You are on page 1of 2
MATERIAL / SAMPLE SUBMMISION | CADANGAN PEMBANGUNAN 1 UNIT 6TINGKAT IBU PEJABAT | MAJLIS BEKAS WAKIL RAKYAT (MUBARAK) MALAYSIA, 5 UNIT Project | KEDAI PEJABAT 5 TINGKAT DAN SEBUAH PENCAWANG ELEKTRIK | Date | 10/1/2019 IATAS LOT PT 9869, JALAN SENTUL PASAR, MUKIM SETAPAK, DAERAH GOMBAK, WILAYAH PERSEKUTUAN KUALA LUMPUR. | Client | POWERNET PROPERTIES SDN BHD het: | mpsp/ia/mus/ma/ors ante"! | taqyerse/ups8/07/2018/LA a) To : SNA Consult Sdn Bhd Attn : Mr. Mohamad Helmiy ce: 1) POWERNET PROPERTIES SDN BHD —_- Atin: Dato’ Wayne / Mr. Kenny Yeong (Encl.) 2) BADERULZAMAN ARCHITECT ~ Atin: Mr. Farhan Dato’ Ghazall (Encl) - Attn : Mr. Shaharuddin Hassan (Encl) 3) TAQ-SURVEYOR - Atin : Mr. Tony B.E. Thang (Encl) = Atin : En, Wan Khairul Nizam DESCRIPTIONS : METHOD STATEMENT FOR RE JACKING RC PILE FROM 24 METER UP TO 42M DEPTH | with reference to the above, we submit herewith the following documents for Re Jacking 200mm x | 200mm RC Piles from 24meter fo 42meter depth for your review / approval. Your attention is drawn to the above. Thank you. ‘STATUS: SCOPE OF WORK : arrnoven [7] ewe structure [7] aproveo wi comment ancnmecrure [| reviseo & resusmirreo ] MECHANICAL & ELECTRICAL (M&E) remarks / COMMENTS: Reviewed by: Approved by : MUHD NOOR HAKIM PROJECT ENGINEER * é [INNOVATIONS DESIGN SDN BHD \WISMA lINNOVATIONS, 0-95 & 0-29 5, No, 35, dt PIU 1A/20B,Dataran ARA Damansara, 47201 Petaling Jaye, Selangor Dar Ehsan ICT PILING WORKS SDN. BHD. 654579.) ‘No. 923, The Earth Jalan Jl 1, Bunt Bukit Ja ebubraya Puchong ~ Bes! 37000 Kuala Lumpur Tel 038080 8822 Fax: 6280748280 Ema: lemeusb@choo.com kp) 2amailco METHOD STATEMENT OF RE JACKING 200MM X 200MM RC PILES FROM 24 METER - 42 METER Determine the 24 meter location of unset point by surveyor. Excavate the said pile by using JCB. Transfer the soil/earth to nearby area, Clean and make it good the pile head so that it can be weld. Shift the jack in machine to the position. Pitch. the 6 meter piles and place to the hole for weld. After weld, jack in the extension piles. Cut the expose pile to allow machine move to other place. Recover back the earth to the hole.

You might also like