Achmad Erfan Prihadana

BEBAN
1 350
2 300
3 200
4 250
5 325

Tabel Kemungkinan

Beban
350 300 200 250 325
Total

A=15 A A A A A 690

B=14 B B B B B 630

C=13 C C C C C 610

D=12 D D D D D 550

E=11 E E E E E 440

F=10 F F F F F 390

G=9 G G G G G 380

H=8 H H H H H 360

I=7 I I I I 330

J=6 J J J 310

K=5 K K K 300

L=4 L L 250

M=3 140

N=2 80

O=1 60

0 0
Achmad Erfan Prihadana

Memperhitungkan Spinning Reserve dari Pembangkit Online Terbesar :


No. Unit 1 Unit 2 Unit 3 Unit 4 Spinning Unit OL
Reserve Maximum
A 1 1 1 1 0 300
B 1 1 1 0 60 300
C 0 1 1 1 80 300
D 0 1 1 0 140 300
E 1 0 1 1 250 300
F 1 1 0 1 300 250
G 1 0 1 0 310 300
H 0 0 1 1 330 300
I 1 1 0 0 360 250
J 0 1 0 1 380 250
K 0 0 1 0 390 300
L 0 1 0 0 440 250
Tabel Reduksi Spinning Reserve

Beban
350 300 200 250 325
Total

A=15 690

B=14 630

C=13 610

D=12 550

E=11 440

F=10 F F F F F 390

G=9 G G G G G 380

H=8 H H H H H 360

I=7 I I I I 330

J=6 J J J 310

K=5 K K K 300

L=4 L L 250

M=3 140

N=2 80

O=1 60

0 0
Achmad Erfan Prihadana

Dengan Mengabaikan Minimum Uptime dan Downtime serta Hot Start


Untuk J=1, K=10 kombinasi (1101)
F1 = 10,440 x 2 x 80 + 213,00 = 1883,4
F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 7697,02
P cost (2,10) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 7697,02 + 0 + 350 + 0,02 = 8047,04

Untuk J=1, K=9 kombinasi (1010)


F1 = 10,440 x 2 x 50 + 213,00 = 1257
F3 = 8,73 x 2 x 300 + 684,74 = 5922,74
P cost total = 7179,74
P cost (2,9) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 7179,74 + 0 + 350 = 7529,74

Untuk J=1, K=8 kombinasi (0011)


F3 = 8,73 x 2 x 300 + 684,74 = 5922,74
F4 = 11,9 x 2 x 50 + 252 = 1442
P cost total = 7364,74
P cost (2,8) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 7364,74 + 0 + 0,02 = 7364,76  Termurah
Untuk J=1  D (0011)
Unit Initial Condition Minimum Cold Start
1 -5 4
2 -1 5
3 9 5
4 1 0
Achmad Erfan Prihadana

Untuk J=2, K=10 kombinasi (1101)


F1 = 10,440 x 2 x 30 + 213,00 = 839,4
F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 6653,02
P cost (2,10) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6653,02 + 7364,76 + 400 + 350 + 0 = 14767,78

Untuk J=2, K=9 kombinasi (1010)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F3 = 8,73 x 2 x 275 + 684,74 = 5486,24
P cost total = 6221,24
P cost (2,9) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6221,24 + 7364,76 + 0 + 350 = 13936

Untuk J=2, K=8 kombinasi (0011)


F3 = 8,73 x 2 x 280+ 684,74 = 5573,54
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 6301,54
P cost (2,8) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6301.54 + 7364,76 + 0 = 13666,3

Untuk J=2, K=7 kombinasi (1100)


F1 = 10,440 x 2 x 50 + 213,00 = 1257
F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
P cost total = 6342,62
P cost (2,7) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6342,62 + 7364,76 + 350 + 400 = 14457,38
Achmad Erfan Prihadana

Untuk J=2, K=6 kombinasi (0101)


F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
F4 = 11,9 x 2 x 50 + 252 = 1442
P cost total = 6527,62
P cost (2,6) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6527,62 + 7364,76 + 0 + 400 = 14292,38

Untuk J=2, K=5 kombinasi (0010)


F3 = 8,73 x 2 x 300 + 684,74 = 5922,74
P cost total = 5922,74
P cost (2,5) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5922,74+ 7364,76 + 0 = 13287,5  Termurah

Untuk J=2  D (0010)


Unit Initial Condition Minimum Cold Start
1 -6 4
2 -2 5
3 10 5
4 -1 0
Achmad Erfan Prihadana

Untuk J=3, K=10 kombinasi (1101)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F2 = 9,00 x 2 x 155 + 585,62 = 3375,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 4838,62
P cost (3,10) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4838,62 + 13287,5 + 400 + 350 + 0,02 = 18876,14

Untuk J=3, K=9 kombinasi (1010)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F3 = 8,73 x 2 x 175 + 684,74 = 3740,24
P cost total = 4475,24
P cost (3,9) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4475,24 + 13287,5 + 0 + 350 = 18112,74

Untuk J=3, K=8 kombinasi (0011)


