut to remove the damaged points from line 3
inch ( 5 locations:PR20-L1, PR27-L1, PR28-L1 ,
PR37-L1, PR19-L1): 5 M Repair the corroded location on pipe
9 Auxiliary 15 015-AUX-032 - Replace the 10 m new pipe 3” with 5 protection (PR20-L1, PR27-L1, PR28-L1 (2 points), WP-AW-19-A2-018 Mr.Khanh
shields by welding (5 locations: PR20-L1, PR27- PR37-L1, PR19-L1)
L1, PR28-L1, PR37-L1, PR19-L1): 10 M
- Fit-up Welding and NDT for weld joints: 10
joints
- Repainting: 2.3 M2
- Blind/Deblind : 1 set
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location PR21-L1) : 01
Point Repair the corroded location on pipe
10 Auxiliary 15 015-AUX-033 WP-AW-19-A2-019 Mr.Khanh
- Replace the 2 m new pipe 6” with protection (PR21-L1)
shield by welding: 02 M
- Fit-up Welding and NDT for weld joint: 02
Joints
- Repainting : 01 M2
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal: 1120 M3
- Cut to remove the damaged points from line 4
inch for replacement (7 locations:PR20-L3, PR21-
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and
PR23-L3) : 07 Points Repair the corroded location on pipe
11 Auxiliary 15 015-AUX-034 - Replace the 14 m new pipe 4” with 7 protection ('PR20-L3, 'PR21-L3, 'PR30-L3, 'PR27- WP-AW-19-A2-020 Mr.Khanh
shields by welding(7 locations:PR20-L3, PR21- L3, 'PR37-L3, 'PR39-L3) (6 locations)
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and
PR23-L3) : 14 M
- Fit-up Welding and NDT for weld joint : 14
Joints
- Painting: 3.7 M2

- Blind/Deblind : 01 set
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 6
inch for replacement (1 location: PR28-L1): 01
Repair the corroded location on pipe
12 Auxiliary 15 015-AUX-035 Point WP-AW-19-A2-021 Mr.Khanh
(PR28-L1)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR28-L1) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 01 M2
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR39-L3) : 1
Repair the corroded location on pipe
13 Auxiliary 15 015-AUX-037 Point WP-AW-19-A2-023 Mr.Khanh
(PR39-L3)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR39-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2
- Blind/Deblind : 01 set
-Scaffolding Installation /Removal: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR34-L3) : 01
Repair the corroded location on pipe
14 Auxiliary 15 015-AUX-038 Point WP-AW-19-A2-024 Mr.Khanh
(PR34-L3)
- Replace the 2 m new pipe 6” with protection
shield by welding (1 location: PR349-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2
- Blinding and deblinding
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 4 Repair the corroded location on pipe
15 Auxiliary 15 015-AUX-039 WP-AW-19-A2-025 Mr.Khanh
inch for replacement (01 location): 2 M (PR20-L1)
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.6 M2
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal : 80 M3
- Cut to remove the damaged point from line 3
inch for replacement (01 location: PR35-L1) : 01
Point Repair the corroded location on pipe
16 Auxiliary 15 015-AUX-040 WP-AW-19-A2-026 Mr.Khanh
- Replace the 2 m new pipe 3” with protection (PR35-L1)
shield by welding (01 locations: PR35-L1): 02 M
- Fit-up Welding and NDT for weld joint: 02
Joints
- Repainting:
Blinding and0.5 M2
deblinding : 1 Set
- Scaffolding Installation /Removal: 180 M3
- Insulation remove/re-install: 01 Set
- Cut to remove 03 damaged elbows size 2 inch
for replacement : 03 PCS
17 Auxiliary 15 015-AUX-041 Repair the eroded pipe/elbow sections WP-AW-19-A2-027 Mr.Khanh
- Replace 03 new elbows and 6m pipe size 2 inch
by welding : 03 PCS
- Fit-up, Welding and NDT for weld joint : 08
Joints
- Repainting : 0.9 M2
- Scaffolding Installation /Removal : 120 m3
- Remove temporary blind : 01 set
- Remove and reinstall insulation :64 M2
Replace the expansion joint at inlet C-
18 Auxiliary 15 015-AUX-042 - Remove damaged expantion joint from line WP-AW-19-A2-028
1502A
( inlet C-1502A) : 01 Set
- Install new expantion joints ( inlet C-1502A,
inlet and outlet C-1502B) : 03 Set
- Blind/Deblind : 01 Set
- Scaffolding Installation /Removal: 320 M3
- Cut to remove the damaged points from line 6
inch for replacement (2 locations:PR21-L3, PR30-
L3) : 02 Point Repair the corroded location on pipe
19 Auxiliary 15 015-AUX-036 WP-AW-19-A2-022 Mr.Khanh
- Replace the 4 m new pipe 6” with 2 protection (PR21-L3, PR30-L3)
shields by welding (2 locations:PR21-L3, PR30-
L3): 4 M
- Fit-up Welding and NDT for weld joint: 4 Joints
- Repainting: 1.9 M2

Install/remove scaffolding
CO/WHB Remove rain hoof from the FDF inlet line by crane
20 Boiler 15 H-1503 Dismantle the rain hoof cover CO/WHB Boiler Package WP-AW-19-A2-003
Package Install inverse cone as original design
Re-install back to the line

- Cut the old trap from lines_x000D_


Replace water trap due to over 10 years
- Cleaning inside the line
21 Auxiliary 15 015-AUX-013 working and suspected of low WP-AW-19-A2-003
- Install new water trap._x000D_
performance
- NDT (PT)
- Cut the old trap from lines_x000D_
Replace water trap due to over 10 years
- Cleaning inside the line
22 Auxiliary 15 015-AUX-012 working and suspected of low WP-AW-19-A2-003
- Install new water trap._x000D_
performance
- NDT (PT)
- Remove ejector from lines_x000D_
23 Equipment 15 C-1501-J-02A Replace ejector WP-AW-19-A2-003 Mr.Huy
- Install new ejector with new gasket
- Remove ejector from lines_x000D_
24 Equipment 15 C-1501-J-03A Replace ejector WP-AW-19-A2-003 Mr.Huy
- Install new ejector with new gasket
- Remove ejector from lines_x000D_
25 Equipment 15 C-1501-J-02B Replace ejector WP-AW-19-A2-003 Mr.Huy
- Install new ejector with new gasket
- Remove ejector from lines_x000D_
26 Equipment 15 C-1501-J-03B Replace ejector WP-AW-19-A2-003 Mr.Huy
- Install new ejector with new gasket
- Cut the old trap from lines_x000D_
Replace water trap due to over 10 years
- Cleaning inside the line
27 Auxiliary 15 015-AUX-014 working and suspected of low WP-AW-19-A2-003
- Install new water trap._x000D_
performance
- NDT (PT)
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then repair if it finds
28 Equipment 15 C-1551-J-02A WP-AW-19-A2-003 Mr.Huy
- Inspect any corrosion/erosion eroded nozzle
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then repair if it finds
29 Equipment 15 C-1551-J-03A WP-AW-19-A2-003 Mr.Huy
- Inspect any corrosion/erosion eroded nozzle
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then repair if it finds
30 Equipment 15 C-1551-J-02B WP-AW-19-A2-003 Mr.Huy
- Inspect any corrosion/erosion eroded nozzle
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then repair if it finds
31 Equipment 15 C-1551-J-03B WP-AW-19-A2-003 Mr.Huy
- Inspect any corrosion/erosion eroded nozzle
- Re-install back ejector with new gasket
- Dismantle the flange 3"
Check/inspect two spray nozzles of BFW
- Internal inspection
32 Auxiliary 15 015-AUX-015 to LPS to header. Repair or replace if WP-AW-19-A2-003
- Repair/replace if damaged
needed
- Install back nozzle with new gasket
- Grinding the old welding seam
Repair the crack of socket weld seam at
33 Auxiliary 15 015-AUX-011 - Re-welding WP-AW-19-A2-003 Mr.Khanh
the elbow
- NDT (PT)
- Cut the damaged pipe 1m from lines_x000D_ Repair the corroded pipe section of
34 Auxiliary 15 015-AUX-016 - Install new pipe section by welding 1000mm in length, reper to IR No. 19- WP-AW-19-A2-003 Mr.Khanh
- NDT (PT/RT 2 points) 033-IR-INS dated 23/01/2019
-Install/remove scaffoding
- remove / reinstall ínulation
- Cut the damaged pipe200mm from Repair the corroded pipe section of 0.75-
35 Auxiliary 15 015-AUX-010 lines_x000D_ FG-217802-A2AD-ST2 refer to 18-222- WP-AW-19-A2-003 Mr.Khanh
- Install new pipe section with flange by welding IR-INS
- replace new gasket
- NDT (PT/RT)
- remove / reinstall insulation
- Dismantle flange connection Repair leaking HC at flange of slurry line
36 Auxiliary 15 015-AUX-017 WP-AW-19-A2-003
- inspect flange face from D-1515 to P-1504
- Repalce new gasket

- Install/ remove scaffolding


- Remove/ install insulation
- Blind/ de-blind
- Replace new reducing Tee 1,5”x3/4” (01 pcs) Replace the corroded drain pipe follow
37 Auxiliary 15 015-AUX-018 WP-AW-19-A2-003 Mr.Khanh
and ¾” new pipe (200mm) by welding on line 1.5- report 19-140-IR-INS
HSO-159407-A2AP-ST2
- NDT 4 joints (2 joints 1,5” and 2 joints ¾” ) to
be confirmed by INS

- Remove valve from lines_x000D_ Repair passing of globe valves at


38 M. VALVE 15 TV616-MTV-001 WP-AW-19-A2-003
- Replace new valve downstream of 015TV616
- Dismantle flange connection
- Cleaning flange face and inspection Repair leaking at flange of inlet slurry blo
39 M. VALVE 15 E-1501B-BLV-015 WP-AW-19-A2-003
- Repair flange face if required ck valve of E-1501B
- Replace new gasket
- Remove valve from lines_x000D_ Repair passing of globe valves at
40 M. VALVE 15 TV616-MTV-002 WP-AW-19-A2-003
- Replace new valve downstream of 015TV616
- Cut the damaged valve from lines_x000D_
Repair process block valve upstream of 0
41 M. VALVE 15 E02-BLV-002 - Install new valve WP-AW-19-A2-003 Mr.Khanh
15-PG-880 (it cannot operate)
- NDT (PT)
- Cut the damaged valve from lines_x000D_
Repair the globle valve at P-
42 M. VALVE 15 P1559-MTV-003 - Install new valve WP-AW-19-A2-003 Mr.Khanh
1559B (it can not close)
- NDT (PT)
Blind/Deblind
Grinding the welding joint 3" Repair the detective weld seam of 3 inch
43 Auxiliary 16 016-AUX-001 WP-AW-19-A2-003
Re-welding pipe of 16-LG-002 of D-1602
RT 1 joint 3"

- Install/remove scaffolding
- Remove/re-install insulation Replace the corroded 0.75" Tee section of
44 Auxiliary 21 021-AUX-011 - Cutting the weldolet and pipe 3/4" 3-F-218039-A1GR1-ST1 follow report WP-AW-19-A2-003 Mr.Khanh
- Replace new weldolet and pipe 3/4" by welding 18-223/IR-INS (TA4 job)
- NDT (PT/RT)

- Install/remove scaffolding
Repair the LP steam leak on the pipe 1.5-
- Install/remove insulation
45 Auxiliary 21 021-AUX-010 SL-214658-A1AS-HS follow report 18- WP-AW-19-A2-003 Mr.Khanh
- Replace 3/4" pipe about 3m
092/IR-INS
- NDT (PT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
46 Auxiliary 21 021-AUX-012 - Cutting and Replace 1m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 25/4/2019
welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
- Cutting the 6m corrosion pipe 3/4"; Replace the corroded drain pipe follow
47 Auxiliary 21 021-AUX-013 WP-AW-19-A2-003 Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
48 Auxiliary 21 021-AUX-014 - Cutting and Replace 2m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 06/5/2019
welding;
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain pipe follow
49 Auxiliary 21 021-AUX-015 - Cutting and Replace 2.2m new pipe 3/4" by WP-AW-19-A2-003 Mr.Khanh
inspection IAT issued 25/4/2019
welding;
- NDT (RT)

- Install/remove scaffolding;
- Remove/re-install insulation;
- Cutting the 6m corrosion pipe 3/4"; Replace the corroded drain pipe follow
50 Auxiliary 21 021-AUX-016 WP-AW-19-A2-003 Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)

- Blind/Deblind;
- Cut the 02 welding joint 2" on Tee 2"x3/4 and
Repair the crack on pipe wall 2-SH-
51 Auxiliary 21 021-AUX-017 flange 2"; WP-AW-19-A2-003 Mr.Khanh
154047-B0K6-HS
- Replace 01 spool pipe 304H material by welding
- RT
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind
- Bending and replace two 90 deg elbow 3/4" by Repair the corroded pipe section and the
52 Auxiliary 21 021-AUX-018 WP-AW-19-A2-003 Mr.Khanh
welding on line 0.75-F-218075-A1GR1-ST1 elbows
- Cut and Replace 0.5m new straight pipe by
welding on line 0.75-F-218075-A1GR1-ST1
- RT 4 joints ( ¾” )

- Install/ remove scaffolding


- Remove/ install insulation
- Blind/ de-blind
53 Auxiliary 21 021-AUX-019 Repair the corroded pipe section WP-AW-19-A2-003 Mr.Khanh
- Cut and Replace 1.5m new straight pipe by
welding on line 1.5-F-218018-A1GR1-ST1
- RT 2 joints ( 1.5" )

- Install/ remove scaffolding


- Remove/ install insulation
- Blind/ de-blind
54 Auxiliary 21 021-AUX-020 Repair the corroded pipe section WP-AW-19-A2-003 Mr.Khanh
- Cut and Replace 0.5m new straight pipe by
welding on line 0.75-F-218111-A1GR-ST1
- RT 2 joints ( ¾” )

- Install/remove scaffolding
- Dismantle the valve from the line
- Pre-cleaning and install temporary cover;
55 M. VALVE 17 PSV019A-BLV-001 - Transfer the valve to Workshop and handover to Remove and Reinstall valve at site WP-AW-19-A2-003
P6
- Receive the valve from P6
- Re-install back valve to the line with new gasket

- Blinding and deblinding


- remove and reinstall insulation
- remove gearbox of valve and valve from line
14" Valve M1501-BLV-001 on feed line
- Bring gear box, valve to Workshop.
56 M. VALVE 15 M1501-BLV-001 downstream mixer was being passed on WP-AW-19-A2-010
- Repair gearbox of valve
15-06-2019. Need to repair it
- Repair valve.
- Passing test
- Install valve and gearbox at site

- Blinding and deblinding


- Erect and remove scaffolding
- remove and reinstall insulation 20" block valve on steam export from
- remove valve from line COB
57 M. VALVE 15 TV918A-BLV-007 WP-AW-19-A2-010
- Bring valve to Workshop. TV918A-BLV-007 had leaking at valve
- Replace new bonnet gasket of valve. bonnet flange. Need to repair
- Testing
- Install valve at site

- Blinding and deblinding


- Remove valve from line
8" block valve D-1555-BLV-006 was
- Bring valve to Workshop.
58 M. VALVE 15 D1555-BLV-006 passed during D-1555 isolation. Need to WP-AW-19-A2-010
- Repair valve.
repair
- Passing test
- Install valve at site
- Blinding and deblinding
- Remove valve from line
8" block valve D-1555-BLV-005 was
- Bring valve to Workshop.
59 M. VALVE 15 D1555-BLV-005 passed during D-1555 isolation. Need to WP-AW-19-A2-010
- Repair valve.
repair
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove valve from line
8" block valve D-1555-BLV-003 was
- Bring valve to Workshop.
60 M. VALVE 15 D1555-BLV-003 passed during D-1555 isolation. Need to WP-AW-19-A2-010
- Repair valve.
repair
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove valve from line
8" block valve D-1555-BLV-002 was
- Bring valve to Workshop.
61 M. VALVE 15 D1555-BLV-002 passed during D-1555 isolation. Need to WP-AW-19-A2-010
- Repair valve.
repair
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove and reinstall insulation
- Remove valve from line 14" Valve M1501-BLV-002 on feed line
62 M. VALVE 15 M1501-BLV-002 - Bring valve to Workshop. downstream mixer was being passed on WP-AW-19-A2-010
- Repair valve. 15-06-2019. Need to repair it
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove and reinstall insulation
- Remove valve from line
Repair the block valve on BFD outlet line
63 M. VALVE 15 E1507AB-MTV-003 - Bring valve to Workshop. WP-AW-19-A2-010
to E-1507A/B is passing
- Repair valve.
- Passing test
- Install valve at site

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-015 can not open. Need to
64 M. VALVE 15 E01-BLV-015 WP-AW-19-A2-010 Mr.Khanh
- Cut to remove the old valve from line repair
- Replace the new valve by welding.
- NDT

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-016 can not open. Need to
65 M. VALVE 15 E01-BLV-016 WP-AW-19-A2-010 Mr.Khanh
- Cut to remove the old valve from line repair
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-018 can not open. Need to
66 M. VALVE 15 E01-BLV-018 WP-AW-19-A2-010 Mr.Khanh
- Cut to remove the old valve from line repair
- Replace the new valve by welding.
- NDT

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation E01-MTV-005 can not open. Need to
67 M. VALVE 15 E01-MTV-005 WP-AW-19-A2-010 Mr.Khanh
- Cut to remove the old valve from line repair
- Replace the new valve by welding.
- NDT

