ESTIMATE
OPENING HMR KMR D
SR. No ASSET CODE ASSET DESCRIPTION Location READING (MONTH RUNNING
BEGINNING) HRS. KMS
FOR THE
KG/3H8414/
1 30 KVA DG KOEL 157 4001 630
2120 566
2 25922815 250 KVA DG 157 7940 80
3 2104X423 30 KVA DG 157 3001 630
4 25505165 62.5 KVA DG 158 SITE CHANGED
5 530225216437 7.5 KVA LIGHT MAST 158 3345 300
6 02170060 50 TON CRANE IHI 159 562 360
7 25505114 62.5 KVA DG 159 2770 630
8 530225216434 7.5 KVA DG 159 PCY 562 100
9 25701304 125 KVA DG 159 PCY 592 150
10 25961446 500 KVA DG 159 PCY 3640 100
11 2104X424 30 KVA DG 160 5293 630
KG/3H8414/
12 30 KVA DG KOEL 160 6432 660
2120 567
KG/3H8414/
13 30 KVA DG KOEL 161 7465 660
2120 511
14 25238779 7.5 KVA LIGHT MAST 161 1920 380
15 25505157 62.5 KVA DG 162 4692 120
16 02170116 50 TON CRANE ZOOMLION 162 16103 350
17 25322540 15 KVA DG 162 IDLE NOT WORKING
MS - Maintenance
Note: a. This schedule is to be
b. Planned quantity of work
c. Column 1 & 2 of each
d. Column 3 to be filled on
e. In column 'type',
MS1 MS2 MS3
Carried Carried Carried
DUE HMR out at DUE HMR out at DUE HMR out at
TYPE TYPE TYPE
/ KMR HMR / / KMR HMR / / KMR HMR /
KMR KMR KMR
50 4051 500 4101 50 4151
50 7990 50 8040 50 8090
250 3051 50 3101 50 3151
50 16453
M
MS10 MS11 MS12
Carried Carried Carried
DUE HMR out at DUE HMR out at DUE HMR out at
TYPE TYPE TYPE
/ KMR HMR / / KMR HMR / / KMR HMR /
KMR KMR KMR
50 3270
50 5793
50 3651
50 3995
50 1242