You are on page 1of 1

FOOTING SCHEDULE

30000

SCHEDULE OF COLUMN
C-1
10000

6075

TOP OF COLUMN
10000

G.I PIPE 2"DIA SCH. 40


5000
ON 10MM THK X 150MM X 150MM
BASE PLATE AND 4-6MM THK X
37.5MM X 125MM STIFFENER PLATE

NATURAL GROUND LINE

30000

FLOORPLAN
SCALE 1:100 M

6075
6075

TOP OF COLUMN
TOP OF COLUMN

G.I PIPE 2"DIA SCH. 40 5000


ON 10MM THK X 150MM X 150MM
BASE PLATE AND 4-6MM THK X G.I PIPE 2"DIA SCH. 40 5000
37.5MM X 125MM STIFFENER PLATE ON 10MM THK X 150MM X 150MM
BASE PLATE AND 4-6MM THK X
37.5MM X 125MM STIFFENER PLATE

ANCHOR BOLT
4-12MM DIA. X 200MM

NATURAL GROUND LINE

30000
20000
RIGHT SIDE ELEVATION
SCALE 1:100 M
FRONT ELEVATION
SCALE 1:100 M

2" Ø GI PIPE, SCHED. 40

6075
6075

TOP OF COLUMN

TOP OF COLUMN

G.I PIPE 2"DIA SCH. 40


5000
ON 10MM THK X 150MM X 150MM
BASE PLATE AND 4-6MM THK X
37.5MM X 125MM STIFFENER PLATE G.I PIPE 2"DIA SCH. 40
5000
ON 10MM THK X 150MM X 150MM
BASE PLATE AND 4-6MM THK X
37.5MM X 125MM STIFFENER PLATE

ANCHOR BOLT
4-12MM DIA. X 200MM

NATURAL GROUND LINE

30000
20000
LEFT SIDE ELEVATION
REAR ELEVATION SCALE 1:100 M

SCALE 1:100 M

APPROVED BY: SHEET CONTENTS:


FLOOR PLAN RIGHT SIDE ELEVATION
A N ESCALANTE CONSTRUCTION, INC. DESIGN AND BUILD: EMERGENCY BACK-UP POWER SUPPLY (PHASE II) FRONT ELEVATION FRONT ELEVATION DETAILS
ANECI. BLDG. GOYENCO DRIVE, NACILLA VILLAGE, BUGAC MAA, DAVAO CITY
TELEFAX NO.: (082) 244 - 1820/ (082) 244 - 1870
ROY G. PONCE, Ed.D. REAR ELEVATION
SUC President III LEFT SIDE ELEVATION

You might also like