You are on page 1of 1

DATE 

PMI INSPECTION REPORT 

Client
Project
P.O. No.
Manufacturer’s/Technician’s Name
Date of Testing

Component & MOC

Method of Examination (Laboratory or Field 
Analyzer) 
Type of Analyzer & Alloy Analyzer calibration 
Records & Results 
Lot Size & Quantity Examined
TEST RESULT
Sr. No. ELEMENTS SPECIFIED % OBSERVED % REMARKS
1 Cr 16.0 ‐ 18.0 16.55 ‐ 16.72 Satisfactory
2 Ni 10.0 ‐ 14.0 10.40 ‐ 10.65 Satisfactory
3 Mo 2.00 ‐ 3.00 2.04 ‐ 2.06 Satisfactory

Test Results ( Accepted /Rejected)

If Rejected, Reasons of Rejection ………………………

Proposed corrective Action ………………………………

CHECKED BY