- Blinding and deblinding


- Remove and reinstall insulation 3/4" block valve upstream of steam trap
68 M. VALVE 15 STT-001-BLV - Cut to remove the old valve from line on MPS sealing to ST-1501 is passing. WP-AW-19-A2-010 Mr.Khanh
- Replace the new valve by welding. Need to relpace valve
- NDT

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation Repair the hand wheel of block valve
69 M. VALVE 15 FG041-BLV-001 WP-AW-19-A2-010
- Cut to remove the old valve from line upstream of 015-FG-041
- Replace the new valve by welding.
- NDT

- Blinding and deblinding


- Remove and reinstall insulation
The equalizing valve on manual valve
- Remove valve from line by cutting
70 M. VALVE 15 E-1504B-BLV-014 E1504B-BLV-014 was damaged WP-AW-19-A2-010
- Replace new globle valve 3/4 # 800 by welding
(pinhole)
at site
- NDT

- Blinding and deblinding


- Cut to remove the old valve from line The 1st block valve at inlet of 015-SC-
71 M. VALVE 15 SC716-BLV-001 WP-AW-19-A2-010
- Replace the new valve by welding. 716 was passing, Need to replace
- NDT

- Remove temporary support


- Fabricate new structure support at WS following Remove temporary support và reinstall
72 Auxiliary 15 015-AUX-020 design structure support for Duct line of C- WP-AW-19-A2-010 Mr.Khanh
- Erect and remove scaffolding 1502B
- Install new structure support at site

- Fabricate / repare air duct spool at WS following


design
- Erect and remove scaffolding
73 Auxiliary 15 015-AUX-021 Reinstall Air duct line for C-1502B WP-AW-19-A2-010
- remove and reinstall insulation
- remove temporary Blind of the duct
- reinstall air duct at site

- Erect and remove scaffolding


- Remove and reinstall insulation
74 Auxiliary 15 015-AUX-022 Replace expansion joint của C-1502B WP-AW-19-A2-010
- Remove damage expasion joint
- Install new expansion joint
- Erect and remove scaffolding
- Remove damage cooling water piping Repair the damaged section pipe of 1.5-
75 Auxiliary 15 015-AUX-023 - Fabricate new cooling water piping following CWS and 1.5-CWR to C-1502A/C- WP-AW-19-A2-010 Mr.Khanh
design at WS 1502B
- Install new cooling water piping at site

- Blinding and deblinding


- Remove and reinstall insulation Steam trap on MP steam sealing to ST-
76 Auxiliary 15 015-AUX-028 - Cut to remove the old steam trap from line 1501 is not working properly. Need to WP-AW-19-A2-010 Mr.Khanh
- Replace the new steam trap by welding. check and replace
- NDT

- Erect and remove scaffolding


- Remove and reinstall insulation
- Remove temporary repair location X-1507: Repair the damaged casing of
77 Auxiliary 15 015-AUX-025 WP-AW-19-A2-010 Mr.Khanh
- Fabricate new plate and structure following ESP1
design at WS
- Install new plate and structure at site
- Remove and reinstall insulation X-1504: Fix leaking at flange of DCO
78 Auxiliary 15 015-AUX-026 WP-AW-19-A2-010
- Replace new gasket. line from module 6-10

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation
- Cut to remove the 8" tee section and 1500mm
Repair condensate leaking on pipe 8-CL-
79 Auxiliary 15 015-AUX-027 damage pipe downstream of tee section WP-AW-19-A2-010 Mr.Khanh
155401-A1AS-HS follow IAT
- Replace the new 8" tee section and 1500mm pipe
downstream of tee section ( material: SS304) by
welding.
- NDT ( RT)

- Bliding and debliding


- Erect and remove scaffolding
- Remove damage plant air piping
80 Auxiliary 15 015-AUX-024 Replace instrument air line near C-1502 WP-AW-19-A2-010
- Fabricate new plant air piping following design
at WS
- Install new plant air piping at site

- Blinding and deblinding


- Erect and remove scaffolding
Repair the corroded section pipe of 24-
81 Auxiliary 21 021-AUX-021 - Remove and reinstall insulation WP-AW-19-A2-010 Mr.Khanh
PV-210091-B1AP-BHC follow IAT
- Build up the corrosion location by welding.
- NDT

- Blinding and deblinding


- Erect and remove scaffolding
Repair the 0.5 corroded pipe section (due
- Remove and reinstall insulation
82 Auxiliary 21 021-AUX-022 to CUI) of 30-PV-210102-A1GR1-BET WP-AW-19-A2-010 Mr.Khanh
- Cut to remove the 2 x 200mm damage pipe
follow IAT
- Replace the new 2 x 200mm pipe by welding.
- NDT ( RT)

- Remove old element


83 Skin TC 15 015-TE-910D - Welding new element to HP Tube of COB. COB WP-AW-19-A2-008 Mr.Khanh
- Connect element to 015-TI-910-D Loop
o Signal cable and Instrument Air/Hydraulic
Removal / Reinstallation at site
o Remove/reinstall the valve from/to the pipe
o Transfer the valve to whokshop/site
o Dismantle /Overhaul/Assemble Valve
84 Control valve 15 015-TV-857 o Dismantle /Overhaul/Assemble Actuator MAB- Oil Temperature Control WP-AW-19-A2-008 Mr.Khanh
o Body and leaking test
o Calibration at Workshop
o Cover the valve by standard plastic blind
o Test the function and get signature (for CV) at
site

Modify to add 04 access doors on the shell side of


Economizer E-1525 as approved MOC-15-19-335
(Modify drain manhole 710x710 with refractory
85 Economizer 15 E-1525 COB Economizer WP-AW-20-A2-074
lining on bottom of Economizer has been included
in the contract signed item 114 TA4 static
equipment worklist)

Blind/Deblind
Scaffolding Installation/Removal
Cut to remove the damaged weld joint from line 1-
86 Piping 21 1/2inch for repair WP-AW-20-A2-075 Mr.Khanh
Re-weld to repair welding joint
Fit-up, welding and NDT for welding joint
Repainting

Blind/Deblind
Scaffolding Installation/Removal
Fabricate and install temporary supports for repair
work
Remove original clamp supports for further
inspection CUI
87 Piping 15 WP-AW-20-A2-077
Repair the corroded areas following inspection
report
Fit-up, welding and NDT for repair work
Reinstall original clamp supports and remove
temporary supports
Repainting

Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
88 Piping 15 WP-AW-20-A2-078 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting

Insulation remove/re-install
Scaffolding Installation/Removal
Checking condition of the spring supports 015-
HV-188, 015-HC-020/045/046/056 after shut
89 Support 15 Spring support WP-AW-20-A2-079
down
Cutting and welding to repair spring support if
required (anticipated work)
Painting
Blind/Deblind
Insulaiton remove/re-install
E-1524 feed outlet block Remove the damaged valve from line 10" and
90 M. VALVE 15 WP-AW-20-A2-080
valve transfer the damaged valve to WS
Repair and test valve at WS
Reinstall valve with new gasket at site

Install/remove scaffolding
Remove the old vapor distributor pipes
91 Tower 15 T-1501 Install new vapor distributor pipes WP-AW-15-A2-011 Mr.Trí
Install pipe stiffeners by welding
NDT to check quality of pipe stiffeners welding

Install/remove scaffolding
Remove/install insulation
Inspect Pipe support point
92 Support 15 Support WP-AW-20-A2-081 Mr.Khanh
Modify piping support
NDT to check quality of welding work
Do painting

Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
93 Piping 21 WP-AW-20-A2-083 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting

Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
94 Piping 21 WP-AW-20-A2-084 Mr.Khanh
lind 3 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting

Erect and remove scaffolding


Expention Remove and reinstall insulation
95 15 C-1502B WP-20-1164134
jont Remove damage expasion joint
Install new expansion joint

Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
96 Piping 15 015-SCC-902 WP-20-1164138 Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting

Replace 01set seal kit for actuator


97 Actuator 15 015-FV-901 Replace 01 coupleted set positioner WP-AW-20-A2-089
Painted actuator
Blind/Deblind
Insulaiton remove/re-install
Remove the damaged valve from line 2" and
98 M. VALVE 15 WP-AW-20-A2-090
transfer the damaged valve to WS
Repair and test valve at WS
Reinstall valve with new gasket at site

Insulation remove/re-install
Blind/Deblind
Cut and Replace the 2m length pipe with 4 elbow Unplug for the MP steam line to steam
99 Piping 15 WP-AW-20-A2-092 Mr.Khanh
90 and Steam trap size 3/4 inch by welding trap no 1337
Fit-up, welding and NDT for weld joint
Repainting

Blind/Deblind
Insulation remove/re-install
Replace the bypass valve and
Cut to remove the damaged valves size 3/4" and
100 Piping 15 downstream B/V of steam trap on E- WP-AW-20-A2-094 Mr.Khanh
replace by new ones.
1503C export line are passing
Fit-up and rewelding and NDT for weld joints
Repainting
Blind/Deblind
Insulation remove/re-install
Scaffolding Installation / Removal
Fix steam tracing is leaking (under
Cut to remove the damaged point including 1
101 Tracing 21 insulation) on this pipe (between P- WP-AW-20-A2-095 Mr.Khanh
elbow and 1m pipe size 3/4" and replace by new
2102A/B)
ones.
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind
Insulation remove/re-install
Cut to remove the damaged points
Repair weld defect of 2 vents/drains (item
102 Piping 15 Replace 01 weldolet 10"x3/4" for line 10"-PL- WP-AW-20-A2-096 Mr.Khanh
3,9) follow IAT report
150804-B2AP-ST1
Fit-up, welding and NDT for weld joints
Repainting

Blind/Deblind
INPECTION REPORT: Remove
Scaffolding Installation / Removal
clamping supports for pipe 10-PL-
103 Piping 15 Removing Support / Re-install WP-AW-20-A2-098
150534-A2AQ-NI for detail inspection
Preparation for inspection
follow IAT report
Repainting
104 M. VALVE 15 Replace new valve E01-BLV-017 in TA4 WP-AW-20-A2-100 Mr.Khanh

Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Cut to remove the damaged valve size 1" and
Replace new valve E01-MTV-001 in
105 M. VALVE 15 replace by new one. WP-AW-20-A2-101 Mr.Khanh
TA4
Contractor supply new globe valve 1"#800, SW,
body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting

106 M. VALVE 15 Replace new valve E01-BPV-002 in TA4 WP-AW-20-A2-102 Mr.Khanh


THE 4TH URNAROUNDOF DUNG QUAT REFINERY 2020 PLANNING

WORK PACKAGE DOCUMENT MATRIX QC

WORK PLANNING QUALITY TEST PACK SAFETY PLAN ENGINEERING DOC. BSR
SAFETY

Waste management

Work control sheet

P & ID mark up of
Inspection and test
Procedure/Method

General and detail


Work information

List of mandatory
Reduplicate

Refractory /Weld

Final box-up and


Rigging (lifting)

Ventilation plan

PIR/SEIP/SPIP.
statement/Work

position (like as

Management of
Isometric/detail
SPECIAL PPE
Job plan (From

Bill of material

Interim box up
(Blind/LOTO)

manufacturing
Equipment Equipment

Isolation plan

Material Test

drawing with
No. Work scope WORKS DESCRIPTION WP NO.

Watchman )

Rescus plan
Type Name

Scaffolding

Acceptance
Utility plan
WP Complete QCA/QC Mr Binh-Khanh

Data Sheet
checksheet

drawing of
equipment

equipment
Certificate

Zero leak
Plan Person in charge

drawing

markup
MSDS.

change

Other
WO)

steps

JSA.
Map

OIA
plan

plan

plan
Unit
106.00 44 1 1 2 1 1

- Blind/Deblind (9 points hot work) : 9 Set


- Scaffolding Installation /Removal : 324 M3
- Insulation removal/re-installation : 9 Set
- Fabricate new part of spools follow DCA-15-19-
003 at work shop : 21 spool
- Cutting, repair and welding old spools at site
Modification for 9
follow DCA-15-19-003 : 16 spool
flow metters 015-FT-
015-FT- - Cutting, install new part of spools and welding at
426/407/408/406/501/
1 Piping 15 426/407/408/406/501/42 site follow DCA-15-19-003 : 21 spool WP-AW-20-A2-048 1 Mr.Khanh
424/425/439/440
4/425/439/440 - Fit-up, welding, NDT and PWHT for weld
follow DCA-15-19-
joints : 193 Joints
003
- Cutting, install new steam tracing and welding at
site (19 points) : 66 m
- Repair support at site ( if required) : 1 SET
- Cutting, fit up and welding base for instrument
stanchion. Remove : 09 set
- Painting : 6 M2
R X X R X R X R X R R R X R R R R X R R

- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1
Check & repair (if
Set
required) trickle valve
- Inspection for trickle valve CY-1505 : 1 Set
of cyclone in D-1505
2 Drum 15 CY-1505/D-1505 -Repair trickle valve ( if required) following WP-AW-20-A2-052 1 R R Mr.Trí
due to loss of catalyst
Inspection report : 1 SET
during loading
- Fit- up, Welding and NDT for weld joint ( if
catalyst
required) : 1 SET
- Reinstal the cyclone CY-1505 : 1 Set
R X X R R X X R X R R R R R R R

- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1
Check & repair (if
Set
required) trickle valve
- Inspection for trickle valve CY-1507 : 1 Set
of cyclone in D-1507
3 Drum 15 CY-1507/ D-1507 - Repair trickle valve ( if required) following WP-AW-20-A2-053 1 R R Mr.Trí
due to loss of catalyst
Inspection report : 1 SET
during loading
- Fit- up, Welding and NDT for weld joint ( if
catalyst
required) : 1 SET
- Reinstal the cyclone CY-1507 : 1 Set
R X X R R X X R X R R R R R R R

- Scaffolding Installation /Removal : 756 M3


- Insulation remove/re-install : 1 Point
- Cleaning for checking condition of flange joint
( inside and outside) : 1 Point
- Remove the old bolts&nuts to disconnect the
Fix leaking flue gas at
4 Piping 15 Piping flange joint : 1 Point WP-AW-20-A2-067 1 R R
ESP1 inlet
- Cleaning the flange face by hand tool : 1 Point
- Insert Glass Fibre Tape with silicon  into the gap
of flange joint : 1 Point
- Replace all bolts and nuts of flange joint by new
one and tightening : 1 Point
- Scaffolding Installation /Removal : 12 M3 R X X R R R R R R R R
- Insulation remove/re-install : 1 Point
- Insspection for leaking point and issue inspection
report : 1 Point Fix leak at ESP-1
5 Piping 15 ESP - Repair leak following inspection report by inlet (under WP-AW-20-A2-071 1 R R
welding : 1 Point insulation)
- Fit- up, Welding and NDT for repair work : 1
Point R X X R R X R R R R R R R
- Repainting : 1 M2

Replace refractory on hot spot area:


