11 Mitsubihsi
12 Trub chomutov
Seamless Pipe
13 Manfacturer TENARIS
14 Valcvony
Vallurorec Maneshman
15
Tubes Barzil
Lerenveld 20
21 DYLAN België 2547 Lint
BELGIUM
Dynamicalaan 4-8
22
Pipe Fittings F.B.F. 2610 Antwerpen
(Elbows, Tee, BELGIUM
Hohenzollernstrasse 24
Reducers) FERROSTAAL
23 45128 Essen
(MAN Group)
GERMANY
Große Straße 14
24 INTERFORGE 27356 Rotenburg
GERMANY
Mark S. Clarkelaan 13 a
Haven No. M 512
25 KÜRVERS Piping
4761 RK Zevenbergen
THE NETHERLANDS
Premier estate
Leys Road
26 MEREK Engineering Brockmoor Brierley Hill
DY5 3UT West Midlands
UNITED KINGDOM
VENDOR LIST
Nottinghamshire S82 PY
50 GD ENGINEERING
ENGLAND
RMA MASCHINEN-UND
ARMATURENBAU KEHL Oststrasse, 17 77694
53
FAULHABER & KEHL/RHEIN , GERMANY
TRUTTENBACH KG
22, Sarvodaya Society,Nizampura
54 Tata Projects Ltd.
,Baroda-390002
304-305, Anna
58 Germanischer Lloyd Salai,Teyanampet,Chennai -
600018
Velosi Certification Services (I) Pvt.
Ltd.,
Velosi Certification Services, 212,ShivKrupa Commercial
59
Mumbai Centre,
Off Gokhale Road,Navpada
Thane (W) 400 602
404,Mayuresh Chambers, Sector-
ABS Industrial Verification
60 11,CBD Belapur(E), Navi
Ltd.,Mumbai
Mumbai -400614
Instrumentation
111 Signal Control KEI Industries Ltd.,Rajasthan
Cable
Associated Flexibles & wires ,
112
Pune
Udey Pyrocable
113
Pvt.Ltd.,Mumbai
115 ALTOP
RTD
116 Pyrotech controls
117 Control Switch Gear
Station Piping
118 Electromac
(Seamless Pipes)
119 Trader Commet
120
Cable Glands Baliga
122 RMG
123 Actaris
124 RPD Flow Meter Elster - Instromet
125 I - Meter ( Dresser )
126 ROMET ( 150# )
127 RMG
128 FCI, USA
129 Electronic Volume Instromet/Elster
130 Correctro (EVC) Daniel
131 Itron
132 Emerson
133 Slam-shut off RMG
134 valves/ monitors/ Pietro Fiorenteni
Regulators
135 Tartarini (Emerson)
136 Nirmal
141 Yokogawa
Differential
142 pressure Tata honeywell ltd.
transmitter
143 Emerson
NOTE :-
1) The details of Vendors indicated in this list are based on the information available with
Owner. Contractor shall verify capabilities of each vendor for producing the required
quantity with. Owner does not Gurantee any responsibility on the performance of the
Vendor, it is the contractor reponsiblity to verify the correct status of vendor and quality
control of each parties and also to expedite the material in time.
2) Contractor shall submit the details of each of the party before placement of order.