Structural Comparison Calculator for Roads

This document is from a calculator that compares the costs of conventional and optimized road construction approaches. It shows that for a project with 0 square yards to treat, both the conventional and optimized recycling-first approaches have an overall structural number of 0 and a total cost of $0.

Uploaded by

mona hamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views3 pages

Structural Comparison Calculator for Roads

This document is from a calculator that compares the costs of conventional and optimized road construction approaches. It shows that for a project with 0 square yards to treat, both the conventional and optimized recycling-first approaches have an overall structural number of 0 and a total cost of $0.

Uploaded by

mona hamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

This calculator was exported from RoadResource.org.

Visit for more tools on road netw


Structral Comparison Calculator

Total Sq. Yards to be Treated 0

Conventional Approach
Layer Type Depth (in) Coefficient Cost/SY/in

Overall Structural Number: 0.00


Total Cost: $0.00

Total Optimized Strategy Cost


Savings: $0.00
e.org. Visit for more tools on road network management.

Optimized: Recycling First


Cost/SY SN Layer Type Depth (in)
0.00
0.00
0.00
0.00

Overall Structural Number: 0


Total Cost: 0
Coefficient Cost/SY/in Cost/SY SN
0.00
0.00
0.00
0.00