- Scafolding modify : 10 M3
- Remove damged refractory area on valve body
from valve’s dissimilar weld to upper cold joint by
water jet: 5.12 M2
- Remove damaged V-anchors: 43 pCS
- Repair metal loss by weld build-up (Estimated
0.5m2 due to thickness reduction from 30mm to
27.05mm) : 0.5 M2
Regenerated catalyst
6 Slide valve 15 SV-1501 - Install new anchor and welding : 43 PCS WP-AW-19-A2-012 1 R R
slide valve
- PT for V-anchor welding : 5 Point
- Garnet/sand blasting : 5.12 M2
- Form work design/ fabrication/
installation/removal : 5.12 M2
- Casting refractory/curing (Exactly casting area to
be confirmed after refactory removal and internal
inspection) : 5.12 M3
- Dry-out by heating pad (anticipated) or process
dry-out : 5.12 M2
R X X R X X R X R R R R R R R
- Blinding and deblinding : 01 set
- Scaffolding Installation /Removal: 120 M3
- Cut to remove the damaged point from line 2
inch for replacement (01 location at PR3-L2) : 01
Repair the corroded
Points
7 Auxiliary 17 017-AUX-001 location on pipe (at WP-AW-19-A2-014 1 R Mr.Khanh
- Replace the 2 m new pipe 2” with protection
PR3-L2)
shield by welding : 2 M
- Fit- up Welding and NDT for weld joints : 02
Joints
- Repainting: 0.3 M2 R X X R R X R X R R R R R R X R R X
- Blinding and deblinding
- Scaffolding Installation /Removal: 800 M3
- Cut to remove the damaged points from line 6
inch for replacement (5 locations: PR30-L3,
Repair the corroded
''PR37-L3, PR36-L3, PR21-L3, PR23-L3): 5 Point
location (PR30-L3,
8 Auxiliary 15 015-AUX-031 - Replace the 10 m new pipe 6” with 5 protection WP-AW-19-A2-017 1 R
''PR37-L3, PR36-L3,
shields by welding(5 locations: PR30-L3, PR37-
PR21-L3, PR23-L3 )
L3, PR36-L3, PR21-L3, PR23-L3): 10 M.
- Fit-up Welding and NDT for weld joints : 10
Joints
- Repainting : 4.6 M2 R X X R R X X R X R R R X R R R X R R
- Blinding and deblinding
- Scaffolding Installation /Removal: 405 M3
- Cut to remove the damaged points from line 3
inch ( 5 locations:PR20-L1, PR27-L1, PR28-L1 , Repair the corroded
PR37-L1, PR19-L1): 5 M location on pipe
9 Auxiliary 15 015-AUX-032 - Replace the 10 m new pipe 3” with 5 protection (PR20-L1, PR27-L1, WP-AW-19-A2-018 1 R Mr.Khanh
shields by welding (5 locations: PR20-L1, PR27- PR28-L1 (2 points),
L1, PR28-L1, PR37-L1, PR19-L1): 10 M PR37-L1, PR19-L1)
- Fit-up Welding and NDT for weld joints: 10
joints
- Repainting: 2.3 M2 R X X R R X R X R X R R R R R X R R
- Blind/Deblind : 1 set
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location PR21-L1) : 01
Repair the corroded
Point
10 Auxiliary 15 015-AUX-033 location on pipe WP-AW-19-A2-019 1 R Mr.Khanh
- Replace the 2 m new pipe 6” with protection
(PR21-L1)
shield by welding: 02 M
- Fit-up Welding and NDT for weld joint: 02
Joints
- Repainting : 01 M2 R X X R R X X R X R X R R X R R R R X R R X
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal: 1120 M3
- Cut to remove the damaged points from line 4
inch for replacement (7 locations:PR20-L3, PR21-
Repair the corroded
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and
location on pipe
PR23-L3) : 07 Points
('PR20-L3, 'PR21-L3,
11 Auxiliary 15 015-AUX-034 - Replace the 14 m new pipe 4” with 7 protection WP-AW-19-A2-020 1 R Mr.Khanh
'PR30-L3, 'PR27-L3,
shields by welding(7 locations:PR20-L3, PR21-
'PR37-L3, 'PR39-L3)
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and
(6 locations)
PR23-L3) : 14 M
- Fit-up Welding and NDT for weld joint : 14
Joints
- Painting: 3.7 M2
R X X R R X R X R X R R R R R X R R
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 81 M3
- Cut to remove the damaged point from line 6
inch for replacement (1 location: PR28-L1): 01 Repair the corroded
12 Auxiliary 15 015-AUX-035 Point location on pipe WP-AW-19-A2-021 1 R Mr.Khanh
- Replace the 2 m new pipe 6” with protection (PR28-L1)
shield by welding (1 location: PR28-L1) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 01 M2 R X X R R X X R X R X R R X R R R X R R
- Blind/Deblind : 01 set
- Erect and remove scaffolding: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR39-L3) : 1 Repair the corroded
13 Auxiliary 15 015-AUX-037 Point location on pipe WP-AW-19-A2-023 1 R Mr.Khanh
- Replace the 2 m new pipe 6” with protection (PR39-L3)
shield by welding (1 location: PR39-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2 R X X R R X R X R X R R R R R X R R
- Blind/Deblind : 01 set
-Scaffolding Installation /Removal: 160 M3
- Cut to remove the damaged point from line 6
inch for replacement (01 location: PR34-L3) : 01 Repair the corroded
14 Auxiliary 15 015-AUX-038 Point location on pipe WP-AW-19-A2-024 1 R Mr.Khanh
- Replace the 2 m new pipe 6” with protection (PR34-L3)
shield by welding (1 location: PR349-L3) : 2 M
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.9 M2 R X X R R X X R X R X R R X R R R X R R
- Blinding and deblinding
- Erect and remove scaffolding: 81 M3
Repair the corroded
- Cut to remove the damaged point from line 4
15 Auxiliary 15 015-AUX-039 location on pipe WP-AW-19-A2-025 1 R Mr.Khanh
inch for replacement (01 location): 2 M
(PR20-L1)
- Fit-up Welding and NDT for weld joint: 2 Joints
- Repainting: 0.6 M2
R X X R R X R X R X R R R R R X R R
- Blind/Deblind : 01 set
- Scaffolding Installation /Removal : 80 M3
- Cut to remove the damaged point from line 3
inch for replacement (01 location: PR35-L1) : 01
Repair the corroded
Point
16 Auxiliary 15 015-AUX-040 location on pipe WP-AW-19-A2-026 1 R Mr.Khanh
- Replace the 2 m new pipe 3” with protection
(PR35-L1)
shield by welding (01 locations: PR35-L1): 02 M
- Fit-up Welding and NDT for weld joint: 02
Joints
Repainting:
- Blinding and0.5 M2
deblinding : 1 Set R X X R R X X R X R X R R R R R X R R
- Scaffolding Installation /Removal: 180 M3
- Insulation remove/re-install: 01 Set
- Cut to remove 03 damaged elbows size 2 inch
for replacement : 03 PCS Repair the eroded
17 Auxiliary 15 015-AUX-041 WP-AW-19-A2-027 1 R Mr.Khanh
- Replace 03 new elbows and 6m pipe size 2 inch pipe/elbow sections
by welding : 03 PCS
- Fit-up, Welding and NDT for weld joint : 08
Joints R X X R R X X R X R X R R X R R R X R R
- Repainting : 0.9 M2
- Scaffolding Installation /Removal : 120 m3
- Remove temporary blind : 01 set
- Remove and reinstall insulation :64 M2 Replace the
18 Auxiliary 15 015-AUX-042 - Remove damaged expantion joint from line expansion joint at WP-AW-19-A2-028 1 R
( inlet C-1502A) : 01 Set inlet C-1502A
- Install new expantion joints ( inlet C-1502A,
inlet and outlet C-1502B) : 03 Set
R X X R X X R X R X R R R R R

- Blind/Deblind : 01 Set
- Scaffolding Installation /Removal: 320 M3
- Cut to remove the damaged points from line 6
inch for replacement (2 locations:PR21-L3, PR30-
Repair the corroded
L3) : 02 Point
19 Auxiliary 15 015-AUX-036 location on pipe WP-AW-19-A2-022 1 R Mr.Khanh
- Replace the 4 m new pipe 6” with 2 protection
(PR21-L3, PR30-L3)
shields by welding (2 locations:PR21-L3, PR30-
L3): 4 M
- Fit-up Welding and NDT for weld joint: 4 Joints
- Repainting: 1.9 M2
R X X R R X X R X R X R R X R R R R X X X
Install/remove scaffolding
CO/WHB Remove rain hoof from the FDF inlet line by crane
CO/WHB Boiler
20 Boiler 15 H-1503 Dismantle the rain hoof cover WP-AW-19-A2-003 1
Package
Package Install inverse cone as original design
Re-install back to the line
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
21 Auxiliary 15 015-AUX-013 working and WP-AW-19-A2-003 2 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X X X R X R X R R X R R R X R R
performance
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
22 Auxiliary 15 015-AUX-012 working and WP-AW-19-A2-003 3 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X R X R X R R R R R X R R
performance
- Remove ejector from lines_x000D_
23 Equipment 15 C-1501-J-02A Replace ejector WP-AW-19-A2-003 4 R Mr.Huy
- Install new ejector with new gasket R X X R X X X X R X R X R R R R X R X
- Remove ejector from lines_x000D_
24 Equipment 15 C-1501-J-03A Replace ejector WP-AW-19-A2-003 5 R Mr.Huy
- Install new ejector with new gasket R X R X R X R R R R X R
- Remove ejector from lines_x000D_
25 Equipment 15 C-1501-J-02B Replace ejector WP-AW-19-A2-003 6 R Mr.Huy
- Install new ejector with new gasket R X X R X X X R X R X R R R X R
- Remove ejector from lines_x000D_
26 Equipment 15 C-1501-J-03B Replace ejector WP-AW-19-A2-003 7 R Mr.Huy
- Install new ejector with new gasket R X R X X R X R X R R R X X R
Replace water trap
- Cut the old trap from lines_x000D_
due to over 10 years
- Cleaning inside the line
27 Auxiliary 15 015-AUX-014 working and WP-AW-19-A2-003 8 R
- Install new water trap._x000D_
suspected of low
- NDT (PT) R X X R X X R X R X R R X R R R X X R
performance
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
28 Equipment 15 C-1551-J-02A then repair if it finds WP-AW-19-A2-003 9 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X X R X R X R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
29 Equipment 15 C-1551-J-03A then repair if it finds WP-AW-19-A2-003 10 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X X R X R X R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
30 Equipment 15 C-1551-J-02B then repair if it finds WP-AW-19-A2-003 11 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X R X R R R R X X R
- Remove ejector from lines_x000D_
Remove and inspect
- Overhaul ejector
31 Equipment 15 C-1551-J-03B then repair if it finds WP-AW-19-A2-003 12 R Mr.Huy
- Inspect any corrosion/erosion
eroded nozzle
- Re-install back ejector with new gasket R X X R X R X R R R R X X R
Check/inspect two
- Dismantle the flange 3"
spray nozzles of
- Internal inspection
32 Auxiliary 15 015-AUX-015 BFW to LPS to WP-AW-19-A2-003 13 R
- Repair/replace if damaged
header. Repair or
- Install back nozzle with new gasket
replace if needed R X X R R X R X R R R R R R X X R
- Grinding the old welding seam Repair the crack of
33 Auxiliary 15 015-AUX-011 - Re-welding socket weld seam at WP-AW-19-A2-003 14 R Mr.Khanh
- NDT (PT) the elbow R X X R R X R X R X R R R R R X X R R R
Repair the corroded
pipe section of
- Cut the damaged pipe 1m from lines_x000D_
1000mm in length,
34 Auxiliary 15 015-AUX-016 - Install new pipe section by welding WP-AW-19-A2-003 15 R Mr.Khanh
reper to IR No. 19-
- NDT (PT/RT 2 points)
033-IR-INS dated
23/01/2019
R X X R R X R X R X R R X R R R X X R R R
-Install/remove scaffoding
- remove / reinstall ínulation Repair the corroded
- Cut the damaged pipe200mm from pipe section of 0.75-
35 Auxiliary 15 015-AUX-010 lines_x000D_ FG-217802-A2AD- WP-AW-19-A2-003 16 R Mr.Khanh
- Install new pipe section with flange by welding ST2 refer to 18-222-
- replace new gasket IR-INS
- NDT (PT/RT) R X X R X R X R X R R R R R X X R R R
- remove / reinstall insulation Repair leaking HC at
- Dismantle flange connection flange of slurry line
36 Auxiliary 15 015-AUX-017 WP-AW-19-A2-003 17 R
- inspect flange face from D-1515 to P-
- Repalce new gasket 1504 R X X R X R X R R X R R R X X R R
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind
Replace the corroded
- Replace new reducing Tee 1,5”x3/4” (01 pcs)
37 Auxiliary 15 015-AUX-018 drain pipe follow WP-AW-19-A2-003 18 R Mr.Khanh
and ¾” new pipe (200mm) by welding on line 1.5-
report 19-140-IR-INS
HSO-159407-A2AP-ST2
- NDT 4 joints (2 joints 1,5” and 2 joints ¾” ) to
be confirmed by INS
R X X R X R X R X R R R R R X X R R R
Repair passing of
- Remove valve from lines_x000D_ globe valves at
38 M. VALVE 15 TV616-MTV-001 WP-AW-19-A2-003 19 R
- Replace new valve downstream of
015TV616 X X X R X R X R X R R R X X R
- Dismantle flange connection
Repair leaking at flan
- Cleaning flange face and inspection
39 M. VALVE 15 E-1501B-BLV-015 ge of inlet slurry bloc WP-AW-19-A2-003 20 R
- Repair flange face if required
k valve of E-1501B
- Replace new gasket X X X R X R X R R R R X X R
Repair passing of
- Remove valve from lines_x000D_ globe valves at
40 M. VALVE 15 TV616-MTV-002 WP-AW-19-A2-003 21 R
- Replace new valve downstream of
015TV616 X X X R X X R X R X R R R X X R X
Repair process block 
- Cut the damaged valve from lines_x000D_ valve upstream of 01
41 M. VALVE 15 E02-BLV-002 - Install new valve 5-PG- WP-AW-19-A2-003 22 R Mr.Khanh
- NDT (PT) 880 (it cannot operate
) R X X R X X R X R X R R R R R X X X X
Repair the globle valv
- Cut the damaged valve from lines_x000D_
e at P-
42 M. VALVE 15 P1559-MTV-003 - Install new valve WP-AW-19-A2-003 23 R Mr.Khanh
1559B (it can not clos
- NDT (PT) X X X R X X R X R X R R X R R R X X R R
e)
Blind/Deblind Repair the detective
Grinding the welding joint 3" weld seam of 3 inch
43 Auxiliary 16 016-AUX-001 WP-AW-19-A2-003 24
Re-welding pipe of 16-LG-002 of
RT 1 joint 3" D-1602

