Eetc Comments On Abb Offer
Eetc Comments On Abb Offer
This is to inform you that test certificates for protective relays and measuring and
metering Instruments should be submitted from EETC Central Protection Sector.
(G-2):
in (G-2) for Metering instruments and Protection System you didn’t Fill-in the Data for
(Name of Manufacturer, Place of Manufacturer, Place of Testing, Standard), please Fill-in the
Guarantee Schedules (G-2) and send it for evaluation .
Incoming Feeders:
2- Please confirm to provide the number of (DO) to be (16) instead of (10) as per
EETC Guarantee Schedules (G-7a) ,item (1.1.11).
3- Please confirm that Original Software and firmware for the relay should be
provided in all relays.
Outgoing Feeders:
1- This is to inform you that the relay type (REF 611) is not accepted as it doesn’t
complete the field test period according to the (table-item 5) as per EETC specs,
Section (3), item (3.7.1), Page (6/8).
3- Please confirm to provide the number of (DI) to be (16) instead of (4) as per
EETC Guarantee Schedules (G-7a), item (2.1.12).
4- Please confirm to provide the number of (DO) to be (16) instead of (6) as per
EETC Guarantee Schedules (G-7a), item (2.1.13).
6- Please confirm that Original Software and firmware for the relay should be
provided in all relays.
Bus-Ties:
1- Please confirm that Original Software and firmware for the relay should be
provided in all relays.
Load Shedding:
Page 1
EETC Comments for Protection Project Sector on ABB offer for the 11 KV Distribution Feeders
2- Please Follow EETC Guarantee Schedules (G-7a) Specs For the Following:
Operating Time.
Temperature.
Humidity.
Operating frequency.
3- Please confirm that Original Software and firmware for the relay should be
provided in all relays.
Please submit the EETC Central Protection Sector- ROD EL-FARAG- test certificates
for the measuring and metering instruments (MICROSTAR-bluestar, type-A2000) for
evaluation or it will be omitted from your offer.