You are on page 1of 11

Introduction &

Expectation
M E M 7 0 2 : P r o j e c t M a r k e t i n g &
C o n s u m e r M a n a g e m e n t
by Intan Dayana binti Salihudin (2021847766)
1. a) A LITTLE INTRODUCTION ABOUT
MYSELF:

My name is Intan Dayana binti Salihudin, and after graduating from UiTM
Shah Alam with a Bachelor of Electronic Engineering (Hons) Electronic ,
I’ve been offered as Project Engineer in EPCC Solar company, Samaiden
Group Berhad. I’ve been working almost 5 years 9 months in Samaiden
Sdn Bhd starting from Project Engineer till promoted to Assistant
Manager. However, in July 2022, I’ve resigned from Samaiden and
currently working as Senior Technical Engineer at Fabulous Sunview
Sdn Bhd. The main reason for leaving the managerial position is to
develop my technical skills and to get involve in project execution of
132kV project as I want to be a great manager which have a balance
technical knowledge as well the management skills.
MY ROLES AND RESPONSIBILITIES
i) Samaiden Group Berhad
a. Project Engineer (2016-2018)
▪ Work independently as a project engineer to planning & design Photovoltaic system.
▪ Managing and leading home solar rooftop solar project for Feed-In Tariff (FiT) by SEDA.
▪ Asist in managing and leading commercial rooftop solar project for Feed-In Tariff (FiT) by SEDA.
▪ Perform site T&C and handover with relevant authorizes and client.
▪ Prepare and compile paperwork related to projects, authority submission, sales proposal, tender and client management.
▪ Provide summary reports on quotations, invoices, purchase order and others for management

b. Senior Engineer (2019-2020)


▪ Responsible on technical feasibility study of solar Photovoltaic (PV) system.
▪ Specialized in CAD software to design solar PV layout drawing, MV single line diagram (MVSLD) and LV single line diagram
(LVSLD).
▪ Lead detailed construction designs activities including necessary engineering calculation, simulation and drawings production to meet
client’s requirements, project specifications and relevant standard.
▪ Responsible to produce the documentation work of the project and communicate with the related authority regarding the application
submission, liaison, registration and approval process.
▪ Managing and leading Energy Commission (EC) Large Scale Solar (LSS) 3.0 tender preparation, compilation and submission.

c. Assistant Manager (2021- June 2022)


▪ Assist the manager in providing direction and technical expertise in design, development and system integration.
▪ Assist the manager in maintaining the BOQ with updates from suppliers.
▪ Communicate proactively with all involved personnel to provide encouragement, identify problems, create solutions and implement
efficiency improvements.
▪ Responsible for design and optimize the cost-effective detailed engineering design for Project Execution.
▪ Managing and leading Energy Commission (EC) Large Scale Solar (LSS) 4.0 tender preparation, compilation and submission.
MY ROLES AND RESPONSIBILITIES

i) Fabulous Sunview Sdn Bhd


a. Senior Technical Engineer (June 2022-Present)
• To provide technical support and to guide Technical Engineer in all projects.
• To lead and motivate the Technical Engineer Team member and convey the message to Technical Manager if the
issue could not be resolved.
• To discuss with supplier, consultant, client and project team in order to provide solution to the problem arise.
• To equipped with necessary Solar & Electrical knowledge including but not limited to Solar Scheme, DC system, AC
system, equipment selection, electrical protection system, SCADA system, metering system, earthing and lightning
protection, lighting, small power system, CCTV system etc.
• To prepare and conduct feasibility study including PVSyst study, shading analysis, bill quantity, engineering drawings,
technical report, tender evaluation report, product evaluation report and replies to technical queries for LSS projects.
• Technical in charge for 2x50MWac LSS projects and 1x10MWac LSS project.
MY CAREER PATH
Year 2016 -2020

2016 2018 2020

2017 2019

Work Lead the LSS3


Become a Project
Joined SAM as independently as Submission and
Promote to Senior
Manager for FiT
Project Engineer Design Engineer Co-lead the design
Technical Engineer
project and
cum Project Admin for LSS2 bidding work
involvement in LSS
exercise
1
MY CAREER PATH
Year 2021 onwards

2021

PRESENT

• Lead the DC design for LSS4 project execution


• Career change to enhance technical skills
• Current roles as Senior Technical Engineering
Promoted to Asst.
which technical PIC for 2 x 50MWac project
Manager
located at Perak & Pahang and a 10MWac LSS
(Engineering &
project at Sandakan, Sabah
Optimisation)
1. b) What do you consider to be your strengths in the work environment (e.g. decisive,
good communicator, assertive, good at empathising, good listener, etc)

MY STRENGTH

My time management and organizational skills are my greatest strengths.