Replace the corroded


- Install/remove scaffolding
0.75" Tee section of
- Remove/re-install insulation
3-F-218039-A1GR1-
44 Auxiliary 21 021-AUX-011 - Cutting the weldolet and pipe 3/4" WP-AW-19-A2-003 25 R Mr.Khanh
ST1 follow report 18-
- Replace new weldolet and pipe 3/4" by welding
223/IR-INS (TA4
- NDT (PT/RT)
job)
R X X R R X R X R X R R X R R R X X R R R
Repair the LP steam
- Install/remove scaffolding
leak on the pipe 1.5-
- Install/remove insulation
45 Auxiliary 21 021-AUX-010 SL-214658-A1AS- WP-AW-19-A2-003 26 R Mr.Khanh
- Replace 3/4" pipe about 3m
HS follow report 18-
- NDT (PT)
092/IR-INS R X X R R X R X R X R R R R R X X R R R
- Install/remove scaffolding;
Replace the corroded
- Remove/re-install insulation;
drain pipe follow
46 Auxiliary 21 021-AUX-012 - Cutting and Replace 1m new pipe 3/4" by WP-AW-19-A2-003 27 R Mr.Khanh
inspection IAT issued
welding;
25/4/2019 R X X R R X R X R X R R X R R R X X X R
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation; Replace the corroded
- Cutting the 6m corrosion pipe 3/4"; drain pipe follow
47 Auxiliary 21 021-AUX-013 WP-AW-19-A2-003 28 R Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued
- Install new pipe 3/4" by welding; 02/5/2019
- NDT (RT)
R X X R R X R X R X R R R R R X X R R X R
- Install/remove scaffolding;
Replace the corroded
- Remove/re-install insulation;
drain pipe follow
48 Auxiliary 21 021-AUX-014 - Cutting and Replace 2m new pipe 3/4" by WP-AW-19-A2-003 29 R Mr.Khanh
inspection IAT issued
welding;
06/5/2019 R X X R R X R X R X R R X R R R X X R R R
- NDT (RT)
- Install/remove scaffolding;
Replace the corroded
- Remove/re-install insulation;
drain pipe follow
49 Auxiliary 21 021-AUX-015 - Cutting and Replace 2.2m new pipe 3/4" by WP-AW-19-A2-003 30 R Mr.Khanh
inspection IAT issued
welding;
25/4/2019
- NDT (RT) R X X R X X R X R X R R R R R R X R R R
- Install/remove scaffolding;
- Remove/re-install insulation; Replace the corroded
- Cutting the 6m corrosion pipe 3/4"; drain pipe follow
50 Auxiliary 21 021-AUX-016 WP-AW-19-A2-003 31 R Mr.Khanh
- Bending 2 elbow 90 deg; inspection IAT issued
- Install new pipe 3/4" by welding; 02/5/2019
- NDT (RT)
R X X R R X X R X R X R R X R R R R R R
- Blind/Deblind;
- Cut the 02 welding joint 2" on Tee 2"x3/4 and Repair the crack on
51 Auxiliary 21 021-AUX-017 flange 2"; pipe wall 2-SH- WP-AW-19-A2-003 32 R Mr.Khanh
- Replace 01 spool pipe 304H material by welding 154047-B0K6-HS
- RT R X X R R X R X R X R R X R R R X X R R R
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind
Repair the corroded
- Bending and replace two 90 deg elbow 3/4" by
52 Auxiliary 21 021-AUX-018 pipe section and the WP-AW-19-A2-003 33 R Mr.Khanh
welding on line 0.75-F-218075-A1GR1-ST1
elbows
- Cut and Replace 0.5m new straight pipe by
welding on line 0.75-F-218075-A1GR1-ST1
- RT 4 joints ( ¾” )
R X X R R X R X R X R R R R R X X R R R
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind Repair the corroded
53 Auxiliary 21 021-AUX-019 WP-AW-19-A2-003 34 R Mr.Khanh
- Cut and Replace 1.5m new straight pipe by pipe section
welding on line 1.5-F-218018-A1GR1-ST1
- RT 2 joints ( 1.5" )
R X X R R X X R X R X R R X R R R X R R R
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind Repair the corroded
54 Auxiliary 21 021-AUX-020 WP-AW-19-A2-003 35 R Mr.Khanh
- Cut and Replace 0.5m new straight pipe by pipe section
welding on line 0.75-F-218111-A1GR-ST1
- RT 2 joints ( ¾” )
R X X R R X X R X R X R R X R R R X R R R
- Install/remove scaffolding
- Dismantle the valve from the line
- Pre-cleaning and install temporary cover;
Remove and Reinstall
55 M. VALVE 17 PSV019A-BLV-001 - Transfer the valve to Workshop and handover to WP-AW-19-A2-003 36 R
valve at site
P6
- Receive the valve from P6
- Re-install back valve to the line with new gasket
R X X R X X X R X R X R R R X R
- Blinding and deblinding
- remove and reinstall insulation 14" Valve M1501-
- remove gearbox of valve and valve from line BLV-001 on feed line
- Bring gear box, valve to Workshop. downstream mixer
56 M. VALVE 15 M1501-BLV-001 WP-AW-19-A2-010 1 R
- Repair gearbox of valve was being passed on
- Repair valve. 15-06-2019. Need to
- Passing test repair it
- Install valve and gearbox at site
R X X R X X X R X R X R R R X R
- Blinding and deblinding
20" block valve on
- Erect and remove scaffolding
steam export from
- remove and reinstall insulation
COB
- remove valve from line
57 M. VALVE 15 TV918A-BLV-007 TV918A-BLV-007 WP-AW-19-A2-010 2 R
- Bring valve to Workshop.
had leaking at valve
- Replace new bonnet gasket of valve.
bonnet flange. Need
- Testing
to repair
- Install valve at site
R X X R X X X R X R X R R R X R
- Blinding and deblinding
8" block valve D-
- Remove valve from line
1555-BLV-006 was
- Bring valve to Workshop.
58 M. VALVE 15 D1555-BLV-006 passed during D-1555 WP-AW-19-A2-010 3 R
- Repair valve.
isolation. Need to
- Passing test
repair
- Install valve at site
R X X R X X X R X R R X R R R X R
- Blinding and deblinding
8" block valve D-
- Remove valve from line
1555-BLV-005 was
- Bring valve to Workshop.
59 M. VALVE 15 D1555-BLV-005 passed during D-1555 WP-AW-19-A2-010 4 R
- Repair valve.
isolation. Need to
- Passing test
repair
- Install valve at site
R X X R X X X R X R X R R R X R
- Blinding and deblinding
8" block valve D-
- Remove valve from line
1555-BLV-003 was
- Bring valve to Workshop.
60 M. VALVE 15 D1555-BLV-003 passed during D-1555 WP-AW-19-A2-010 5 R
- Repair valve.
isolation. Need to
- Passing test
repair
- Install valve at site
R X X R X X R X R X R R R X R
- Blinding and deblinding
8" block valve D-
- Remove valve from line
1555-BLV-002 was
- Bring valve to Workshop.
61 M. VALVE 15 D1555-BLV-002 passed during D-1555 WP-AW-19-A2-010 6 R
- Repair valve.
isolation. Need to
- Passing test
repair
- Install valve at site
R X X R X X X R X R X R R R R X R
- Blinding and deblinding
14" Valve M1501-
- Remove and reinstall insulation
BLV-002 on feed line
- Remove valve from line
downstream mixer
62 M. VALVE 15 M1501-BLV-002 - Bring valve to Workshop. WP-AW-19-A2-010 7 R
was being passed on
- Repair valve.
15-06-2019. Need to
- Passing test
repair it
- Install valve at site
R X X R X X X R X R X R R R X R
- Blinding and deblinding
- Remove and reinstall insulation
Repair the block
- Remove valve from line
valve on BFD outlet
63 M. VALVE 15 E1507AB-MTV-003 - Bring valve to Workshop. WP-AW-19-A2-010 8 R
line to E-1507A/B is
- Repair valve.
passing
- Passing test
- Install valve at site
R X X R X X X R X R X R R R X R
- Blinding and deblinding
- Erect and remove scaffolding
E01-BLV-015 can
- Remove and reinstall insulation
64 M. VALVE 15 E01-BLV-015 not open. Need to WP-AW-19-A2-010 9 R Mr.Khanh
- Cut to remove the old valve from line
repair
- Replace the new valve by welding.
- NDT
R X X R X X R X R X R R X R R R X R
- Blinding and deblinding
- Erect and remove scaffolding
E01-BLV-016 can
- Remove and reinstall insulation
65 M. VALVE 15 E01-BLV-016 not open. Need to WP-AW-19-A2-010 10 R Mr.Khanh
- Cut to remove the old valve from line
repair
- Replace the new valve by welding.
- NDT
R X X R X X X R X R X R R X R R R X R
- Blinding and deblinding
- Erect and remove scaffolding
E01-BLV-018 can
- Remove and reinstall insulation
66 M. VALVE 15 E01-BLV-018 not open. Need to WP-AW-19-A2-010 11 R Mr.Khanh
- Cut to remove the old valve from line
repair
- Replace the new valve by welding.
- NDT
R X X R X X X R X R X R R X R R R X R
- Blinding and deblinding
- Erect and remove scaffolding
E01-MTV-005 can
- Remove and reinstall insulation
67 M. VALVE 15 E01-MTV-005 not open. Need to WP-AW-19-A2-010 12 R Mr.Khanh
- Cut to remove the old valve from line
repair
- Replace the new valve by welding.
- NDT
R X X R X X R X R X R R X R R R X R
3/4" block valve
- Blinding and deblinding
upstream of steam
- Remove and reinstall insulation
trap on MPS sealing
68 M. VALVE 15 STT-001-BLV - Cut to remove the old valve from line WP-AW-19-A2-010 13 R Mr.Khanh
to ST-1501 is
- Replace the new valve by welding.
passing. Need to
- NDT R X X R X X R X R X R R X R R R X R
relpace valve
- Blinding and deblinding
- Erect and remove scaffolding Repair the hand
- Remove and reinstall insulation wheel of block valve
69 M. VALVE 15 FG041-BLV-001 WP-AW-19-A2-010 14 R
- Cut to remove the old valve from line upstream of 015-FG-
- Replace the new valve by welding. 041
- NDT
R X X R X X X R X R X R R X R R R X R R
- Blinding and deblinding
The equalizing valve
- Remove and reinstall insulation
on manual valve
- Remove valve from line by cutting
70 M. VALVE 15 E-1504B-BLV-014 E1504B-BLV-014 WP-AW-19-A2-010 15 R
- Replace new globle valve 3/4 # 800 by welding
was damaged
at site
(pinhole)
- NDT
R X X R X X X R X R X R R X R R R R R
- Blinding and deblinding The 1st block valve at
- Cut to remove the old valve from line inlet of 015-SC-716
71 M. VALVE 15 SC716-BLV-001 WP-AW-19-A2-010 16 R
- Replace the new valve by welding. was passing, Need to
- NDT replace R X X R X X X R X R X R R X R R R X R R
- Remove temporary support
Remove temporary
- Fabricate new structure support at WS following
support và reinstall
72 Auxiliary 15 015-AUX-020 design WP-AW-19-A2-010 17 R Mr.Khanh
structure support for
- Erect and remove scaffolding
Duct line of C-1502B
- Install new structure support at site R X X R R X X R X R R R X R R R X R R
- Fabricate / repare air duct spool at WS following
design
- Erect and remove scaffolding Reinstall Air duct line
73 Auxiliary 15 015-AUX-021 WP-AW-19-A2-010 18 R
- remove and reinstall insulation for C-1502B
- remove temporary Blind of the duct
- reinstall air duct at site
R X X R R X X R X R R R X R R R R R
- Erect and remove scaffolding
- Remove and reinstall insulation Replace expansion
74 Auxiliary 15 015-AUX-022 WP-AW-19-A2-010 19 R
- Remove damage expasion joint joint của C-1502B
- Install new expansion joint R X X R R X X R X R R X R R R R R
- Erect and remove scaffolding
Repair the damaged
- Remove damage cooling water piping
section pipe of 1.5-
75 Auxiliary 15 015-AUX-023 - Fabricate new cooling water piping following WP-AW-19-A2-010 20 R Mr.Khanh
CWS and 1.5-CWR
design at WS
to C-1502A/C-1502B
- Install new cooling water piping at site R X X R R X X R X R R R R R R R X R
- Blinding and deblinding Steam trap on MP
- Remove and reinstall insulation steam sealing to ST-
76 Auxiliary 15 015-AUX-028 - Cut to remove the old steam trap from line 1501 is not working WP-AW-19-A2-010 21 R Mr.Khanh
- Replace the new steam trap by welding. properly. Need to
- NDT check and replace R X X R X X X R X R X R R R R R X X R
- Erect and remove scaffolding
- Remove and reinstall insulation
X-1507: Repair the
- Remove temporary repair location
77 Auxiliary 15 015-AUX-025 damaged casing of WP-AW-19-A2-010 22 R Mr.Khanh
- Fabricate new plate and structure following
ESP1
design at WS
- Install new plate and structure at site
R X X R X X R X R X R R R R R X R
X-1504: Fix leaking
- Remove and reinstall insulation
78 Auxiliary 15 015-AUX-026 at flange of DCO line WP-AW-19-A2-010 23 R
- Replace new gasket.
from module 6-10 R X X R X X X R X R R R X R

- Blinding and deblinding


- Erect and remove scaffolding
- Remove and reinstall insulation
Repair condensate
- Cut to remove the 8" tee section and 1500mm
leaking on pipe 8-CL-
79 Auxiliary 15 015-AUX-027 damage pipe downstream of tee section WP-AW-19-A2-010 24 R Mr.Khanh
155401-A1AS-HS
- Replace the new 8" tee section and 1500mm pipe
follow IAT
downstream of tee section ( material: SS304) by
welding.
- NDT ( RT)
R X X R X X R X R X R R R R X X R R R R
- Bliding and debliding
- Erect and remove scaffolding
- Remove damage plant air piping Replace instrument
80 Auxiliary 15 015-AUX-024 WP-AW-19-A2-010 25 R
- Fabricate new plant air piping following design air line near C-1502
at WS
- Install new plant air piping at site
R X X R X X X R X R X R R R R R X R
- Blinding and deblinding
Repair the corroded
- Erect and remove scaffolding
section pipe of 24-
81 Auxiliary 21 021-AUX-021 - Remove and reinstall insulation WP-AW-19-A2-010 26 R Mr.Khanh
PV-210091-B1AP-
- Build up the corrosion location by welding.
BHC follow IAT
- NDT R X X R X R X R X R X R R R R R X R
- Blinding and deblinding
Repair the 0.5
- Erect and remove scaffolding
corroded pipe section
- Remove and reinstall insulation
82 Auxiliary 21 021-AUX-022 (due to CUI) of 30- WP-AW-19-A2-010 27 R Mr.Khanh
- Cut to remove the 2 x 200mm damage pipe
PV-210102-A1GR1-
- Replace the new 2 x 200mm pipe by welding.
BET follow IAT
- NDT ( RT)
R X X R X R X R X R X R R R R R X R
- Remove old element
83 Skin TC 15 015-TE-910D - Welding new element to HP Tube of COB. COB WP-AW-19-A2-008 1 R Mr.Khanh
- Connect element to 015-TI-910-D Loop R X X R X X R X R X R R R R X X
o Signal cable and Instrument Air/Hydraulic
Removal / Reinstallation at site
o Remove/reinstall the valve from/to the pipe
o Transfer the valve to whokshop/site
o Dismantle /Overhaul/Assemble Valve
MAB- Oil
84 Control valve 15 015-TV-857 o Dismantle /Overhaul/Assemble Actuator WP-AW-19-A2-008 2 R Mr.Khanh
Temperature Control
o Body and leaking test
o Calibration at Workshop
o Cover the valve by standard plastic blind
o Test the function and get signature (for CV) at
site R X X R X X R X R X X R R R X X R
Modify to add 04 access doors on the shell side of
Economizer E-1525 as approved MOC-15-19-335
(Modify drain manhole 710x710 with refractory
85 Economizer 15 E-1525 COB Economizer WP-AW-20-A2-074 1 R R
lining on bottom of Economizer has been included
in the contract signed item 114 TA4 static
equipment worklist)
R X X R R R R R R R R R R
Blind/Deblind
Scaffolding Installation/Removal
Cut to remove the damaged weld joint from line 1-
86 Piping 21 1/2inch for repair WP-AW-20-A2-075 1 R Mr.Khanh
Re-weld to repair welding joint
Fit-up, welding and NDT for welding joint
Repainting
R X X R X X R X R X R R R R R X X R R R
Blind/Deblind
Scaffolding Installation/Removal
Fabricate and install temporary supports for repair
work
Remove original clamp supports for further
inspection CUI
87 Piping 15 WP-AW-20-A2-077 1 R
Repair the corroded areas following inspection
report
Fit-up, welding and NDT for repair work
Reinstall original clamp supports and remove
temporary supports
Repainting R X X R X X R X R X R R R R R X X R R
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
88 Piping 15 WP-AW-20-A2-078 1 R Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
R X X R X X R X R X R R R R R X X R R R
Insulation remove/re-install
Scaffolding Installation/Removal
Checking condition of the spring supports 015-
HV-188, 015-HC-020/045/046/056 after shut
89 Support 15 Spring support WP-AW-20-A2-079 1 R
down
Cutting and welding to repair spring support if
required (anticipated work)
Painting R X X R X X R X R X R R R X X X R
Blind/Deblind
Insulaiton remove/re-install
E-1524 feed outlet block Remove the damaged valve from line 10" and
90 M. VALVE 15 WP-AW-20-A2-080 1 R
valve transfer the damaged valve to WS
Repair and test valve at WS
Reinstall valve with new gasket at site
R X X R X X R X R R R X X R
Install/remove scaffolding
Remove the old vapor distributor pipes
91 Tower 15 T-1501 Install new vapor distributor pipes WP-AW-15-A2-011 1 R R Mr.Trí
Install pipe stiffeners by welding
NDT to check quality of pipe stiffeners welding R X R R R R R R R
Install/remove scaffolding
Remove/install insulation
Inspect Pipe support point
92 Support 15 Support WP-AW-20-A2-081 1 R Mr.Khanh
Modify piping support
NDT to check quality of welding work
Do painting
X X X R X X R X R X R R R R X X X
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
93 Piping 21 WP-AW-20-A2-083 1 R Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
R X X R X X R X R X R R R R R X X R R R
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
94 Piping 21 WP-AW-20-A2-084 1 R Mr.Khanh
lind 3 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
R X X R X X R X R X R R R R R X X R R R
Erect and remove scaffolding
Expention Remove and reinstall insulation
95 15 C-1502B WP-20-1164134 1 R
jont Remove damage expasion joint
Install new expansion joint R X X R X X R X R X R R R R R X R
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Cut to remove the damaged welding joint from
96 Piping 15 015-SCC-902 WP-20-1164138 1 R Mr.Khanh
lind 3/4 inch for repair
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
R X X R X X R X R X R R R R R X X R R
Replace 01set seal kit for actuator
97 Actuator 15 015-FV-901 Replace 01 coupleted set positioner WP-AW-20-A2-089 1 R
Painted actuator R X X R X X R X R R R R R X R R
Blind/Deblind
Insulaiton remove/re-install
Remove the damaged valve from line 2" and
98 M. VALVE 15 WP-AW-20-A2-090 1 R
transfer the damaged valve to WS
Repair and test valve at WS
Reinstall valve with new gasket at site
R X X R X X R X R R R R X X R
Insulation remove/re-install
Blind/Deblind
Unplug for the MP
Cut and Replace the 2m length pipe with 4 elbow
99 Piping 15 steam line to steam WP-AW-20-A2-092 1 R Mr.Khanh
90 and Steam trap size 3/4 inch by welding
trap no 1337
Fit-up, welding and NDT for weld joint
Repainting
R X X R X X R X R X R R R R X X R R
Blind/Deblind Replace the bypass
Insulation remove/re-install valve and
Cut to remove the damaged valves size 3/4" and downstream B/V of
100 Piping 15 WP-AW-20-A2-094 1 R Mr.Khanh
replace by new ones. steam trap on E-
Fit-up and rewelding and NDT for weld joints 1503C export line are
Repainting passing
R X X R X X R X R X R R R R X X R R
Blind/Deblind
Insulation remove/re-install
Fix steam tracing is
Scaffolding Installation / Removal
leaking (under
Cut to remove the damaged point including 1
101 Tracing 21 insulation) on this WP-AW-20-A2-095 1 R Mr.Khanh
elbow and 1m pipe size 3/4" and replace by new
pipe (between P-
ones.
2102A/B)
Fit-up, welding and NDT for weld joints
Repainting R X X R X X R X R X R R R R X X R R
Blind/Deblind
Insulation remove/re-install
Repair weld defect of
Cut to remove the damaged points
2 vents/drains (item
102 Piping 15 Replace 01 weldolet 10"x3/4" for line 10"-PL- WP-AW-20-A2-096 1 R Mr.Khanh
3,9) follow IAT
150804-B2AP-ST1
report
Fit-up, welding and NDT for weld joints
Repainting
R X X R X X R X R X R R R R X X R R R
INPECTION
Blind/Deblind REPORT: Remove
Scaffolding Installation / Removal clamping supports for
103 Piping 15 Removing Support / Re-install pipe 10-PL-150534- WP-AW-20-A2-098 1 R
Preparation for inspection A2AQ-NI for detail
Repainting inspection follow IAT
report
R X X R X X R X R X R R R X X R R R
Replace new valve
104 M. VALVE 15 WP-AW-20-A2-100 1 R Mr.Khanh
E01-BLV-017 in TA4 R X X R X X R X R R R X X R

Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Cut to remove the damaged valve size 1" and Replace new valve
105 M. VALVE 15 replace by new one. E01-MTV-001 in WP-AW-20-A2-101 1 R Mr.Khanh
Contractor supply new globe valve 1"#800, SW, TA4
body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting
R X X R X X R X R X R R R R X X R
Replace new valve
106 M. VALVE 15 WP-AW-20-A2-102 1 R Mr.Khanh
E01-BPV-002 in TA4 R X X R X X R X R R R X X R
R
99 0 0 104 2 31 0 0 104 0 104 0 77 104 76 0 5 0 104 0 81 0 0 100 20 0 98 41 3 27
X
5 102 101 0 33 26 36 99 0 100 0 61 1 0 0 46 0 0 0 0 0 0 0 0 81 55 6 3 4 0
F 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Additional Work List - RFQ1/2/3/4
Include Refractory
Cancle
Slide Valve & Include Refractory Received Date : 31/03/2020
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
20-Apr-00
- Blind/Deblind (9 points hot work) : 9 Set
- Scaffolding Installation /Removal : 324 M3
- Insulation removal/re-installation : 9 Set
- Fabricate new part of spools follow DCA-15-19-003 at work shop : 21 spool Modification for 9 flow
015-FT- - Cutting, repair and welding old spools at site follow DCA-15-19-003 : 16 spool metters 015-FT-
Piping works -Turnaround 20-1055782
### RFQ1-1 Additional A2 Piping ### 426/407/408/406/501/424/ - Cutting, install new part of spools and welding at site follow DCA-15-19-003 : 21 spool 426/407/408/406/501/424/42 AW-20-A2-048 WP-AW-20-A2-048 PIPING GTS 210009 015-PIP-001 1464-154 NA NA 31-Dec-99 SET Follow MOC-15-19-354
maintenance service 20-1023980
425/439/440 - Fit-up, welding, NDT and PWHT for weld joints : 193 Joints 5/439/440 follow DCA-15-19-
- Cutting, install new steam tracing and welding at site (19 points) : 66 m 003
- Repair support at site ( if required) : 1 SET
- Cutting, fit up and welding base for instrument stanchion. Remove : 09 set
- Painting : 6 M2

