WELDING SURVEILLANCE REPORT

(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-006 Date : 2/26/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E1,E2 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 160 24 200 1.15

Cap FCAW LNG-ST-WD-039 DCEP 162 22 560 0.38

Root FCAW LNG-ST-WD-039 DCEP 160 24 200 1.15

Cap FCAW LNG-ST-WD-039 DCEP 162 22 550 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 2/26/2021 2/26/2021

Page 1 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-007 Date : 2/27/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E5,E6 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 162 23 210 1.06

Cap FCAW LNG-ST-WD-039 DCEP 162 22 550 0.39

Root FCAW LNG-ST-WD-039 DCEP 160 23 208 1.06

Cap FCAW LNG-ST-WD-039 DCEP 162 22 550 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 2/27/2021 2/27/2021

Page 2 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-008 Date : 3/1/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E9,E10 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 164 23 210 1.08

Cap FCAW LNG-ST-WD-039 DCEP 162 23 560 0.40

Root FCAW LNG-ST-WD-039 DCEP 163 24 208 1.13

Cap FCAW LNG-ST-WD-039 DCEP 162 23 565 0.40

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/1/2021 3/1/2021

Page 3 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-009 Date : 3/2/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E13,E14 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 164 23 210 1.08

Cap FCAW LNG-ST-WD-039 DCEP 163 22 560 0.38

Root FCAW LNG-ST-WD-039 DCEP 163 24 208 1.13

Cap FCAW LNG-ST-WD-039 DCEP 162 22 565 0.38

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/2/2021 3/2/2021

Page 4 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-010 Date : 3/3/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E20,E21 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 164 23 210 1.08

Cap FCAW LNG-ST-WD-039 DCEP 162 22 560 0.38

Root FCAW LNG-ST-WD-039 DCEP 160 24 208 1.11

Cap FCAW LNG-ST-WD-039 DCEP 162 22 565 0.38

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/3/2021 3/3/2021

Page 5 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-011 Date : 3/4/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : E24,E25 Dwg No. : 195363-DHI-03-DWG-CP-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-039 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-039 DCEP 162 22 560 0.38

Root FCAW LNG-ST-WD-039 DCEP 164 24 208 1.14

Cap FCAW LNG-ST-WD-039 DCEP 162 22 570 0.38

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/4/2021 3/4/2021

Page 6 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-012 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-1,1-2 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-015 DCEP 164 23 210 1.08

Cap FCAW LNG-ST-WD-015 DCEP 160 22 560 0.38

Root FCAW LNG-ST-WD-015 DCEP 165 24 208 1.14

Cap FCAW LNG-ST-WD-015 DCEP 160 22 570 0.37

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 7 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-013 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-3,1-4 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-017 DCEP 166 23 210 1.09

Cap FCAW LNG-ST-WD-017 DCEP 160 22 560 0.38

Root FCAW LNG-ST-WD-017 DCEP 165 24 208 1.14

Cap FCAW LNG-ST-WD-017 DCEP 162 23 570 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 8 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-014 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-5,1-6 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-019 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-019 DCEP 161 22 560 0.38

Root FCAW LNG-ST-WD-019 DCEP 165 23 208 1.09

Cap FCAW LNG-ST-WD-019 DCEP 162 23 570 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 9 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-015 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-7,1-8 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-020 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-020 DCEP 161 22 560 0.38

Root FCAW LNG-ST-WD-020 DCEP 165 23 208 1.09

Cap FCAW LNG-ST-WD-020 DCEP 162 23 570 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 10 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-016 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-9,1-10 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-022 DCEP 166 23 210 1.09

Cap FCAW LNG-ST-WD-022 DCEP 162 22 560 0.38

Root FCAW LNG-ST-WD-022 DCEP 165 23 208 1.09

Cap FCAW LNG-ST-WD-022 DCEP 163 23 570 0.39

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 11 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-017 Date : 3/19/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-9,1-10 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-023 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-023 DCEP 165 22 560 0.39

Root FCAW LNG-ST-WD-023 DCEP 165 23 208 1.09

Cap FCAW LNG-ST-WD-023 DCEP 162 24 572 0.41

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/19/2021 3/19/2021

Page 12 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-018 Date : 3/20/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-14,1-15 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-024 DCEP 165 23 211 1.08

Cap FCAW LNG-ST-WD-024 DCEP 164 22 570 0.38

Root FCAW LNG-ST-WD-024 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-024 DCEP 162 24 572 0.41

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/20/2021 3/20/2021

Page 13 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-019 Date : 3/20/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-17,1-18 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-036 DCEP 164 23 211 1.07

Cap FCAW LNG-ST-WD-036 DCEP 162 23 570 0.39

Root FCAW LNG-ST-WD-036 DCEP 165 23 210 1.08

Cap FCAW LNG-ST-WD-036 DCEP 162 24 572 0.41

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/20/2021 3/20/2021

Page 14 of 15
WELDING SURVEILLANCE REPORT
(for Ni 9% Steel)
Report No. : 195363-02-QC-DHI-INN-NI-SR-020 Date : 3/20/2021

Project : PV GAS THI VAI LNG RECEIVING TERMINAL Location : DHI Workshop.

Wps No. : LNG-WPS-T-FC-16

Joint No. : 1-17,1-18 Dwg No. : 195363-DHI-03-DWG-SB-001


Material : A553 type 01

Welding Parameter

Current
Travel Speed
Layer Welding process Welder No. Type Heat Input (kJ/ mm)
Amp (A) Volt (V) (mm/ min)
(Polarity)

Root FCAW LNG-ST-WD-037 DCEP 164 23 211 1.07

Cap FCAW LNG-ST-WD-037 DCEP 162 23 572 0.39

Root FCAW LNG-ST-WD-037 DCEP 165 23 212 1.07

Cap FCAW LNG-ST-WD-037 DCEP 164 24 572 0.41

Organization DHI SUB-CONTRACTOR CONTRACTOR COMPANY CA

Signature

Name Lê Trung Tính Tran Huu Huan

Date 3/20/2021 3/20/2021

Page 15 of 15