You are on page 1of 1

Rencana Schedule Pengecoran

Desember Januari 2023 Total


No Item Pekerjaan Satuan
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Volume
S20,S19,S18 S17,S16,S15
PHT Tanjung Pura (Scc) Ra 9.31 9.31 18.62 m3
1
(TP Beton 800 mm) Ri m3
Sisa
A1 P1
PHT Tanjung Pura (Scc) Ra 14.4 21.6 35.93 m3
2
(TP Baja t=15,88 mm) Ri m3
Sisa
A1 P1
Ra 6.87 7.96 14.82 m3
2 Lc Tanjung Pura (f'c 10 Mpa)
Ri m3
Sisa
P6 A2
PHT Tanjung Raya (Scc) Ra 21.6 14.4 35.93 m3
3
(TP Baja t=15,88 mm) Ri m3
Sisa
P6 A2
Ra 7.96 6.87 14.82 m3
2 Lc Tanjung Raya (f'c 10 Mpa)
Ri m3
Sisa
P2
PHT Sungai (Scc) Ra 35.9 35.93 m3
4
(TP Baja t=15,88 mm) Ri m3
Sisa
S22-S24 S28-S25 S21-S19
Ra 26.3 35.4 31.7 67.15 m3
5 Pile Head Tanjung Pura (f'c 30 Mpa)
Ri m3
Sisa