F3 = 8,73 x 2 x 180 + 684,74 = 3827,54
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 4555,54
P cost (3,8) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4555,54 + 13287,5 + 0 = 17843,04

Untuk J=3, K=7 kombinasi (1100)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F2 = 9,00 x 2 x 175 + 585,62 = 3735,62
P cost total = 4470,62
P cost (3,7) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4470,62 + 13287,5 + 350 + 400 = 18508,12
Achmad Erfan Prihadana

Untuk J=3, K=6 kombinasi (0101)


F2 = 9,00 x 2 x 180 + 585,62 = 3825,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 4553,62
P cost (3,6) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4553,62 + 13287,5 + 0 + 400 = 18241,12

Untuk J=3, K=5 kombinasi (0010)


F3 = 8,73 x 2 x 200 + 684,74 = 4176,74
P cost total = 4176,74
P cost (3,5) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4176,74+ 13287,5 + 0 = 17464,24  Termurah

Untuk J=3, K=4 kombinasi (0100)


F2 = 9,00 x 2 x 200 + 585,62 = 4185,62
P cost total = 4185,62
P cost (3,5) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4176,74+ 13287,5 + 400 = 17873,12

Untuk J=3  D (0010)


Unit Initial Condition Minimum Cold Start
1 -7 4
2 -3 5
3 11 5
4 -2 0
Achmad Erfan Prihadana

Untuk J=4, K=10 kombinasi (1101)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F2 = 9,00 x 2 x 205 + 585,62 = 4275,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 5738,62
P cost (4,10) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5738,62 + 17464,24 + 400 + 350 + 0,02 = 23952,88

Untuk J=4, K=9 kombinasi (1010)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F3 = 8,73 x 2 x 225 + 684,74 = 4613,24
P cost total = 5348,24
P cost (4,9) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5348,24 + 17464,24 + 0 + 350 = 23162,48

Untuk J=4, K=8 kombinasi (0011)


F3 = 8,73 x 2 x 230 + 684,74 = 4700,54
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 5428,54
P cost (4,8) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5428,54 + 17464,24 + 0,02 = 22892,8

Untuk J=4, K=7 kombinasi (1100)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F2 = 9,00 x 2 x 175 + 585,62 = 3735,62
P cost total = 4470,62
P cost (4,7) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 4470,62 + 17464,24 + 350 + 400 = 22684,86
Achmad Erfan Prihadana

Untuk J=4, K=6 kombinasi (0101)


F2 = 9,00 x 2 x 230 + 585,62 = 4725,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 5453,62
P cost (4,6) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5453,62 + 17464,24 + 0 + 400 = 23317,86

Untuk J=4, K=5 kombinasi (0010)


F3 = 8,73 x 2 x 250 + 684,74 = 5049,74
P cost total = 5049,74
P cost (4,5) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5049,74+ 17464,24 + 0 = 22513,98  Termurah

Untuk J=4, K=4 kombinasi (0100)


F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
P cost total = 5085,62
P cost (4,5) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 5085,62 + 17464,24 + 400 = 22549,86

Untuk J=4  D (0010)


Unit Initial Condition Minimum Cold Start
1 -8 4
2 -4 5
3 12 5
4 -3 0
Achmad Erfan Prihadana

Untuk J=5, K=10 kombinasi (1101)


F1 = 10,440 x 2 x 55 + 213,00 = 1361,4
F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
F4 = 11,9 x 2 x 20 + 252 = 728
P cost total = 7175,02
P cost (5,10) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 7175,02 + 22513,98 + 400 + 350 + 0,02 = 30439,02

Untuk J=5, K=9 kombinasi (1010)


F1 = 10,440 x 2 x 25 + 213,00 = 735
F3 = 8,73 x 2 x 300 + 684,74 = 5922,74
P cost total = 6657,74
P cost (5,9) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6657,74 + 22513,98 + 0 + 350 = 29521,72

Untuk J=5, K=8 kombinasi (0011)


F3 = 8,73 x 2 x 300 + 684,74 = 5922,74
F4 = 11,9 x 2 x 25 + 252 = 847
P cost total = 6769,74
P cost (5,8) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6769,74 + 22513,98 + 0,02 = 29283,74  Termurah

Untuk J=5, K=7 kombinasi (1100)


F1 = 10,440 x 2 x 75 + 213,00 = 1779
F2 = 9,00 x 2 x 250 + 585,62 = 5085,62
P cost total = 6864,62
P cost (5,7) = P cost + F cost termurah sebelumnya + start up cost (cold)
= 6864,62 + 22513,98 + 350 + 400 = 30128,6
Achmad Erfan Prihadana

Untuk J=5  D (0010)


Unit Initial Condition Minimum Cold Start
1 -8 4
2 -4 5
3 12 5
4 -3 0

Beban
350 300 200 250 325
Total

A=15 690

B=14 630

C=13 610

D=12 550

E=11 440

F=10 F F F F F 390

G=9 G G G G G 380

H=8 H H H H H 360

I=7 I I I I 330

J=6 J J J 310

K=5 K K K 300

L=4 L L 250

M=3 140

N=2 80

O=1 60

0 0