- Blind/Deblind : 1 Set
- Remove the cyclone CY-1505 from D-1505 : 1 Set Check & repair (if required)
- Inspection for trickle valve CY-1505 : 1 Set trickle valve of cyclone in D- Drum - Turnaround maintenance Can not repair in normal operation,
### RFQ1-2 Additional A2 Drum ### CY-1505/D-1505 AW-20-A2-052 WP-AW-20-A2-052 DRUM GTS 210011 D-1505 19-1562322 1464-154 NA NA 31-Dec-99 SET
-Repair trickle valve ( if required) following Inspection report : 1 SET 1505 due to loss of catalyst service backlog WO: 19-1562322
- Fit- up, Welding and NDT for weld joint ( if required) : 1 SET during loading catalyst
- Reinstal the cyclone CY-1505 : 1 Set
- Blind/Deblind : 1 Set
- Remove the cyclone CY-1507 from D-1507 : 1 Set Check & repair (if required)
- Inspection for trickle valve CY-1507 : 1 Set trickle valve of cyclone in D- Drum - Turnaround maintenance Can not repair in normal operation,
### RFQ1-3 Additional A2 Drum ### CY-1507/ D-1507 AW-20-A2-053 WP-AW-20-A2-053 DRUM GTS 210011 D-1507 19-1562324 1464-154 NA NA 31-Dec-99 SET
- Repair trickle valve ( if required) following Inspection report : 1 SET 1507 due to loss of catalyst service backlog WO: 19-1562324
- Fit- up, Welding and NDT for weld joint ( if required) : 1 SET during loading catalyst
- Reinstal the cyclone CY-1507 : 1 Set
- Scaffolding Installation /Removal : 756 M3
- Insulation remove/re-install : 1 Point
- Cleaning for checking condition of flange joint ( inside and outside) : 1 Point Can not repair in normal operation,
Fix leaking flue gas at ESP1 Piping works -Turnaround 19-1520170 and
### RFQ1-4 Additional A2 Piping ### Piping - Remove the old bolts&nuts to disconnect the flange joint : 1 Point AW-20-A2-067 WP-AW-20-A2-067 PIPING GTS 210009 ESP1 1464-154 NA NA 31-Dec-99 SET backlog WO: 19-1520170 and 20-
inlet maintenance service 20-1060422
- Cleaning the flange face by hand tool : 1 Point 1060422
- Insert Glass Fibre Tape with silicon  into the gap of flange joint : 1 Point
- Replace all bolts and nuts of flange joint by new one and tightening : 1 Point
- Scaffolding Installation /Removal : 12 M3
- Insulation remove/re-install : 1 Point
- Insspection for leaking point and issue inspection report : 1 Point Fix leak at ESP-1 inlet (under Piping works -Turnaround Can not repair in normal operation,
### RFQ1-5 Additional A2 Piping ### ESP AW-20-A2-071 WP-AW-20-A2-071 PIPING GTS 210009 X-1507 17-1431672 1464-154 NA NA 31-Dec-99 SET
- Repair leak following inspection report by welding : 1 Point insulation) maintenance service backlog WO: 17-1431672
- Fit- up, Welding and NDT for repair work : 1 Point
- Repainting : 1 M2

Replace refractory on hot spot area:


- Scafolding modify : 10 M3
- Remove damged refractory area on valve body from valve’s dissimilar weld to upper cold joint
by water jet: 5.12 M2
Replace refractory for SV-1501, valve
- Remove damaged V-anchors: 43 pCS
body hot spot (Anticipated work)
- Repair metal loss by weld build-up (Estimated 0.5m2 due to thickness reduction from 30mm to
If not thoroughly repair it shall be
27.05mm) : 0.5 M2 Regenerated catalyst slide Slide Valve Valves - Turnaround maintenance
### RFQ1-6 Additional A2 Slide valve ### SV-1501 AW-19-A2-012 WP-AW-19-A2-012 VALVE 210010 SV-1501 19-1533025 1464-155 NA NA 31-Dec-99 SET impact to equipment performance,
- Install new anchor and welding : 43 PCS valve PSC service
relaibility, safety.
- PT for V-anchor welding : 5 Point
In the worse case, RFCC will be
- Garnet/sand blasting : 5.12 M2
shutdown for repairing
- Form work design/ fabrication/ installation/removal : 5.12 M2
- Casting refractory/curing (Exactly casting area to be confirmed after refactory removal and
internal inspection) : 5.12 M3
- Dry-out by heating pad (anticipated) or process dry-out : 5.12 M2

- Blinding and deblinding : 01 set


- Scaffolding Installation /Removal: 120 M3
- Cut to remove the damaged point from line 2 inch for replacement (01 location at PR3-L2) : 01 If not thoroughly repair it shall be
Repair the corroded location Piping works -Turnaround
### RFQ1-7 Additional A2 Auxiliary ### 017-AUX-001 Points AW-19-A2-014 WP-AW-19-A2-014 PIPING GTS 210009 2-CAB-170024-A2AN-NI 19-1430154 1464-155 2-CAB-170024-A2AN-NI 8474L-015-PID-0021-104-2 1-Jan-00 29-May-00 31-Dec-99 SET leak caustic to atm and impact to
on pipe (at PR3-L2) maintenance service
- Replace the 2 m new pipe 2” with protection shield by welding : 2 M environment & safe operation
- Fit- up Welding and NDT for weld joints : 02 Joints
- Repainting: 0.3 M2

- Blinding and deblinding


- Scaffolding Installation /Removal: 800 M3
- Cut to remove the damaged points from line 6 inch for replacement (5 locations: PR30-L3, If not thoroughly repair it shall be
Repair the corroded location
''PR37-L3, PR36-L3, PR21-L3, PR23-L3): 5 Point Piping works -Turnaround leak and impact to operation (no
### RFQ1-8 Additional A2 Auxiliary ### 015-AUX-031 (PR30-L3, ''PR37-L3, PR36-L3, AW-19-A2-017 WP-AW-19-A2-017 PIPING GTS 210009 6-SW-156701-A1AW-NI 19-1430160 1464-155 6-SW-156701-A1AW-NI 8474L-015-PID-0021-106/531/532 5-Jan-00 29-May-00 31-Dec-99 SET
- Replace the 10 m new pipe 6” with 5 protection shields by welding(5 locations: PR30-L3, PR37- maintenance service water seal for vacuum pump at silo,
PR21-L3, PR23-L3 )
L3, PR36-L3, PR21-L3, PR23-L3): 10 M. no water for sample cooler)
- Fit-up Welding and NDT for weld joints : 10 Joints
- Repainting : 4.6 M2

- Blinding and deblinding


- Scaffolding Installation /Removal: 405 M3
- Cut to remove the damaged points from line 3 inch ( 5 locations:PR20-L1, PR27-L1, PR28-L1 , Repair the corroded location If not thoroughly repair it shall be
PR37-L1, PR19-L1): 5 M on pipe (PR20-L1, PR27-L1, Piping works -Turnaround 19-1430148 leak hydrocabon to atm and impact
### RFQ1-9 Additional A2 Auxiliary ### 015-AUX-032 AW-19-A2-018 WP-AW-19-A2-018 PIPING GTS 210009 3-FLS-159076-A2AP-NI 1464-155 3-FLS-159076-A2AP-NI 8474L-015-PID-0031-564-3 2-Jan-00 29-May-00 31-Dec-99 SET
- Replace the 10 m new pipe 3” with 5 protection shields by welding (5 locations: PR20-L1, PR27- PR28-L1 (2 points), PR37-L1, maintenance service 19-1467308 to safe operation, RFCC to be
L1, PR28-L1, PR37-L1, PR19-L1): 10 M PR19-L1) shutdown for repair leakage point
- Fit-up Welding and NDT for weld joints: 10 joints
- Repainting: 2.3 M2

- Blind/Deblind : 1 set
- Erect and remove scaffolding: 81 M3 If not thoroughly repair it shall be
- Cut to remove the damaged point from line 6 inch for replacement (01 location PR21-L1) : 01 leak sour water to atm, relaese H2S
Repair the corroded location Piping works -Turnaround
### RFQ1-10 Additional A2 Auxiliary ### 015-AUX-033 Point AW-19-A2-019 WP-AW-19-A2-019 PIPING GTS 210009 6-SOW-150729-B4A51-NI 19-1430142 1464-155 6"-SOW-150729-B4A51-NI 8474L-015-PID-0021-102-2 5-Jan-00 26-Oct-00 31-Dec-99 SET and impact to safe operation, RFCC
on pipe (PR21-L1) maintenance service
- Replace the 2 m new pipe 6” with protection shield by welding: 02 M to be shutdown for repair leakage
- Fit-up Welding and NDT for weld joint: 02 Joints point
- Repainting : 01 M2

- Blind/Deblind : 01 set
- Scaffolding Installation /Removal: 1120 M3
If not thoroughly repair it shall be
- Cut to remove the damaged points from line 4 inch for replacement (7 locations:PR20-L3, PR21- Repair the corroded location
8474L-015-PID-0031-542-3 leak Nitrogen to atm, impact to N2
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and PR23-L3) : 07 Points on pipe ('PR20-L3, 'PR21-L3, Piping works -Turnaround
### RFQ1-11 Additional A2 Auxiliary ### 015-AUX-034 AW-19-A2-020 WP-AW-19-A2-020 PIPING GTS 210009 4-N-157840-A1AA-NI 19-1430135 1464-155 4"-N-157840-A1AA-NI 8474L-015-PID-0031-543-3 3-Jan-00 29-May-00 31-Dec-99 SET user(WGC, PVC, Reaction section), in
- Replace the 14 m new pipe 4” with 7 protection shields by welding(7 locations:PR20-L3, PR21- 'PR30-L3, 'PR27-L3, 'PR37-L3, maintenance service
8474L-015-PID-0031-544-3.0 the worse case, RFCC to be
L3, PR30-L3, PR27-L3, PR37-L3, PR39-L3 and PR23-L3) : 14 M 'PR39-L3) (6 locations)
shutdown for repair leakage point
- Fit-up Welding and NDT for weld joint : 14 Joints
- Painting: 3.7 M2

- Blind/Deblind : 01 set
- Erect and remove scaffolding: 81 M3 If not thoroughly repair it shall be
- Cut to remove the damaged point from line 6 inch for replacement (1 location: PR28-L1): 01 leak hydrocabon to atm and impact
Repair the corroded location Piping works -Turnaround
### RFQ1-12 Additional A2 Auxiliary ### 015-AUX-035 Point AW-19-A2-021 WP-AW-19-A2-021 PIPING GTS 210009 6-PL-150718-B4A5-NI 19-1432817 1464-155 6-PL-150718-B4A5-NI 8474L-015-Pid-0021-403 5-Jan-00 26-Oct-00 31-Dec-99 SET to safe operation, In the worse case,
on pipe (PR28-L1) maintenance service
- Replace the 2 m new pipe 6” with protection shield by welding (1 location: PR28-L1) : 2 M RFCC to be shutdown for repair
- Fit-up Welding and NDT for weld joint: 2 Joints leakage point
- Repainting: 01 M2

- Blind/Deblind : 01 set
Repair the corroded location on pipe
- Erect and remove scaffolding: 160 M3
(PR39-L3)
- Cut to remove the damaged point from line 6 inch for replacement (01 location: PR39-L3) : 1
Repair the corroded location Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-13 Additional A2 Auxiliary ### 015-AUX-037 Point AW-19-A2-023 WP-AW-19-A2-023 PIPING GTS 210009 6-IA-157501-A1AA-NI 19-1432805 1464-155 6-IA-157501-A1AA-NI 8474L-015-Pid-0021-106 5-Jan-00 29-May-00 31-Dec-99 SET
on pipe (PR39-L3) maintenance service leak LA to atm and impact to LA
- Replace the 2 m new pipe 6” with protection shield by welding (1 location: PR39-L3) : 2 M
user, In the worse case, RFCC to be
- Fit-up Welding and NDT for weld joint: 2 Joints
shutdown for repair leakage point
- Repainting: 0.9 M2

- Blind/Deblind : 01 set Repair the corroded location on pipe


-Scaffolding Installation /Removal: 160 M3 (PR34-L3)
- Cut to remove the damaged point from line 6 inch for replacement (01 location: PR34-L3) : 01 If not thoroughly repair it shall be
Repair the corroded location Piping works -Turnaround
### RFQ1-14 Additional A2 Auxiliary ### 015-AUX-038 Point AW-19-A2-024 WP-AW-19-A2-024 PIPING GTS 210009 6-FG-158585-A2AD-NI 19-1432799 1464-155 6-FG-158585-A2AD-NI 8474L-015-Pid-0031-552 5-Jan-00 29-May-00 31-Dec-99 SET leak hydrocabon to atm and impact
on pipe (PR34-L3) maintenance service
- Replace the 2 m new pipe 6” with protection shield by welding (1 location: PR349-L3) : 2 M to CO operation & Drum blanket, in
- Fit-up Welding and NDT for weld joint: 2 Joints the worse case, RFCC to be
- Repainting: 0.9 M2 shutdown for repair leakage point

Repair the corroded location on pipe


- Blinding and deblinding
(PR20-L1)
- Erect and remove scaffolding: 81 M3
Repair the corroded location Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-15 Additional A2 Auxiliary ### 015-AUX-039 - Cut to remove the damaged point from line 4 inch for replacement (01 location): 2 M AW-19-A2-025 WP-AW-19-A2-025 PIPING GTS 210009 4-PL-150512-B2AP-NI 19-1432792 1464-155 4-PL-150512-B2AP-NI 8474L-015-Pid-0021-328 3-Jan-00 26-Oct-00 31-Dec-99 SET
on pipe (PR20-L1) maintenance service leak hydrocabon to atm, In the
- Fit-up Welding and NDT for weld joint: 2 Joints
worse case, RFCC to be shutdown
- Repainting: 0.6 M2
for repair leakage point

- Blind/Deblind : 01 set
Repair the corroded location on pipe
- Scaffolding Installation /Removal : 80 M3
(PR35-L1)
- Cut to remove the damaged point from line 3 inch for replacement (01 location: PR35-L1) : 01
Repair the corroded location Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-16 Additional A2 Auxiliary ### 015-AUX-040 Point AW-19-A2-026 WP-AW-19-A2-026 PIPING GTS 210009 3-PL-150604-A2AP-NI 19-1432784 1464-155 3-PL-150604-A2AP-NI 8474L-015-Pid-0021-301 2-Jan-00 29-May-00 31-Dec-99 SET
on pipe (PR35-L1) maintenance service leak hydrocabon to atm, In the
- Replace the 2 m new pipe 3” with protection shield by welding (01 locations: PR35-L1): 02 M
worse case, RFCC to be shutdown
- Fit-up Welding and NDT for weld joint: 02 Joints
for repair leakage point
- Repainting: 0.5 M2

- Blinding and deblinding : 1 Set


Repair the eroded pipe/elbow
- Scaffolding Installation /Removal: 180 M3
sections
- Insulation remove/re-install: 01 Set
Repair the eroded pipe/elbow Piping works -Turnaround If not thoroughly repair it shall be
### RFQ1-17 Additional A2 Auxiliary ### 015-AUX-041 - Cut to remove 03 damaged elbows size 2 inch for replacement : 03 PCS AW-19-A2-027 WP-AW-19-A2-027 PIPING GTS 210009 2-CL-154823-A1AS-HS 19-1350297 1464-155 2-CL-154823-A1AS-HS 8474L-015-PID-0031-512 1-Jan-00 29-May-00 31-Dec-99 SET
sections maintenance service leak condensate to atm, In the worse
- Replace 03 new elbows and 6m pipe size 2 inch by welding : 03 PCS
case, RFCC to be shutdown for
- Fit-up, Welding and NDT for weld joint : 08 Joints
repair leakage point
- Repainting : 0.9 M2

