Professional Documents
Culture Documents
33000
500 (SHYNESS)
500 (SHYNESS)
500 (SHYNESS)
500 (SHYNESS)
GRANULAR GRANULAR
SHOULDER SHOULDER
CORRIDOR
CORRIDOR
UTILITY
UTILITY
THRIE BEAM
CRASH BARRIER
℄
THRIE BEAM CRASH THRIE BEAM CRASH
BARRIER BARRIER
600 600
600 600
2.5% 2.5%
3.0% 3.0%
1.5 1.5
1 1
SLOPE PROTECTION SLOPE PROTECTION
SELECTED
CHUTE DRAIN @10m C/C EARTH FILL CHUTE DRAIN @10m C/C
BOUNDARY BOUNDARY
WALL WALL
GL GL
BC BC
EARTHEN DBM DBM EARTHEN
BASE BASE
DRAIN DRAIN
SUB-BASE SUB-BASE
SUB GRADE SUB GRADE
NOTE:-
1. All dimensions are in mm unless otherwise specified.
2. Road boundary wall shall be provided at extreme outer line of ROW as
PROPOSED ROAD 500
GROUND LEVEL
per Schedule- C.
1.5
1 1
1.5 3. Turfing shall be provided on embankment slope as per Manual Provision
VARIES
4. Stone pitching shall be provided on slope as per Manual provision
600
5. Lined chute drain shall be provided @20 m interval on embankment
TYPE-1: UNLINED TRAPEZOIDAL DRAIN slope for embankment height more than 3.0m.
SCALE : NOT TO SCALE
CORRIDOR
10500 MEDIAN 10500
UTILITY
500 (SHYNESS)
500 (SHYNESS)
500 (SHYNESS)
GRANULAR GRANULAR
500 (SHYNESS)
CARRIAGEWAY CARRIAGEWAY
CORRIDOR
SHOULDER SHOULDER
UTILITY
THRIE BEAM
CRASH BARRIER
600 600
600 600
2.5% 2.5%
3.0% 3.0%
1.5
1.5 1
SLOPE PROTECTION SLOPE PROTECTION
1
SELECTED
CHUTE DRAIN @10m C/C EARTH FILL CHUTE DRAIN @10m C/C
BOUNDARY BOUNDARY
WALL WALL
TCS-2: 6-LANE DIVIDED HIGHWAY WITH FLUSH MEDIAN AND WITHOUT SERVICE ROAD AT APPROACH TO
VUP LOCATION
NOTE:-
1. All dimensions are in mm unless otherwise specified.
2. Road boundary wall shall be provided at extreme outer line of ROW as
PROPOSED ROAD 500
per Schedule- C.
GROUND LEVEL
3. Turfing shall be provided on embankment slope as per Manual Provision
1.5 1.5
1 VARIES 1 4. Stone pitching shall be provided on slope as per Manual provision
600
5. Lined chute drain shall be provided @20 m interval on embankment
TYPE-1: UNLINED TRAPEZOIDAL DRAIN
slope for embankment height more than 3.0m.
SCALE : NOT TO SCALE
5000
MEDIAN
500 (SHYNESS)
500 (SHYNESS)
500 12500 12500 500
500 LEFT CARRIAGEWAY RIGHT CARRIAGEWAY 500
CRASH BARRIER
CRASH BARRIER
KERB SHYNESS
KERB SHYNESS
THRIE BEAM
CRASH BARRIER
PROW
PROW
℄
PROW
PROW
600 600
2.5% 2.5%
PROW
PROW
RE Wall RE Wall
PROW
PROW
SELECTED
EARTH FILL
PROW
PROW
BC BC
RIGHT OF WAY
RIGHT OF WAY
DBM DBM
PROW
PROW
7500 CARRIAGEWAY BASE BASE 7500 CARRIAGEWAY
1000 1000 1000 1000 SUB-BASE SUB-BASE
1000 1000 1000 1000
E.S. P.S. P.S. SUB GRADE SUB GRADE P.S. P.S. E.S.
PROW
PROW
TCS 3: 6-LANE DIVIDED HIGHWAY WITH FLUSH MEDIAN AND RE WALL AT
INTERCHANGE LOCATION
33000
500 (SHYNESS)
500 (SHYNESS)
GRANULAR CARRIAGEWAY CARRIAGEWAY GRANULAR
500 (SHYNESS)
500 (SHYNESS)
SHOULDER SHOULDER
PROW
PROW
THRIE BEAM THRIE BEAM
CRASH BARRIER
CRASH BARRIER
2000
℄
PROW
PROW
THRIE BEAM CRASH
BARRIER 2000
UTILITY 600 600 UTILITY
SPACE SPACE
PROW
PROW
3.0% 2.5% 2.5% 3.0%
SLOPE PROTECTION 1.5 1.5 SLOPE PROTECTION
1 1
PROW
PROW
RIGHT OF WAY
RIGHT OF WAY
DRAIN
BOUNDARY EARTH FILL 1000 7000 CARRIAGEWAY BOUNDARY
1000 1000
1000
WALL P.S. WSA ENTRY/EXIT WALL
P.S. E.S.
2.5%
1.5
BC BC 1
GL
DBM DBM
BASE BASE
SUB-BASE SUB-BASE BC
EARTHEN SUB GRADE SUB GRADE DBM
DRAIN BASE
SUB-BASE
SUB GRADE
TCS-4: 6-LANE DIVIDED HIGHWAY WITH RAISED MEDIAN (WSA OF ENTRY/EXIT)
NOTE:-
1. All dimensions are in mm unless otherwise specified.
2. Road boundary wall shall be provided at extreme outer
line of ROW as per Schedule- C.
Crash Barrier
Crash Barrier
Crash Barrier
Crash Barrier
Shyness
Shyness
Shoulder
Shoulder
Shyness
Shyness
Paved
Paved
TCS-5: 6-LANE DIVIDED HIGHWAY FOR INTERCHANGE FLYOVER/VUP/LVUP/MNB/MJB/ROB
STRUCTURE PORTION
12000
TOP OF SHADE
LED LED
RIGHT OF WAY Light Light
RIGHT OF WAY
11000
11000
500 7000 500
7000
500 SHYNESS
500 SHYNESS
SHOULDER
SHYNESS 500
PAVED
SHYNESS 500
SHOULDER
PAVED
RCC BOX STRUCTURE
2.5%
BOUNDARY BOUNDARY
WALL WALL
WEARING COAT
11000
200 200
1000 1000 EDS 3500 3500 EDS 1000 1000
E.S. P.S. (C/W) (C/W) P.S. E.S.
BC
DBM
BASE
2-Lane Interchange Ramp , Loop Section
SUB-BASE (Open Country Plain/Rolling Terrain)
SUB GRADE
1200
150
4500
1900
3200
1900
3200
1900
1900
3200
3200
1900
1900
3200
3200
1900
1900
3200
3200
1900
1900
3200
1900
3200
1900
4500
150
1200
Toll Office Building
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
X
9.0m
6.5m
Cash OSV Cash OSV Cash OSV Cash OSV Cash OSV Cash OSV
ADMIN BUILDING
150
500
6000 1200 4500 1900 3200 1900 3200 1900 3200 1900 3200 1900 3200 1900 3500 3500 3500