I'm capable of juggling multiple projects at the same time. At my last job, I
was typically assigned to be team lead on team assignments due to my
ability to adhere to deadlines and keep track of the team’s progress.

I’m also passionate in completing the task given by the management. No


matter how hard the job is, I will try my best to deliver it.

Other than that, I’m a good at empathizing and a good listener team
leader. When my colleagues or subordinate have a problems, I’ll take the
time to listen to the things so that I can understanding how they think and
feel.
3) What previous experience do you have of managing projects?

Highlighted Experience
In my role as Engineer and Assistant manager for Samaiden Group
Berhad , I frequently work simultaneously on multiple tasks mainly to
i) Project Manager for 48kWp
secure the project and to deliver high quality completed project that
FiT Solar Rooftop CSR Project meet client and company expectations. I’m not only in constant
at Bota, Perak contact with the internal team of engineering, but also coordinating
ii) Project Manager for 60kWp ongoing communication with clients and ensuring that everyone is on
the same page in terms of timeline and expectations. For preliminary
FiT Home Solar Project at
works, I’ve be in lead many tender exercise and secure a few projects
Selangor and Kedah (large and small scale) for my company. I worked very closely with the
iii) Tender lead for LSSPV team and guide the team throughout the process. I’m acutely familiar
with the pressures that come with big-budget projects and the
Bidding Exercise under
nuances of interfacing with both clients and company. It was definitely
Energy Commission a very stressful couple of weeks, but I was so proud of the whole
iv) Tender lead for LSSPV team for coming together to get the job done. As a result, we
Bidding Exercise under
successfully secured 5 projects of LSS solar farm with capacity
ranging from 10-50MWac. I would say this is a big contribution to the
awarded Developer company.
What are your expectations from today?

• After complete my Master in Engineering


Management, I’m going to assist my husband to
Business
expand his small setup company mainly focus on
Renewable Energy and Electrical Services by
implement my knowledge
• Become more confident,
think and act professionally
• Enhance my knowledge in
• To become well educated
management skills Myself Expectations Family
mother to my children
• Work life balance

•To be a leader with strong technical skills


• Target to work in industry for 10 years
• After 10 years, I intent to join any relevant
government bodies (i.e, SEDA or Suruhanjaya Career
Tenaga)
• To become a lecturer with my working experience
THANK YOU
Assignment 1: Quad Chart
Name: Intan Dayana binti Salihudin
Student ID: 2021847766
Quad Chart
Design, Supply, Installation, Commissioning, of Rooftop Solar Photovoltaic (PV) Power Plant located UTeM’s
Technology Campus Facility Taman Tasik Utama, Ayer Keroh, Melaka.

Purpose Customers (Stakeholders)

Objective: Clear, concise (two to three sentences) description Key Customers


of the objectives and methodologies of the effort.
i) Building’s Owner
Description of effort: A bullet list (2-3) of the primary scientific ii) Investors
challenges being addressed iii) Project Sponsors
iv) Local Authorities

Desired and Result (Critical Success Factors) Measures of Success (KPIs)

Project Deliverable: i) Project Budget (Meet the project budget)


ii) Date of Commencement (No project delay)
Major Deliverable Deliverable Description
iii) Customer satisfaction (Customer satisfy with the
Authority approval Request for the Authority's consentfor the service)
solar project
iv) SEDA NEM Certificate
Procurement Purchasing materials and equipment

Equipment and Delivery Evaluating product specification and design

Construction and Physical Work Building plan approval

Testing and Commissioning Testing for safety and designrequirement

Commercial operation (COD) Agreement to starts generating power

You might also like