Professional Documents
Culture Documents
Ø fooj.k vuqyXud@layXud
1 2 3
1 dk;Z dk uke okMZ dz- 08 xkSBku esa 'ksM fuekZ.k dk;ZA
2 dk;Z LFky dk uke okMZ Ø- 08
3 dk;Z dh fo|eku fLFkfr vizkjEHk
4 dk;Z dh vko';drk eq[;ea=h tupkSiky esa ekaxkuqlkj
5 izkDdyu jkf'k 7.40
S. Item
Discription No L B D/H Qty. Unit Rate Amount
no No
1 2 3 4 5 6 7 8 9 10 11
1 1.1 Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m,
including dressing and leveling of pits.
1.1.1 In all types of soils.
Column 21 0.9 0.9 0.9 15.31 cum
Total 15.31 cum 185 2832.0
2 3.1 Providing and laying nominal mix plain
cement concrete with crushed stone
aggregate using concrete mixer in all works
upto plinth level excluding cost of form work.
3.1.2 1:4:8 (1 cement : 4 coarse sand : 8 graded
stone aggregate 40mm nominal size).
Column 21 0.9 0.9 0.2 3.40 cum
Total 3.40 cum 2659 9046.0
3 2.1 Providing and fixing form work including
centring, shuttering, strutting, staging,
propping bracing etc. complete and including
its removal at all levels, for:
2.1.1 Foundations, footings, bases of columns
plinth beam, curtain wall in any shape and
size and all type of wall below plinth level.
Footing 84 0.75 - 0.9 56.70 Sqm
Total Qty. 56.70 Sqm 139 7881.0
4 3.2 Providing and laying nominal mix
reinforcement cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level excluding cost of form
work.
3.2.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm nominal size).
Footing 21 0.75 0.75 0.9 10.63 cum
Total 10.63 cum 4163 44258.0
5 3.12 Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings including cost of
binding wire in foundation and plinth all
complete:
3.12.1 Thermo-Mechanically treated bars FE 415
Total Rcc Quantityx100kg 1 10.63 x80 = 850.50 Kg 54.5 46352.0
6 1.18 Providing and filling in plinth with sand/
crusher dust and hard moorum under floor in
layers not exceeding 20cm in depth
consolidating each deposited layer by
ramming and watering, including dressing
etc. complete.
Footing 84 0.15 3 0.8 30.24 cum
total 30.24 cum 371 11219.0
7 9.3 Steel work in tubular (round, square or
rectangular hollow tubes etc.) structure in
built-up sections, trusses and frame work
including cutting, hoisting, fixing in position
upto a height of 5m above plinth level,
consisting of columns trusses, roof and
bottom purlins, base plate, holding down
bolts, wind ties bracing (if required), bolts,
nuts and washers for fastening etc. complete
with applying a priming coat of red oxide
zinc chromate primer.
9.3.1 Electric resistance or induction butt welded
tubes Grade-250 .
For Strut 100mm Dia pipe 14 3 9.75 - 409.50
For Strut 100mm Dia pipe 7 3.6 9.75 - 245.70
Truss 7 nos @500kg 7 - 300 - 2100.00
perlin 50mm dia 2.67kg/m 10 90 2.67 - 2403.00
Nut bolts 84 4 1.5 - 504.00
Plate 200mmx200mmx8mm 42 2 2.2 - 184.80
Total 5847.00 Kg 80.5 470684.0
8 10.11 Supply and fixing of precoated galvanized
iron profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-
charge) 0.50 mm +/- 5% total coated
thickness (TCT), Zinc coating 120gsm as per
IS: 277 in 240mpa steel grade, 5-7 microns
epoxy primer on both side of the sheet and
polyester top coat 15-18 microns. Sheet
should have protective guard film of 25
microns minimum to avoid scratches while
1 10 20 - 200.00 Sqm
10% extra for overlapping 20.00 Sqm
Total 220.00 Sqm 636 139920.0
9 14.22 Painting on new work (two or more coats) to
give an even shade with:
14.22.1 Satin synthetic enamel paint - - LS - 150.00 Sqm
Total 150.00 Sqm 55 8250.0
Total RS. 740442
SAY LAKH 7.40