Replace the expansion joint at inlet


- Scaffolding Installation /Removal : 120 m3
C-1502A
- Remove temporary blind : 01 set
Replace the expansion joint at Piping works -Turnaround 19-1462699 and If not thoroughly repair it shall be
### RFQ1-18 Additional A2 Auxiliary ### 015-AUX-042 - Remove and reinstall insulation :64 M2 AW-19-A2-028 WP-AW-19-A2-028 PIPING GTS 210009 C-1502B 1464-155 expansion joint at inlet C-1502A 8474L-015-A0103-0160-001-029-7-C NA NA 31-Dec-99 SET
inlet C-1502A maintenance service 19-1252837 damage expansion joint, in the
- Remove damaged expantion joint from line ( inlet C-1502A) : 01 Set
worse case, RFCC to be shutdown
- Install new expantion joints ( inlet C-1502A, inlet and outlet C-1502B) : 03 Set
for repair leakage point
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
- Blind/Deblind : 01 Set
- Scaffolding Installation /Removal: 320 M3
- Cut to remove the damaged points from line 6 inch for replacement (2 locations:PR21-L3, PR30- If not thoroughly repair it shall be
L3) : 02 Point Repair the corroded location Piping works -Turnaround leak PA to atm and impact to PA
### RFQ1-19 Additional A2 Auxiliary ### 015-AUX-036 AW-19-A2-022 WP-AW-19-A2-022 PIPING GTS 210009 6-PA-157046-A1AA-NI 19-1432811 1464-155 6-PA-157046-A1AA-NI 8474L-015-Pid-0021-106 5-Jan-00 29-May-00 31-Dec-99 SET
- Replace the 4 m new pipe 6” with 2 protection shields by welding (2 locations:PR21-L3, PR30- on pipe (PR21-L3, PR30-L3) maintenance service user, In the worse case, RFCC to be
L3): 4 M shutdown for repair leakage point
- Fit-up Welding and NDT for weld joint: 4 Joints
- Repainting: 1.9 M2
Install/remove scaffolding
Remove rain hoof from the FDF inlet line by crane
CO/WHB Boiler Heater - Turnaround maintenance
1 RFQ2-1 Cancle A2 ### H-1503 Dismantle the rain hoof cover CO/WHB Boiler Package AW-19-A2-003 WP-AW-19-A2-003 HEATER Cancel 210014 H-1503 6-Jan-04 NA NA 31-Dec-99 SET Missed in WL rev.4
Package service
Install inverse cone as original design
Re-install back to the line
- Cut the old trap from lines_x000D_
Replace water trap due to
- Cleaning inside the line Piping works -Turnaround
2 RFQ2-2 Additional A2 Auxiliary ### 015-AUX-013 over 10 years working and AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 1-CC-156515-A2AS-PP 19-1433015 6-Jan-04 1"-CC-156515-A2AS-PP 8474L-015-A0103-1040-001-004-12.0 31-Dec-99 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new water trap._x000D_ maintenance service
suspected of low performance
- NDT (PT)
- Cut the old trap from lines_x000D_
Replace water trap due to
- Cleaning inside the line Piping works -Turnaround
3 RFQ2-3 Additional A2 Auxiliary ### 015-AUX-012 over 10 years working and AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 1-CC-156514-A2AS-PP 19-1433022 6-Jan-04 1"-CC-156514-A2AS-PP 8474L-015-A0103-1040-001-004-12.0 31-Dec-99 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new water trap._x000D_ maintenance service
suspected of low performance
- NDT (PT)
- Remove ejector from lines_x000D_ Valves - Turnaround maintenance
4 RFQ2-4 Additional A2 Equipment ### C-1501-J-02A Replace ejector AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1501-J-02A 19-1432846 6-Jan-04 2"-SM-154303-B1AS-HS 8474L-015-A0103-1040-001-004-12.0 1-Jan-00 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new ejector with new gasket service
- Remove ejector from lines_x000D_ Valves - Turnaround maintenance
5 RFQ2-5 Additional A2 Equipment ### C-1501-J-03A Replace ejector AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1501-J-03A 19-1432849 6-Jan-04 2"-SM-154303-B1AS-HS 8474L-015-A0103-1040-001-004-12.0 2-Jan-00 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new ejector with new gasket service
- Remove ejector from lines_x000D_ Valves - Turnaround maintenance
6 RFQ2-6 Additional A2 Equipment ### C-1501-J-02B Replace ejector AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1501-J-02B 19-1432852 6-Jan-04 2"-SM-154303-B1AS-HS 8474L-015-A0103-1040-001-004-12.0 1-Jan-00 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new ejector with new gasket service
- Remove ejector from lines_x000D_ Valves - Turnaround maintenance
7 RFQ2-7 Additional A2 Equipment ### C-1501-J-03B Replace ejector AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1501-J-03B 19-1432855 6-Jan-04 2"-SM-154303-B1AS-HS 8474L-015-A0103-1040-001-004-12.0 2-Jan-00 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new ejector with new gasket service
- Cut the old trap from lines_x000D_
Replace water trap due to
- Cleaning inside the line Piping works -Turnaround
8 RFQ2-8 Additional A2 Auxiliary ### 015-AUX-014 over 10 years working and AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 1.5-CC-156507-A2AS-PP 19-1432858 6-Jan-04 1-1/2"-CC-156507-A2AS-PP 8474L-015-A0103-1010-001-039-6 31-Dec-99 29-May-00 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Install new water trap._x000D_ maintenance service
suspected of low performance
- NDT (PT)
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then Valves - Turnaround maintenance
9 RFQ2-9 Additional A2 Equipment ### C-1551-J-02A AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1551-J-02A 19-1432863 6-Jan-04 1"-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-6 NA NA 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Inspect any corrosion/erosion repair if it finds eroded nozzle service
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then Valves - Turnaround maintenance
10 RFQ2-10 Additional A2 Equipment ### C-1551-J-03A AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1551-J-03A 19-1432868 6-Jan-04 1"-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-6 NA NA 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Inspect any corrosion/erosion repair if it finds eroded nozzle service
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then Valves - Turnaround maintenance
11 RFQ2-11 Additional A2 Equipment ### C-1551-J-02B AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1551-J-02B 19-1432873 6-Jan-04 1"-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-6 NA NA 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Inspect any corrosion/erosion repair if it finds eroded nozzle service
- Re-install back ejector with new gasket
- Remove ejector from lines_x000D_
- Overhaul ejector Remove and inspect then Valves - Turnaround maintenance
12 RFQ2-12 Additional A2 Equipment ### C-1551-J-03B AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 C-1551-J-03B 19-1432878 6-Jan-04 1"-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-6 NA NA 31-Dec-99 SET Based on BSR-TED-TEC-MOM-19016
- Inspect any corrosion/erosion repair if it finds eroded nozzle service
- Re-install back ejector with new gasket
- Dismantle the flange 3" Check/inspect two spray
- Internal inspection nozzles of BFW to LPS to Piping works -Turnaround WR 19-102257: nozzle damaged,
13 RFQ2-13 Additional A2 Auxiliary ### 015-AUX-015 AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 20-SL-154401-A1AS-HS 19-1467453 6-Jan-04 20"-BFD-154401-A1AS-HS 8474L-015-PID-0021-107 2-Jan-00 29-May-00 31-Dec-99 SET
- Repair/replace if damaged header. Repair or replace if maintenance service Can not repair in normal
- Install back nozzle with new gasket needed
- Grinding the old welding seam
Repair the crack of socket Piping works -Turnaround 18-601-IR-INS: Crack was found at
14 RFQ2-14 Additional A2 Auxiliary ### 015-AUX-011 - Re-welding AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-SM-153141-C30G-HS 19-1432883 6-Jan-04 0.5-SM-153141-C30G-HS 8474L-015-A0103-1010-001-039-4 30-Dec-99 3-Feb-01 31-Dec-99 SET
weld seam at the elbow maintenance service the socket weld seam of elbow
- NDT (PT)
19-033-IR-INS: CUPS was found on
Repair the corroded pipe
- Cut the damaged pipe 1m from lines_x000D_ the pipe, the remaining thickness is
section of 1000mm in length, Piping works -Turnaround
15 RFQ2-15 Additional A2 Auxiliary ### 015-AUX-016 - Install new pipe section by welding AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 3-FLS-159076-A2AP-NI 19-1028272 6-Jan-04 3-FLS-159076-A2AP-NI 8474L-015-PID-0031-562 2-Jan-00 29-May-00 31-Dec-99 SET 1.7mm less
reper to IR No. 19-033-IR-INS maintenance service
- NDT (PT/RT 2 points) than structural thickness 1.8mm, Can
dated 23/01/2019
not repair in normal
-Install/remove scaffoding
- remove / reinstall ínulation Repair the corroded pipe
18-222-IR-INS: CUI was observed
- Cut the damaged pipe200mm from lines_x000D_ section of 0.75-FG-217802- Piping works -Turnaround
16 RFQ2-16 Additional A2 Auxiliary ### 015-AUX-010 AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-FG-217802-A2AD-ST2 19-1432888 6-Jan-04 0.75-FG-217802-A2AD-ST2 8474L-015-PID-0031-506-2 30-Dec-99 29-May-00 31-Dec-99 SET remaining thickness is 3.6mm, Can
- Install new pipe section with flange by welding A2AD-ST2 refer to 18-222-IR- maintenance service
not repair in normal
- replace new gasket INS
- NDT (PT/RT)
- remove / reinstall insulation
Repair leaking HC at flange of
- Dismantle flange connection Piping works -Turnaround 18-1506275 Pending WO, can not
17 RFQ2-17 Additional A2 Auxiliary ### 015-AUX-017 slurry line from D-1515 to P- AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 015-PIP-001 18-1506275 6-Jan-04 6"-PS-150555-A2AP-ST1 8474L-015-PID-0021-321-4-P-1504 5-Jan-00 29-May-00 31-Dec-99 SET
- inspect flange face maintenance service repair in normal operation
1504
- Repalce new gasket
- Install/ remove scaffolding
- Remove/ install insulation 19-140-IR-INS: Remaining thickness
Replace the corroded drain
- Blind/ de-blind Piping works -Turnaround is 1.57mm, less than minimum
18 RFQ2-18 Additional A2 Auxiliary ### 015-AUX-018 pipe follow report 19-140-IR- AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 1.5-HSO-159407-A2AP-ST2 19-1166109 6-Jan-04 1.5-HSO-159407-A2AP-ST2 8474L-015-PID-0021-111 31-Dec-99 29-May-00 31-Dec-99 SET
- Replace new reducing Tee 1,5”x3/4” (01 pcs) and ¾” new pipe (200mm) by welding on line 1.5- maintenance service required thickness 1.8mm,
INS
HSO-159407-A2AP-ST2 Can not repair in normal
- NDT 4 joints (2 joints 1,5” and 2 joints ¾” ) to be confirmed by INS
Repair passing of globe
- Remove valve from lines_x000D_ Valves - Turnaround maintenance 19-1153496 Pending WO. Can not
19 RFQ2-19 Additional A2 M. VALVE ### TV616-MTV-001 valves at downstream of AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 TV616-MTV-001 19-1153496 6-Jan-04 2"-BFD-155141-B2AS-HS 8474L-015-PID-0021-107 1-Jan-00 26-Oct-00 31-Dec-99 SET
- Replace new valve service repair in normal operation
015TV616
- Dismantle flange connection
Repair leaking at flange of inl
- Cleaning flange face and inspection Valves - Turnaround maintenance 18-1353086 Pending WO. Can not
20 RFQ2-20 Additional A2 M. VALVE ### E-1501B-BLV-015 et slurry block valve of E- AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 E-1501B-BLV-015 18-1353086 6-Jan-04 8"-PS-150920-B2FV-ST1 8474L-015-PID-0021-304 7-Jan-00 26-Oct-00 31-Dec-99 SET
- Repair flange face if required service repair in normal operation
1501B
- Replace new gasket
Repair passing of globe
- Remove valve from lines_x000D_ Valves - Turnaround maintenance 19-1153496 Pending WO. Can not
21 RFQ2-21 Additional A2 M. VALVE ### TV616-MTV-002 valves at downstream of AW-19-A2-003 WP-AW-19-A2-003 VALVE GTS 210010 TV616-MTV-002 19-1533007 6-Jan-04 2"-BFD-155140-B2AS-HS 8474L-015-PID-0021-107 1-Jan-00 26-Oct-00 31-Dec-99 SET
- Replace new valve service repair in normal operation
015TV616
- Cut the damaged valve from lines_x000D_ Repair process block valve up
Piping works -Turnaround 18-1430010 Pending WO. Can not
22 RFQ2-22 Additional A2 M. VALVE ### E02-BLV-002 - Install new valve stream of 015-PG- AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 E02-BLV-002 18-1430010 6-Jan-04 C-1551-E-02 8474L-015-A0103-1010-212-092-2 3/4 26-Oct-00 31-Dec-99 SET
maintenance service repair in normal operation
- NDT (PT) 880 (it cannot operate)
- Cut the damaged valve from lines_x000D_
Repair the globle valve at P- Piping works -Turnaround 18-1430004 Pending WO. Can not
23 RFQ2-23 Additional A2 M. VALVE ### P1559-MTV-003 - Install new valve AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 P1559-MTV-003 18-1430004 6-Jan-04 1/2"-CC-156510-A2AS-NI 8474L-015-A0103-1010-001-039-4 1/2 29-May-00 31-Dec-99 SET
1559B (it can not close) maintenance service repair in normal operation
- NDT (PT)
Blind/Deblind
Repair the detective weld
Grinding the welding joint 3" Piping works -Turnaround 19-1199584 Pending WO. Can not
24 RFQ2-24 Cancle A2 Auxiliary ### 016-AUX-001 seam of 3 inch pipe of 16-LG- AW-19-A2-003 WP-AW-19-A2-003 PIPING Cancel 210009 016-LG-002 6-Jan-04 N/A 8474L-016-PID-0021-112 2-Jan-00 26-Oct-00 31-Dec-99 SET
Re-welding maintenance service repair in nomal operation
002 of D-1602
RT 1 joint 3"
- Install/remove scaffolding
Replace the corroded 0.75"
- Remove/re-install insulation 18-223IR-INS: CUI and thickness loss
Tee section of 3-F-218039- Piping works -Turnaround
25 RFQ2-25 Additional A2 Auxiliary ### 021-AUX-011 - Cutting the weldolet and pipe 3/4" AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 3-F-218039-A1GR1-ST1 18-1391933 6-Jan-04 3"-F-218039-A1GR1-ST1 8474L-021-PID-0021-116-4 2-Jan-00 29-May-00 31-Dec-99 SET was found
A1GR1-ST1 follow report 18- maintenance service
- Replace new weldolet and pipe 3/4" by welding Can not repair in normal
223/IR-INS (TA4 job)
- NDT (PT/RT)
- Install/remove scaffolding Repair the LP steam leak on 18-092IR-INS: LP steam leak was
- Install/remove insulation the pipe 1.5-SL-214658-A1AS- Piping works -Turnaround observed at the Tee location of the
26 RFQ2-26 Additional A2 Auxiliary ### 021-AUX-010 AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-SL-214658-A1AS-HS 18-1232149 6-Jan-04 0.75-SL-214658-A1AS-HS 8474L-021-PID-0031-501-2 30-Dec-99 29-May-00 31-Dec-99 SET
- Replace 3/4" pipe about 3m HS follow report 18-092/IR- maintenance service pipe
- NDT (PT) INS Can not repair in normal
- Install/remove scaffolding;
Replace the corroded drain
- Remove/re-install insulation; Piping works -Turnaround
27 RFQ2-27 Additional A2 Auxiliary ### 021-AUX-012 pipe follow inspection IAT AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218020-A1GR1-ST1 19-1202731 6-Jan-04 0.75-F-218020-A1GR1-ST1 8474L-021-PID-0021-119-4 30-Dec-99 29-May-00 31-Dec-99 SET Currently is wrapping
- Cutting and Replace 1m new pipe 3/4" by welding; maintenance service
issued 25/4/2019
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain
- Cutting the 6m corrosion pipe 3/4"; Piping works -Turnaround
28 RFQ2-28 Additional A2 Auxiliary ### 021-AUX-013 pipe follow inspection IAT AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218026-A1GR1-ST1 19-1192875 6-Jan-04 0.75-F-218026-A1GR1-ST1 8474L-021-PID-0021-114-3 30-Dec-99 29-May-00 31-Dec-99 SET Currently is wrapping
- Bending 2 elbow 90 deg; maintenance service
issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)
- Install/remove scaffolding;
Replace the corroded drain
- Remove/re-install insulation; Piping works -Turnaround 19-1197649 Pending WO, can not
29 RFQ2-29 Additional A2 Auxiliary ### 021-AUX-014 pipe follow inspection IAT AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218063-A1GR1-ST1 19-1197649 6-Jan-04 0.75-F-218063-A1GR1-ST1 8474L-021-PID-0041-601-2 30-Dec-99 29-May-00 31-Dec-99 SET
- Cutting and Replace 2m new pipe 3/4" by welding; maintenance service repair in normal operation
issued 06/5/2019
- NDT (RT)
- Install/remove scaffolding;
Replace the corroded drain
- Remove/re-install insulation; Piping works -Turnaround
30 RFQ2-30 Additional A2 Auxiliary ### 021-AUX-015 pipe follow inspection IAT AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218137-A1GR1-ST1 19-1192865 6-Jan-04 0.75-F-218137-A1GR1-ST1 8474L-021-PID-0021-119-5 30-Dec-99 29-May-00 31-Dec-99 SET Curently is Wrapping
- Cutting and Replace 2.2m new pipe 3/4" by welding; maintenance service
issued 25/4/2019
- NDT (RT)
- Install/remove scaffolding;
- Remove/re-install insulation;
Replace the corroded drain
- Cutting the 6m corrosion pipe 3/4"; Piping works -Turnaround 19-1197728 Pending WO, can not
31 RFQ2-31 Additional A2 Auxiliary ### 021-AUX-016 pipe follow inspection IAT AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218183-A1GR1-ST1 19-1197728 6-Jan-04 0.75-F-218183-A1GR1-ST1 8474L-021-PID-0041-631-2 30-Dec-99 29-May-00 31-Dec-99 SET
- Bending 2 elbow 90 deg; maintenance service repair in normal operation
issued 02/5/2019
- Install new pipe 3/4" by welding;
- NDT (RT)
- Blind/Deblind;
- Cut the 02 welding joint 2" on Tee 2"x3/4 and flange 2"; Repair the crack on pipe wall Piping works -Turnaround 19-1203505 Pending WO. Can not
32 RFQ2-32 Additional A2 Auxiliary ### 021-AUX-017 AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 2-SH-154047-B0K6-HS 19-1203505 6-Jan-04 2-SH-154047-B0K6-HS 8474L-021-PID-0021-123 1-Jan-00 26-Oct-00 31-Dec-99 SET
- Replace 01 spool pipe 304H material by welding 2-SH-154047-B0K6-HS maintenance service repair in normal operation
- RT
- Install/ remove scaffolding
- Remove/ install insulation
- Blind/ de-blind Repair the corroded pipe Piping works -Turnaround Repair the corroded pipe section
33 RFQ2-33 Additional A2 Auxiliary ### 021-AUX-018 AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218075-A1GR1-ST1 19-1213219 6-Jan-04 0.75-F-218075-A1GR1-ST1 8474L-021-PID-0041-601-2 30-Dec-99 29-May-00 31-Dec-99 SET
- Bending and replace two 90 deg elbow 3/4" by welding on line 0.75-F-218075-A1GR1-ST1 section and the elbows maintenance service and the elbows
- Cut and Replace 0.5m new straight pipe by welding on line 0.75-F-218075-A1GR1-ST1
- RT 4 joints ( ¾” )
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
- Install/ remove scaffolding
- Remove/ install insulation
Repair the corroded pipe Piping works -Turnaround
34 RFQ2-34 Additional A2 Auxiliary ### 021-AUX-019 - Blind/ de-blind AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 1.5-F-218018-A1GR1-ST1 19-1213227 6-Jan-04 1.5-F-218018-A1GR1-ST1 8474L-021-PID-0021-113-3 31-Dec-99 29-May-00 31-Dec-99 SET Repair the corroded pipe section
section maintenance service
- Cut and Replace 1.5m new straight pipe by welding on line 1.5-F-218018-A1GR1-ST1
- RT 2 joints ( 1.5" )
- Install/ remove scaffolding
- Remove/ install insulation
Repair the corroded pipe Piping works -Turnaround
35 RFQ2-35 Additional A2 Auxiliary ### 021-AUX-020 - Blind/ de-blind AW-19-A2-003 WP-AW-19-A2-003 PIPING GTS 210009 0.75-F-218111-A1GR-ST1 19-1216503 6-Jan-04 0.75-F-218111-A1GR-ST1 8474L-021-PID-0041-601-2 30-Dec-99 29-May-00 31-Dec-99 SET Repair the corroded pipe section
section maintenance service
- Cut and Replace 0.5m new straight pipe by welding on line 0.75-F-218111-A1GR-ST1
- RT 2 joints ( ¾” )
- Install/remove scaffolding
- Dismantle the valve from the line
- Pre-cleaning and install temporary cover; Remove and Reinstall valve at Valves - Turnaround maintenance 18-1346689 WO pending, can not
36 RFQ2-36 Additional A2 M. VALVE ### PSV019A-BLV-001 AW-19-A2-003 WP-AW-19-A2-003 PSV GTS 210010 PSV019A-BLV-001 19-1465574 6-Jan-04 8"-PL-170006-A2AP-NI 8474L-017-PID-0021-112-3 7-Jan-00 29-May-00 31-Dec-99 SET
- Transfer the valve to Workshop and handover to P6 site service repair in normal
- Receive the valve from P6
- Re-install back valve to the line with new gasket

