Bridge Design Details 6.3 February 2020


Abutment Drainage Details
l Abut (S EAT OR
l Abu t (S EAT OR
DlAP HRAGM TYP E)
w
DIAP HRAGM TYP E}
u i
i
I
i
i @ i

8" PSP UNDER DRA l


AND PERME AB LE
PERV IOUS BACK FILL MATE RIAL CONTl NUOUS
MA TER I AL OR BEHIN D AB UTMENT
GEOCOMPOS JTE
ALTER NA TJ VE

WEE P HOLES & PE RV IOUS MATERIAL UNDERDRA IN & PERM EABLE MATERIAL

DRA INAG E WITHOU T APPROAC H SLAB

/t Abu t (S EAT OR
DlAPHRAGM TYPE}w
l Abu t (SEAT OR
DlAP HRAG M TYP E)w STRUC TUR E APP ROACH i
i
i
STRUC TUR E APP ROACH
~
! i
i

~
i
i
I

e,
8" PSP UNDER DRA I i
AND PERME ABLE i
MATE RIAL CON Tl NUOUS
GEOCOMPOS lTE DRA IN
BEHIN D ABU TME T
ft - 5%
8" CSP DOWNDRA IN
AT LOW EN D OF PSP

~ ::::::j:::_·_-_·; \::/.
i ,.,,' ·,:- ::,, /A LTERNA TI VE
i ·-::--/ WlTH SLOP E
l ··-::::::tAV ING

SLOTTED PIPE & GEOCOMPOS ITE DRA IN UNDERDRA IN & PERMEAB LE MA TE RIAL

DRA INAG E WITH APPROAC H SLAB

Figure 6.3.1 Abutment Drainage

ABUTMENT DRAINAGE DETAILS 6.3.1


,..
lb/trans·

!NISHED PIF'E CAP , Typ

j ADE
BACKFACE OF
ABUT ET OR
RET AIN! G 'l 'ALL
SEE NO TE 2

IT
I

"'
I
DETAIL A
GEOC0',1 POS ITE
DRA IN
SEE - 2¾ ', TEE
NO TE 1 - ..J--t,~ f a _j_
CON ECTIO
1----'o-';;pn.,.a J

'...,~,,. "-.. DETAIL B

WA LL SECTION SECTION A- A

bJ TPB

DETAIL A DET AIL B


NO TE S:
1 . 4"¢ dr o i s o t i n t er e d i t e sog po irit s ond 25' oxi um ce nt e r t o
c e +e r {9' - 0" C- C f or Ty pe 3 and 9 - " C- C f or Type 4 re t ai n ing wo l l s) .
Fo r \\'Oli s adj oce n+ t o i dewa l s or c ur· b , p r ovi d e 'I "¢ p l as ti c pi p@
w1dler t he s ia ewo l t o d i sc orge t h ough c ur b face . Exposed wc l I
drai ns sha l I be l oca t ed 3"± above fi i s d grade.
2 - Geo com pos i t e dro i n , -tr eot e d per me,a le base ma t eria l ond 3"¢ s l o tt ed
p l as t i c pi pe conti nuous beh i nd r et a i ni ng wa l I or abut me +. Cap ends
of p i pe , Prov i de "Tee" con ec ti o o t eac h 4"¢ dr o in.
3. Co nee + t e l ow end o f p i as t re i pe t o t he ma in ou tl et i pe os
app l ic.ab l e , ~

ALTER ATI VE TO BR ID GE DET AIL ®

WEE P HOLE AND GEOCOMPOS ITE DRA IN DETAIL


NO SCA LE

Figure 6.3.2 Weep Hole and Geocomposite Drain Alternative

6.3.2 ABUTMENT DRAINAGE DETAILS


Notes:

1. Continuous pervious backfill material (Standard Plan B0-3: Bridge Detail 3-1),
structure approach drainage (Standard Plan B9-6: Structure Approach Drainage
Details), or perforated pipe with permeable material (Standard Plan B0-3: Bridge
,,
Detail 3-5) should be placed in accordance with the instructions in Memo to
Designers: 5-2 Diaphragm Abutments. Permeable material (Standard Plan B0-3:
Bridge Detail 3-5), is only specified when known water bearing material is present
behind the abutment as identified in the Foundation Report.
2. For all abutments (without structure approaches) and for retaining walls, the
“Weep Hole and Geocomposite Drain Detail”, shown in Figure 6.3.2, shall be
added to the plans. This detail provides an alternative detail to the pervious
backfill specified in Standard Plan B0-3: Bridge Detail 3-1. The plans should
show the pervious material and not the alternative geocomposite drain in the
abutment or retaining wall sections. Edit the NOTES in the “Weep Hole and
Geocomposite Drain Detail” to remove references to wall types or elements that
are not specific to the project plans.
ABUTMENT DRAINAGE DETAILS

3. Reference ROADWAY PLANS or show drainage outlet details behind the


abutment whenever possible.
6.3.3