You are on page 1of 8

ACCEPTANCE TEST SHEET

FOR ESA MIGRATION FROM G-11 TO IS -25

PURPOSE OF TEST DATE

ACCEPTANCE

PROJECT NO: SITE


Name/ID

HUB Name: SITE


Address:

CUSTOMER AIRTEL NIGERIA

Remarks (Please comment if there is SNAG or Not):

…………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………

APPROVAL

AUTHORITY NAME SIGNATURE DATE

AIRTEL Regional
Representative

CONTRACTOR’s
Representative

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


RESULTS
Site Parameters

Site Name:

Site Location:

Registration No :

Co-ordinates - Latitude :

Longitude :

Satellite : IS-25

Azimuth (TN) :

Polarisation :

Transponder ;

TX Frequency :

Rx Frequency :

Eb/No (As aligned with Intelsat) 9.0 (+- 2dBm)

ATP Results – Installation

Item Description OK/Fault

1 Antenna Migration

2 Indoor Cabling (If Required)

3 Outdoor Cabling (If Required)

4 RFT Indoor Unit Installation (If Required)

5 RFT Outdoor Unit Installation (If Required)

6 Modem Installation

7 Carrier-in-Carrier Operation

8 Civil Works Preparation (Where Required)

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


Equipment Installed

Item Description Comm. Remote Serial No


Settings Address

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Please supply the details of the equipment in the applicable spaces.

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


1 Key Modem Parameters

1 S/N___________
Menu Sub-Menu Description Setting/Value Value

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


2 S/N___________
Menu Sub-Menu Description Setting/Value Value

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


3. S/N___________
Menu Sub-Menu Description Setting/Value Value

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


4. S/N___________
ITEM Sub-Menu Description Setting/Value Value

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document


Snag List

Fault No Description Completed


Yes/No

APPROVAL

AUTHORITY NAME SIGNATURE DATE

AIRTEL Regional
Representative

CONTRACTOR’s
Representative

Attach screen captures and Pictures where applicable

Airtel Nigeria Satellite Migration G-11 to IS-25 Acceptance Document

You might also like