- Blinding and deblinding


- remove and reinstall insulation
- remove gearbox of valve and valve from line 14" Valve M1501-BLV-001 on
Can not repair in normal operation
- Bring gear box, valve to Workshop. feed line downstream mixer Valves - Turnaround maintenance
### RFQ3-1 Additional A2 M. VALVE ### M1501-BLV-001 AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 M1501-BLV-001 19-1253386 1468-010 14"-PL-150005-B2AP-ST2 8474L-015-PID-0021-121-2 13-Jan-00 26-Oct-00 31-Dec-99 SET (Backlog WO : 19-1253386 and 19-
- Repair gearbox of valve was being passed on 15-06- service
1252843)
- Repair valve. 2019. Need to repair it
- Passing test
- Install valve and gearbox at site

- Blinding and deblinding


- Erect and remove scaffolding
20" block valve on steam
- remove and reinstall insulation
export from COB
- remove valve from line Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-2 Additional A2 M. VALVE ### TV918A-BLV-007 TV918A-BLV-007 had leaking AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 TV918A-BLV-007 19-1252924 1468-010 20"-SH-154010-DIDS-HS 8474L-015-A0103-1060-001-033-3-C 19-Jan-00 22-Aug-01 31-Dec-99 SET
- Bring valve to Workshop. service (Backlog WO : 19-1252924)
at valve bonnet flange. Need
- Replace new bonnet gasket of valve.
to repair
- Testing
- Install valve at site

- Blinding and deblinding


- Remove valve from line
8" block valve D-1555-BLV-
- Bring valve to Workshop. Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-3 Additional A2 M. VALVE ### D1555-BLV-006 006 was passed during D- AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 D1555-BLV-006 19-1252915 1468-010 8"-PL-150816-B2AP-NI 8474L-015-PID-0021-411-3 7-Jan-00 26-Oct-00 31-Dec-99 ETAB
- Repair valve. service (Backlog WO : 19-1252915)
1555 isolation. Need to repair
- Passing test
- Install valve at site
- Blinding and deblinding
- Remove valve from line
8" block valve D-1555-BLV-
- Bring valve to Workshop. Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-4 Additional A2 M. VALVE ### D1555-BLV-005 005 was passed during D- AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 D1555-BLV-005 19-1252906 1468-010 8"-PL-150816-B2AP-NI 8474L-015-PID-0021-411-3 7-Jan-00 26-Oct-00 31-Dec-99 SET
- Repair valve. service (Backlog WO : 19-1252906)
1555 isolation. Need to repair
- Passing test
- Install valve at site
- Blinding and deblinding
- Remove valve from line
8" block valve D-1555-BLV-
- Bring valve to Workshop. Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-5 Additional A2 M. VALVE ### D1555-BLV-003 003 was passed during D- AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 D1555-BLV-003 19-1252897 1468-010 8"-PL-150815-B2AQ1-NI 8474L-015-PID-0021-411-3 7-Jan-00 26-Oct-00 31-Dec-99 SET
- Repair valve. service (Backlog WO : 19-1252897)
1555 isolation. Need to repair
- Passing test
- Install valve at site
- Blinding and deblinding
- Remove valve from line
8" block valve D-1555-BLV-
- Bring valve to Workshop. Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-6 Additional A2 M. VALVE ### D1555-BLV-002 002 was passed during D- AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 D1555-BLV-002 19-1252888 1468-010 8"-PL-150815-B2AQ1-NI 8474L-015-PID-0021-411-3 7-Jan-00 26-Oct-00 31-Dec-99 SET
- Repair valve. service (Backlog WO : 19-1252888)
1555 isolation. Need to repair
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove and reinstall insulation
14" Valve M1501-BLV-002 on
- Remove valve from line
feed line downstream mixer Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-7 Additional A2 M. VALVE ### M1501-BLV-002 - Bring valve to Workshop. AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 M1501-BLV-002 19-1252848 1468-010 14"-PL-150005-B2AP-ST2 8474L-015-PID-0021-121-2 13-Jan-00 26-Oct-00 31-Dec-99 SET
was being passed on 15-06- service (Backlog WO : 19-1252848)
- Repair valve.
2019. Need to repair it
- Passing test
- Install valve at site

- Blinding and deblinding


- Remove and reinstall insulation
- Remove valve from line Repair the block valve on BFD
Valves - Turnaround maintenance Can not repair in normal operation
### RFQ3-8 Additional A2 M. VALVE ### E1507AB-MTV-003 - Bring valve to Workshop. outlet line to E-1507A/B is AW-19-A2-010 WP-AW-19-A2-010 VALVE GTS 210010 E1507AB-MTV-003 19-1195998 1468-010 4"-TPW-150301-A1AS-PP 8474L-015-PID-0021-323 3-Jan-00 29-May-00 31-Dec-99 SET
service (Backlog WO : 19-1195998)
- Repair valve. passing
- Passing test
- Install valve at site
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-015 can not open. Piping works -Turnaround Can not repair in normal operation
### RFQ3-9 Additional A2 M. VALVE ### E01-BLV-015 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 E01-BLV-015 19-1259820 1468-010 1-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-5-C 31-Dec-99 26-Oct-00 31-Dec-99 SET
- Cut to remove the old valve from line Need to repair maintenance service (Backlog WO : 19-1259820)
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-016 can not open. Piping works -Turnaround Can not repair in normal operation
### RFQ3-10 Additional A2 M. VALVE ### E01-BLV-016 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 015-PIP-001 19-1259830 1468-010 1-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-5-C 31-Dec-99 26-Oct-00 31-Dec-99 SET
- Cut to remove the old valve from line Need to repair maintenance service (Backlog WO : 19-1259830)
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation E01-BLV-018 can not open. Piping works -Turnaround Can not repair in normal operation
### RFQ3-11 Additional A2 M. VALVE ### E01-BLV-018 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 015-PIP-001 19-1259827 1468-010 1-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-5-C 31-Dec-99 26-Oct-00 31-Dec-99 SET
- Cut to remove the old valve from line Need to repair maintenance service (Backlog WO : 19-1259827)
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation E01-MTV-005 can not open. Piping works -Turnaround Can not repair in normal operation
### RFQ3-12 Additional A2 M. VALVE ### E01-MTV-005 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 E01-MTV-005 19-1259823 1468-010 1-SM-154305-B1AS-HS 8474L-015-A0103-1010-001-039-5-C 31-Dec-99 26-Oct-00 31-Dec-99 SET
- Cut to remove the old valve from line Need to repair maintenance service (Backlog WO : 19-1259823)
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
3/4" block valve upstream of
- Remove and reinstall insulation
steam trap on MPS sealing to Piping works -Turnaround Can not repair in normal operation
### RFQ3-13 Additional A2 M. VALVE ### STT-001-BLV - Cut to remove the old valve from line AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 STT-001-BLV 19-1259910 1468-010 3/4"-CM-155333-B1AS-HS 8474L-015-A0103-1040-001-003 30-Dec-99 26-Oct-00 31-Dec-99 SET
ST-1501 is passing. Need to maintenance service (Backlog WO : 19-1259910)
- Replace the new valve by welding.
relpace valve
- NDT
- Blinding and deblinding
- Erect and remove scaffolding
Repair the hand wheel of
- Remove and reinstall insulation Piping works -Turnaround Can not repair in normal operation
### RFQ3-14 Additional A2 M. VALVE ### FG041-BLV-001 block valve upstream of 015- AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 FG041-BLV-001 19-1149037 1468-010 1"-SM-154300-B1AS-HS 8474L-015-PID-0021-201-4.0 31-Dec-99 26-Oct-00 31-Dec-99 SET
- Cut to remove the old valve from line maintenance service (Backlog WO : 19-1149037)
FG-041
- Replace the new valve by welding.
- NDT
- Blinding and deblinding
- Remove and reinstall insulation The equalizing valve on
Piping works -Turnaround Can not repair in normal operation
### RFQ3-15 Additional A2 M. VALVE ### E-1504B-BLV-014 - Remove valve from line by cutting manual valve E1504B-BLV-014 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 015-PIP-001 19-1277978 1468-010 6"-SH-154038-D1AG-HS 8474L-015-PID-0021-315-3.0 30-Dec-99 22-Aug-01 31-Dec-99 SET
maintenance service (Backlog WO : 19-106582)
- Replace new globle valve 3/4 # 800 by welding at site was damaged (pinhole)
- NDT
- Blinding and deblinding
The 1st block valve at inlet of
- Cut to remove the old valve from line Piping works -Turnaround Can not repair in normal operation
### RFQ3-16 Additional A2 M. VALVE ### SC716-BLV-001 015-SC-716 was passing, AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 SC716-BLV-001 19-1533017 1468-010 3/4"-F-158093-A1AK-NI 8474L-015-PID-0021-611-2 30-Dec-99 29-May-00 31-Dec-99 SET
- Replace the new valve by welding. maintenance service (Backlog WO : 19-106559)
Need to replace
- NDT
- Remove temporary support
Remove temporary support
- Fabricate new structure support at WS following design Piping works -Turnaround Can not repair in normal operation
### RFQ3-17 Additional A2 Auxiliary ### 015-AUX-020 và reinstall structure support AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 C-1502B 19-1252840 1468-010 N/A 8474L-015-A0103-0160-001-033-3-C NA NA 31-Dec-99 SET
- Erect and remove scaffolding maintenance service (Backlog WO : 19-1252840)
for Duct line of C-1502B
- Install new structure support at site
- Fabricate / repare air duct spool at WS following design
- Erect and remove scaffolding
Reinstall Air duct line for C- Piping works -Turnaround Can not repair in normal operation
### RFQ3-18 Additional A2 Auxiliary ### 015-AUX-021 - remove and reinstall insulation AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 C-1502B 19-1252827 1468-010 N/A 8474L-015-A0103-0160-001-033-3-C NA NA 31-Dec-99 SET
1502B maintenance service (Backlog WO : 19-1252827)
- remove temporary Blind of the duct
- reinstall air duct at site
- Erect and remove scaffolding
- Remove and reinstall insulation Replace expansion joint của Piping works -Turnaround Can not repair in normal operation
### RFQ3-19 Additional A2 Auxiliary ### 015-AUX-022 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 C-1502B 19-1252837 1468-010 N/A 8474L-015-A0103-0160-001-033-3-C NA NA 1-Jan-00 SET
- Remove damage expasion joint C-1502B maintenance service (Backlog WO : 19-1252837)
- Install new expansion joint
- Erect and remove scaffolding
Repair the damaged section
- Remove damage cooling water piping Piping works -Turnaround 1.5"-CWS-156209-A1AW-NI Damaged & wait for new C-1502B
### RFQ3-20 Additional A2 Auxiliary ### 015-AUX-023 pipe of 1.5-CWS and 1.5-CWR AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 6-CWS-156209-A1AW-NI 19-1246483 1468-010 8474L-015-A0103-0160-001-033-3-C 31-Dec-99 29-May-00 31-Dec-99 SET
- Fabricate new cooling water piping following design at WS maintenance service 1.5"-CWR-156409-A1AW-NI (Blocking WO : 19-1246483)
to C-1502A/C-1502B
- Install new cooling water piping at site
- Blinding and deblinding
Steam trap on MP steam
- Remove and reinstall insulation
sealing to ST-1501 is not Piping works -Turnaround Can not repair in normal operation
### RFQ3-21 Additional A2 Auxiliary ### 015-AUX-028 - Cut to remove the old steam trap from line AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 STT-001 19-1259904 1468-010 3/4"-CM-155333-B1AS-HS 8474L-015-A0103-1040-001-003 30-Dec-99 26-Oct-00 31-Dec-99 SET
working properly. Need to maintenance service (Backlog WO : 19-1259904)
- Replace the new steam trap by welding.
check and replace
- NDT
- Erect and remove scaffolding
- Remove and reinstall insulation
X-1507: Repair the damaged Piping works -Turnaround Damaged & temporary repair
### RFQ3-22 Additional A2 Auxiliary ### 015-AUX-025 - Remove temporary repair location AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 X-1507 19-1246458 1468-010 N/A 8474L-015-PID-0021-204 NA NA 31-Dec-99 SET
casing of ESP1 maintenance service (Blocking WO : 19-1246458)
- Fabricate new plate and structure following design at WS
- Install new plate and structure at site
X-1504: Fix leaking at flange
- Remove and reinstall insulation Piping works -Turnaround Can not repair in normal operation
### RFQ3-23 Additional A2 Auxiliary ### 015-AUX-026 of DCO line from module 6- AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 4-PL-150562-B2AP-ST1 19-1040587 1468-010 3"-PL-150562-B2AP-ST1 8474L-015-PID-0021-323 2-Jan-00 26-Oct-00 31-Dec-99 SET
- Replace new gasket. maintenance service (Backlog WO : 19-1040587)
10
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
- Blinding and deblinding
- Erect and remove scaffolding
- Remove and reinstall insulation Repair condensate leaking on
Piping works -Turnaround
### RFQ3-24 Additional A2 Auxiliary ### 015-AUX-027 - Cut to remove the 8" tee section and 1500mm damage pipe downstream of tee section pipe 8-CL-155401-A1AS-HS AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 8-CL-155401-A1AS-HS 19-1246477 1468-010 8-CL-155401-A1AS-HS 8474L-015-PID-0031-511 7-Jan-00 29-May-00 31-Dec-99 SET Patching (Backlog WO : 19-1246477)
maintenance service
- Replace the new 8" tee section and 1500mm pipe downstream of tee section ( material: SS304) follow IAT
by welding.
- NDT ( RT)
- Bliding and debliding
- Erect and remove scaffolding
Replace instrument air line Piping works -Turnaround Damaged & temporary repair
### RFQ3-25 Additional A2 Auxiliary ### 015-AUX-024 - Remove damage plant air piping AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 015-PIP-001 19-1250718 1468-010 0.75-157509-A1AA-NI 8474L-015-PID-0031-546-3 30-Dec-99 29-May-00 31-Dec-99 SET
near C-1502 maintenance service (Blocking WO : 19-1250718)
- Fabricate new plant air piping following design at WS
- Install new plant air piping at site
- Blinding and deblinding
- Erect and remove scaffolding Repair the corroded section
Piping works -Turnaround Can not repair in normal operation
### RFQ3-26 Additional A2 Auxiliary ### 021-AUX-021 - Remove and reinstall insulation pipe of 24-PV-210091-B1AP- AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 24-PV-210091-B1AP-BHC 19-1249015 1468-010 24-PV-210091-B1AP-BHC 8474L-021-Pid-0021-117-3 23-Jan-00 26-Oct-00 31-Dec-99 SET
maintenance service (Backlog WO : 19-1249015)
- Build up the corrosion location by welding. BHC follow IAT
- NDT
- Blinding and deblinding
- Erect and remove scaffolding Repair the 0.5 corroded pipe
- Remove and reinstall insulation section (due to CUI) of 30- Piping works -Turnaround Wrapping (Backlog WO : 19-
### RFQ3-27 Additional A2 Auxiliary ### 021-AUX-022 AW-19-A2-010 WP-AW-19-A2-010 PIPING GTS 210009 30-PV-210102-A1GR1-BET 19-1246451 1468-010 30-PV-210102-A1GR1-BET 8474L-021-PID-0021-117-3 29-Jan-00 29-May-00 31-Dec-99 SET
- Cut to remove the 2 x 200mm damage pipe PV-210102-A1GR1-BET follow maintenance service 1246451)
- Replace the new 2 x 200mm pipe by welding. IAT
- NDT ( RT)
- Remove old element 252-TTr-BDSC sensor could not
Piping works -Turnaround
### RFQ3-28 Additional A2 Skin TC ### 015-TE-910D - Welding new element to HP Tube of COB. COB AW-19-A2-008 WP-AW-19-A2-008 PIPING GTS 210009 015-TE-910-D 20-1116259 1468-008 NA NA 31-Dec-99 SET work properly
maintenance service
- Connect element to 015-TI-910-D Loop Can not replace in normal
o Signal cable and Instrument Air/Hydraulic Removal / Reinstallation at site
o Remove/reinstall the valve from/to the pipe
o Transfer the valve to whokshop/site
o Dismantle /Overhaul/Assemble Valve
MAB- Oil Temperature Valves - Turnaround maintenance 8474L-015-PID-0021-303 19-1216166 WO pending, can not
### RFQ3-29 Additional A2 Control valve ### 015-TV-857 o Dismantle /Overhaul/Assemble Actuator AW-19-A2-008 WP-AW-19-A2-008 VALVE GTS 210010 015-TV-857 19-1216166 1468-008 3-Jan-00 26-Oct-00 31-Dec-99 SET
Control service 8474L-015-A0103-1040-001-008- repair in normal
o Body and leaking test
o Calibration at Workshop
o Cover the valve by standard plastic blind
o Test the function and get signature (for CV) at site

