Professional Documents
Culture Documents
P.T. Control Systems FA: FOR APPROVAL FF: FOR FINAL 01: APPROVED 03: DISAPPROVED S: SCHEDULED
FC: FOR CONSTRUCTION FI: FOR INFORMATION 02: APPROVED W/ COMMENTS 04: INFORMATION ONLY A: ACTUAL STS: STATUS
SIZE
QTY
REV. CUSTOMER DOC. NO DOCUMENT TITLE REMARKS
DATE
OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT ACK
A PROJECT MANAGEMENT
25-A114006-DG-001 VENDOR PRINT INDEX &
S 4/12
1 A4
SCHEDULE A
25-A114006-DG-002 S 4/12
2 PROJECT SCHEDULE A3
A
25-A114006-DG-004 S 4/12
4 PROJECT EXECUTION PLAN A4
A
25-A114006-DG-006 S 4/12
6 SET POINT , ALARM INDEX A4
A
25-A114006-DS-001 S 4/12
7 DESIGN BASIS A4
A
25-A114006-DS-002 S 4/12
8 INSTRUMENT DATA SHEET A4
A
25-A114006-DS-004 S 4/12
9 CABLE SCHEDULE A3
A
P.T. Control Systems FA: FOR APPROVAL FF: FOR FINAL 01: APPROVED 03: DISAPPROVED S: SCHEDULED
FC: FOR CONSTRUCTION FI: FOR INFORMATION 02: APPROVED W/ COMMENTS 04: INFORMATION ONLY A: ACTUAL STS: STATUS
SIZE
QTY
REV. CUSTOMER DOC. NO DOCUMENT TITLE REMARKS
DATE
OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT ACK
25-A114006-DS-005 S 4/12
10 UTILITY CONSUMPTION LIST A4
A
25-A114006-DW-006 S 4/12
17 PIPING ISOMETRIC DRAWING A3
A
P.T. Control Systems FA: FOR APPROVAL FF: FOR FINAL 01: APPROVED 03: DISAPPROVED S: SCHEDULED
FC: FOR CONSTRUCTION FI: FOR INFORMATION 02: APPROVED W/ COMMENTS 04: INFORMATION ONLY A: ACTUAL STS: STATUS
SIZE
QTY
REV. CUSTOMER DOC. NO DOCUMENT TITLE REMARKS
DATE
OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT ACK
25-A114006-DW-007 S 4/12
18 CABLE LAYOUT DRAWING A3
A
25-A114006-DW-008 S 4/12
19 PIPING LAYOUT DRAWING A3
A
25-A114006-DW-012 S 4/12
23 METER SIZING CALCULATION A3
A
25-A114006-DW-013 S 4/12
24 SKID WIRING DIAGRAM A3
A
P.T. Control Systems FA: FOR APPROVAL FF: FOR FINAL 01: APPROVED 03: DISAPPROVED S: SCHEDULED
FC: FOR CONSTRUCTION FI: FOR INFORMATION 02: APPROVED W/ COMMENTS 04: INFORMATION ONLY A: ACTUAL STS: STATUS
SIZE
QTY
REV. CUSTOMER DOC. NO DOCUMENT TITLE REMARKS
DATE
OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT ACK
D QUALITY PROCEDURE
25-A114006-PS-001 FACTORY ACCEPTANCE
S 4/12
29 A4
PROCEDURE A
25-A114006-PS-003 S 4/12
31 INSPECTION AND TEST PLAN A4
A
25-A114006-PS-005 S 4/12
33 NDT/NDE PROCEDURE A4
A
25-A114006-PS-006 S 4/12
34 HYDROTEST PROCEDURE A4
A
P.T. Control Systems FA: FOR APPROVAL FF: FOR FINAL 01: APPROVED 03: DISAPPROVED S: SCHEDULED
FC: FOR CONSTRUCTION FI: FOR INFORMATION 02: APPROVED W/ COMMENTS 04: INFORMATION ONLY A: ACTUAL STS: STATUS
SIZE
QTY
REV. CUSTOMER DOC. NO DOCUMENT TITLE REMARKS
DATE
OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT IN STS OUT ACK
- OPERATION AND
S 4/12
39
MAINTENANCE PROCEDURE A
- MANUFACTURERS DATA
S 4/12
40
REPORT (MDR) A
S 4/12
***
A