Ref: SME/22-23/071
Budgetary offer
Dear sir,
This is in reference to your requirement for above item. As desired, we are pleased to quote below our
price under:
PRICE OFFER
S.no DESCRIPTION QUANTITY RATE TOTAL
* LABOUR CHARGE
1. 10’’ MS Pipe labour charge 44m 1000/m 44000.00
2. 10’’ Insulation pipe 44m 400/m 17600.00
3. Bend labour charge 12pc 1200/pc 14400.00
4. Bend insulation labour charge 12pc 500/pc 6000.00
5. Iron labour vharge 250kg 25/kg 6250.00
SUB TOTAL 88250.00
18% GST 15885.00
TOTAL 104135.00