If it does not modify, E-1525 tube


Modify to add 04 access doors on the shell side of Economizer E-1525 as approved MOC-15-19-
Adding 4 access for the Economizer surface cannot clean in TA and
335 GTS
### RFQ4-1 Additional A2 Economizer ### E-1525 COB Economizer AW-20-A2-074 WP-AW-20-A2-074 HEATER 29-Dec-74 E-1525 E-1525 to do cleaning for tubes as 20-1168252 255-KH 3-Jan-00 SET resulted in deposition on tube., may
(Modify drain manhole 710x710 with refractory lining on bottom of Economizer has been included PSC
the approved MOC-15-19-335 expose to corrosion. Rfcc operation
in the contract signed item 114 TA4 static equipment worklist)
shall impact
Blind/Deblind
Scaffolding Installation/Removal If not through repair it, hydrocarbon
Cut to remove the damaged weld joint from line 1-1/2inch for repair Repair weld defect of line 1.5-F- shall be leak to ATM and impact to
### RFQ4-2 Additional A2 Piping ### AW-20-A2-075 WP-AW-20-A2-075 PIPING GTS 24-Dec-74 021-AUX-026 20-1096837 255-KH 1.5-F-218152-A1GR-ST1 31-Dec-99 29-May-00 7-Jan-00 POINT
Re-weld to repair welding joint 218152-A1GR-ST1 PRU operation. In the worse case
Fit-up, welding and NDT for welding joint PRU will be shutdown
Repainting

Blind/Deblind
Scaffolding Installation/Removal
Fabricate and install temporary supports for repair work If it does not through repair, hot
Remove original clamp supports for further inspection CUI Repair the corroded areas for 48-PG- hydrocarbon shall leak out and catch
### RFQ4-3 Additional A2 Piping ### AW-20-A2-077 WP-AW-20-A2-077 PIPING GTS 24-Dec-74 015-AUX-057 20-1089884 255-KH 48-PG-150431-A2A5-PP 31-Dec-99 29-May-00 1-Jan-00 POINT
Repair the corroded areas following inspection report 150431-A2A5-PP fire. RFCC will be fired totally, unit
Fit-up, welding and NDT for repair work shutdown for longtime
Reinstall original clamp supports and remove temporary supports
Repainting

Blind/Deblind
Insulaiton remove/re-install
Repair weld defect of 2 vents/drains
Scaffolding Installation/Removal If it does not through repair,
(detail as IAT attached): 42-PG- 42-PG-150705-A2A5-BS1
### RFQ4-4 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3/4 inch for repair AW-20-A2-078 WP-AW-20-A2-078 PIPING GTS 24-Dec-74 015-AUX-058 20-1096841 255-KH 30-Dec-99 26-Oct-00 1-Jan-00 POINT hydrocarbon shall leak out and catch
150705-A2A5-BS1 and 6-PL-160002- 6-PL-16002-B2GP-NI
Re-weld to repair weldind joint fire. RFCC unit shutdown
B2GP-NI
Fit-up, welding and NDT for repair work
Repainting

Insulation remove/re-install
If does not through check & repair,
Scaffolding Installation/Removal
015-HV-188,015-HC- Fix the spring supports with rod spring support will be not function
### RFQ4-5 Additional A2 Support ### Spring support Checking condition of the spring supports 015-HV-188, 015-HC-020/045/046/056 after shut down AW-20-A2-079 WP-AW-20-A2-079 SUPPORT GTS 24-Dec-74 19-1460434 255-KH A2-PIP 4-Jan-00 POINT
020/045/046/056 bending of 05 spring supports and eqipment shall move. RFCC unit
Cutting and welding to repair spring support if required (anticipated work)
shutdown
Painting

Blind/Deblind
Insulaiton remove/re-install
E-1524 feed outlet block Disassembly, transport valve to WS If it does not through repair,
### RFQ4-6 Additional A2 M. VALVE ### Remove the damaged valve from line 10" and transfer the damaged valve to WS AW-20-A2-080 WP-AW-20-A2-080 VALVE GTS 25-Dec-74 E-1524-BLV-003 20-1161972 255-KH 9-Jan-00 31-Dec-99 PC
valve and reassembly valve at site hydrocarbon shall leak out
Repair and test valve at WS
Reinstall valve with new gasket at site
Install/remove scaffolding
Remove the old vapor distributor pipes
Replace the vapor distributors of T-
### RFQ4-7 Additional A2 Tower ### T-1501 Install new vapor distributor pipes AW-15-A2-011 WP-AW-15-A2-011 TOWER GTS 27-Dec-74 T-1501 20-1135330 AW-15-A2-011 31-Dec-99 SET
1501
Install pipe stiffeners by welding
NDT to check quality of pipe stiffeners welding
Install/remove scaffolding
Remove/install insulation
Inspect Pipe support point Install pipe shoes for insulated pipes
### RFQ4-8 Additional A2 Support ### Support 242-BB-VHSX-A2 WP-242-BB-VHSX-A2 SUPPORT GTS 24-Dec-74 A2-PIP 20-1120640 AW-20-A2-081 A2-PIP 15-Jan-00 POINT
Modify piping support as support points 242-BB-VHSX-A2
NDT to check quality of welding work
Do painting
Blind/Deblind
Insulaiton remove/re-install
Repair the weldolet defect and
Scaffolding Installation/Removal
corroded pipe section on line 0.75-
### RFQ4-9 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3/4 inch for repair AW-20-A2-083 WP-AW-20-A2-083 PIPING GTS 24-Dec-74 0.75-FG-217802-A2AD-ST2 20-1135369 AW-083-255-ITA-INS 0.75-FG-217802-A2AD-ST2 8474L-021-PID-0021-104-2 30-Dec-99 29-May-00 31-Dec-99 SET
FG-217802-A2AD-ST2 follow IAT
Re-weld to repair weldind joint
report
Fit-up, welding and NDT for repair work
Repainting

Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal
Repair leaking point of line 3-PL-
### RFQ4-10 Additional A2 Piping ### Cut to remove the damaged welding joint from lind 3 inch for repair AW-20-A2-084 WP-AW-20-A2-084 PIPING GTS 24-Dec-74 3"-PL-210028-B1GR-ST1 20-1133377 AW-084 3"-PL-210028-B1GR-ST1 8747L-021-PID-0021-112 2-Jan-00 26-Oct-00 31-Dec-99 SET
210005-B1AP2-HC follow IAT report
Re-weld to repair weldind joint
Fit-up, welding and NDT for repair work
Repainting
Erect and remove scaffolding
Reinstall inlet expansion joint of C-
Remove and reinstall insulation
### RFQ4-11 Additional A2 Expention jont ### C-1502B C-1502B WP-C-1502B EXPENTION GTS 24-Dec-74 C-1502B 1502B. It was damaged during 20-1164134 C-1502B V-215B-001-A-029 31-Dec-99 SET
Remove damage expasion joint
incident in June-2019
Install new expansion joint
Blind/Deblind
Insulaiton remove/re-install
Scaffolding Installation/Removal Fabricate and install saturated HPS
### RFQ4-12 Additional A2 Piping ### 015-SCC-902 Cut to remove the damaged welding joint from lind 3/4 inch for repair MOC-15-20-365 WP-MOC-15-20-365 PIPING GTS 24-Dec-74 015-SCC-902 sample point modification as per 20-1164138 MOC-15-20-365 10"-SH-154030-D1AS-HS 8474L-410-SP-1399-006 30-Dec-99 26-Oct-00 2-Jan-00 POINT
Re-weld to repair weldind joint MOC-15-20-365
Fit-up, welding and NDT for repair work
Repainting
Replace 01set seal kit for actuator Maintenance for ball joint/other
### RFQ4-13 Additional A2 Actuator ### Replace 01 coupleted set positioner AW-20-A2-089 WP-AW-20-A2-089 Actuator GTS 25-Dec-74 015-FV-901 mechanical parts of 015-FV-901/902 20-1161043 015-FV-901 1-Jan-00 SET
Painted actuator during 4th TA follow 247
Blind/Deblind
Insulaiton remove/re-install
Remove and Re-install 8 valves at site
### RFQ4-14 Additional A2 M. VALVE ### Remove the damaged valve from line 2" and transfer the damaged valve to WS AW-20-A2-090 WP-AW-20-A2-090 VALVE GTS 25-Dec-74 VAL-15 20-1168207 VAL-15 8747L-015-PID-0021-129 1-Jan-00 29-May-00 7-Jan-00 SET
015-AT-004/005/006/007/008/009
Repair and test valve at WS
Reinstall valve with new gasket at site
Insulation remove/re-install
Blind/Deblind
Unplug for the MP steam line Piping works -Turnaround
### RFQ5-1 Additional A2 Piping ### Cut and Replace the 2m length pipe with 4 elbow 90 and Steam trap size 3/4 inch by welding AW-20-A2-092 WP-AW-20-A2-092 PIPING GTS 24-Dec-74 015-PIP-001 19-1548259 329-20-2352-DH 30-Dec-99 29-May-00 31-Dec-99 SET
to steam trap no 1337 maintenance service
Fit-up, welding and NDT for weld joint
Repainting
Blind/Deblind
Replace the bypass valve and
Insulation remove/re-install
downstream B/V of steam Piping works -Turnaround
### RFQ5-2 Additional A2 Piping ### Cut to remove the damaged valves size 3/4" and replace by new ones. AW-20-A2-094 WP-AW-20-A2-094 PIPING GTS 24-Dec-74 VAL-15 20-1169205 329-20-2352-DH 30-Dec-99 29-May-00 1-Jan-00 SET
trap on E-1503C export line maintenance service
Fit-up and rewelding and NDT for weld joints
are passing
Repainting
Blind/Deblind
Insulation remove/re-install
Scaffolding Installation / Removal Fix steam tracing is leaking
Piping works -Turnaround
### RFQ5-3 Additional A2 Tracing ### Cut to remove the damaged point including 1 elbow and 1m pipe size 3/4" and replace by new (under insulation) on this pipe AW-20-A2-095 WP-AW-20-A2-095 PIPING GTS 24-Dec-74 0.75-CL-215706-A1AS-HS 19-1585083 329-20-2352-DH 30-Dec-99 29-May-00 31-Dec-99 SET
maintenance service
ones. (between P-2102A/B)
Fit-up, welding and NDT for weld joints
Repainting

Blind/Deblind
Insulation remove/re-install
Repair weld defect of 2
Cut to remove the damaged points Piping works -Turnaround
### RFQ5-4 Additional A2 Piping ### vents/drains (item 3,9) follow AW-20-A2-096 WP-AW-20-A2-096 PIPING GTS 24-Dec-74 015-PIP-001 20-1194497 329-20-2352-DH 30-Dec-99 26-Oct-00 1-Jan-00 SET
Replace 01 weldolet 10"x3/4" for line 10"-PL-150804-B2AP-ST1 maintenance service
IAT report
Fit-up, welding and NDT for weld joints
Repainting
Blind/Deblind INPECTION REPORT: Remove
Scaffolding Installation / Removal clamping supports for pipe
Piping works -Turnaround
### RFQ5-5 Additional A2 Piping ### Removing Support / Re-install 10-PL-150534-A2AQ-NI for AW-20-A2-098 WP-AW-20-A2-098 PIPING GTS 24-Dec-74 015-PIP-001 20-1171239 329-20-2352-DH 1-Jan-00 SET
maintenance service
Preparation for inspection detail inspection follow IAT
Repainting report
Type of Equip Equip Size Rating
No S/N Area Unit Tag.name Work description Change No. 작업구분 수행 Item Code Tag No. Short Description WO (at site) Document No. Line No. P&ID No. UoM Quantity Reason for change
change Type Description (inch) (lb)
Replace new valve E01-BLV- Piping works -Turnaround
### RFQ5-6 Additional A2 M. VALVE ### AW-20-A2-100 WP-AW-20-A2-100 VALVE GTS 24-Dec-74 VAL-15 20-1222617 329-20-2352-DH 31-Dec-99 SET Detail 확인중
017 in TA4 maintenance service
Blind/Deblind
Scaffolding Installation / Removal
Insulation remove/re-install
Replace new valve E01-MTV- Piping works -Turnaround
### RFQ5-7 Additional A2 M. VALVE ### Cut to remove the damaged valve size 1" and replace by new one. AW-20-A2-101 WP-AW-20-A2-101 VALVE GTS 24-Dec-74 VAL-15 20-1222612 329-20-2352-DH 31-Dec-99 10-Mar-02 31-Dec-99 SET
001 in TA4 maintenance service
Contractor supply new globe valve 1"#800, SW, body: ASTM 105, trim: 13Cr, Stellited seat
Fit-up and rewelding and NDT for weld joints
Repainting
Replace new valve E01-BPV- Piping works -Turnaround
### RFQ5-8 Additional A2 M. VALVE ### AW-20-A2-102 WP-AW-20-A2-102 VALVE GTS 24-Dec-74 VAL-15 20-1222606 329-20-2352-DH 31-Dec-99 SET Detail 확인중
002 in TA4 maintenance service

ITEM 추가 작업수량 취소 작업수량 SUB-CON TOTAL ITEM 추가 취소


TOTAL ### 13-Apr-00 1-Jan-00 18-Jan-00 GTS 11-Apr-00 RFQ1 18-Jan-00
GTS
PIPING ### 9-Mar-00 ### 2-Feb-00 31-Dec-99 RFQ2 4-Feb-00 1-Jan-00
PSC
Slide Valve
SUPPORT 1-Jan-00 1-Jan-00 28-Jan-00 31-Dec-99 RFQ3 28-Jan-00
PSC
EXPENTION ### 31-Dec-99 13-Jan-00 TOTAL 13-Apr-00 RFQ4 13-Jan-00
Actuator ### 31-Dec-99 7-Jan-00 RFQ5 7-Jan-00
PSV ### 31-Dec-99 13-Apr-00 TOTAL 15-Apr-00 1-Jan-00
VALVE ### 25-Jan-00
DRUM 1-Jan-00 1-Jan-00
TOWER ### 31-Dec-99
HEATER 1-Jan-00 31-Dec-99 ###
WORK PACKAGE LIST
STATISTIC EQUIPMENT
Damper Drum Heater Rx Tank Tower Valve

PIPING AND C&I


Manual Control Damper On/Off Orifice Thermo
PSV Auxiliary Quill Actuator
valve Valve Actuator Valve Plate well

WP-015- WP-XV- WP-J02B-


AUX-001- U15-19- BLV-001-
18-1082065 1199306 17-1512730
WP-
WP-015-
FV010B-
AUX-002-
BLV-002-
18-1058813
19-1330539
WP-
WP-015-
UV021-
AUX-003-
BLV-001-
18-1196367
19-1330531
WP-
WP-015-
UV021-
AUX-004-
BLV-002-
18-1056334
19-1330535
WP-
WP-015-
P1519B-
AUX-005-
BLV-002-
18-1058874
18-1180252
WP-
WP-015-
STT155332
AUX-006-
-BLV-001-
18-1299644
18-1346736
WP-015- WP-VAL-
AUX-008- U16-19-
18-1169290 1310540
WP-015- WP-VAL-
AUX-009- U17-19-
18-1390084 1310664
WP-015- WP-VAL-
AUX-019- U21-19-
18-1196372 1311381
WP-021-
AUX-001-
18-1380832
WP-021-
AUX-002-
18-1216590
WP-021-
AUX-003-
18-1518696
WP-021-
AUX-004-
19-1533063
WP-021-
AUX-005-
17-1532051
WP-021-
AUX-006-
18-1343926
WP-021-
AUX-007-
17-1468821
WP-021-
AUX-008-
18-1518701
WP-021-
AUX-009-
18-1329861