CONTENTS
1.0 PURPOSE 4
2.0 SCOPE 4
3.0 REFERENCES 5
4.0 DEFINITIONS 5
Annexure
Format for Basic Rate Collection
Format No.5-6842-1060-F1 (Exhaustive) Annexure-1
Format No.5-6842-1060-F2 (Major Items) Annexure-2
1.0 PURPOSE
2.0 SCOPE
The scope of this procedure covers civil and structural work involved
in refineries, petrochemical plants, metallurgical units, power plants,
pipelines, offshore platforms and Port & terminals, In-house &
Infrastructural works etc.
Civil and structural works for a project in EIL are generally categorized in
the following:
It covers the general civil works involved in site grading, compound wall
& fencing, site development work (plant roads & flexible pavements,
ERC/ IRC road crossings, storm water drains, pipe culverts, box culverts,
pipe way bridges), construction facilities, RCC sleepers, raw water
supply (intake well/ sump, earthen reservoirs, raw water treatment
plant), filtration plant, drinking water system, cooling water system, fire
protection system, waste collection & disposal system incl. underground
piping, spheres/ tank farms (tank pads, dyke walls, fire walls), RCC
pavements, railways, horticulture & landscaping, micro grading & road
work, Infrastructure facilities (approach road, construction water,
construction power) etc.
Civil & Structural works for Raw water treatment plant (RWTP), RO
system, Effluent treatment plant (ETP), Waste water treatment plant
(WWTP), Waste/sludge handling /disposal management and
Environment impact assessment study (EIA), etc.
It covers sea bed survey, marine geo technical investigation and civil &
structural work involved in jetty, ports & terminals etc.
3.0 REFERENCES
4.0 DEFINITIONS
Input requirements for preparing cost estimates for various purposes are
as follows:
The Civil and Structural Works cost estimate for FR / DFR for Units
shall be based on bill of materials for major items / MTO prepared
by Engineering Department and in-house cost data. In case MTO is
not available, cost estimates shall be prepared based on factor of
total equipment (incl. sub contracts) and bulk materials supplies
cost as per in-house data.
ii) Cost estimate of civil and structural works for U&O shall be based
on MTO furnished by Engg. / Projects & in-house cost data.
Due care shall be taken for the latest market trend for high valued
items.
If cost data for a grass root project is required to be used for the works
within a running plant, suitable loadings will be applied in consultation
with Project/construction on account of productivity / hindrance of
material / machinery / man-power entry due to security check & work
permit, shift working and safety aspects etc.
The schedule of rates for civil and structural works may be developed for
the particular project site based on material, labour and machinery
hiring rates prevailing in and around the project site. The collection of
cost data shall involve discussions with local contractors/ vendors
/suppliers /applicators for budgetary quotations and Regional Labour
Commissioner’s Office for minimum wages.
A typical list of items for collecting basic rates are enclosed as Annexure-
I (for Exhaustive) & Annexure-II (for Major Items)
The analysis of rates for all items of work shall include Contractor’s
overheads & profit @ 15%.
(i) Price of BIS marked steel which is a requirement in most of the tenders
/ works contracts, are used for cost estimation. Steel price published by
steel Guru Website (EIL subscribed online site) shall be considered for
cost estimation. Further backup data of steel price will be kept at server
for the cut off date of 1st,11th and 21st of every month. For preparation
(ii) For pre filled tender, the base price of steel which is to be used for cost
estimation, shall be communicated to SCM for price variation wherever
sought.
Wherever cost estimates are prepared by the site in-charge the same is
reviewed by cost engineering department based on the documentary
evidence / BQ, rate analysis as provided and in house cost data
wherever available.
Lead Cost Engineer (LCE) / Cost Engineer shall maintain all the records
of estimation along with inputs.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
Caterpillar Hr
Excavator Ex 90 Hr
Plate Compactor Day
Truck / Tipper 10T capacity Hr
Trailor
HYDRAULIC MOBILE CRANES
ESCORT-ECEL 5T Hr
ESCORT-ECEL 8T Hr
ESCORT-ECEL 10 T Hr
ESCORT-ECEL 15 T Hr
ESCORT-ECEL 18 T/360 Hr
ESCORT-ECEL 25 T/360 Hr
ESCORT-ECEL 32 T/360 Hr
ESCORT-ECEL 40 T/360 Hr
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
Hydra Hr
MATERIALS FOR BUILDING WORK AND ROAD WORK
Bitumen
30101 Paving Bitumen VG-10 (80/100) Ton
30102 Petroleum Bitumen 85-25 Ton
Brick Aggregate
30201 63mm nominal size Brick Aggregates Cum
40mm nominal size Brick Aggregates Cum
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
Spirit Lts
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATIONS FOR CIVIL, STRUCTURAL & ARCHITECTURAL'S ITEMS (Major Items)
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.
PRICE QUOTATIONS FOR CIVIL, STRUCTURAL & ARCHITECTURAL'S ITEMS (Major Items)
PRICE QUOTATION
To, Date :
Mr. Manufacturer/ Vendor's Name & Address :
ALL RATES SHOULD BE INCLUSIVE OF ALL TAXES, DUTIES & FREIGHT BUT EXCLUDING GST ie PROVIDE FOT SITE RATES.