MATERIAL / SAMPLE SUBMMISION CADANGAN PEMBANGUNAN 1 UNIT 6 TINGKAT IBU PEJABAT MAJLIS BEKAS WAKIL RAKYAT (MUBARAK) MALAYSIA, 5 UNIT Project | KEDAI PEJABAT 5 TINGKAT DAN SEBUAH PENCAWANG ELEKTRIK | Date | 15/1/2019 DIATAS LOT PT 9869, JALAN SENTUL PASAR, MUKIM SETAPAK, | DAERAH GOMBAK, WILAYAH PERSEKUTUAN KUALA LUMPUR. Client | POWERNET PROPERTIES SDN BHD aa pss, 18/muB/ma/017 Ganttect | raqyrese/lios6/07/2018/LA No | To : BADERULZAMAN ARCHITECT | Attn : Mr. Farhan Dato Ghazali / Mr. Shaharuddin cc 7 1) POWERNET PROPERTIES SDN BHD - Alin: Dato’ Wayne / Mr. Kenny Yeong (Encl) 2) SNA CONSULT SDN BHD - Alin : Mr. Mohamad Helmiy (Encl) 3) TAQ ~ SURVEYOR + Alin : Mr. Tony B.E. Thang Encl.) - Atin : En, Wan Khairul Nizam DESCRIPTIONS : METHOD STATEMENT FOR WALL & FLOOR FINISH With reference to the above, we submit herewith the following documents for Walll & Floor Finish works for your review / approval = 1. Method Statement for Plastering 2. Method Statement for Screeding. 3. Method Statement for Ting. 4, Method Statement for Painting, STATU: ‘SCOPE OF WORK: Z| approves L CIVIL & STRUCTURE armoveowmcoument [_v_|_ ARCHMECTUE ] reunwmes [TT] MeceaNtcaLa escent | neve snes | snectanicaL mee) reams / COMMENTS: "i Reviewed by: Zi ae Nam te: HAKIM is tT / TOT s IINNOVATIONS DESIGN SDN BHD I-INNOVATIONS DESIGN SDN BHD METHOD STATEMENT FOR WALL AND FLOOR FINISH (PLASTERING) Purpose: To ensure quality of work T. Material: Method: a) Cement 7 Sand Ensure various services 2. Machinery a) Concrete Mixer 3. Quality Required a) All outlet in correct position. b) Level nogging at wall 6) The surface shall be cleaned. ) Correct Mixing ratio and batching as per specification. ) Ensure platform is safe for working g) Two coats shall be applied and reinforced exmet shall be provided to interface between brick wall and RC beam, Evenness of finish surface. have been installed anc concealed in block wall 1 Setting out alignment on block wall surface Cleaning Block wall surface Mixing Cement Mortar Preparing platform for working, ¥* Applying first coat Prepared by A Name vip NOOR HAKIMA INEER ne PROJECT ENG! ish fa01a Reviewed by Name Date Approved by Name Date Den! Pareto ty/a/ls I-INNOVATIONS DESIGN SDN BHD @ METHOD STATEMENT FOR WALL AND FLOOR FINISH (SCREEDING) Purpose: Ensure quality of work. T, Materia 7. Method a) Cement b) Sand Setting out for 2. Machinery a) Concrete Mixer 3. Quality Required a) Ensure thickness as per specification, Fixing of mortar level pegs (recommended 1.2 mtr centres) b) Ensure concrete surface clean, } Preparation of Mixing ratio and ensure consistency of mixing, 4) Ensure rendering to fall and evenness of finish surface using steel trowel. ) Ensure finish surface is protected and covered with polythene sheet at least 2 days after laying, thickness and to fal Cleaning of Floor a Mixing of Cement Mortar + Placing Cement Mortar and rendering Curing and Protection End Prepared by: Name MUHD NOOR HAKIM PROJECT ENGINEER (Si fala, Date Reviewed by: Name Date eaten 14/2.[ Approved by Name Date I-INNOVATIONS DESIGN SDN BHD P METHOD STATEMENT FOR WALL AND FLOOR FINISH (TILING) Purpose: Ensure tiles are fixed or laid as per specification. T. Material: a) Cement Mortar/ White Lime b) Tile ©) Hillstone 2. Machinery a) Grinding Machine b) Concrete Mixer 3. Quality Required a) Check Level b) Free from Dust and Surface is roughen to achieve sufficient bonding ©) Check tiles quality, size, surface appearance, and soak for overnight. ) Thickness of mortar, mixing ratio €) Pattern arrangement according, to specification, Gradient floor tiles to trap, size of joints, evenness (Less than 3mm). f) White cement for wall, OPC for floor. ¢g) Clean from mortar surplus. “4. Method! Setting out for tiles area ! Ensure completion of other works (e.g. Wiring, piping, opening for sanitary fitting, ete.) End and proceed tonext stage ¥ Soak Tilles before Cleaning the laying contact + Prepare mortar Laying of Tiles base — ¥ Cleaning of Tiles Pointing to Tiles surface —| _ ey eee Name 1D NOOR HAKIN Weer ewanees Date is /i/ao1a Reviewed by: Name Date Name Date Approved by: oe Saberdde fal I-INNOVATIONS DESIGN SDN BHD @ METHOD STATEMENT FOR WALL FINISH (PAINTING) Purpose: Ensure quality of work. T. Material: a) Paint For Wall - Emulsion or weather bond, ») Paint for timber- Emulsion. ¢) Paint for metal- Emulsion gloss. d) Undercoat paint. 2. Machinery a) Spray Gun (if any) 3. Quality Required a) Clean, trim, sand and dry. b) Correct mixing or dilution and colour scheme as per contract specification. ©) Secure and handle properly as per safety requirement. 4) Thorough application. ¢) Smooth. 4) Even and consistent colour texture . Method: Prepare surface for painting | + Prepare paint by mixing or dilute with suitable solution ie Prepare platform for working if required only, + Provide undercoat or priming to all surfaces ¥ Sanding apply before 2nd coat (Timber surface only) eT Paint to final End Prepared by : Name §UHD NOOR HAKIM PROJECT ENGINEER S/i /o014, Date Reviewed by: Name Date Name Date Cho» tel=[o

You might also like