Proyecto - Aplicacion de Los 3 Puntos de Control en Almacen
Proyecto - Aplicacion de Los 3 Puntos de Control en Almacen
in warehouse
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Position
HAI-Q
QA Jr Sv QA Sv QC Sv QC Sv
Tch.
Main functions:
• Warranty reports control [Ford Customer]
• Yokoten control [T&S]
• PPAP follow up.
• Transfer lines meeting [T&S]
• Special Task “3 control points in warehouse area”
• Follow up quality system implemented (TPO activities)
• Special Activities (Monitoring System )
“Working With 3©Points
Copyright Control
2018 Sumitomo / GEMBA”
Electric Wiring Systems, Inc.
CONFIDENTIAL
2.- Objetive
Adopt the system of 3 Control Points in Warehouse areas (Sinaloa), which allows to keep
track of the records of change points and abnormal situations that may arise daily, coupled
with this, record the necessary countermeasures for each situation and give the timely
follow-up, avoiding discrepancies and customer claims from the assortment of material and
the verification of storage processes.
3. Background
During the FY 2018 & 2019 we had official claims by wrong components, therefore actually, the project of 3 control points has been implemented in
the plants, generally for the production areas (C&C and Assembly) where all the defects and internal claims are recorded for their monitoring and
action plan. however for the service areas, (warehouse) has not been 100% implemented, which implies a lack of tracking of change points,
process verifications and monitoring of abnormal situations.
Last customer claims Problem: Wrong connector (one was Repetitive) in the products 14290 of Ranger & CD6.
claims en 2019
54 Cause: Probably the materialist was supply incorrectly the connector in the sub-assy station
Wrong connector 3 because the connectors are very similar and the materials were close them self in the racks.
6%
Project leader
8 “Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
CONFIDENTIAL
Materials
Manager
requirement
9 “Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
CONFIDENTIAL
7.- Follow up y Results
Status by Plant
10 “Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
CONFIDENTIAL
30
Change
21MY 6
25 CD6
20
15
24
10
5 1
6
5
4
1
0
August-20 September-20 October-20 November-20 December-20
“Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
CONFIDENTIAL
9. Formats improvement and Evaluation
Adaptation of the warehouse process to the Change point chart register, was add the abnormal situation findings and was
format of change point register add a new symbology.
Explain to the
warehouse
supervisor
“Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
CONFIDENTIAL
Follow up to the system implemented
“Working with
Copyright Advanced
© 2018 Preparation”
Sumitomo Electric Wiring Systems, Inc.
www.sewsus.com