MATERIAL/ SAMPLE SUBMMISION
CADANGAN PEMBANGUNAN 1 UNIT 6 TINGKAT IBU PEJABAT
MAJLIS BEKAS WAKIL RAKYAT (MUBARAK) MALAYSIA, § UNIT
7 KEDAI PEJABAT 5TINGKAT DAN SEBUAH PENCAWANG
Project | eLeKTRIK DI ATAS LOT PT 9869, JALAN SENTUL PASAR, MUKIN
SETAPAK, DAERAH GOMBAK, WILAYAH PERSEKUTUAN KUALA
Date | 27/12/2018
LUMPUR.
Client _| POWERNET PROPERTIES SDN BHD i
coma = - Ret | voss/resmua/narotsr)
Ref, TAQ/PPSB/IIDSB/07/2018/LA
To : SNA CONSULT SDN. BHD.
Attn : Mr. Mohamad Helmiy
CG;
1) POWERNET PROPERTIES SDN BHD
2) BADERULZAMAN ARCHITECT
Jato’ Wayne / Mr. Kenny Yeong —(Encl.)
. Farhan Dato’ Ghazali
. Shaharuddin Hassan
3) TAQ-SURVEYOR - Attn : Mr. Tony B.E. Thang (Encl.)
Attn : En. Wan Khairul Nizam
SAMPLE / MATERIAL DESCRIPTIONS : METHOD STATEMENT FOR STRUCTURE WORKS.
With reference to the above, we submit herewith the folowing documents for structure works for
your review / approval
Method Statement for Excavation & Underground Piping
Method Statement for Pilecap & Column Stump
Method Statement for Ground Beam, Slab & Column
Method Statement for Upper Floor Beam & Slab
STATUS ‘SCOPE OF WORK
Z| srmroven [] emma structure
APPROVED WITH COMMENT __| ARCHITECTURE
al —
__| REVISED 2 RESUBNITTED MECHANICAL ELECTRICAL (M&E)
REMARKS / COMMENTS :
Prepared by: Reviewed by :
|
|
|
Name: Name:
Date PROJECTENGINEER | poy.
af 2018
LINNOVATIONS DESIGN SDN BHD
\WISMA LNNGVATIONS, 0-188 0-295, No.6 Jain PY 14/208 Oalatan ARA Damansara. 47901 Peaing Java, SelaraorOand Ehsan